This is a Solicitation, Offer, and Award form (SF 1442) for a firm-fixed-price construction contract to re-slurry and re-stripe three parking lots at VA Northern California Healthcare System in McClellan Park, California. The solicitation number is 36C26126Q1261, issued by the Department of Veterans Affairs Sierra Pacific Network (VISN 5) Network Contracting Office. The work includes surveying existing parking lot features, developing striping plans, removing existing striping, cleaning and preparing surfaces, applying sealcoat layers, and applying new striping to Building 88 parking lot (21,117 square feet), Building 98 North lot (34,254 square feet), and Building 98 South lot (36,538 square feet), with additional street parking and crosswalk features. The contract period is 90 calendar days from Notice to Proceed, with work performed during normal business hours (7:30 AM–4:00 PM, Monday–Friday). The project magnitude is estimated between $250,000 and $500,000 under NAICS Code 236220.
This procurement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) with award based on price only, and offerors must be verified as SDVOSBs in the SBA Dynamic Small Business Search database at time of submission and prior to award. Sealed email offers are due by November 3, 2026, at 12:00 PST, submitted to David Rovner (Contract Specialist) at david.rovner@va.gov and Charee Harris (Contracting Officer) at charee.harris@va.gov. Offerors must provide a cover letter, detailed price breakdown utilizing the required pricing template, completed representations and certifications, and a bid bond. A pre-solicitation site visit is scheduled for October 13, 2026, at 9:00 AM PT at Building 98 parking lot. Requests for Information must be submitted by October 20, 2026, at 12:00 PM PDT. Performance and payment bonds are required within 10 calendar days of award. Applicable wage determination CA20260007 (dated September 3, 2026) applies. Invoices are submitted monthly to the VA Financial Services Center. All work is subject to Buy American requirements for construction materials, Davis-Bacon wage requirements, and standard federal contract clauses including records management, security, and DEI compliance requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26126Q1261
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C26126Q1261 612-27-1-6056-0008 612A4-27-013 36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 5) Network Contracting Office (NCO) 21
Offers have been authorized and are to email to David.Rovner@va.gov and cc: charee.harris@va.gov
David Rovner 925-372-4614
a. Project Title: Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots. Project#: 612A4-27-013.
Project Location: VA Northern California Health Care System(VANCHCS), McClellan Park, CA 95652.
Project Completion: 90 calendar days from when Notice To Proceed (NTP) is issued.
b. This is a firm-fixed price construction requirement. Offeror must furnish all supervision, labor, materials, services, tools, equipment, transportation, required engineering services, and overhead and profit to Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots in accordance with (IAW)the Statement of Work (SOW), Drawings, and Specifications.
c. In accordance with FAR 36.204, the magnitude of the project is between $250,000 and $500,000.
This project is being solicited under NAICS Code 236220 with a Small Business Size Standard of $45 Million.
d. The basis for award is price only. The Government intends to award without discussions the quote offering the Best Value to the Government. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. Offeror shall be verified as SDVOSB to be eligible for an award in Small Business Administration (SBA) DSBS Database at: https://veterans.certify.sba.gov/ pursuant to 38 U.S.C. 8127 and VAAR subpart
819.70. A proposal will be rejected and will not be considered for an award if offeror’s SDVOSB/VOSB status cannot be verified at the time of submission of quote and prior to award.
e. Applicable Wage Determination: CA20260007 dated September 03, 2026 is applicable for this solicitation and resulting award.
f. This requirement is an open market total set-aside for eligible SDVOSBs.
g. Questions and/or request for information (RFI) must be submitted using the RFI form, attached and are due by 12:00 PM PDT on October 20, 2026, to the Contract Specialist, David Rovner, by email david.rovner@va.gov and Contracting Officer, Charee Harris, by email charee.harris@va.gov. Please see Instructions To Offerors for the Pre-Solicitation Site Visit information. All potential Offerors are highly encouraged to attend the scheduled Pre-Solicitation Site Visit.
h. All Offerors must complete all representations and certifications in the solicitation.
i. Pursuant to 40 U.S.C. Chapter 31, subchapter III, Bonds (formerly known as the Miller Act), requires performance and payment bonds for any construction contract exceeding $150,000, the successful contractor is required to submit payment bond, and certificate of insurance within 10 calendar days of award. Only emailed bonds will be accepted.
