Attachment - Drawings.pdf

PDF 22 MB Posted

Attached to
Z2DA--Replace Flooring in OR, PACU, and Special Procedures Federal contract opportunity
Solicitation number
36C26124R0094
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

This document appears to be an attachment containing drawings related to a federal contract opportunity. The federal contract opportunity is for construction services to replace flooring in the Operating Room, Post-Anesthesia Care Unit, and Special Procedures areas of a Department of Veterans Affairs facility. The solicitation number is 36C26124R0094, and the proposal is due by December 19, 2024 at 11:00 AM PDT. Proposals should be submitted to david.rovner@va.gov and daniel.jhun@va.gov. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING LIST

VICINITY MAP

PROJECT TEAMBUILDING SUMMARY

PROJECT INFORMATION

GENERAL NOTES

PROJECT NAME: LAS VEGAS REPLACE FLOORING IN OR, PACU, AND SPECIAL PROCEDURES

PROJECT NUMBER: 593-19-310

PROJECT LOCATION: LAS VEGAS, NEVADA

PROJECT PURPOSE/USE: THIS PROJECT WILL REPLACE EXISTING FLOORING IN SEVERAL CRITICAL AREAS IN AND AROUND

THE OPERATING ROOMS AND CREATE A NEW OPENING BETWEEN THE PACU AND SPECIAL

PROCEDURE AREAS. THE END GOAL OF THE FLOORING PORTION OF THE PROJECT IS TO

PROVIDE COMPLIANT FLOORING MATERIALS FOR EACH AREA THAT ARE DURABLE, CLEANABLE,

AND VISUALLY APPEALING. THE PROJECT WILL INCLUDE REMOVAL OF PLUMBING FIXTURES,

WALL CLEAN OUTS, TOILET ACCESSORIES AND OTHER ITEMS THAT WILL BE REMOVED AND THEN

REINSTALLED AFTER THE FLOORING IS COMPLETED.

AREA OF WORK BUILDING AREA:

THIRD FLOOR

1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW

ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.

2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED BEFORE

SUBMITTING COST QUOTATIONS FOR WORK.

3. NOTIFY THE VA CONTRACTING OFFICER'S REPRESENTATIVE PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS

SO THAT A RESOLUTION CAN BE PROVIDED PRIOR TO CONTINUING WITH WORK.

4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT

5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.

6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE

CONTRACTOR'S EXPENSE.

7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.

8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE VA CONTRACTING OFFICER'S REPRESENTATIVE IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE

ADVANTAGEOUS TO THE OWNER WITH RESPECT TO DELIVERY DATE, QUALITY, OR COST.

9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE VA DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S MEANS AND

METHODS OR FOR TEMPORARY STRUCTURES.

10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL

EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.

11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA

REGULATIONS DURING CONSTRUCTION.

12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE.

13. THE GENERAL CONTRACTOR SHALL ADHERE TO CONTRACTOR ACCESS LOCATED ON . ACCESS TO THE SURGICAL SUITE SHALL ONLY BE FROM 4:30 PM TO 6:00 AM AND ON WEEKENDS. OCCASIONALLY, EMERGENCY SURGERIES

WILL BE PERFORMED ON WEEKENDS. PLEASE COORDINATE ACCESS AND TIMING WITH THE COR.

14. PRIOR TO DEMOLITION OF FIXTURES OR OTHER FIXED EQUIPMENT IDENTIFY ANY MALFUNCTIONING FIXTURES OR EQUIPMENT. THE COR SHALL BE ADVISED OF ANY EXISTING MALFUNCTIONING FIXTURES PRIOR TO DEMOLITION. ANY FIXTURES OR EQUIPMENT THAT ARE NOT FUNCTIONING PROPERLY AFTER REINSTALLATION WILL BE THE RESPONSIBILITY

OF THE GENERAL CONTRACTOR.

15. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF TEMPORARY FIRE EXTINGUISHERS AND SIGNAGE TO REDIRECT EXITING DURING THE CONSTRUCTION PERIOD TO ENSURE PATIENT AND STAFF SAFETY.

16. NOTIFY THE COR OF ANY POSSIBLE SHUTDOWNS OF MAJOR UTILITIES, I.E., ELECTRICAL, WATER, HVAC A MINIMUM OF THREE WEEKS PRIOR TO THE ANTICIPATED SHUTDOWN TO NOTIFY AND COORDINATE WITH VA STAFF.

17. THE GENERAL CONTRACTOR IS TO COORDINATE ALL PARKING AND DELIVERY PROVISIONS WITH THE VA PRIOR TO ANY

EXECUTION.

18. COR RESERVES THE RIGHT TO DIRECT THE GENERAL CONTRACTOR TO STOP WORK WHICH MAY IMPACT OPERABLE

AREAS OF THE MEDICAL CENTER.

30,816 GSF

AREA OF WORK

E. DEER SPRINGS WAY

N

P E

C O

S R

D

BRUCE WOODBURY BELTWAY

CLASS IV ICRA NOTES

DURING CONSTRUCTION

1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Seal holes, pipes, conduits, and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site. Anteroom to have walk-off mats at entry and whose surface is to be replaced as needed.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and thoroughly cleaned by the owner’s Environmental Services Department.

UPON COMPLETION OF PROJECT

1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in Tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

/1 GC100

DEDUCTIVE ALTERNATES:

1) DELETE INSTALLATION OF FLOORING AT STAFF LOUNGE/DICTATION ROOM 3D244.

2) DELETE INSTALLATION OF FLOORING AT ANESTHESIA WORK ROOM 3D422.

3) DELETE INSTALLATION OF FLOORING AT CORRIDOR C3-66

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

U.S. Department of Veterans Affairs

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

B

IM

/V

IS

N

L a s V e g a s R e p la c e

F lo o r

S p e c C lin ic s /L a s V e g a s R e p la c e F lo o r

S p e c C lin ic s

V

.r v t

/1

/2

:1

:2

A

M

VA PROJECT NUMBER - 593-19-310

REPLACE FLOORING IN OR, PACU, AND SPECIAL

PROCEDURES

100% CONSTRUCTION DOCUMENT SUBMISSION

MARCH 19, 2024

RCO IL

593-19-310

GI100

593 - NORTH LAS VEGAS, NV

MARCH 19, 2024

01-

SHEET INDEX & GENERAL INFORMATION 100% CONSTRUCTION

DOCUMENT SUBMISSION

REPLACE FLOORING IN OR, PACU,

AND SPECIAL PROCEDURES

COR:

Veterans Affairs Southern Nevada Healthcare System 6900 North Pecos Rd North Las Vegas, NV 89086

Marjorie Winemiller Marjorie.Winemiller@va.gov

702.791.9000 x18823

702.241.9729 cell

PROJECT ARCHITECT:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Rebecca Olson, AIA, ACHA, NCARB, LEED AP rebecca.olson@RomanykConsulting.com

855.424.3838 x302

602.430.1265 cell

MECHANICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

319.721.4986 cell

ELECTRICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Yumei Wang, PE, PMP, LEED AP yumei.wang@RomanykConsulting.com

855.424.3838 x311

402.321.3766 cell

PLUMBING ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

319.721.4986 cell

CONTRACTING OFFICER, CONSTRUCTION TEAM II:

