This is a Request for Task Order Proposal (RFTOP) document issued by the District of Columbia Department of General Services, Contracts and Procurement Division, for multiple construction and renovation projects at District schools and facilities. The solicitation addresses various scopes of work across different elementary schools, including door replacement at Bunker Hill ES, a welcome center at Ketcham ES, miscellaneous work at Bruce Monroe, and HVAC system installation at Tyler Elementary School's cafeteria. Each task order proposal requires contractors to provide detailed bid forms, lists of key personnel (field superintendents and project managers with qualifications), potential subcontractors and suppliers, project management plans with preliminary schedules, bid bonds in the form specified in Attachment E, and subcontracting plans per Attachment H. The District intends to award single task orders to responsive and responsible offerors with the lowest lump sum bids as described in the respective bid forms.
All work performed under the proposed task orders is subject to Davis-Bacon wage determinations (Attachment D), the Living Wage Act, and the Service Contract Act in effect at the time of task order execution. Contractors must provide performance and payment bonds prior to commencing work in accordance with Article 11.5 of the underlying IDIQ contract. Additionally, contractors and subcontractors must comply with mandatory subcontracting requirements, residency hiring requirements (51% of new positions for District residents), apprenticeship act provisions, and First Source Employment Agreement obligations. The solicitations include requirements for tax certifications and affidavits for those registered to conduct business in the District of Columbia, and contractors must demonstrate compliance with District procurement policies including the District of Columbia Small and Local Business Enterprise (DSLBD) provisions.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR TASK ORDER PROPOSAL
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| The Contractor is required to comply with the provisions set forth in Article 12 of the underlying IDIQ Contract. |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount considering only the Lump sum price as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| Draft RFTOP Generic Attachments.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| The Contractor is required to comply with the provisions set forth in Article 12 of the underlying IDIQ Contract. |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount considering only the Lump sum price as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| RFTOP - ATTACHMENT.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Attachment I- First Source Employment Agreementn -.pdf |
| Untitled |
| Untitled |
| Untitled |
| Untitled |
| Revised Employment Plan 51% Requirement Final (1).pdf |
| I. REVISED FIRST SOURCE EMPLOYMENT PLAN |
| GOVERNMENT‐ASSISTED PROJECT/CONTRACT INFORMATION |
| EMPLOYER INFORMATION |
| ALL EMPLOYERS: |
| Please indicate ALL new position(s) you will create as a result of the project. If you WILL NOT be creating any new employment opportunities, please complete the attached justification sheet with an explanation. Attach additional sheets as needed. |
| B. JUSTIFICATION SHEET: Please provide a detailed explanation of why the Employer will not have any new hires on the project. |
| I. Provide a timetable outlining the 51% Hiring of District Resident over the life of the project or contract and an associated hiring schedule. |
| III. Provide a strategy to fill the 51% hiring of District residents requirement, including a component on communicating these requirements to contractors and subcontractors and a component on potential community outreach partnerships with the Univers... |
| VIII. Provide a strategy to hire graduates of District of Columbia Public Schools, District of Columbia Public Charter Schools, community‐based job training providers, and hard‐to‐ employ residents. |
| Attachment L - Tax Affidavit Certification Form n.pdf |
| GOVERNMENT OF THE DISTRICT OF COLUMBIA |
| Office of the Chief Financial Officer |
| TAX CERTIFICATION AFFIDAVIT |
| THIS AFFIDAVIT IS TO BE COMPLETED ONLY BY THOSE WHO ARE REGISTERED TO CONDUCT BUSINESS IN THE DISTRICT OF COLUMBIA. |
| Exhibit 3 - Specification & Product Cutsheets.pdf |
| SL-17SalesSheet |
| SL-17 Specifications |
| SL-19andSL-19-1SalesSheet |
| SL-19-1 Specifications |