X X 52.211-10 X
EMAIL ONLY 1
12:00
PST
11-03-2026 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C261 Department of Veterans Affairs Veterans IntegratedServiceNetwork(VISN5) Network Contracting Office (NCO) 21 3237 Peacekeeper Way Bldg 200 Suite 204 McClellan
CA
95652-2613 Department of Veterans Affairs FMS-VA-2(101) Financial Services Center PO Box 149971 Austin
TX
78714-9971 Charee Harris Contracting Officer
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 CONTRACT ADMINISTRATION DATA | 5 |
| A.4 STATEMENT OF WORK – 36C26126Q1261 | 6 |
| A.5 PRICE/COST SCHEDULE | 13 |
| ITEM INFORMATION | 13 |
| A.6 DELIVERY SCHEDULE | 13 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 15 |
| 2.1 INSTRUCTIONS TO OFFERORS – 36C26126Q1261 | 15 |
| 2.2 Information Regarding Bidding Bonds and Bid Guarantee | 20 |
| SECTION C - CONTRACT CLAUSES | 21 |
| C.1 MANDATORY WRITTEN DISCLOSURES | 21 |
| C.2 SUPPLEMENTAL INSURANCE REQUIREMENTS | 21 |
| C.3 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (JAN 2025)(DEVIATION NOV 2025) | 21 |
| C.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS(OCT 2018)(DEVIATION NOV 2025) | 23 |
| C.5 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)(DEVIATION NOV 2025) | 24 |
| C.6 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025) (DEVIATION) | 24 |
| C.7 52.222-12 CONTRACT TERMINATION—DEBARMENT (MAY 2014)(DEVIATION NOV 2025) | 27 |
| C.8 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026) | 27 |
| C.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV 2025) | 28 |
| C.10 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991)(DEVIATION NOV 2025) | 33 |
| C.11 52.233-3 PROTEST AFTER AWARD (AUG 1996)(DEVIATION NOV 2025) | 34 |
| C.12 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) (DEVIATION NOV 2025) | 35 |
| C.13 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION) | 35 |
| C.14 52.240-93 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (DEVIATION) (NOV 2025) | 45 |
| C.15 52.243-5 CHANGES AND CHANGED CONDITIONS (APR 1984)(DEVIATION JUL 2025) | 47 |
| C.16 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) | 47 |
| C.17 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)(DEVIATION NOV 2025) | 48 |
| C.18 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (DEVIATION) (MAR 2026) | 48 |
| C.19 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 51 |
| C.20 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 53 |
| C.21 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 56 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 57 |
| D.1 List of Attachments | 57 |
| SECTION E - SOLICITATION PROVISIONS | 58 |
| E.1 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION) | 58 |
| E.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION) | 58 |
| E.3 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2025) (DEVIATION) | 58 |
| E.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) | 61 |
| E.5 52.225-2 BUY AMERICAN CERTIFICATE (OCT 2022) | 61 |
| E.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 62 |
| E.7 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION (JUN 2020)(DEVIATION SEP 2025) | 63 |
| E.8 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 65 |
| E.9 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) | 69 |
| E.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 69 |
A.3 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Contracting Officer 36C261 Charee Harris Department of Veterans Affairs VA Sierra Pacific Network (VISN 5) Network Contracting Office (NCO) 21
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Monthly. |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs FMS VA-9(101) Financial Services Center ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
Page 1 of Page 1 of
A.4 STATEMENT OF WORK – 36C26126Q1261
Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots; Project #612A4-27-013
1. GENERAL INTENTION
A. The purpose of this project is to reseal and restripe three (3) existing McClellan Clinic parking lots for VA Northern California Healthcare System (VANCHCS).
B. Contractor shall furnish all labor and materials needed to perform all surveying, demolition, surface preparation, and installation required by this scope and attached specifications.
C. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contractors Officers Representative (COR).
D. Location of work; the geographic location for service(s) are the following areas:
· McClellan VA Clinic Building 98 5342 Dudley Boulevard McClellan Park, CA 95652
· McClellan VA Dental Clinic Building 88 5401 Arnold Avenue McClellan Park, CA 95652
E. The contractor shall assume that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking Only designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions.
F. Schedule of work; all work shall be performed during normal working hours from 7:30 AM to 4:00 PM, Monday through Friday (not including observed holidays). Contractor may submit a formal request to the VA Contracting Officer (CO) a minimum of three (3) working days in advance for approval to work off hours.
