Attachment V - Deliverables List.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Dry Dock Repairs NOAA Ship Oscar Elton Sette
Solicitation number
1305M220QNMAN0149
Issued by

About this file

This document contains a list of deliverables required for the dry dock repairs of NOAA Ship Oscar Elton Sette. The contractor must submit various reports, schedules, inspection results, and certifications to the Contracting Officer's Representative throughout the project period and after task completion. Key deliverables include an American Bureau of Shipping status report and schedule submitted weekly and within 48 hours of start of contract performance; a detailed production schedule on the first day; and condition and technical reports, ultrasound readings, paint certifications, and spreadsheets submitted after inspection, repair and maintenance tasks are finished. The related federal contract opportunity is a solicitation from the Department of Commerce National Oceanic and Atmospheric Administration for dry dock repairs of NOAA Ship Oscar Elton Sette, as outlined in the attached request for quotation and attachments.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Q and A 2 7-16.docx DOCX document
Attachment I SOW Rev1.pdf PDF
OS-800-004.pdf PDF
NOAA DOCKING REPORT.pdf PDF
Anchor Windlass and Capstan.pdf PDF
568-6233884.pdf PDF
Tunnel Thruster Ref-568-01 Model S300-L.pdf PDF
OS-140-001.pdf PDF
Image 1 WI 26.jpg JPG image
0606- Standards for Lifting Appliances on NOAA Ships (1) (1).doc DOC document
Q and A 1.docx DOCX document
Hydraulic Hose Inventory.xlsx XLSX spreadsheet
SE_529_529-6233835_RevG_Sht1-7_NONE_TA-529-6233835 BILGE And BALLAST SYS ARRGT.pdf PDF
0606-01 - Shipboard Lifting Appliance Certification and Inspections (1).doc DOC document
Image 2 WI 26.jpg JPG image
Amendment 0001.pdf PDF
SE_529_529-6233819_RevG_Sht1-8_NONE_TA-529-6233819 BILGE AND BALLAST SYSTEM DIAGRAM.pdf PDF
OS-085-002 Revision A - Docking Plan.pdf PDF
Attachment IV - Price Schedule SE (Autosaved).xlsx XLSX spreadsheet
RFQ 1305M220QNMAN0149 6-18.docx DOCX document
Reference Drawings 1.zip ZIP file
Reference Drawings 3.zip ZIP file
Attachment II Past Performance Information Form.rtf RTF text file
Reference Drawings 5.zip ZIP file
Attachment III Past Performance Questionnaire.docx DOCX document
Reference Drawings 2.zip ZIP file
Reference Drawings 6.zip ZIP file
Attachment VI - Subcontracting Plan Outline.doc DOC document
Reference Drawings 4.zip ZIP file
Attachment I SOW.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FY21 OSCAR ELTON SETTE LIST OF DELIVERABLES