| Draft RFTOP. Bunker Hill ES Door Rep Rev.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| The Contractor is required to comply with the provisions set forth in Article 12 of the underlying IDIQ Contract. |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount considering only the Lump sum price as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| RFTOP - ATTACHMENT.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Draft RFTOP. Ketcham ES Welcome Center.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| The Contractor is required to comply with the provisions set forth in Article 12 of the underlying IDIQ Contract. |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| Draft RFTOP. Ketcham ES Welcome Center Rev.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| The Contractor is required to comply with the provisions set forth in Article 12 of the underlying IDIQ Contract. |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| Draft RFTOP. Bruce Monroe Misc.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| The Contractor is required to comply with the provisions set forth in Article 12 of the underlying IDIQ Contract. |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| Draft RFTOP. Bruce Monroe Misc.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| The Contractor is required to comply with the provisions set forth in Article 12 of the underlying IDIQ Contract. |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| Draft RFTOP. Bruce Monroe Misc Rev.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| 5.1. Mandatory Subcontracting Requirements |
| 5.2 Subcontracting Plan Requirements |
| 5.3 Copies of Subcontracts |
| 5.4 Subcontracting Plan Compliance Reporting |
| 5.5 Annual Meetings |
| 5.6 DSLBD Notices |
| 5.7 Enforcement and Penalties for Breach of Subcontracting Plan |
| 5.8 Residency Hiring Requirements for Contractors and Subcontractors |
| 5.9 Apprenticeship Act |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor and its subcontractors shall comply ... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| Draft RFTOP Tyler ES HVAC.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| 5.1. Mandatory Subcontracting Requirements |
| 5.2 Subcontracting Plan Requirements |
| 5.3 Copies of Subcontracts |
| 5.4 Subcontracting Plan Compliance Reporting |
| 5.5 Annual Meetings |
| 5.6 DSLBD Notices |
| 5.7 Enforcement and Penalties for Breach of Subcontracting Plan |
| 5.8 Residency Hiring Requirements for Contractors and Subcontractors |
| 5.9 Apprenticeship Act |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| Draft RFTOP Tyler ES HVAC.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| 5.1. Mandatory Subcontracting Requirements |
| 5.2 Subcontracting Plan Requirements |
| 5.3 Copies of Subcontracts |
| 5.4 Subcontracting Plan Compliance Reporting |
| 5.5 Annual Meetings |
| 5.6 DSLBD Notices |
| 5.7 Enforcement and Penalties for Breach of Subcontracting Plan |
| 5.8 Residency Hiring Requirements for Contractors and Subcontractors |
| 5.9 Apprenticeship Act |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| Draft RFTOP Tyler ES HVAC.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| 5.1. Mandatory Subcontracting Requirements |
| 5.2 Subcontracting Plan Requirements |
| 5.3 Copies of Subcontracts |
| 5.4 Subcontracting Plan Compliance Reporting |
| 5.5 Annual Meetings |
| 5.6 DSLBD Notices |
| 5.7 Enforcement and Penalties for Breach of Subcontracting Plan |
| 5.8 Residency Hiring Requirements for Contractors and Subcontractors |
| 5.9 Apprenticeship Act |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, The Contractor and its subcontractors shall comply with t... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that the Contractor intends to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Office |
| Draft RFTOP Tyler HVAC2.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| 5.1. Mandatory Subcontracting Requirements |
| 5.2 Subcontracting Plan Requirements |
| 5.3 Copies of Subcontracts |
| 5.4 Subcontracting Plan Compliance Reporting |
| 5.5 Annual Meetings |
| 5.6 DSLBD Notices |
| 5.7 Enforcement and Penalties for Breach of Subcontracting Plan |
| 5.8 Residency Hiring Requirements for Contractors and Subcontractors |
| 5.9 Apprenticeship Act |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, the Contractor and its subcontractors shall comply with ... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| A complete (Attachment B), Bid Form addressing all of the Scope of Work, including, but not limited to, furnish all supervision, labor, materials, and equipment necessary to design and build TYLER ELEMENTARY SCHOOL NEW HVAC AT THE CAFETERIA (the “Pro... |
| In addition to the above, the Proposals should also include: |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that Contractor intents to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Officer |