G. The VA will allow the Contractor to close off one parking lot at a time. The Contractor shall provide their own parking lot closure signage and barriers notifying the public of the parking lot closure and detours to other available parking. The Contractor shall phase the project to complete an entire parking lot for reopening before requesting authorization to proceed to close the next parking lot for construction.
H. The sequence of parking lost closures shall be Building 88 Lot (VA101), Building 98 North Lot (VA102), and Building 98 South Lot (VA103).
I. The contractor shall dispose of all components demolished or replaced as part of this project.
2. SCOPE OF WORK
A. The contractor shall survey the existing features of three VA McClellan Clinic parking lots at the McClellan campus. The survey should be detailed enough to capture widths and lengths of each parking stall by capturing their border striping, as well as crosswalks, directional arrows, texts, access aisles, and striped “no stopping” zones. Provide the VA COR with that report for their records.
B. The approximate square footage of the project work areas is as follows:
· Building 88 Lot – 21,117 square feet
· Additional Street Parking – 1,440 square feet
· Additional Crosswalk feature – 780 square feet
· Building 98 North Lot – 34,254 square feet
· Building 98 South Lot – 36,538 square feet
These are shown in the attached Reference Drawings. This is a brief description of the estimated quantities. These quantities are for informational purposes only and are based on the best information available at the time of the Scope of Work preparation.
C. The Contractor shall develop a striping plan based on their survey report to meet the requirements shown on the Reference Drawings, as best as possible. The intent of the striping plan is to confirm minimum parking stall widths and access aisles are met for new striping.
D. For each parking lot closure, Contractor shall provide VA with a Signage and Barrier plan. The plans shall be diagrammatic and show where signage and barriers are to be placed. The plans shall show the content of the signage, as well as dimensions. The plans shall also show barrier material and dimensions. The intent of the Signage and Barrier plans are to confirm that there is enough information to direct drivers to available parking and prevent unintended access to the construction sites.
E. Generally, the sequence of work shall be as follows:
a. After VA has approved the Contractor’s Striping and Signage and Barrier plans, Contractor shall close one parking lot at a time by placing signage and barriers at each entry/exit point.
b. Once Contractor has placed their signage and barriers, they shall remove all existing striping to expose the asphalt. The Contractor shall clean the surface, including removing oil spots, and fill cracks with sealant.
c. After VA has inspected the surface preparation and find it satisfactory, Contractor shall apply two layers of sealcoat throughout, and a third layer in drive aisles. Contractor shall allow each layer to be properly cured (per manufacturer’s instructions) before applying the next layer.
d. Once all sealcoat layers have been applied and cured, Contractor shall mark up the surface with chalk showing striping per their VA approved Striping Plan. VA shall inspect and accept the chalk mark ups before Contractor applies striping.
e. Once striping has been cured, the Contractor shall remove their signage and barriers and reopen the parking lot before closing the next parking lot.
The process above shall be repeated until all three parking lots are completed and reopened.
F. The Contractor shall hold weekly meetings via Teams with VA to discuss project progress their three-week look ahead schedule.
G. The Contractor shall be responsible for the administration and management of all aspects of this SOW. This includes responsibility for all Contractor employees, Subcontractors, Agents, and anyone acting for or on behalf of the Contractor.
H. This project is to take no longer than 90 calendar days from notice to proceed (NTP).
I. Awardee will utilize ProCore for their submittals and RFIs.
J. Only the Contracting Officer is authorized to modify the contract. All change orders initiated by the contractor require the contractor to formally submit a request to the Contracting Officer for their consideration. Performing work in addition to the contract without the Contracting Officer agreeing to scope, price and schedule is not authorized.
K. The Contractor is solely responsible for determining construction means and methods, field verification of existing conditions, layout, grading transitions, and compliance with applicable codes, standards, and VA requirements.
L. Awardee will have to develop and submit a detailed construction schedule.
3. SITE VISITS AND EXISTING CONDITIONS
1. Discrepancies in Planning Information: The contractor shall promptly report to the Contractor Officer, in writing, any discrepancy between this contract. The contractor shall make no adjustments to his/her work due to the discrepancy before the Contracting Officer has reviewed the matter and forwarded his/her determination to the contractor. The contractor’s failure to report any such discrepancy or wait for the Contracting Officer’s determination shall be at his/her risk and expense.
