ATTACHMENT Reference Drawings revised 09-02-26.pdf

PDF 1 MB Posted

Attached to
Z1LZ--Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots
Solicitation number
36C26126Q1261
Issued by

About this file

This document is a set of architectural construction drawings for a parking lot resurfacing and re-striping project. The project, numbered 612A4-27-013, involves the re-slurry and re-stripe of Buildings 88 and 98 parking lots located at McClellan Park, 5342 Dudley Boulevard, McClellan Park, California 95652, with an issue date of 04.28.2026 and updated to 08.04.2026 for the details sheet. The project is prepared by the Office of Construction and Facilities Management under the U.S. Department of Veterans Affairs.

The scope of work includes removing existing parking lot striping, repairing asphalt cracks, and applying new border striping and specialized markings. Specific work items include re-striping patient parking spaces and ADA-accessible parking spaces with 4-inch-wide white stripes at 45-degree angles using contrasting colors (blue or white preferred); installing accessible parking symbols and van access symbols with stenciled text in white; creating no-stopping and no-parking striping; installing or reinstalling wheel stops epoxied to asphalt paving with silicone sealant; removing and filling existing metal sign post holes; and removing and reinstalling wheel stops after re-striping is complete. The drawings include detailed specifications for accessible parking dimensions, access aisle striping, crosswalk details, and symbol and text alignment requirements. Four parking lots are identified on the site plans: VA101 (Building 88), VA102 (Building 98 North), VA103 (Building 98 South), and VA105 containing the detailed specifications and construction standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

ADA

ADA

ADA

ADA

ADA

ADA

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

ADA

ADA

ADA

ADA

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

ADA

ADA

ADA

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

ADA

ADA

ADA

ADA

ADA

ADA

ADA

ADA

VAN

VAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-013

VA100

COVER SHEET RE-SLURRY AND RE-STRIPE

BLDG. 88 AND 98 PARKING LOTS

04.28.2026

5342 Dudley Boulevard McClellan Park, CA 95652

Revisions: Date:

B88

BUILDING

ARNOLD AVE

DUDLEY BLVD

PALM ST

Feet 1:600

2001000 50

VA102

VA101

VA103

BUILDING

COMMISSARY

PALM ST

DUDLEY BLVD

AutoCAD SHX Text CONTRACTOR PROVIDED SIGNAGE FOR PARKING LOT CLOSURE SHALL NOTIFY DRIVERS OF THE OPTION TO PARK AT BUILDING 911

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENTPATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

ADA

ADA

ADA

ADA

ADA

ADA

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

ADA

ADA

ADA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-013

VA101

BUILDING 88 PARKING LOT RE-SLURRY AND RE-STRIPE

BLDG. 88 AND 98 PARKING LOTS

04.28.2026

5401 Arnold Avenue McClellan Park, CA 95652

Revisions: Date:

BUILDING

BUILDING

AR

NO

LD

A

VE

Feet 1:200

100500 25

PALM ST

LIONS LN

VA105

VA105

VA105

NO

A

SP

HA

LT

R

ES

UR

FA

CI

NG

T

HE

SE

S

TA

LL

S, R

EM

OV

E

EX

IS

TI

NG

S

TR

IP

IN

G, RE

PA

IR

A

SP

HA

LT

C

RA

CK

S

AN

D

RE

PL

AC

E

W

IT

H

NE

W B

OR

DE

R

ST

RI

PI

NG

VA105

TYP AT "PATIENT"

VA105

TYP AT "ADA"

VA105

VA105

FIELD ST

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENTPATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

ADA

ADA

ADA

ADA

ADA

ADA

PATIENT

PATIENT

PATIENT

PATIENT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

PA

TIE

NT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-013

VA102

BUILDING 98 NORTH PARKING LOT RE-SLURRY AND RE-STRIPE

BLDG. 88 AND 98 PARKING LOTS

04.28.2026

5342 Dudley Boulevard McClellan Park, CA 95652

Revisions: Date:

BUILDING

PALM ST

Feet 1:200

100500 25DU

DL

EY

BL

VD

VA105

TYP AT "PATIENT"