Network Contracting Office (NCO 21) 10535 Hospital Way Mather, CA 95655

Daniel Jhun daniel.jhun@va.gov

916.923.4507

SHEET # SHEET TITLE

GENERAL

01-GI100 SHEET INDEX & GENERAL INFORMATION

01-GI101 ABBREVIATIONS & SYMBOLS

01-GI102 ADA INFORMATION

01-GI103 ICRA SHEET

01-GI200 SITE PLAN

01-GI201 THIRD LEVEL OVERALL LIFE SAFETY PLAN

01-GI202 THIRD LEVEL SCOPE OF WORK LIFE SAFETY PLAN

01-GC100 PHASING PLAN

ARCHITECTURAL

01-AD101 THIRD LEVEL OVERALL DEMOLITION PLAN

01-AD102 THIRD LEVEL AREA A DEMOLITION PLAN

01-AD103 THIRD LEVEL AREA B DEMOLITION PLAN

01-AE101 THIRD LEVEL OVERALL PLAN

01-AE102 THIRD LEVEL AREA A PLAN

01-AE103 THIRD LEVEL AREA B PLAN

01-AE200 ENLARGED TOILET PLANS AND ELEVATIONS

01-AE201 ENLARGED TOILET PLANS AND ELEVATIONS

01-AE202 ENLARGED TOILET PLANS AND ELEVATIONS

01-AE203 ENLARGED TOILET PLANS AND ELEVATIONS

01-AE204 ENLARGED PLANS AT OPENING

01-AE400 THIRD LEVEL INTERIOR ELEVATIONS

01-AE501 METAL STUD DETAILS

01-AF100 INTERIOR FINISH NOTES AND DETAILS

01-AF101 THIRD LEVEL OVERALL FINISH PLAN

01-AF102 THIRD LEVEL AREA A FINISH PLAN

01-AF103 THIRD LEVEL AREA B FINISH PLAN

SPRINKLER

01-F-100 FIRE SPRINKLER LEGEND, SCHEDULES AND ABBREVIATIONS

01-FD101 THIRD LEVEL OVERALL SPRINKLER DEMOLITION PLAN

01-FS101 THIRD LEVEL OVERALL SPRINKLER PLAN

PLUMBING

01-P-100 PLUMBING LEGEND, SCHEDULES AND ABBREVIATIONS

01-PD101 THIRD LEVEL OVERALL PLUMBING DEMOLITION PLAN

01-PP101 THIRD LEVEL OVERALL PLUMBING PLAN

MECHANICAL

01-M-100 MECHANICAL LEGEND, SCHEDULES AND ABBREVIATIONS

01-MD101 THIRD LEVEL OVERALL HVAC DEMOLITION PLAN

01-MH101 THIRD LEVEL OVERALL HVAC PLAN

ELECTRICAL

01-E-100 ELECTRICAL LEGEND, SCHEDULES AND ABBREVIATIONS

01-ED101 THIRD LEVEL OVERALL ELECTRICAL DEMOLITION PLAN

01-EP101 THIRD LEVEL OVERALL ELECTRICAL PLAN

Revisions: Date:

1i

0 GRID / COLUMN LINE DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

Ga5xFB1

WALL TYPE

WINDOW TYPE

ROOM NAME

ROOM NAME / NUMBER

REVISION TAG

PLAN NORTH

NORTH ARROW WITH TRUE

NORTH INDICATION

EGRESS ROUTE ID AND

SECTION LENGTH

ROOM

ROOM OCCUPANCY

150 SF

EGRESS : EGRESS ID

Egress Length

ROOM OCCUPANCY & AREA

ELEVATION NUMBER

SECTION

INTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

Name Elevation

FLOOR LEVEL &

NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

SHEET KEYNOTE

A101

SIM

EXTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

A101

A101

ANNOTATION DRAWING SYMBOLS

INDEX OF DRAWINGS

202-A101

DISCIPLINE:

G - GENERAL

A - ARCHITECTURE

I - INTERIORS

F- FIRE PROTECTION

P - PLUMBING

M - MECHANICAL

E - ELECTRICAL

T - TELECOM

V - VENTILATION

SHEET TYPE

DESIGNATOR

BUILDING NUMBER

SHEET NUMBER

WITHIN SERIES

ARCHITECTURAL SYMBOLS

LEGEND

CONCRETE/ PRECAST

CONCRETE

SOIL

SAND, EIFS FINISH COAT,

OR CEMENT PLASTER

BRICK

CMU

STONE

FIBERGLASS BATT

INSULATION

EXPANDED POLYSTYRENE

RIGID INSULATION

EXTRUDED POLYSTYRENE

RIGID INSULATION

POLYISOCYANURATE RIGID

INSULATION

GYPSUM BOARD

EXTERIOR GYPSUM

SHEATHING

EXTERIOR CEMENT

BOARD

COATED GLASS MAT

WATER RESISTANT

GYP BD

PLYWOOD

COVER BOARD

MATERIALS

CEILING SYMBOLS

MECHANICAL SUPPLY DIFFUSER

MECHANICAL RETURN GRILLE

MECHANICAL EXHAUST GRILLE

24" X 24" ACOUSTICAL CEILING

PANEL AND GRID

GYPSUM BOARD CEILING OR

SOFFIT

2' x 2' LED FLUORESCENT

FIXTURE - EMERGENCY NIGHT

LIGHT

RECESSED CAN DOWNLIGHT

CEILING ELEVATION A.F.F.X'-X"

EXIT SIGN

LED LIGHT

1' x 4' LED FLUORESCENT

FIXTURE

2' x 4' LED FLUORESCENT

FIXTURE

INDUSTRIAL LUMINAIRE

EMERGENCY LIGHT

2' x 2' LED FLUORESCENT

FIXTURE

OC

NURSE CALL DOME LIGHT WALL

MOUNTED

A

FIRE ALARM AUDIO/VISUAL

NOTIFICATION DEVICE-CEILING

MOUNTED.

CAM

LS

OCCUPANCY SENSOR

A1 A3

DAYLIGHT LEVEL SENSOR

CLOSED CIRCUIT CAMERA (CCTV)

CEILING MOUNTED

N

S SPEAKER

CLOSED CIRCUIT CAMERA (CCTV)CAM

VC VACANCY SENSOR

WAP CEILING INFORMATION OUTLET

FIRE ALARM VISUAL NOTIFICATION

DEVICE - WALL MOUNTED

V1

WALL CONTROL STATIONSW

NURSE CALL STATIONN

SMOKE,FIRE/SMOKE

DAMPER CONTROLLER

ARD

FIRE ALARM MANUAL PULL

STATION

F

FIRE ALARM SMOKE,

SMOKE DAMPER

SD

SD FIRE ALARM DUCT SMOKE

DETECTOR

D DIMMER LED

A FIRE ALARM AUDIO/VISUAL

NOTIFICATION DEVICE- WALL

MOUNTED.