2. The awardee shall attend in person or through Microsoft Teams the Pre-Construction Meeting at VANCHCS in support of this effort. This meeting will occur before notice to proceed has been issued by the Contracting Officer. The meeting will be used to review the requirements of the Scope of Work (SOW) and discuss roles, responsibilities, expectations and deliverables. The Contractor shall also identify to the Government any issues or concerns they have with any direction from the Government or VA standards. The contractor shall communicate with the CO and COR via e-mail to establish the dates, times, and location of this meeting.
3. It is highly recommended for the Offeror to attend the pre-solicitation site visit (date TBD) to become familiar with existing conditions prior to bidding and construction.
4. Any discrepancies between site conditions and Government-provided information shall be promptly reported in writing to the Contracting Officer. No changes shall be made without written direction from the Government.
4. TESTING / PUNCH LIST
1. The contractor shall prepare punch lists if needed and schedule a pre-final walkthrough with the COR at least five (5) working days prior notice. After the pre-final walkthrough, the VA will submit its own punch list if needed.
2. Once contractor has completed or resolved all punch list items, the contractor shall schedule a final walkthrough with the CO/COR of the area.
3. A copy of the final transmittals must be sent to the CO.
4. The contractor shall not submit final invoice for payment until all punch list items have been completed and final transmittals have been confirmed as received and accepted by the COR.
5. At project closeout, the Contractor shall submit:
a) Contractor’s punch list and confirmation of completion.
b) Confirmation of VA’s completed punch list.
c) Warranty documentation
d) As-built drawings reflecting actual constructed conditions, including pavement repairs, concrete work, and drainage features if applicable.
5. WARRANTY
The Contractor shall warrant all road repair work, including asphalt, concrete, and slurry seal, against defects in materials and workmanship for one (1) year from final acceptance, in accordance with FAR 52.246-21, Warranty of Construction. Defective work identified during the warranty period shall be corrected by the Contractor at no additional cost to the Government.
6. RISK CONTROL
1. The VASNHS is an active hospital and therefore will require consideration to those areas with patients and staff.
2. The contractor shall perform daily cleanup of the construction areas affected by the execution of this contract sufficient to the point there are no hazards or safety concerns with VA patients and staff.
3. The contractor shall ensure all construction materials and equipment have been secured from the VASNHS patients and staff, theft, damage and weather and the work area cleaned and made safe at the end of each working day.
7. DRAWINGS AND SPECIFICATIONS FOR CONTRACTOR
A. The following documents are attachments to this SOW:
· Reference Drawings
· Specifications
8. RECORDS MANAGEMENT REQUIERMENTS:
A. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
B. Definitions “Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
1. includes VHA records.
1. does not include personal materials.
1. applies to records created, received, or maintained by Contractors pursuant to their VHA contract.
1. may include deliverables and documentation associated with deliverables.
C. Requirements
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
1. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
1. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
1. VHA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report to VHA. The agency must report promptly to NARA in accordance with 36 CFR 1230.
1. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
1. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
1. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy.
1. The Contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract.
1. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
1. The VHA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
1. Training. All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]
D. Flow down of requirements to subcontractors
1. The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.
1. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
END OF STATEMENT OF WORK
A.5 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
The contractor shall survey the existing features of three VA McClellan Clinic parking lots at the McClellan campus. The Contractor shall develop a striping plan based on their survey report to meet the requirements shown on the Reference Drawings, as best as possible. Once contractor has placed their signage and barriers, they shall remove all existing striping to expose the asphalt. The Contractor shall clean the surface, including removing oil spots, and fill cracks with sealant. After VA has inspected the surface preparation and find it satisfactory, Contractor shall apply two layers of sealcoat throughout, and a third layer in drive aisles. Contractor shall allow each layer to be properly cured (per manufacturer's instructions) before applying the next layer. Once all sealcoat layers have been applied and cured, Contractor shall mark up the surface with chalk showing striping per their VA approved Striping Plan. VA shall inspect and accept the chalk mark ups before contractor applies striping. Once striping has been cured, the Contractor shall remove their signage and barriers and reopen the parking lot before closing the next parking lots.