VA105

TYP AT "ADA"5

VA105

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

ADA

ADA

ADA

ADA

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

PATIENT

ADA

ADA

ADA

ADA

ADA

ADA

ADA

ADA

VA

N

VA

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR REFERENCE ONLY

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-013

VA103

BUILDING 98 SOUTH PARKING LOT RE-SLURRY AND RE-STRIPE

BLDG. 88 AND 98 PARKING LOTS

04.28.2026

5342 Dudley Boulevard McClellan Park, CA 95652

Revisions: Date:

BUILDING

Feet 1:200

100500 25

DU

DL

EY

B

LV

D

VA105

VA105

TYP AT "ADA" 6

VA105

TYP AT "PATIENT"

VA105

TYP AT "VAN"

AutoCAD SHX Text REMOVE (2) EXISTING METAL SIGN POSTS, FILL POST HOLES WITH HIGH STRENGTH CONCRETE PATCH, FLUSH WITH EXISTING SIDEWALK GRADE

REMOVE (3) WHEEL STOPS AND RETAIN (2), REINSTALL (2) AFTER RE-STRIPING IS COMPLETE PER DETAIL 8/VA105

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

CONSTRUCTION

DOCUMENT

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

612A4-27-013

VA105

DETAILS RE-SLURRY AND RE-STRIPE

BLDG. 88 AND 98 PARKING LOTS

08.04.2026

5342 Dudley Boulevard McClellan Park, CA 95652

Revisions: Date:

BORDER SHAPE

VARIES, MATCH

EXISTING

4" WIDE STRIPES @ 45

DEGREE USE

CONTRASTING COLOR

TO PAVEMENT. BLUE

OR WHITE PREFERRED

3' MAX

O.C. TYP.

ACCESSIBLE

SYMBOL PAINTED

ON PAVING

WHITE BORDER

OUTLINE 2" TYP.

BLUE FIELD/

BACKGROUND

ALIGN BOTTOM OF

SYMBOL WITH THE

END OF THE

PARKING SPACE

STRIPE

3'

3'

NO

PARKING

NO

PARKING

NO

PARKING

NO

PARKING

STENCIL

IN WHITE

7 CROSSWALK DETAIL1

NO STOPPING STRIPING, TYP

VAN ACCESSIBLE SYMBOL PAINTED IN STALL

4" WIDE WHITE

STRIPE @

BORDER, TYP.

6 PATIENT PARKING ONLY STRIPING

ACCESSIBLE

SYMBOL PAINTED

ON PAVING

WHITE BORDER

OUTLINE 2" TYP.

BLUE FIELD/

BACKGROUND

ALIGN BOTTOM OF

SYMBOL WITH THE

END OF THE

PARKING SPACE

STRIPE

3'

3'

STENCIL

IN WHITE

2 ACCESSIBLE SYMBOL PAINTED IN STALL, TYP

ACCESSIBLE PARKING DIMENSIONS

STENCIL IN WHITE

1' 1'

1' 4"

CLCL

5' STENCIL IN WHITE

4" WIDE WHITE

STRIPE @

BORDER, TYP.

4" WIDE STRIPES @ 45

DEGREE USE

CONTRASTING COLOR

TO PAVEMENT. BLUE

OR WHITE PREFERRED

3' MAX

O.C. TYP.

1' 1'

1' 4"

4 ACCESS AISLE STRIPING, TYP

-- 4

4" WIDE WHITE

STRIPE @

BORDER, TYP.

9', TYP

CL CLSTENCIL IN WHITE

1' 1'

4" ALIGN BOTTOM OF

TEXTS WITH THE END

OF THE PARKING

SPACE STRIPE

8' MIN

5' MIN EACH

SIDE 11' MIN VAN ACCESS

5' MIN EACH

SIDE 8' MIN

5' MIN EACH

SIDE

5' MIN EACH

SIDE 2' TYP 1' TYP

MA

TC

H

EX

IS

TI

NG

MA

TC

H

EX

IS

TI

NG

MA

TC

H

EX

IS

TI

NG

SECTION:

PLAN:

ELEVATION:

8 WHEEL STOP

EPOXY TO

A.C. PAVING

#5 REBAR 10" LONG

SILICONE SEALANT AT

TOP OF REBAR

FLUSH WITH WHEEL STOP

EPOXY TO

A.C. PAVING

TOP OF A.C. PAVING

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

NOT TO SCALE

Sheets and Views
612A4-27-013 Re-slurry and Re-stripe-COVER

File details come from the government source that posted it. Updated .