A1 A3

S SWITCH

{LD}

{LS}

LIGHT DIMMER

LIGHT SENSOR

ARCHITECTURAL DRAWING ABBREVIATIONS

A ---------------------

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNL ACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALG ALUMINUM AND GLASS

AL ALUMINUM

ALUM ALUMINUM

ANOD ANODIZE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWT ACOUSTICAL WALL TREATMENT

B ---------------------

B LABEL CLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

CAB CABINET

CATW CATWALK

CAV CAVITY

CBB CEMENTITIOUS (BACKER) BOARD

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR COLOR

CLRM CLASSROOM

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUE

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPT CARPET

CR CONTROL ROOM

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CW CASEMENT WINDOW

D ---------------------

D DEPTH

D LABEL CLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

ELEV EQ ELEVATOR EQUIPMENT

ENTR ENTRANCE

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EWC ELECTRIC WATER COOLER

EXP EXPOSED

EXT EXTERIOR

EXT EXTINGUISHER

EXT GR EXTERIOR GRADE

F ---------------------

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF INSUL FOIL BACKED INSULATION

FGL FIBERGLASS

FH FIRE HOSE

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FR FIRE RESISTANT

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBERGLASS REINFORCED PLASTIC

FRTW FIRE RETARDANT TREATED WOOD

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET

FTG FOOTING

FWC FABRIC WALLCOVERING

G ---------------------

G NATURAL GAS

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GFGI GOVERNMENT FURNISHED INSTALLED BY GOVERNMENT

GFRG GLASS-FIBER-REINFORCED GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GSF GROSS SQUARE FEET

GUT GUTTER

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H ---------------------

HAC HOUSE AID KEEPING CLOSET

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HORIZ HORIZONTAL

HR HOUR

HT HEIGHT

HVAC HEATING, VENTILATION, AND AIR CONDITIONING

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

ISO ISOLATION

J ---------------------

JAN JANITOR

K ---------------------

KPD KEYPAD

KIT KITCHEN

KPL KICKPLATE

L ---------------------

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBS POUND

LDG LANDING

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LOC LOCATION

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH RM MACHINE ROOM

MATL MATERIAL

MAX MAXIMUM

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MF MILL FINISH

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM, MINUTE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MO MASONRY OPENING

MOD MODIFY

MB MOISTURE BARRIER

MTG MOUNTING

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PULL BOX

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLYWD PLYWOOD

PNL PANEL

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

R --------------------

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDG INS RIGID INSULATION, SOLID

REC RECESSED

REC ROOM RECREATION ROOM

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

S --------------------

SB SPLASH BLOCK

SCHED SCHEDULE

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGL SINGLE

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHWR SHOWER

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SST STAINLESS STEEL

ST STAIRS

STD STANDARD

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRB/HRN STROBE/HORN

SUB FL SUBFLOOR

SV SHEET VINYL

SW SIDEWALK

T --------------------

T TREAD

T/S TUB/SHOWER

TC TERRA COTTA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TRANS TRANSOM

TRTD TREATED

TV TELEVISION

SEE OTHER DISCIPLINES FOR

ADDITIONAL ABREVIATIONS

NOTE: NOT ALL MAY BE USED

ARCHITECTURAL SYMBOLS

NOTE:

KEYNOTES RESIDE ON A 'MASTER' SCHEDULE FOR DEMOLITION AND NEW WORK.

THIS IS FURTHER BROKEN DOWN BY SHEET. ALL KEYNOTES MAY NOT PERTAIN

TO EACH SHEET, THEREFORE:

• ONLY KEYNOTES ON THE SHEET WILL BE LISTED IN THE KEYNOTE LEGEND.

• KEYNOTE MAY NOT BEGIN AT "1" FOR A SHEET.

• KEYNOTES MAY SKIP NUMBERS, BUT WILL LIST IN NUMERICAL ORDER FOR

THAT SHEET.

KEYNOTE NUMBER (ON SHEET)

KEYNOTE DESCRIPTION

THIS IS AN EXAMPLE OF WHAT KEYNOTE 3 COULD BE. IT

MIGHT BE THE FIRST KEYNOTE ON A SHEET. IT MIGHT ALSO

SHOW ON MULTIPLE SHEETS.

THIS IS AN EXAMPLE OF WHAT KEYNOTE 7 COULD BE. IT

MIGHT ALSO SHOW ON MULTIPLE SHEETS.

THIS IS AN EXAMPLE OF WHAT KEYNOTE 22 COULD BE. IT

MIGHT ALSO SHOW ON MULTIPLE SHEETS.

KEYNOTE DESIGNATIONS

KEYNOTES

KEYNOTE SYMBOL ON SHEET

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

B

IM

/V

IS

N

L a s V e g a s R e p la c e

F lo o r

S p e c C lin ic s /L a s V e g a s R e p la c e F lo o r

S p e c C lin ic s

V

.r v t

/1

/2

:1

:3

A

M

RCO IL

593-19-310

GI101

593 - NORTH LAS VEGAS, NV

MARCH 19, 2024

01-

ABBREVIATIONS & SYMBOLS 100% CONSTRUCTION

DOCUMENT SUBMISSION

REPLACE FLOORING IN OR, PACU,

AND SPECIAL PROCEDURES

ACCESSIBLE SIGNAGE REQS

CHARACTER HEIGHTS

TOILET ACCESSORY LEGEND

NOTES

CHARACTER PROPORTIONS:

LETTERS AND NUMBERS ON SIGNS SHALL HAVE A WIDTH-TO-HEIGHT RATIO

BETWEEN 3:5 AND 1:1 AND A STROKE-WIDTH-TO-HEIGHT RATIO BETWEEN 1:5 AND

1:10, UTILIZING AN UPPER CASE 'X' FOR MEASUREMENT.

CHARACTER HEIGHT:

SEE LETTER AND NUMBER HEIGHT CHART BELOW

*EXCEPTION: CHARACTER HEIGHT SHALL BE 5/8" HIGH MINIMUM FOR BUILDING

DIRECTORIES.

PICTOGRAMS:

WHERE PICTOGRAMS ARE REQUIRED, THEY SHALL HAVE A 6" MINIMUM SIZE

MEASURED AT THE BORDER. WHERE TEXT DESCRIPTORS FOR PICTOGRAMS ARE

REQUIRED, THEY SHALL COMPLY WITH THE TACTILE CHARACTER PROVISIONS OF

RAISED CHARACTERS AND SYMBOLS, BRAILLE, AND LOCATION OF TACTILE

SIGNAGE PORTIONS BELOW.

FINISH AND CONTRAST:

THE CHARACTERS, SYMBOLS AND BACKGROUND OF SIGNS SHALL BE EGGSHELL,

MATTE, OR OTHER NON-GLARE FINISH. CHARACTERS AND BRAILLE, AND LOCATION

OF TACTILE SIGNAGE PORTIONS BELOW. LIGHT BACKGROUND.

RAISED CHARACTERS AND SYMBOLS:

CHARACTERS AND SYMBOLS ON TACTILE SIGNS SHALL BE RAISED 1/32" MINIMUM.

RAISED CHARACTERS AND SYMBOLS SHALL BE IN UPPERCASE CHARACTERS.

RAISED CHARACTERS AND SYMBOLS SHALL BE 5/8" HIGH MINIMUM, AND 2"

MAXIMUM. RAISED CHARACTERS AND SYMBOLS SHALL BE ACCOMPANIED BY

BRAILLE IN ACCORDANCE WITH THE PROVISIONS OUTLINED BELOW.

BRAILLE:

BRAILLE SHALL BE SEPARATED 1/2" MINIMUM FROM THE CORRESPONDING RAISED

CHARACTERS OR SYMBOLS. BRAILLE PROVIDED IN ACCORDANCE WITH THE

REQUIREMENTS FOR ELEVATOR CONTROLS SHALL BE PLACED 3/16" MINIMUM BELOW

THE CORRESPONDING CHARACTERS OR SYMBOLS. BRAILLE SHALL BE GRADE II AND

SHALL CONFORM TO SPECIFICATION #800, NATIONAL LIBRARY SERVICE, LIBRARY OF

CONGRESS.