| Draft RFTOP Tyler HVAC2.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| 5.1. Mandatory Subcontracting Requirements |
| 5.2 Subcontracting Plan Requirements |
| 5.3 Copies of Subcontracts |
| 5.4 Subcontracting Plan Compliance Reporting |
| 5.5 Annual Meetings |
| 5.6 DSLBD Notices |
| 5.7 Enforcement and Penalties for Breach of Subcontracting Plan |
| 5.8 Residency Hiring Requirements for Contractors and Subcontractors |
| 5.9 Apprenticeship Act |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, the Contractor and its subcontractors shall comply with ... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| A complete (Attachment B), Bid Form addressing all of the Scope of Work, including, but not limited to, furnish all supervision, labor, materials, and equipment necessary to design and build TYLER ELEMENTARY SCHOOL NEW HVAC AT THE CAFETERIA (the “Pro... |
| In addition to the above, the Proposals should also include: |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that Contractor intents to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Officer |
| Draft RFTOP Tyler HVAC2.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
| 2. PROGRAM MANAGER (“PM” or “Project Manager”) |
| 5.1. Mandatory Subcontracting Requirements |
| 5.2 Subcontracting Plan Requirements |
| 5.3 Copies of Subcontracts |
| 5.4 Subcontracting Plan Compliance Reporting |
| 5.5 Annual Meetings |
| 5.6 DSLBD Notices |
| 5.7 Enforcement and Penalties for Breach of Subcontracting Plan |
| 5.8 Residency Hiring Requirements for Contractors and Subcontractors |
| 5.9 Apprenticeship Act |
| 7. DAVIS BACON wage determination |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Davis Bacon Wage Determination as set forth in (Attachment D) in effect at the time of the Task Order execution by the Department. |
| 7.1 LIVING WAGE ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the living wage act in effect at the time of the Task Order execution by the Department. As such, the Contractor and its subcontractors shall comply with ... |
| 7.2 SERVICE CONTRACT ACT |
| The Contractor agrees that the work performed under the proposed Task Order shall be subject to the Service Contract act in effect at the time of the Task Order execution by the Department. As such, the Contractor(s) and its subcontractors shall comp... |
| 8. PERFORMANCE AND PAYMENT BONDS |
| The Contractor shall provide to the Department a payment and performance bond prior to commencing work on the Project, in accordance with Article 11.5 of the underlying IDIQ Contract. |
| 9. LIQUIDATED DAMAGES |
| 10. FIRST SOURCE AGREEMENT AND EMPLOYMENT PLAN |
| 11. ADMINISTRATIVE MATTERS |
| 12. TERMS AND CONDITIONS |
| 13. TASK ORDER PROPOSAL REQUIREMENTS |
| A complete (Attachment B), Bid Form addressing all of the Scope of Work, including, but not limited to, furnish all supervision, labor, materials, and equipment necessary to design and build TYLER ELEMENTARY SCHOOL NEW HVAC AT THE CAFETERIA (the “Pro... |
| In addition to the above, the Proposals should also include: |
| i. A list of key personnel, to include the (i) the Field Superintendent, and (ii) the Project Manager as appropriate for the Scope of the Work, that would be assigned to this Project and details of the personnel experience, qualifications, certificat... |
| ii. Potential subcontractors and suppliers that Contractor intents to utilize in the performance of the proposed Task Order; |
| iii. A project management plan and preliminary schedule outlining how the Offeror intends to implement the Project, key subcontractors and vendors that will be utilized, means and methods that will be implemented to accomplish the Scope of Work and ac... |
| iv. Bid Bond, in the Form of (Attachment E); |
| v. Subcontracting Plan as set forth in (Attachment H); |
| 14. ATTACHMENTS |
| The RFTOP contains the following Attachments: |
| 15. METHOD OF AWARD |
| The District intends to award a single Task Order to the responsive and responsible Offeror with the lowest bid and who will be determined to be the most advantageous to the District. However, the Department reserves the right to consider non price fa... |
| For the purpose of evaluation, the lowest bid will be the lowest total amount as further described in the Bid Form (Attachment B) |
| __________________________________ ________________________ |
| Ebti K. Hana Date: |
| Contracting Officer |
| Draft Bid Form Tyler HVAC team.pdf |
| REQUEST FOR TASK ORDER PROPOSAL |
| Issued by: Department of General Services |
| Contracts and Procurement Division |
| 2000 14th Street, NW – 8th Floor |
| Washington, DC 20009 |
File details come from the government source that posted it. Updated .