About this file

This document appears to be an attachment entitled "ATTACHMENT U - OKC ORSICU - CFM Phasing Plan" related to a federal contract opportunity for Initial Outfitting, Transition, and Activation (IOTA) services in support of the Oklahoma City VA Medical Center Surgical Intensive Care Unit and Operating Room Area Activation.

The attachment outlines a phased construction plan for the renovation and activation of the Surgical Intensive Care Unit (SICU) and Operating Room (OR) areas at the Oklahoma City VAMC. The phasing plan details room names/numbers, construction activities, and sequencing requirements to minimize disruptions to ongoing medical operations. The plan includes temporary ICRA barrier requirements and deadlines for completing various tasks.

The related federal contract opportunity is Solicitation Number 36C77624Q0204 for IOTA services to support the SICU and OR area activation at the Oklahoma City VAMC. The solicitation is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files

File Type Posted
C01 - Notice of Award - OKC.pdf PDF
ATTACHMENT T - 635-456 ORSICU - Rm x Rm PRCL REVISED.xlsx XLSX spreadsheet
S06 36C77624Q0204 0002 OKC.docx DOCX document
36C77624Q0204 0001.docx DOCX document
ATTACHMENT D - Contract Staff Roster.pdf PDF
ATTACHMENT V - OKC ORSICU - Sheets AE111 and AE112.pdf PDF
ATTACHMENT J - Integrated Move Plan Template.xlsx XLSX spreadsheet
ATTACHMENT A - PWS - OKC IOTA 5.30.2024.pdf PDF
ATTACHMENT T - 635-456 ORSICU - Rm x Rm PRCL.xlsx XLSX spreadsheet
ATTACHMENT O - QASP.docx DOCX document
ATTACHMENT I - Disposal Plan Template.xlsx XLSX spreadsheet
ATTACHMENT N - 6500.6 Appendix A.pdf PDF
ATTACHMENT S - Pricing Worksheet - OKC.xlsx XLSX spreadsheet
S02 - 36C77624Q0204_1.docx DOCX document
ATTACHMENT C - Travel Authorization Request.pdf PDF
ATTACHMENT H - Contents Acq Plan Template 9.21.2023.xlsx XLSX spreadsheet
ATTACHMENT K - Proposed FTE Report.xlsx XLSX spreadsheet
ATTACHMENT Q - VSC Security Package 3.4.2024.pdf PDF
ATTACHMENT G - WBS Template.pdf PDF
ATTACHMENT B - OKC Activation Project Timelines.xlsx XLSX spreadsheet
ATTACHMENT M - Procurement Package Template 5.1.2024.pdf PDF
ATTACHMENT L - Furniture IDIQ Templates.pdf PDF
ATTACHMENT R - Wage Determination.pdf PDF
ATTACHMENT P - PDAT Summary - OKC.pdf PDF
ATTACHMENT E - Risk Management Plan and Register Template.xlsx XLSX spreadsheet
ATTACHMENT F - Change Management Plan and Log Template.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 11a

C1

D

E

F

G

H

I

J

K

9A

G2

EXIST.