LOCATION OF TACTILE SIGNAGE:

TACTILE SIGNAGE SHALL BE LOCATED ALONGSIDE THE DOOR ON THE LATCH SIDE

AND SHALL BE MOUNTED AT 60" ABOVE THE ADJACENT FINISHED FLOOR TO THE

CENTERLINE OF THE SIGN. IN LOCATIONS HAVING DOUBLE DOORS, TACTILE SIGNS

SHALL BE MOUNTED TO THE RIGHT OF THE RIGHT HAND DOOR. WHERE THERE IS

NO WALL SPACE ON THE LATCH SIDE OF THE DOOR, INCLUDING DOUBLE LEAF

DOORS, SIGNS SHALL BE RIGHT HAND DOOR. WHERE THERE IS NO WALL SPACE

ON THE LATCH SIDE OF THE DOOR, INCLUDING DOUBLE LEAF DOORS, SIGNS SHALL

BE PLACED ON THE NEAREST ADJACENT WALL.

GENERAL NOTES:

ANY ADDITIONAL TEXT REQUIRED DUE TO LOCAL ORDINANCES (FINES FOR

PARKING IN ACCESSIBLE SPACES, ETC.) SHALL COMPLY WITH THE SIGNAGE

REQUIREMENTS ABOVE.

ALL INTERIOR SIGNAGE WITHIN THE ASC SHALL CONFORM TO THE REQUIREMENTS

OF ADA 2010 AND ANY OTHER STATE OR LOCAL APPLICABLE CODES.

HEIGHT ABOVE FLOOR/ GROUND: MIN. CHARACTER HEIGHT:

GREATER THAN 80" (6'-8") AFF 3"

GREATER THAN 60" (5'-0") AFF BUT LESS THAN 80" (6'-8") AFF 2"

GREATER THAN 48" (4'-0") AFF BUT LESS THAN 60" (5'-0") AFF 1"

A FLOOR MOUNTED TOILET (CFCI)

GB42 42" - GRAB BAR (BOX FURNISHED & INSTALLED)

GB36 36" - GRAB BAR (BOX FURNISHED & INSTALLED)

GB18 18" - GRAB BAR (VERTICAL) (BOX FURNISHED &

INSTALLED)

E MIRROR (BOX FURNISHED & INSTALLED)

F TOILET PAPER DISPENSER (OFCI)

G ROBE HOOK (CFCI)

H SOAP DISPENSER (OFCI)

H PAPER TOWEL DISPENSER (OFCI)

J SANITARY NAPKIN DISPOSAL (CFCI)

O BABY CHANGING TABLE (CFCI)

P WALL MOUNTED SINK (BOX FURNISHED &

INSTALLED)

U SURFACE MTD TOILET SEAT COVER DISPENSER

1. SEE SPECIFICATIONS FOR MANUFACTURERS INFORMATION ON ALL TOILET

ACCESSORIES.

2. ALL SOAP DISPENSERS, PAPER TOWEL DISPENSERS, TOILET PAPER

DISPENSERS & HAND SANITIZER DISPENSERS TO BE OWNER FURNISHED AND

CONTRACTOR INSTALLED. LOCATIONS SHOWN FOR FACILITY.

3. FOR ALL TOILET ROOMS, REFER TO BOX VENDOR DRAWINGS FOR PARTITION

TYPES & DETAILS AND BLOCKING REQUIREMENTS FOR TOILET ACCESSORIES.

4. ALL TOILET LOCATIONS, WHETHER NOTED OR NOT, SHALL BE PROVIDED WITH

THE FOLLOWING UNLESS OTHERWISE NOTED:

a) ONE MIRROR

b) ONE TOILET PAPER DISPENSER

c) ONE ROBE HOOK - MOUNTED BEHIND STALL DOORS.

A D

A

T O

H A

N D

L E

MIRROR SOAP DISPENSER PAPER

TOWEL

DISPENSER

TOILET PAPER

DISPENSER

TOILET

PAPER

HOLDER

SANITARY

NAPKIN

DISPOSAL

MIN

1' - 3"

LAVATORY

M

IN

INSULATE EXPOSED

PIPING WITH WHITE

PLASTIC PRE-FITTED

INSULATION

M A

X

MEASURE

TO BOTTOM

OF REFLECTIVE

SURFACE

D

IS

P E

N S

E R

M A

X O

P E

R A

B L E

D

IS

P E

N S

E R

M

A X

T O

O P

E R

A B

L E

M A

X

M

IN

M

IN

FIRE

EXTINGUISHERS

AND CABINETS

7-PEG

COAT RACK

2' - 0"

"MIN

8"

MIN

11"

KNEE AND TOE

CLEARANCES

E

E

SEALANT

PROVIDE ADA

COMPLIANT FAUCET

WITH WRIST BLADE

CONTROLS

M A

X

5" MAX 15" MAX

ACCESS HGT. D.F.

SPOUT LOCATION

M

IN

SPOUT

HEIGHT

STANDING AND

ACCESSIBLE DRINKING

FOUNTAINS

FRONT SIDE

PLAN

ALUM. SEMI-RECESSED CAB.

W/ FULL CLEAR ACRYLIC DOOR

10 LBS

ABC TYPE

BABY CHANGING

TABLE

M A

X

/2

ROBE

HOOK

M A

X

"FIRE EXTINGUISHER" IN

RED LETTERS

G

F

F

(ALT)H

J

C

N O O

P

P

M

IN9

MIN

11"

M

IN

8"

25" MAX

30x48

CLEAR

SPACE

U

M A

X

TOILET

SEAT COVER

DISPENSER

SIGNAGE

(12" BELOW CEILING)

2"

HANDRAIL

PER NFPA 10

PTD (OF/OI)

PUBLIC TLTS

ONLY

SEMI-

RECESSED

WASTE RECP.

S P

O U

T H

G T

S T

A N

D

IN

G H

E

IG

H T

D .F

A C

C E

S S

H

E

IG

H T

D .F

M A

X

NOTE: PROVIDE CANE

DETECTABLE APRON AT

THE STANDING HEIGHT

UNIT

MIN

3' - 6"

MAX

1' - 0"

WATER CLOSET

SIDE WALL

1 1/4" MIN., 2" MAX DIA.

GRAB BAR WITH 1 1/2"

GAP FROM WALL

WATER CLOSET

BACK WALL

TP DISPENSER

MOUNTING AREA

1' - 6"

T .O

G

.B

/2

4' - 6" MIN

MIN

1' - 0"

MIN

2' - 0"

FLUSH CONTROLS

ON OPEN SIDE

M

IN

GB42

GB36

A

A

3' - 4"

/2

GB18

U

CENTER ON

GRAB BAR END

NOTE: GRAB BARS

SHALL BE 33" - 36" TO

TOP OF BAR

3' - 0"

NOTE: INFORMATION USED FOR MOUNTING OF EXISTING PLUMBING FIXTURES AND TOILET ACCESSORIES.

6"

6"

8"

MEN WOMEN

NO SMOKING

T

O F

IN

IS

H E

D F

L O

O R

F

IN

IS

H

E D

F L O

O R

T O

T O

F

IN

IS

H

E D

F L O

O R

PROPORTIONS OF THE INTERNATIONAL

SYMBOL OF ACCESSIBILITY

INTERIOR SIGNAGE

DOOR FRAME

LATCH SIDE OF

DOOR PANEL

TO TOP OF SIGN

GENERAL NOTES:

PROVIDE INTERIOR SIGNAGE FOR EVERY DOOR/ROOM UNLESS NOTED

OTHERWISE (REFER TO FINISH DRAWINGS).

ALL FINAL ROOM NAMES SHALL BE APPROVED BY ARCHITECT/OWNER PRIOR

TO SIGN FABRIACATION.

AT LOCATIONS WHERE THERE ISN'T AVAILABLE WALL SPACE TO INSTALL THE

INTERIOR SIGNAGE AS INDICATED, OBTAIN ARCHITECT'S INSTRUCTION PRIOR

TO INSTALLATION.