Contract Period: Base POP Begin:
POP End:
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2LZ - Repair or Alteration of Parking Facilities
MANUFACTURER PART NUMBER (MPN): N/A
| GRAND TOTAL |
| __________________ |
A.6 DELIVERY SCHEDULE
| ITEM NUMBER |
| SHIPPING INFORMATION |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| VA Northern California Healthcare System (VANCHCS) |
5401 Arnold Avenue McClellan, CA 95652
USA
| 1.00 |
| 90 DAYS FROM NTP |
| FOB: |
| DESTINATION |
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 INSTRUCTIONS TO OFFERORS – 36C26126Q1261
1. INTRODUCTION:
a. These instructions prescribe the format of Offers. Offers are defined as consisting of the Prime Contractor’s Price Quote. These instructions describe the approach for the development and presentation of the required information and documentation. These instructions are designed to ensure the submission of necessary information and documentation to provide for the comprehensive evaluation of offers.
b. This solicitation is a firm-fixed price solicitation. This procurement action is a Total SDVOSB set-aside. As a result of this solicitation, a single firm-fixed price contract will result from this solicitation. Your company must be a verified SDVOSB firm in SBA VetCert and SAM.gov at the time of quote submission and before award to be eligible. Quotes submitted by Offerors who cannot be verified in SBA SDBS VetCert and registered in SAM.gov will not be considered.
c. Offerors are cautioned to carefully review this solicitation prior to commencing preparation. For offers to receive full consideration for award, offerors shall ensure the information and documentation furnished in support of the price quote are current, factual, complete, and accurate.
d. Offerors are strictly advised to comply with all instructions within this solicitation to ensure submission of a complete Prime Contractor Offer. Failure to furnish a complete offer per the instructions of this solicitation by the required time and date may result in the Offeror’s quote being determined ineligible.
e. The Government intends to award without discussions unless discussions are in the best interest of the Government.
f. AVAILABILITY OF SOLICITATION DOCUMENTS: All solicitation related documents will be published to and to, and only be accessible via, https://sam.gov/.
g. AMENDMENTS: Amendments to this solicitation will be posted at https://sam.gov/. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential Offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your quote being considered unacceptable.
h. PREPARATION OF QUOTES: The Government will not pay for any costs incurred in the preparation and submission of quotes.
i. SELECTION PROCEDURES: All quotes shall be subject to evaluation by a team of Government personnel. You are required to submit a completed and detailed price breakdown sheet for your base offer (see Attachment - Pricing Breakdown 36C26126Q1261). All quotes received will be evaluated per the content provided in the solicitation and the details of items listed in the price breakdown sheet as cited in the Statement of Work (SOW), Drawings, and Specifications provided.
j. The Government intends to award a firm fixed-price (FFP) contract, as required by the procedures pursuant to FAR Part 12, based on price only, FAR Subparagraph 6.401(b)(1) and VAAR 852.236-92 NOTICE TO BIDDERS–ADDITIVE OR DEDUCTIVE BID LINE ITEMS (APR 2019).
All offers will be evaluated individually on their merit and per the following evaluation factor: Price only.
Per FAR Part 12, a source selection decision will be completed, after determination of responsibility by the Contracting Officer.
2. CONTRACT TYPE:
a. The awarded contract will be a firm fixed price (FFP) Construction contract.
This solicitation is set aside for Service-Disabled Veteran Owned Small-Businesses (SDVOSB’s). The offeror MUST have an active UEI Sam.gov number and be current in System for Award Management (SAM). Offerors must be verified in the SBA Veteran Small Business Certification Program as an SDVOSB to be eligible for an award. The Contracting Officer (CO) will use the SBA Dynamic Small Business Search (SBA DSBS) (https://dsbs.sba.gov/search/dsp_dsbs.cfm ) to verify SDVOSB status until further guidance is provided by the Department of Veterans Affairs.
b. Quotes will be rejected and not considered for an award if the offeror's SDVOSB status cannot be verified in the SBA DSBS database at the time of quote submission and prior to award. This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offers received from other than SDVOSB concerns will not be considered at this time.