TELECOM

ALIGN

ALIGN

ALIGN

ALIGN ALIGN

ALIGN

ALIGN

ALIGN

ALIGN ALIGN

STORAGE

STORAGE

SCRUB

SCRUB

GAS CYLINDERS

GAS CYLINDERS

IMAGE EQUIP

COMPONENT

ROOM

IMAGE EQUIP

COMPONENT

ROOM

CONTROL ROOM

723B

CONTROL ROOM

723B

HAC

HAC

NEURO EQUIP

NEURO EQUIP

NEUROSURGERY

OR 9

728A

NEUROSURGERY

OR 9

728A

HYBRID OR 10

723A

HYBRID OR 10

723A

SCRUB

SCRUB

HYBRID STORAGE

723C

HYBRID STORAGE

723C

CARDIAC OR 3

720A

CARDIAC OR 3

720A

STAIR 10

STAIR 10

STORAGE

STORAGE

GAS STORAGE

GAS STORAGE

TOILET

TOILET

CORRIDOR

COR-7-10

CORRIDOR

COR-7-10

CORRIDOR

COR-7-12

CORRIDOR

COR-7-12

CORRIDOR

COR-7-12

CORRIDOR

COR-7-12

CORRIDOR

COR-7-9

CORRIDOR

COR-7-9

CORRIDOR

COR-7-8

CORRIDOR

COR-7-8

BIOMED

COMMUNICATION

BIOMED

COMMUNICATION

CORRIDOR

COR-7-6

CORRIDOR

COR-7-6

CORRIDOR

COR-7-3

CORRIDOR

COR-7-3

POST-OP AREA

POST-OP AREA

MEDICATION

MEDICATION

TOILET

TOILET

STORAGE

STORAGE

CLEAN SUPPLY

CLEAN SUPPLY

EQUIPMENT

STORAGE

720C

EQUIPMENT

STORAGE

720C

IT CLOSET

IT CLOSET

ELEVATOR

P-12

ELEVATOR

P-12

EXIST. ELEC

CLOSET

7F-116a

EXIST. ELEC

CLOSET

7F-116a

EXIST. ELEC

CLOSET

7F-116

EXIST. ELEC

CLOSET

7F-116

SOILED UTILITY

SOILED UTILITY

MEDICATION

MEDICATION

STORAGE

STORAGE

RECOVERY

RECOVERY

ISOLATION BAY

ISOLATION BAY

CONSULT

CONSULT

OR COUNTER

702A

OR COUNTER

702A

ELEVATOR LOBBY

COR-7-1

ELEVATOR LOBBY

COR-7-1

ELEVATOR

P-8

ELEVATOR

P-8

ELEVATOR

P-7

ELEVATOR

P-7

ELEVATOR

P-9

ELEVATOR

P-9

ELEVATOR

P-10

ELEVATOR

P-10

STAIR 8

STAIR 8

TOILET

701C

TOILET

701C

TOILET

701B

TOILET

701B

CORRIDOR

COR-7-2

CORRIDOR

COR-7-2

SURGICAL

WAITING

701A

SURGICAL

WAITING

701A

ALCOVE

ALC-7-1

ALCOVE

ALC-7-1

PUMP ROOM &

ABG

720B

PUMP ROOM &

ABG

720B

SOILED UTILITY

SOILED UTILITY

CLEAN SUPPLY

CLEAN SUPPLY

STORAGE

STORAGE

TOILET

TOILET

ANTE ROOM

ANTE ROOM

CORRIDOR

COR-7-4

CORRIDOR

COR-7-4

CORRIDOR

COR-7-5

CORRIDOR

COR-7-5

PATIENT BAY

704B

PATIENT BAY

704B

PATIENT BAY

704A

PATIENT BAY

704A

PATIENT BAY

704C

PATIENT BAY

704C

PATIENT BAY

704D

PATIENT BAY

704D

PATIENT BAY

704E

PATIENT BAY

704E

PATIENT BAY

704F

PATIENT BAY

704F

PATIENT BAY

704G

PATIENT BAY

704G

PATIENT BAY

704H

PATIENT BAY

704H

PATIENT BAY

704J

PATIENT BAY

704J

RECOVERY BAY

711L

RECOVERY BAY

711L

RECOVERY BAY

711K

RECOVERY BAY

711K

RECOVERY BAY

711J

RECOVERY BAY

711J

RECOVERY BAY

711H

RECOVERY BAY

711H

RECOVERY BAY

711B

RECOVERY BAY

711B

RECOVERY BAY

711C

RECOVERY BAY

711C

RECOVERY BAY

711D

RECOVERY BAY

711D

RECOVERY BAY

711E

RECOVERY BAY

711E

RECOVERY BAY

711F

RECOVERY BAY

711F

RECOVERY BAY

711G

RECOVERY BAY

711G

REFRESHMENT

CENTER

701D

REFRESHMENT

CENTER

701D

HAC

HAC

CORRIDOR

COR-7-7

CORRIDOR

COR-7-7

DOC. STORAGE

702B

DOC. STORAGE

702B

RECOVERY BAY

711A

RECOVERY BAY

711A

ALIGN

SCRUB

7F120

GENERAL

O.R. #2 7F122

GENERAL

O.R. #1 7F118

SUB

STERILE

7F113b

SHAFT

SUB

STERILE

7F113a

H.A.C.

7F114CARDIAC

O.R. #4 7F128

CLEAN

UTILITY

7F129

X-RAY

STORAGE

7F130

H.A.C.