ITEMPARAGRAPHDELVERABLEDUE
22.2.6Maintain ABS Status reportWeekly
22.2.6ABS Approved welding procedures and list of qualified weldersPrior to start of repair period
22.2.7ABS ScheduleWithin 48 hours of start of contract performance period
22.2.9Detailed production scheduleFirst day of contract performance period
22.2.12Detailed weight changesEnd of project
33.3.3.6.4Rudder ClearancesWithin first 7 days of dry docking
33.3.3.6.8.4Submit report to COR for amount of travel in rudder bearingsAfter completion of task
33.3.3.9UT Readings of Sea ChestAfter completion of task
33.3.3.10.5CFR for any additional workAfter completion of task
33.3.3.12Provide final marked up copy of ship's docking planAfter completion of task
33.3.4.2NOAA Docking reportAfter completion of task
33.4.3.4Oil ReportAfter completion of task
33.4.3.18CFR for any additional workAfter completion of task
33.4.3.1CFR for any additional workAfter completion of task
33.4.3.18CFR for any additional workAfter completion of task
33.4.3.19CFR for any additional workAfter completion of task
33.4.4.1ReportAfter completion of task
33.5.4.6Documentation for paintingAfter completion of task
33.5.4.7Provide ship with an International Anti Fouling System Certificate from ABS
33.6.3.2Provide CFRAfter disassembly
33.6.3.6Magnetic Particle inspection, provide CFRAfter inspection
33.6.3.8CFR for any additional workAfter completion of task
33.6.3.12Provide 2 copies of Tech Reps service reportAfter completion of task
33.7.3.3.3CFR for condition report on ValvesAfter completion of task
33.8.3.1.2CFR for air gap readingsAfter completion of task
33.8.3.1.6CFR for motor mountsAfter completion of task
33.8.3.1.7.2CFR for additional work for motor foot and structureAfter completion of task
33.8.3.2.1CFR for measured resistanceAfter completion of task
33.8.3.3.3CFR for material condition and recommended repairs for bearingsAfter completion of task
33.9.3.1.2Submit Schedule for dock trials48 hours before dock trials
33.9.3.1.8Provide a dock trial reportAfter completion of dock trials
33.9.3.2.2Submit Contractor's personnel for sea trials24 hours prior to sea trials
33.9.3.2.6Submit Sea Trial ReportAfter sea trials
33.10.3.7CFR for additional life raft repairsAfter compleition of inspection
33.11.3.3.4CFR for anchor windlassAfter completion of inspection
33.11.3.3.5.3CFR for paint readingsAfter surface prep
33.11.3.4CFR for ancohr chain additional repairsAfter completion of inspection
33.11.4.1CFR for results of inspectionAfter completion of inspection
33.11.4.4CFR for certification of paintAfter completion of task
33.12.3.3.3Accomplish testing/inspections for breakersAfter completion of inspection
33.12.3.3.4CFR for findings and recommendationsAfter completion of inspection
33.12.3.3.6Report for completed inspections for breakersAfter completion of inspection
33.13.3.1.2.2CFR for additional fire extinguisher growthAfter completion of inspection
33.13.3.1.3.4CFR for additional cylinders growthAfter completion of inspection
33.13.3.1.3.5CFR for additional hoses growthAfter completion of inspection
33.13.3.1.5.2CFR for gaylord hoodAfter completion of inspection
33.13.3.1.6.4CFR for testingAfter completion of inspection
33.13.3.1.7.3CFR for additional SCBA growth workAfter completion of inspection
33.13.3.1.11CFR for certificate of servicingAfter completion of inspection
33.15.3.3.2CFR for condition report on ValvesAfter completion of inspection
33.15.3.4Excel Spreadsheet of Valves worked onAfter completion of task
33.23.3.6.4CFR for findings and recommendationsAfter completion of inspection
33.24.3.6CFR for findings and recommendations for gaugesAfter completion of inspection
33.24.3.11Excel Spreadsheet of Guages worked onAfter completion of task
33.25.3.8Provide As Built drawings for Ballast Water Management SystemAfter completion of task
33.25.3.9Provide test dataAfter completion of task
33.26.3.6Provide Test results for RO systemAfter completion of task
33.26.3.7Provide As Built drawings for RO systemAfter completion of task
33.26.3.8Provide test dataAfter completion of task
33.27.3.5.4Report for field and dip switch settingsAfter completion of task
33.27.3.5.5.10Provide passwordsAfter completion of task
33.27.3.5.6Provide hard and soft manual documentsAfter completion of task
33.27.4.1Provide qualification certificate for FURNO engineerPrior to commencement of work
33.27.4.5Provide a cerficiate of electronic disposalAfter completion of task
33.28.1.1Chloride testingPrior to painting
33.29.3.4Provide UT reportPrior to painting
33.29.1.1Chloride testingAfter completion of task
33.29.3.3Chloride testingPrior to painting
33.29.3.4Provide UT reportPrior to painting
33.29.1.1Chloride testingAfter completion of task
33.32.3.2.2CFR for additional workfor kick pipesAfter inspection
33.34.3.2Photos of gallowsPrior to start of work
33.38.3.4CFR for additional work on drainsPrior to completion of task
33.38.3.8CFR for additional steel workPrior to completion of task
55.3.1.2Chloride testingAfter completion of task
55.6.4.1CFR for the followingAfter completion of task
55.7.3.4UT Readings of deckAfter completion of inspection
55.8.3.3CFR for continuityAfter completion of inspection
55.8.3.6.7CFR to document checkpointAfter completion of task
55.8.3.6.10CFR to document all commisioning checklists and etcAfter completion of task
55.8.3.6.11Copy of all reports and documentationAfter completion of task
55.10.3.8CFR for any findings during HVAC cleaningAfter completion of task
55.12.3.1.3CFR for any additional work on drainsAfter completion of inspection
55.12.3.1.7CFR for any deteriorated steelAfter completion of inspection
55.12.3.2.6Provide UT reportAfter completion of inspection
55.12.3.3.3Provide UT reportAfter completion of inspection
55.12.4.3Chloride testingAfter completion of task
55.12.3.2.3CFR for any additional drain workAfter completion of inspection
55.13.3.2.10CFR for any additioanl steel workAfter completion of inspection