AT LOCATIONS WHERE THERE ISN'T AVAILABLE WALL SPACE, BUT AVAILABLE

WINDOW SPACE, ADHERE INTERIOR SIGNAGE WITH DOUBLE SIDED TAPE TO

PROVIDE A PERMANENT INSTALLATION. PROVIDE A BLANK PANEL OF THE

SAME COLOR, SIZE, AND MATERIAL FOR THE BACK SIDE OF THE SIGN TO BE

INSTALLED ON THE GLASS.

1.

2.

3.

4.

NTS

TOILET ACCESSORY MOUNTING HEIGHTS

NTS

ACCESSIBLE SIGNAGE DIAGRAMS

NTS

GENERAL - SIGNAGE

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

B

IM

/V

IS

N

L a s V e g a s R e p la c e

F lo o r

S p e c C lin ic s /L a s V e g a s R e p la c e F lo o r

S p e c C lin ic s

V

.r v t

/1

/2

:1

:3

A

M

RCO IL

593-19-310

GI102

593 - NORTH LAS VEGAS, NV

MARCH 19, 2024

01-

ADA INFORMATION 100% CONSTRUCTION

DOCUMENT SUBMISSION

REPLACE FLOORING IN OR, PACU,

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

FULLY SPRINKLERED

B

IM

/V

IS

N

L a s V e g a s R e p la c e

F lo o r

S p e c C lin ic s /L a s V e g a s R e p la c e F lo o r

S p e c C lin ic s

V

.r v t

/1

/2

:1

:3

A

M

RCO IL

593-19-310

GI103

593 - NORTH LAS VEGAS, NV

MARCH 19, 2024

01-

ICRA SHEET 100% CONSTRUCTION

DOCUMENT SUBMISSION

REPLACE FLOORING IN OR, PACU,

D

Y

H

D

Y

H

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

V A N

VAN

VAN

PARKING LOT

D

PARKING LOT

CPARKING LOT

B

PARKING LOT

A

PARKING LOT

F

PARKING LOT

E

GOV

PARKING LOT

G

PARKING LOT

H

PARKING LOT

J

PARKING LOT

I

VAN

VAN

VAN

BLDG

#1

BLDG

#5 BLDG

#2

BLDG

#3

BLDG

#6

BLDG

#4

EAST DEER SPRINGS WAY

HOSPITAL

ADMINISTRATION

EMERGENCY

DEPARTMENT

ENERGY

PLANT

GENERATORS

WATER

TANKS

(4 Typ)

WAREHOUSE

HOSPITAL

AUDITORIUM

EMERGENCY

MANAGEMENT &

RESIDENT ENGINEER

BLDG

BLDG

#7 EDUCATION

SOLAR FARM (1.8

MW)

