Attachment - Pricing Breakdown 36C26126Q1261.docx

DOCX document 47 KB Posted

Attached to
Z1LZ--Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots
Solicitation number
36C26126Q1261
Issued by

About this file

This is a pricing breakdown template for RFQ/RFP No. 36C26126Q1261 for re-slurry and re-stripe work at Buildings 88 and 98 parking lots at McClellan Park, California. The template is structured according to the Construction Specifications Institute (CSI) MasterFormat divisions and is designed to capture both labor and material costs for the project.

The pricing template includes line items organized by 23 CSI divisions, ranging from General Requirements (Division 01) through Utilities (Division 33). Each division section provides columns for personnel count, hourly rates, hours worked, total labor costs, material quantities, material unit costs, and total material costs. The General Requirements section specifically identifies cost categories such as project manager, superintendent, mobilization, after-hours work premiums, infection control (ICRA), storage containers, dumpsters, and design fees for engineer-stamped shop drawings. The template concludes with subtotal rows for each division, followed by final calculation rows for overhead, profit, bonds and insurance, and a total offer price. Bidders are instructed that all other costs not captured in the specified divisions may be included as separate line items. This template is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 36C26126Q1261 QUOTE PRICE BREAKDOWN

RFQ No. 36C26126Q1261 QUOTE PRICE BREAKDOWN

QUOTE PRICE BREAKDOWN

Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots, McClellan Park, CA

DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

01. General Requirements (Division 01)

A. Project Manager

$
$

B. Superintendent

$
$

C. General Requirements

$
$

D. Mobilization

$
$

E. Premium After Hours Work

$
$

F. Infection Control (ICRA)

$
$

G. Storage Container/Office (rent)

$
$

H. Dumpster (rent)

$
$

I. Design Fee (Engineer stamped shop drawings)

$
$
$
$
$
$
$
$
$
$
$
$

01. General Requirements Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

02. Existing Conditions (Division 02)

$
$
$
$
$
$
$
$
$
$

02. Existing Conditions Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

03. Concrete (Division 03)

$
$
$
$
$
$
$
$

03. Concrete Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

05. Metals (Division 05)

$
$
$
$
$
$
$
$

05. Metals Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

06. Wood and Plastic (Division 06)

$
$
$
$
$
$
$
$

06. Wood and Plastic Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

07. Thermal and Moisture Protection (Division 07)

$
$
$
$
$
$
$
$

07. Thermal and Moisture Protection Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

08. Doors and Windows (Division 08)

$
$
$
$
$
$
$
$

08. Doors and Windows Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

09. Finishes (Division 09)

$
$
$
$
$
$
$
$

09. Finishes Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

10. Specialties (Division 10)

$
$
$
$
$
$
$
$

10. Specialties Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

11. Furnishings (Division 12)

$
$
$
$
$
$
$
$

11. Furnishing Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

12. Special Construction (Division 13)

$
$
$
$
$
$
$
$

12. Special Construction Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

13. Fire Suppression (Division 21)

$
$
$
$
$
$
$
$

13. Fire Suppression Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

14. Plumbing (Division 22)

$
$
$
$
$
$

14. Plumbing Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

15. Heating, Ventilating, and Air Conditioning (Division 23)

$
$
$
$
$
$

15. Heating, Ventilating, and Air Conditioning Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

16. Electrical (Division 26)

$
$
$
$
$
$

16. Electrical Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

17. Communications (Division 27)

$
$
$
$
$
$

17. Communications Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

18. Electronic Safety and Security (Division 28)

$
$
$
$
$
$

18. Electronic Safety and Security Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

19. Earthwork (Division 31)

$
$
$
$
$
$

19. Earthwork Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

20. Exterior Improvements (Division 32)

$
$
$
$
$
$

20. Exterior Improvements Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

21. Utilities (Division 33)

$
$
$
$
$
$

21. Utilities Subtotal

$
$

SUB TOTAL (Items 1 – 23)

Overhead

$
$

Profit

$
$

Bonds and Insurance

$
$

Total

$
$

TOTAL OFFER

Note: All other costs may be included as a separate item and shall be specified in this breakdown.