7F131 SCRUB

7F132

SUB

STERILE

7F133c

PHASE 1 - ANY 8TH FLOOR THRU-FLOOR PENETRATIONS MUST TAKE PLACE PRIOR

TO COMPLETION OF 7TH FLOOR SCOPE OF WORK

GENERAL PHASING PLAN NOTES

PHASE 1 - WORK MUST BE COMPLETED AFTER HOURS AND ON WEEKENDS - MUST

BE COORDINATED WITH VA FOR SHUT DOWN OF OR'S

PHASE 2 - MUST BE COMPLETED AFTER PHASE 1 IS COMPLETELY AND VA HAS

OCCUPIED PHASE 1

ICRA LEGEND

TEMPORARY CLASS IV ICRA BARRIER AT THIS LOCATION. CONTRACTOR TO

COORDINATE WITH VA COR AND VA SAFETY OFFICER FOR EXTENTS OF

BARRIER. REFER TO PARTITION TYPES SHEET FOR DETAIL (5/GI004)

TEMPORARY 3'-0" x 7'-0" ICRA BARRIER DOOR WITH FRAME SYSTEM.

SEAL DOOR AND PROVIDE LOCKING HARDWARE.

PROVIDE STICKY AND WET WALK-OFF MATS THIS AREA

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1/8" = 1'-0" 1/ AE502

1 2 3 4 5 6 7 8 9 10 11 11a

E

F

G

H

I

J

K

9A

G2

P-

TU

BE

SICU PATIENT

ISOLATION ROOM,

BARIATRIC (ACC.)

811B

SICU PATIENT

ISOLATION ROOM,

BARIATRIC (ACC.)

811B

ICU TOILET

811C

ICU TOILET

811C

ANTE ROOM

811A

ANTE ROOM

811A

ICU TOILET

810B

ICU TOILET

810B

SICU PATIENT

ROOM

810A

SICU PATIENT

ROOM

810A

SICU PATIENT

ROOM

809A

SICU PATIENT

ROOM

809A

SICU PATIENT

ROOM

808A

SICU PATIENT

ROOM

808A

SICU PATIENT

ROOM

807A

SICU PATIENT

ROOM

807A

ICU TOILET

807B

ICU TOILET

807B

SICU PATIENT

ROOM

806A

SICU PATIENT

ROOM

806A

ICU TOILET

806B

ICU TOILET

806B

ICU TOILET

805B

ICU TOILET

805B

SICU PATIENT

ROOM

805A

SICU PATIENT

ROOM

805A

SICU PATIENT

ROOM

804A

SICU PATIENT

ROOM

804A

SICU PATIENT

ROOM (ACC.)

803A

SICU PATIENT

ROOM (ACC.)

803A

ICU TOILET

803B

ICU TOILET

803B

ICU TOILET

802C

ICU TOILET

802C

SICU PATIENT

ISOLATION ROOM,

BARIATRIC (ACC.)

802B

SICU PATIENT

ISOLATION ROOM,

BARIATRIC (ACC.)

802B

ANTE ROOM

802A

ANTE ROOM

802A ICU TOILET

801B

ICU TOILET

801B

SICU PATIENT

ROOM (ACC.)

801A

SICU PATIENT

ROOM (ACC.)

801A

TOILET

TOILET

TOILET

TOILET

SICU WAITING

SICU WAITING

SICU PATIENT

825A

SICU PATIENT

825A

SICU PATIENT

ISOLATION ROOM,

BARIATRIC (ACC.)

824B

SICU PATIENT

ISOLATION ROOM,

BARIATRIC (ACC.)

824B

ANTE ROOM

824A

ANTE ROOM

824A

ICU TOILET

824C

ICU TOILET

824C

ICU TOILET

825B

ICU TOILET

825B

ANTE ROOM

823A

ANTE ROOM

823A

ICU TOILET

823C

ICU TOILET

823C

SICU PATIENT

ISOLATION ROOM,

BARIATRIC (ACC.)

823B

SICU PATIENT

ISOLATION ROOM,

BARIATRIC (ACC.)