FISHER

HOUSE

BLDG

#8

MAIN

HOSPITAL

BLDG

#9

MENTAL HEALTH

CLINIC

EMERGENCY

MANAGEMENT

YARD

SPECIALTY

CLINICS

215 BELTWAY

EM

ERGENCY D

EPT

PARKIN

G

VAN

VAN

VAN

VAN

VAN

VAN

26HC

14HC

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

AA

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A A

A

A A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

LEGEND

HAUL ROUTE

LAYDOWN AREA

LOADING DOCK

CONTRACTOR ACCESS TO

SITE

GENERAL PROJECT

LOCATION

ACCESS ROUTE TO LOADING

DOCK

STAGING

AREA

LOADING

DOCK

3RD FLOOR

PROJECT AREA

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

NORTH

FULLY SPRINKLERED

B

IM

/V

IS

N

L a s V e g a s R e p la c e

F lo o r

S p e c C lin ic s /L a s V e g a s R e p la c e F lo o r

S p e c C lin ic s

V

.r v t

/1

/2

:2

:3

A

M

RCO IL

593-19-310

GI200

593 - NORTH LAS VEGAS, NV

MARCH 19, 2024

01-

SITE PLAN 100% CONSTRUCTION

DOCUMENT SUBMISSION

REPLACE FLOORING IN OR, PACU,

AND SPECIAL PROCEDURES

NTS

SITE PLAN

LIFE SAFETY NOTESKEY NOTES CODE SUMMARY

KEY PLAN

MECHANICAL SCREEN

TYPICAL

EQUIPMENT PAD - ELEVATION

MECHANICAL SCREEN

TYPICAL

EQUIPMENT PAD - ELEVATION

3A120

3A125 3A127 3A129 3A131 3A133 3A135

3A101

3A103

3A123

3A119

C3-6

3A117 3A118

3A153

3A151

C3-3 3A134

3A169

C3-1

3A121

3A1123A122

C

3A108

3A132

3A110

C

C3-5

3A113 3A111 3A109 3A107 3A105 3

A

3A115 3A163 3A165

3A104

3A167

3A149

3A147

C

C3-9

3A156 3A158 3A164 3A166

C

3A171

3A146 3A1423A144 3A1403A145

3A143 C3-12

C

3A141

3A139

3A231

3A182 3A180 3A178 3A176

3A173

3A175

3A184 3A184A 3D187

3A229

3A233

3A181

A

3A177

C

3A227

C3-17A

C A

3A253

3A255

3A257

3A250

3A252

3A204

3A208

C3-13

3A254

3B156

3D198

3A210 3A209

3A211

3A212

3A225

3A223

C3-14

C3-16A

C

3A282

3A2603A258

3A221 3A219 3A217 3A215

3A213

3A279

3A279A

3A277

3A278

3A272

3A270

C3-20 3A275

3A274

3A273

3A276

3A268

C3-18 3A262

3A263

3A271

3A269

C3-21

3A267

3A266

3A264

3A286

D

3D267

3A265

S-4

C3-45

C3-24

3B124

3B125

3B127 3B149

3B117 3B123

3B115

C3-26

B

C

3B116

3B112

3B113

3B110

3B111

3B118

3B122 3B124A

3B128

3B144

3B142 3B140A 3B140

3B130

C

3B129

C3-28

3B131 3B146

C

3B154

3B158

3B105

3B104

3B101

B

3B102

3B106

C

C3-48

3D101 3D103

D

3D104

3B145 3B143 3B141 3B139 3B137 3B135

3B133

3B157

3B189 3B191 3B193 3B195

3B197 3B159

3B187

C3-29

3B186

C

C3-31

3B107

3B108

3B190 3B192 3B194 3B196

3B198 3B165

3B163

3B181

3B179

C3-32

3B177 3B175 3B173

3B167 3B166

3B226

3B184

3B180 3B178 3B176

3B174

3B172

B

3B223

3B228

3B230

C3-34

3B221

C3-33

3B182

3B217 3B219

3B222A

3B220

3B218

3B2163B2143B2123B2103B208

3B222 3B245

3B243

3B241

3B2393B237

3B233

3B235

C3-35

3B238

3B232 C3-38

3B231

3B234 3B236 3B240 3B242 3B244 3B246 C3-36

3B292

3B251

3B253

3B255

3B257

3B252

3B256

C3-41

3B281 3B285

3B289 3B291

3B287

3B280

3B279

3B278

3B277 C3-39

3B276 3B274 3B272 3B270 3B268 3B266 3B264

3B262

C3-42

3B258

3B275

3B273 3B271 3B265

3B286 3B2883B2843B282

3B267

3B261

C3-39

3B260

C3-60

C3-61 3B205

3B204

B

3B201 3B2002

3D111

3D109

3D110

C

C3-65 C3-66

3D105

C3-49

3D180

3D164

3D167

3D165

C

C3-54

3D162

3D159

3D157

3D155

3D153

3D149

3D147

3D148

3D168

3D166

3D160

C

3D113

3D112

3D114

3D116

3D120

3D122

3D128

3D130

3D132

3D126

C A

3D115

3D117

C3-52

3D119

3D125 3D123

3D154 3D127

3D152

3D131

3D133

3D150

3D146

C3-55

C3-63

C3-88

3D141

3D151

3D140 3D144

3D136 3D134

3D231 3D232

3D230 3D229

C3-56

3D225

3D239

3D237

3D235 3D2333D2273D223

3D222

3D221

3D221A

C3-58

3D220

3D218

3D219

3D226

C3-62

3D234

3D236

3D238

3D201

3D203

3D205

D

3D204

3D214 3D212 3D210 3D208 3D206

C3-91

C3-90

C

C3-93

3D484 3D4823D4863D4883D4903D492

3D493

3D494

3D405

3D403

3D401

D

3D404

C3-69 3D309

3D3083D307

3D310A

3D311

3D316

3D317 3D319

3D303

3D301

3D304

C3-70

D

3D305

3D108 3D333

3D335

3D331

3D337 3D339 3D341

C3-73

3D334 3D336 3D338 3D340 3D342

3D332

3D343

3D349 3D174 C3-73A 3D318

3D322

C3-72

3D320

3D389 3D391

3D388

C3-77

3D348

3D3463D344

C

3D324

3D321

3D323

3D326

3D392A

3D393

3D392

3D395

3D397

3D399

3D411

3D390

3D417

3D413

3D415

D

3D394

3D414

3D419

3D432

3D430

3D386

3D398

3D384 3D383

3D382

3D436

3D427

3D434

3D421

3D4163D409

3D410

3D422 3D244

3D240

3D246B

3D246

3D426B

3D426A

3D426

3D246A

3D472

3D328

D

3D352

3D353 3D355 3D357 3D359 3D361 3D363 3D365

3D471

3D470

3D468 3D466 3D464 3D462

3D460

3D458

3D456

3D454

C3-84

C3-86

C3-79

C3-82 C3-80

C3-81

C3-85

3D429

3D356 3D358

3D475

3D473

3D461

3D459

C3-83

3D453

3D4793D477

3D4443D446

3D354

3D374

3D377

3D375

3D373

3D364

3D366

3D368

3D370

3D367

3D360

3D440

3D381

3D369

3D362

3D371

3D437

3D435

3D433

3D431

3D442

3D448

3D452

3D450

P-4

P-7

P-5

P-6

S-3

P-8

P-9

S-1

S-2

P-1 P-2 P-3

S-8

S-7

3A124

3B229

3B227

3B247

3D325

C3-73B

3B132

3B115A

3B164

3B215

C3-1

S-6

ELECTRICAL

ROOM

IT

TELECOM

EXAM EXAM EXAM EXAM EXAM

WAITING

RECEPTION

FACILITIES

SYSTEMS

HAC

CORRIDOR

STAFF

LOUNGE

STAFF

TOILET

PROVIDERS

OFFICE

PROVIDERS

OFFICE

CORRIDOR LINEN

ALCOVE

SCALE

ALCOVE

MAIN

CORRIDOR

PIPE

RISER

CLEAN

UTILITY

SOCIAL

WORKER

OFFICE

C O R R

ID

O R

NURSES

STATION

PATIENT

TOILET

SOILED

UTILITY

C O R R

ID

O R

CORRIDOR

PROCEDURE

EXAM EXAM EXAM EXAM

E L E C

PROCEDURE

RESEARCH

PHARMACIST

RESEARCH

PHARMACIST

STORAGE

CLINICAL

FILESTORAGE

CLEAN

UTILITY

SOILED

UTILITY

C O R R

ID

O R

CORRIDOR

EXAM

CONSULT

EXAM

CONSULT

EXAM

CONSULT

EXAM

CONSULT

C O R R

ID

O R

WAITING

TRIAGE TRIAGE

EXAM

CONSULT

EXAM

CONSULT

STAFF

TOILET

CLINICAL

COORDINATOR

OFFICES

C O R R

ID

O R

CORRIDOR

C O R R

ID

O R

CLINICAL

COORDINATOR

OFFICES

CLINICAL

COORDINATOR

OFFICES

MALE

TOILET

EXAM

CONSULT

EXAM

CONSULT

EXAM

CONSULT

EXAM

CONSULT

RECEPTION

STORAGE

EQUIPMENT

CLINICAL

FILESTORAGE MONITOR

BREAK

ROOM

FEMALE

TOILET

STAFF

TOILET

E L E

CMONITOR

C O R R

ID

O R

CHIEF

NURSEEXECUTIVE

CORRIDOR

C O R R

ID

O R

NURSING

PROFESSIONALSMALL

GROUPOFFICE

NURSING

PROFESSIONALSMALL

OFFICE

NURSING

PROFESSIONALSMALL

OFFICE

NURSING

PROFESSIONALSMALL

OFFICE

NURSING

PROFESSIONALGROUP

LARGEOFFICE

OPERATIONSPLANNER

OFFICE

OPERATIONSCAO

OFFICE

CORRIDOR

NURSING

PROFESSIONALNURSE

RECRUITERSLARGE

OFFICE

NURSING

PROFESSIONALNURSE

RECRUITERSLARGE

OFFICE

RECEPTION/

WAITING

OPERATIONS

COMPLIANCE

OFFICE

DATA

OFFICESMALL

OFFICE(VISN

AUDITOR)

DATA

OFFICESMALL

OFFICEOFFICE (2

MOFHBUDGET

STAFF)

OPERATIONSSMALL

GROUPOFFICE

(CBIVISN and

AUDITOR

CNE

SECRETARYand

WAITING

PROFESSIONAL

ADMINISTRATIVE

OFFICER

CORRIDOR

CORRIDOR

C O R R

ID

O R

KITCHENETTE

HAC

CONFERENCE

ROOM

NURSING

PROFESSIONALFILE

STORAGE

OFFICE OF

THEDIRECTOR

DATA

OFFICEDATA

MANAGER

OPERATIONSPAO

SMALLOFFICE OPERATIONSOFFICE

DATAFILE

STORAGE

HOSPITALDIRECTOR

OFFICE

TOILET

EQUIPMENT

ROOM

HD

SECRETARYand

WAITING

AHD

SECRETARYand

WAITING

COS

SECRETARYand

WAITING

SERVICE

LOBBY

PIPE

RISER

FACILITIES

SYSTEMS

IT

TELECOM

ELECTRICAL

ROOM

OFFICE OF

THEDIRECTOR

CORRIDOR VESTIBULE

RECEPTIONand

WAITING

ASSOCIATE

HOSPITAL

DIRECTOR

CHIEF OF

STAFF

CORRIDOR

PROFESSIONAL

ADMINISTRATIVE

OFFICER

PROFESSIONAL

ADMINISTRATIVE

OFFICER

PROFESSIONAL

ADMINISTRATIVE

OFFICER

OFFICEOF

THEDIRECTOR

E L E C

ELEVATOR

VESTIBULE

TRAINING

OFFICE

ELEVATOR

MAIN

CORRIDOR

CORRIDOR

UROLOGY

EXAM

(BIOPSY)

PLAST.