3. QUOTE SUBMISSION INSTRUCTIONS:
a. All quotes must contain a cover letter at least one (1) page minimum and a detailed price breakdown sheet due by the date cited on page 1, block 13 of the SF 1442 form of this solicitation. All price breakdown sheets must be detailed, contain all divisions in the specifications, and include a base offer as cited in the Statement of Work (SOW).
b. All offerors will provide a complete copy of their quote with all representations and certifications completed, completed/signed VAAR clauses 852.219-75, bid bonds, and a detailed price breakdown sheet. Send offers via electronic mail (e-mail) to: Mr. David Rovner, Contract Specialist, at e-mail: David.rovner@va.gov and copy, Ms. Charee Harris, Contracting Officer, at e-mail: Charee.harris@va.gov.
c. The subject line of the e-mail must cite RFQ: 36C26126Q1261, Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots at VA McClellan OPC. In no circumstances will a single file size exceed 7MB. Multiple emails are acceptable.
d. Faxed or hard-mailed quotes are not permitted under any circumstances. Only emailed quotes will be accepted.
e. All solicitation pages are required to be submitted with your quote. Failure to submit all pages of the solicitation will result in your quote being considered unacceptable.
f. All Representations and Certifications within the solicitation are required to be completed. Failure to complete all representations and certification may result in your quote being considered unacceptable.
g. A complete and detailed Price Breakdown worksheet utilizing Attachment - Pricing Breakdown 36C26126Q1261 is required. Failure to submit a complete and detailed Price Breakdown may result in your quote being considered unacceptable.
h. Offeror is required to provide bid bonds. Failure to submit bid bonds will result in your quote being eliminated from consideration. One (1) bid bond guarantee. Electronic submission of the Bid Guarantee is required via email only. Mailed bid bonds will not be accepted. Bid Guarantee part must include an electronic copy of the bid guarantee scanned in a manner that the raised seal is clearly visible. A bid guarantee must be submitted in the form of bid bond by the quote submission due date and time.
i. Offerors are responsible for ensuring and verifying their price and all required documents are received at the email address designated in block 8 of the SF 1442 Solicitation and by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment). Any exception to the terms and conditions of this request for quote will result in a nonresponsive quote.
4. PRE-QUOTE SITE VISIT:
Potential Offerors are strongly urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing these services. In no event will failure to inspect the site constitute grounds for a claim after contract award. This pre-quote site visit will be the only opportunity for potential offerors to visit the site. All potential contractors, subcontractors, and suppliers are strongly encouraged to attend this pre-quote site visit.
The only pre-quote site visit is scheduled for October 13, 2026, at 09:00 AM PT. Potential offerors are to meet the COR at the flagpole in the parking lot of Building 98. This will be the only opportunity for potential offerors to visit the site. All potential offerors, subcontractors, and suppliers are strongly encouraged and expected to attend the pre-quote site visit.
5. TECHINCAL QUESTIONS/REQUESTS FOR INFORMATION (RFI’s):
All Requests for Information (RFIs) regarding this solicitation must be submitted in writing and received no later than October 20, 2026, at 12:00 PM, Pacific Time to allow replies to reach all prospective offerors in a timely manner. All RFIs must be sent via email to David Rovner at David.rovner@va.gov and Copy: Charee.harris@va.gov .
RFIs will be responded to as necessary in amendment format and will be posted on SAM.gov. No questions will be answered after the date/time above unless determined to be in the best interest of the Government as determined by the Contracting Officer. Telephone requests for information will not be accepted or returned.
6. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://sam.gov/SAM/ and enter all mandatory information into the system. Award cannot be made until the contractor has been registered. Offerors must ensure that they are registered in SAM prior to submitting their quote. (See FAR 4.1102).
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
7. ADDITIONAL SBA INFORMATION:
(a) Eligibility of SDVOSBs continues to be governed by the Small Business Administration regulations, 13 CFR subparts 125.8 through 125.13, as well as the FAR, except where expressly directed otherwise by the VAAR, and 38 CFR verification regulations for SDVOSBs.
(b) At the time of submission of offer, the offeror must represent to the contracting officer that it is a—
(1) SDVOSB concern
(2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and
(3) Offerors must be verified in the SBA Veteran Small Business Certification Program as an SDVOSB to be eligible for an award. The Contracting Officer (CO) will use the SBA Dynamic Small Business Search (SBA DSBS) (https://dsbs.sba.gov/search/dsp_dsbs.cfm ) to verify SDVOSB status until further guidance is provided by the Department of Veterans Affairs.
(c) A joint venture may be considered an SDVOSB or VOSB concern if
(1) At least one member of the joint venture is an SDVOSB or VOSB concern, and makes the representations in paragraph (b) of this section;
(2) Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement;
(3) The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in FAR 19.101; and
(4) The joint venture meets the requirements of 13 CFR 125.15(b), modified to include Veteran-owned small businesses where this CFR section refers to SDVOSB concerns.
(d) Any SDVOSB or VOSB concern (nonmanufacturer) must meet the requirements in FAR 19.102(f) to receive a benefit under this program.