823B

SICU PATIENT

ROOM

822A

SICU PATIENT

ROOM

822A

ICU TOILET

822B

ICU TOILET

822B

ICU TOILET

821B

ICU TOILET

821B

SICU PATIENT

ROOM

821A

SICU PATIENT

ROOM

821A

SICU PATIENT

ROOM

820A

SICU PATIENT

ROOM

820A

ICU TOILET

820B

ICU TOILET

820B

ON-CALL

ON-CALL

ON-CALL

TOILET/SHOWER

ON-CALL

TOILET/SHOWER

STAFF TOILET

STAFF TOILET

STAFF BREAK

STAFF BREAK

SHARED OFFICE

SHARED OFFICE

SINGLE OFFICE

SINGLE OFFICE

TEAM WORK

TEAM WORK

MED GAS

MED GAS

HAC

HAC

EQUIP. STORAGE

EQUIP. STORAGE

NOURISH.

NOURISH.

COMM

COMM

ELEC

ELEC

CLEAN UTILITY

CLEAN UTILITY

SOILED UTILITY

SOILED UTILITY

ALCOVE

ALC-8-5

ALCOVE

ALC-8-5

MEDS

MEDS

CLEAN SUPPLY /

LINEN

CLEAN SUPPLY /

LINEN

ALCOVE

ALC-8-1

ALCOVE

ALC-8-1

NURSE STATION

NURSE STATION

ALCOVE

ALC-8-3

ALCOVE

ALC-8-3

ALCOVE

ALC-8-4

ALCOVE

ALC-8-4

NURSE STATION/

TEAM COLLAB.

NURSE STATION/

TEAM COLLAB.

ALCOVE, ICE

ALC-8-2

ALCOVE, ICE

ALC-8-2

ICU TOILET

809B

ICU TOILET

809B

ICU TOILET

804B

ICU TOILET

804B

ICU TOILET

808B

ICU TOILET

808B

COMM

COMM

ELEVATOR LOBBY

COR-8-1

ELEVATOR LOBBY

COR-8-1

COMM

COMM

ELEVATOR

P-9

ELEVATOR

P-9

ELEVATOR

P-10

ELEVATOR

P-10

ELEVATOR

P-8

ELEVATOR

P-8

ELEVATOR

P-7

ELEVATOR

P-7

ELEVATOR LOBBY

COR-8-7

ELEVATOR LOBBY

COR-8-7

ELEVATOR

P-12

ELEVATOR

P-12

CORRIDOR

COR-8-4

CORRIDOR

COR-8-4

CORRIDOR

COR-8-6

CORRIDOR

COR-8-6

CORRIDOR

COR-8-5

CORRIDOR

COR-8-5

CORRIDOR

COR-8-9

CORRIDOR

COR-8-9

CORRIDOR

COR-8-10

CORRIDOR

COR-8-10

CORRIDOR

COR-8-8

CORRIDOR

COR-8-8

CORRIDOR

COR-8-3

CORRIDOR

COR-8-3

ALCOVE

ALC-8-6

ALCOVE

ALC-8-6

ALCOVE

ALC-8-7

ALCOVE

ALC-8-7

ALCOVE

ALC-8-8

ALCOVE

ALC-8-8

CORRIDOR

COR-8-2

CORRIDOR

COR-8-2

STAIR 10

STAIR 10

STAIR 8

PHASE 1 - COMPLETE VERTICAL TRANSPORTATION ACCESS TO LIMIT DISRUPTION

ONCE 7TH FLOOR IS OPEN

GENERAL PHASING PLAN NOTES

PHASE 3 - ALL FLOOR PENETRATIONS MUST BE COMPLETED PRIOR TO 7TH FLOOR

COMPLETION - WORK CAN TAKE PLACE IN PHASE 3 DURING CONSTRUCTION OF

PHASE 1, BUT PHASES 1 AND 2 MUST BE TURNED OVER TO VA FOR OCCUPANCY

PRIOR TO PHASE 3 COMPLETION

ICRA LEGEND

TEMPORARY CLASS IV ICRA BARRIER AT THIS LOCATION. CONTRACTOR TO

COORDINATE WITH VA COR AND VA SAFETY OFFICER FOR EXTENTS OF

BARRIER. REFER TO PARTITION TYPES SHEET FOR DETAIL (5/GI004)

TEMPORARY 3'-0" x 7'-0" ICRA BARRIER DOOR WITH FRAME SYSTEM.

SEAL DOOR AND PROVIDE LOCKING HARDWARE.

PROVIDE STICKY AND WET WALK-OFF MATS THIS AREA

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1/8" = 1'-0" 1/ AE502

File details come from the government source that posted it. Updated .