EXAM

STORAGE

GROUP

OFFICEMULTIPURPOSE

PROCEDURE-

ENT

MULTIPURPOSE

PROCEDURE-

PLASTICS

ENT

EXAM

CORRIDOR

E L E C

C O R R

ID

O R

ENT

EXAM

ENT

EXAM

CLINICAL

MODULE

RECEPTION

WAITING

VESTIBULE

OFFICE

NURSE

MANAGER

PLASTICS

PATIENT

TOILET

PATIENT

TOILET

CLEAN

SUPPLY

UROLOGY

EXAM

PATIENT

TOILET PATIENT

TOILET

UROLOGY

EXAM(MALE

SEXUALTESTING)

SOILED

UTILITY

C O R R

ID

O R

GS

PROCEDURE

OFFICE

PHYSICIAN

GROUP

OFFICE

CLINIC

MANAGER

C O R R

ID

O R

OFFICE

PHYSICIAN

GROUP

STAFF

LOUNGE

ELECTRICAL

ROOM

IT

TELECOM

VESTIBULE

F A C

IL

IT

IE

S

S Y S T E M S

PIPE

RISER

VENDING

C O R R

ID

O R

STAIR

ELECTRICAL

ROOM

IT

TELECOM

V E S T

IB

U L E

FACILITIES

SYSTEM

UROLOGY

EXAM

UROLOGY

EXAM

GENERALSURGERY

EXAM

GENERALSURGERY

EXAM

GENERALSURGERY

EXAM

GENERAL

SURGERY

EXAM

HAC

STAFF

TOILET

ORTHO

EXAM

ORTHO

EXAM PATIENT

TOILET

ORTHO

EXAM

ORTHO

EXAM

PHYSICIAN

OFFICE

CAST

ROOM

CORRIDOR

STORAGE

C O R R

ID

O R

CORRIDOR

PUBLIC

TOILETMENS

PUBLIC

TOILETWOMEN

PREOP

INTAKE

CONSULT

(SW,DIET,PHARM)

THORACIC

EXAM

THORACIC

EXAM

ORTHO

EXAM CLEAN

SUPPLY

LINEN

VASCULAR

EXAM

VASCULAR

EXAM

CORRIDOR

PATIENT

TOILET

NEURO

EXAM

NEURO

EXAM

MEDS

PHYSICIAN

OFFICE

PHYSICIAN

OFFICE

WAITING

PRE-OP

(INTAKE)

MED PRE-OP

EXAM STORAGE

VASC.

LAB

SOILED

UTILITY

E L E C

HBO

EXAM

STAFF

TOILET

STAFF

LOUNGE

CORRIDOR

OFFICE

GROUP

CORRIDOR

CLINICAL

MODULE

RECEPTION

PODIATRY

PROC.

HBO

EXAM

PATIENT

TOILET

HBO

EXAM

PATIENT

TOILETMULTI

PURPOSE

EXAM

PODIATRY

EXAM

PODIATRY

EXAM

PODIATRY

EXAM

PODIATRY

EXAM

HYPERBARIC

CHAMBERSSTORAGE

SOILED

AREA(DISASSEMBLY

ANDCLEAN

UP)

STORAGE

SELF

DIALYSISSUPPORT

PERSONNEL

DIALYSIS

TRAINING

WAITING

RECEPTION

CORRIDOR

ELEC

NURSING

INTAKE CORRIDOR

NURSING

INTAKE

OFFICE,

SOCIALWORKER

OFFICE,

CHIEFNURSE

SECRETARY/

ADMIN

DIALYSIS

CHIEF

DIALYSATE

STORAGE

CLEAN

AREA(PREPARATIONAND

TESTING)