8. VETS 4212:
Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at: http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.
9. JOINT VENTURES: See 13 C.F.R. § 121.103(h)
(h) Affiliation based on joint ventures. A joint venture is an association of individuals and/or concerns with interests in any degree or proportion consorting to engage in and carry out no more than three specific or limited-purpose business ventures for joint profit over a two year period, for which purpose they combine their efforts, property, money, skill, or knowledge, but not on a continuing or permanent basis for conducting business generally.
This means that a specific joint venture entity generally may not be awarded more than three contracts over a two-year period, starting from the date of the award of the first contract, without the partners to the joint venture being deemed affiliated for all purposes. Once a joint venture receives one contract, SBA will determine compliance with the three awards in two years rule for future awards as of the date of initial offer including price.
As such, an individual joint venture may be awarded more than three contracts without SBA finding general affiliation between the joint venture partners where the joint venture had received two or fewer contracts as of the date it submitted one or more additional offers which thereafter result in one or more additional contract awards. The same two (or more) entities may create additional joint ventures, and each new joint venture entity may be awarded up to three contracts in accordance with this section. At some point, however, such a longstanding inter-relationship or contractual dependence between the same joint venture partners will lead to a finding of general affiliation between and among them.
For purposes of this provision and in order to facilitate tracking of the number of contract awards made to a joint venture, a joint venture must be in writing and must do business under its own name, and it may (but need not) be in the form of a separate legal entity, and if it is a separate legal entity it may (but need not) be populated (i.e., have its own separate employees). SBA may also determine that the relationship between a prime contractor and its subcontractor is a joint venture, and that affiliation between the two exists, pursuant to paragraph (h)(4) of this section.
10. NOTICE TO PROCEED (NTP): A notice to proceed (NTP) must be issued after award of a fully executed contract. The NTP date and time are “to be determined” after award to a successful offeror. Primary factor in determination to issue NTP must be the Prime Contractor submission of, and the Government review and approval of both Payment and Performance Bonds, both of which are enforceable legal documents.
11 . SECURITY REQUIREMENTS (GENERAL):
1. All personnel employed by the contractor in the performance of work, issued under this contract, or any representative of the contractor must abide by all security instructions and directives of the Department of Veterans Affairs. Employees are responsible for safeguarding all government property provided for contractor use.
1. At the close for each work period, government facilities, equipment and materials must be secured, lights, and all doors and window secured.
1. The contractor and, as applicable, subcontractor must not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the station/campus and its population, nor must the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during background checks.
1. Contractors must ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities.
1. Contractor Badge Policies: All requests for contractor ID badges will be submitted through the station COR, and Police/Security office.
1. Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the station/campus. All vehicles entering the station/campus are subject to search. Any refusal or non-consent by an employee will result in termination of their access and immediate confiscation of their ID badge.
12. BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform the statement of work is: Low Risk. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor.
13. REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER:
Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”
End of Instructions to Offerors
2.2 Information Regarding Bidding Bonds and Bid Guarantee
The Government intends to solicit this as a Total SDVOSB set-aside on the Open Market thereby providing Fair Opportunity as required by FAR Part 12 Acquisition of Commercial Products and Commercial Services. The selection will be based on price only. One firm-fixed price construction contract will be awarded as a result of this solicitation.
BID GUARANTEE:
Electronic submission of the Bid Guarantee via email is authorized and required. Bid Guarantee part must include an electronic copy of the bid guarantee scanned in a manner that the raised notary seals are all clearly visible. A bid guarantee must be submitted in a form of bid bond by the quote submission due date and time.
PERFORMANCE & PAYMENT BONDS:
Bid Bonds, Payment Bonds, and Performance Bonds are all required.
LIQUIDATED DAMAGES:
Not applicable.
SECTION C - CONTRACT CLAUSES
C.1 MANDATORY WRITTEN DISCLOSURES
Mandatory written disclosures required by FAR clause 52.203-13 to the Department of Veterans Affairs, Office of Inspector General (OIG) must be made electronically through the VA OIG Hotline at https://www.vaoig.gov/hotline/online-forms and clicking on "FAR clause 52.203-13 Reporting." If you experience difficulty accessing the website, call the Hotline at 1-800-488-8244 for further instructions.
C.2 SUPPLEMENTAL INSURANCE REQUIREMENTS
In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:
(a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's…