Attachment IV - Price Schedule SE (Autosaved).xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Dry Dock Repairs NOAA Ship Oscar Elton Sette
Solicitation number
1305M220QNMAN0149
Issued by

About this file

This document contains a price schedule attachment for a National Oceanic and Atmospheric Administration solicitation seeking dry dock repairs for the NOAA ship Oscar Elton Sette. The attachment includes a schedule of base line items and unit prices for work such as hull surveys, drydocking, propeller and tailshaft inspection and repair, underwater hull preservation and coating, and various system maintenance. It also includes additional line items and unit prices for growth work that may be added through contract modifications. Optional line items with unit prices are provided as well for work that may be exercised under the contract. Pricing is solicited for labor rates, material markup fees, and additional temporary services and laydays that could arise. The total potential value of the solicitation encompasses the base work, growth additions, and optional line items.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Q and A 2 7-16.docx DOCX document
Attachment I SOW Rev1.pdf PDF
OS-800-004.pdf PDF
NOAA DOCKING REPORT.pdf PDF
Anchor Windlass and Capstan.pdf PDF
568-6233884.pdf PDF
Tunnel Thruster Ref-568-01 Model S300-L.pdf PDF
OS-140-001.pdf PDF
Image 1 WI 26.jpg JPG image
0606- Standards for Lifting Appliances on NOAA Ships (1) (1).doc DOC document
Q and A 1.docx DOCX document
Hydraulic Hose Inventory.xlsx XLSX spreadsheet
SE_529_529-6233835_RevG_Sht1-7_NONE_TA-529-6233835 BILGE And BALLAST SYS ARRGT.pdf PDF
0606-01 - Shipboard Lifting Appliance Certification and Inspections (1).doc DOC document
Image 2 WI 26.jpg JPG image
Amendment 0001.pdf PDF
SE_529_529-6233819_RevG_Sht1-8_NONE_TA-529-6233819 BILGE AND BALLAST SYSTEM DIAGRAM.pdf PDF
OS-085-002 Revision A - Docking Plan.pdf PDF
RFQ 1305M220QNMAN0149 6-18.docx DOCX document
Reference Drawings 1.zip ZIP file
Attachment V - Deliverables List.xlsx XLSX spreadsheet
Reference Drawings 3.zip ZIP file
Attachment II Past Performance Information Form.rtf RTF text file
Reference Drawings 5.zip ZIP file
Attachment III Past Performance Questionnaire.docx DOCX document
Reference Drawings 2.zip ZIP file
Reference Drawings 6.zip ZIP file
Attachment VI - Subcontracting Plan Outline.doc DOC document
Reference Drawings 4.zip ZIP file
Attachment I SOW.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Prices

Attachment IV NOAA Ship Oscar Elton Sette Drydock
PRICE SCHEDULE
BASE ITEMS
CLINSPEC WORK ITEMSPECIFICATION WORK ITEM TITLEUNITQTYUNIT PRICEEXTENDED PRICE
10003.1Temporary Services1JB
10003.2ABS Intermediate Hull Survey 7 Inspection1JB
10003.3Drydock & Routine Drydock Work1JB
10003.4Propeller and Tailshaft Inspection and Repair1JB
10003.5Underwater Hull Preservation and Coating1JB
10003.6Bow Thruster Inspection and Service1JB
10003.7Sea Valve Overhauls1JB
10003.8Main Propulsion Motors Maintenance and Inspection1JB
10003.9Dock and Sea Trials1JB
10003.10Annual Liferaft Inspections1JB
10003.11Ground Tackle Preservation and Anchor Windlass Overhaul1JB
10003.12General Electric Systems Maintenance1JB
10003.13Annual Fire Detection and Suppression Systems Inspection1JB
10003.140-1 Deck Soft Patch (BERP) Renewal1JB
10003.15Bilge Valve Overhauls1JB
10003.16Miscellaneous Piping Repairs1JB
10003.17Air Receiver Visual and Hydrostatic Testing1JB
10003.18Miscellaneous Steel Repairs1JB
10003.19Sewage Holding Tank (2-20-0-W) Repairs and Painting1JB
10003.20Motor Room Intake Vent Renewal1JB
10003.21Auxiliary Sea Water (ASW) Pump Overhauls1JB
10003.22Anti-Roll Tank Piping and Reach Rod Modifications1JB
10003.23Steering System Maintenance1JB
10003.24Gauge and Instrument Calibration1JB
10003.28Generation Room (3-34-0-E) Bilge Preservation1JB
10003.29Propulsion Motor Room (3-60-0-E) Bilge Preservation1JB
10003.30Hydraulic Hose Replacement1JB
10003.31Annual Inspection and Weight Testing of Lifting Appliances1JB
10003.32MCT Repairs1JB
10003.33Freeboard Preservation1JB
10003.34Gallows Frame Preservation1JB
10003.35Main Deck and 0-2 Deck Water Heater Renewals1JB
10003.38Laundry Room Deck Covering Renewal1JB
20003.25Ballast Water Treatment System Installation1JB
20003.26Reverse Osmosis Installation1JB
20003.27Radar Installation1JB
20003.36Galley Range Replacement and Fryer Installation1JB
20003.37Aft Deck Crane Installation1JB
Total Base Items$0.00
ADDITIONAL ITEMS - GROWTH
ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
CLINSPEC WORK ITEMSPECIFICATION WORK ITEM TITLEUNITQTYUNIT PRICEEXTENDED PRICE
3000/ 40004.0AIRS/Growth (estimated)

**Provide breakdown, as follows:

AIRs/Growth Labor Rate Unit Price: $________; Quantity: 2,900; Unit of Issue: Hour; Extended Price: $____________

HRSEST. 2,900
3000/ 40004.0AIRs/Growth Material Markup/Handling Fee

Unit Price: $; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$300,000.00 X percentage quoted]: $______________

%EST. 300,000.00
N/AAdditional Temp Services (See CAR CLAUSE 1352.271-89)DayEST 1
N/ALaydays (See CAR Clause 1352.271-86)DayEST 1
Total Growth$0.00
OPTION ITEMS
Note: These items (0024 - 0034) may be exercised in accordance with FAR Clause 52.217-7 “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS”.
CLINSPEC WORK ITEMSPECIFICATION WORK ITEM TITLEUNITQTYUNIT PRICEEXTENDED PRICE
50005.1Port and Stbd SSDG Exhaust Stack Insulation Renewal1JB
50005.2Mission Deck Void (1-86-01-V) Preservation1JB
50005.3Main Generator Room Void (4-34-01-V) Spot Preservation1JB
50005.4Jackstaff Preservation1JB
50005.5Interior Motor Room Ventilation Duct Renewal1JB
50005.6Ships Service Diesel Generator Resilient Mount Replacement1JB
50005.7Scientific Freezer Deck Repairs1JB
50005.9Foremast Preservation1JB
50005.10HVAC Cleaning1JB
50005.11Uncontaminated Seawater Lower Suction Mods1JB
50005.12Decking Renewals1JB
50005.13Bunk Room and Shower Repairs1JB
50005.14VHF Antenna Installations1JB
50005.15Trimble ABX-2 System Installation1JB
60005.8Bridge UPS Renewal1JB
Total Option Items$0.00
BASE$0.00
BASE + OPTIONS$0.00
BASE + OPTIONS +GROWTH$0.00

&KFF0000Attachment IV

RFQ

NOAA Ship Oscar Elton Sette Drydock

Sheet1

File details come from the government source that posted it. Updated .