Attachment_-_St_Pete_Marina_South_Basin_.pdf
PDF 2 MB Posted
- Attached to
- Marina Redevelopment (Project No. 25204-130)
- Solicitation number
- RFQ- 26 - 022
- Issued by
- Pinellas County, Florida
About this file
This is a conceptual design plan document for the St. Petersburg Marina South Basin redevelopment project, prepared by the City of St. Petersburg, Florida. The document presents a visual architectural rendering of the proposed South Basin improvements as part of the broader Marina Redevelopment Project (Project No. 25204-130). The solicitation for design-build services was released on October 28, 2025, with qualifications due by December 2, 2025, at 3:00 pm. The City will conduct interviews with at least three shortlisted qualified firms on January 13, 2026. The project encompasses the design and construction of floating docks, dock houses, ship store renovation, fueling facilities, seawalls, and a bridge connecting to Demens Landing across the North, Central, and South Marina Basins, with a substantial completion timeline of 60 months from the Notice to Proceed.
The total construction budget for this comprehensive marina redevelopment is $148,000,000, with the selected Design-Build firm responsible for providing progressive design-build services at a Guaranteed Maximum Price. The project requires extensive insurance coverage, including $10,000,000 in Commercial General Liability, $5,000,000 in Pollution/Environmental Liability, and $5,000,000 in Professional Liability insurance, along with a Public Construction Bond equal to the cumulative Guaranteed Maximum Price. Technical evaluation will allocate 88% of scoring points to qualifications, including 33 points for team background, 25 points for relevant experience, and 22 points for project approach. The solicitation includes preferences for Minority Business Enterprises (MBE), Small Business Enterprises (SBE), Woman Owned Business Enterprises (WBE), and Disadvantaged Business Enterprises (DBE). The selected firm must demonstrate experience in coastal marine facilities, saltwater environments, and coastal high-hazard zone design, with structures designed to meet minimum 75-year service life requirements and incorporate sea level rise recommendations from the Tampa Bay Regional Planning Council.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
CONCEPTUAL PLAN
MHerrman Pen
MHerrman Pen
MHerrman Pen
MHerrman Pen
MHerrman Pen l
MHerrman Pen
MHerrman Pen
File details come from the government source that posted it. Updated .