Attachment - Pricing Breakdown 36C26124R0094.docx

DOCX document 26 KB Posted

Attached to
Z2DA--Replace Flooring in OR, PACU, and Special Procedures
Solicitation number
36C26124R0094
Issued by

About this file

This document is a pricing breakdown for RFP No. 36C26124R0094 issued by the Department of Veterans Affairs (VA) Veterans Health Administration, Veterans Integrated Service Network 21, for a construction project to replace flooring in the Operating Room (OR), Post-Anesthesia Care Unit (PACU), and Special Procedures areas.

The pricing breakdown provides a detailed line-item cost estimate for materials, labor, and total costs across various construction divisions, including General Requirements, Existing Conditions, Wood and Plastic, Thermal and Moisture Protection, Finishes, Specialties, Fire Suppression, Plumbing, HVAC, Electrical, and Communications. The total offer amount is provided, along with overhead, profit, and bond/insurance costs. The RFP has a due date of December 19, 2024 by 11:00 AM PDT, and proposals should be submitted to david.rovner@va.gov and daniel.jhun@va.gov.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 36C26124R0094

PRICE BREAKDOWN

PRICE BREAKDOWN

Replace Flooring in OR, PACU, and Special Procedures

DESCRIPTION
MATERIAL
LABOR
TOTAL

01. General Requirements (Division 01)

A. Project Manager
$
$
$
B. Superintendent
$
$
$
C. Manufacturer Oversight and Rep
$
$
$
D. Mobilization
$
$
$
E. General Conditions/Labor
$
$
$
F. Infection Control
$
$
$
G. Storage Container (rental)
$
$
$
H. Office and Dumpster (rental)
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
01. General Requirements Subtotal
$
$
$

02. Existing Conditions (Division 02)

$
$
$
$
$
$
$
$
$
$
$
$
02. Existing Conditions Subtotal
$
$
$

03. Wood and Plastic (Division 06)

$
$
$
$
$
$
$
$
$
$
$
$
03. Wood and Plastic Subtotal
$
$
$

04. Thermal and Moisture Protection (Division 07)

$
$
$
$
$
$
$
$
$
$
$
$
04. Thermal and Moisture Protection Subtotal
$
$
$

05. Finishes (Division 09)

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
05. Finishes Subtotal
$
$
$
DESCRIPTION
MATERIAL
LABOR
TOTAL

06. Specialties (Division 10)

$
$
$
$
$
$
$
$
$
$
$
$
06. Specialties Subtotal
$
$
$

07. Fire Suppression (Division 21)

$
$
$
$
$
$
$
$
$
07. Fire Suppression Subtotal
$
$
$

08. Plumbing (Division 22)

$
$
$
$
$
$
$
$
$
08. Plumbing Subtotal
$
$
$

09. Heating, Ventilating, and Air Conditioning (Division 23)

$
$
$
$
$
$
$
$
$
09. Heating, Ventilating, and Air Conditioning Subtotal
$
$
$

10. Electrical (Division 26)

$
$
$
$
$
$
$
$
$
10. Electrical Subtotal
$
$
$

11. Communications (Division 27)

$
$
$
$
$
$
$
$
$
11. Communications Subtotal
$
$
$

SUB TOTAL (Items 1 – 11)

Overhead
$
$
$
Profit
$
$
$
Bonds and Insurance
$
$
$
Total
$
$
$
TOTAL OFFER
$
$
$

Note: All other costs maybe included as a separate item and shall be specified in this breakdown.

File details come from the government source that posted it. Updated .