CORRIDOR

1-BED

LKRS

LKRS

OFFICEOF

THEDIRECTOR

HAC

PHYSICIAN

OFFICE

STAFF

TOILET

CORRIDOR

TREATMENT

BAY

TREATMENT

BAY TREATMENT

BAY

TREATMENT

BAY

CLEAN

SUPPLY

TREATMENT

BAY

NOURISHMENT

1-BED

1-BED

CORRIDOR

TREATMENT

BAY

TREATMENT

BAY

TREATMENT

BAY

TREATMENT

BAY

TREATMENT

BAY

TREATMENT

BAY

TREATMENT

BAY

1-BED

ELEVATOR

LOBBY

OFFICEOF

THEDIRECTOR

NURSE

STATION

TREATMENT

BAY

TREATMENT

BAY

TREATMENT

BAY

TREATMENT

BAY

TREATMENT

BAYMEDS

PATIENT

TOILET

PATIENT

TOILET

NURSE

STATION

CORRIDOR

SOILED

UTILITY

CORRIDOR

CORRIDORELECTRICAL

ROOM

IT

TELECOM

IT

T E L E C O M

VESTIBULE PIPE

RISER

WAIT

CORRIDOR

WAIT

WAIT

C O R R

ID

O R

CORRIDOR CORRIDOR

PIPE

RISER

CORRIDOR

HAC

OFFICE

EXAM

EXAM

C O R R

ID

O R

CORRIDOR

EXAM

EXAM

EXAM

EXAM

CARDIAC

REHAB

OFFICE

OFFICE

STAFF

LOUNGE

EXAM

EXAM

EXAM

C O R R

ID

O R

RECEPTION

EXAM

EXAM

EXAM

EXAM

EXAM

ECHO

ECHO

TEE

PACE/

HOLTER

C O R R

ID

O R

PHARMACIST

MEDS

CORRIDOR

NURSES

STATION

CLEAN

UTILITY/EQUIP

STOR. SOILED

UTILITY

PATIENT

TOILET

PATIENT

TOILET

OFFICE

TREADMILL/ECG

STRESS/ECHO

PACEMAKER

CHECK

OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

STAFF

TOILET

ELEC

PATIENT

TOILET

EXAM/

TEST

HAC HAC

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

NURSE

STATION

CORRIDOR

CLEAN

UTILITY/EQUIP

STOR

OFFICE

OFFICE

OFFICESOILED

UTILITY

CORRIDOR

BLOOD GAS

LAB

STAFF

TOILET

LOCKERS

LOCKERS

STAFF

TOILET

CORRIDOR

SCRUB

CONTROL

READING

CARDIAC

CATH

CORRIDOR

DATA

CONTROL

HEAD

NURSE

ELECTRICAL

ROOM

FACILITIES

SYSTEMS

PIPE

RISER

V E S T

IB

U L E

IT

TELECOM

OFFICE OFFICE OFFICE OFFICE OFFICE

SERVICE

ELEVATOR

LOBBY

CORRIDOR

P A T

IE

N T

T R A N S F E R

E L E V A T O R

L O B B Y

CORRIDOR

OFFICE OFFICEOFFICEOFFICEOFFICE

SCRUB

DISPENSE

OFFICE

FLOOR

MACHINE

ROOM

PIPE

RISER

IT

TELECOM

ELECTRICAL

ROOM

V E S T

IB

U L E

FACILITIES

SYSTEMS

PASSENGERELEVATOR

LOBBY

OFFICE

PUBLIC

TOILETMENS

PUBLIC

TOILETWOMEN

STAFF

LOUNGE

STAFF

TOILET

BRONCH

EGD EGD

IT

TELECOM

ELECTRICAL

ROOM

STAIR

FACILITIES

SYSTEMS

CORRIDOR

V E S T

IB

U L E

PIPE

RISER

RECEPTION PATIENT

TOILET

RECOV

LINEN

ALCOVE

RECOV

RECOV RECOV

CORRIDOR

RECOV RECOV RECOV RECOV RECOV

SOILED

UTILITY

NURSE

STATION

PREP PREP

CORRIDOR MEDS

LINEN

ALCOVE

CORRIDOR

HAC

HAC GURNEY

SCRUB

CORRIDOR

GOWNED

WAITING

PATIENT

TOILET

PATIENT

TOILET

C O R R

ID

O R

SCOPE

CLEAN

EGD

EGD

SCOPE

CLEAN

CONTROL

PLASTER

ANDSPLINT

STOR

CYSTO

O.R

SCRUB

GURNEY

O.R

SUB-STERILE

O.R

SCRUB

GURNEY

E L E C

EQUIP

STOR

GURNEY

SCRUB

SCRUB

O.R

O.R

INST

PREP/STORAGE

SCRUB

SUB

STERILEOPT

A

O.R

O.R

CLEAN

CORE

SUB-STERILE

SUB-STERILE

SOILED

HOLDINGVESTIBULE

BOTTLE

STORAGEANESTHESIA

WORKROOM

LOUNGE/DICTATION

ELEC

STAFF

FACILITIES

MALE

STAFF

FACILITIES

MALE

STAFF

FACILITIES

FEMALE

STAFF

FACILITIES

FEMALE

STAFF

FACILITIES

FEMALE

STAFF

FACILITIES

MALE

STAFF

TOILET

CLEAN

SUPPLY

E L E C

PATIENT

TOILET

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

ELEC

RECOV

RECOV RECOV RECOV RECOV

RECOV

RECOV

RECOV

RECOV

C O R R

ID

O R

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

STORAGE

PATIENT

TOILET

PATIENT

TOILET

ANTE

ROOM

ISOLATION

MEDS NURSE

STATION

CORRIDOR

ALCOVE

RECOVRECOV

RECOVRECOV

NURSE

STATION

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

ALCOVE

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/RECOV

PREP/

RECOV

DICTATION

GURNEY

NURSE

STATION

MEDS/NOURISH

PATIENT

TOILET

VESTIBULE

HAC

GURNEY

X-RAY-STOR

PATIENT

TOILET

SOILED

UTILITY

STAFF

TOILET

CLEAN

SUPPLY/STORAGE

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR ELEVATOR ELEVATOR

ELEVATOR

ELEVATOR

SCALE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

STAIR

STAIR

STAIR

STAIR

STAIR

STAIR

STAIR

STAIR

MAIN

CORRIDOR

DUMBWAITER

55.04.00.05.0

55.04.0

0.05.0

55.04.0

0.05.0

55.04.00.05.0

SUITE DESCRIPTIONS

LIFE SAFETY LEGEND

1. THE LIFE SAFETY PLANS ARE "DIAGRAMMATIC ONLY". THEIR PURPOSE IS SOLELY

TO REPRESENT THE LIFE SAFETY COMPONENTS FOR THE PROJECT. THE

GENERAL CONTRACTOR SHALL USE THE CONSTRUCTION DOCUMENTS (NOT THE

LIFE SAFETY PLANS) FOR THE IMPLEMENTATION OF THE OF THE REQUIRED LIFE

SAFETY COMPONENTS INTO THE PROJECT.

1. UL LISTED 2 HOUR WINDOW SPRINKLER PROTECTION.

2. FLOOR OPENINGS PROTECTED WITH SMOKE DETECTOR CONTROLLED FIRE

SHUTTERS IN ACCORDANCE WITH SECTION 8.6.8.6(3) OF NFPA 101-2003 EDITION.

3. SMOKE SHUTTER.

4. UL LISTED FIRE RATED ACCORDION DOOR.

5. 90 MINUTE FIRE DOOR AND FRAME LABELS UNDER PIANO HINGE.

APPLICABLE CODES

2021 NFPA 101 - NATIONAL FIRE PROTECTION ASSOCIATION LIFE SAFETY CODE

NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

2021 IBC - INTERNATIONAL BUILDING CODE

OSHA - OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

7/1/2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

2023 NEC - NATIONAL ELECTRIC CODE

2021 IPC - INTERNATIONAL PLUMBING CODE

11/1/2022 ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON

THE TECHNICAL INFORMATION LIBRARY (TIL) (WWW.CFM.VA.GOV/TIL/)

OCCUPANCY GROUP

IBC INSTITUTIONAL GROUP 1-2 (HOSPITALS) SECTION 308.3.

NFPA 101 OCCUPANCY GROUP HEALTHCARE USE 7.3.1.2

OCCUPANT LOAD FACTOR

IBC TABLE 1004.5 MAX. FLOOR AREA ALLOWANCES PER OCCUPANT 240

NFPA 101 7.3.1.2 OCCUPANCY GROUP HEALTHCARE LOAD FACTOR 240

BUILDING CONSTRUCTION CLASSIFICATION

NFPA 101 CONSTRUCTION TYPE 1 (332) TABLE 19.1.6.1 EXISTING HEALTHCARE

OCCUPANCY

IBC TABLE 601 (1-A)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS PER IBC TABLE

I-A

3 HR. PRIMARY STRUCTURAL FRAME

3 HR. BEARING WALLS-EXTERIOR

3 HR. BEARING WALLS-INTERIOR

NONBEARING WALLS & PARTITIONS TABLE 602

0 HR. NONBEARING WALLS & PARTITION-INTERIOR

2 HR. FLOOR CONSTRUCTION & SECONDARY MEMBERS SECTION 202 (N/A)

1 1/2 HR. ROOF CONSTRUCTION AND ASSOCIATED SECONDARY MEMBERS

SECTION 202 (N/A)

BUILDING IS PROTECTED THROUGHOUT BY AN AUTOMATIC SPRINKLER SYSTEM

NFPA 101 TABLE A7.6

COMMON PATH OF TRAVEL LIMITS SPRINKLERED EXISTING HEALTHCARE NR

DEAD-END LIMIT SPRINKLERED EXISTING HEALTHCARE 30 FT

TRAVEL DISTANCE LIMITS SPRINKLERED EXISTING HEALTHCARE 200FT

INTERIOR FINISHES PER IBC TABLE 803.13

CLASS B INTERIOR EXIT STAIRWAYS & RAMPS

CLASS B CORRIDORS & ENCLOSURE FOR EXIT ACCESS STAIRWAYS & RAMPS

CLASS B ROOMS & ENCLOSED SPACES

F

F

F

F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

SD. 01

SD. 02

SD. 03

SD. 04

SD. 07

SD. 05

SD. 06

SD. 11

SD. 10

SD. 09

SD. 08

SD. 13

SD. 12

SD. 14

ZONE 3-1

ZONE 3-2

ZONE 3-5ZONE 3-3

ZONE 3-7

ZONE 3-8

ZONE 3-7ZONE 3-5

ZONE 3-11

GI202

S1

S2

P1

P2

SUITE NUMBER SUITE NAME SUITE SIZE TYPE OF SUITE

SD. 01 GI RECOVERY 4,435 SQFT.

NON SLEEPING

PATIENT CARE

SD. 02 O.R. 7,200 SQFT.

NON SLEEPING

PATIENT CARE

SD. 03

PACU PATIENT

CARE

3,200 SQFT.

NON SLEEPING

PATIENT CARE

SD. 04

SAME DAY

PATIENT CARE

4,700 SQFT.

NON SLEEPING

PATIENT CARE

SD. 05 CATH LAB 3,660 SQFT.

NON SLEEPING

PATIENT CARE

SD. 06 CARDIAC REHAB 8,650 SQFT.

NON SLEEPING

PATIENT CARE

SD. 07 DIALYSIS 7,600 SQFT.

NON SLEEPING

PATIENT CARE

SD. 08 PEDIATRY 2,200 SQFT.

NON SLEEPING

PATIENT CARE

SD. 09 VASCULAR 2,000 SQFT.

NON SLEEPING

PATIENT CARE

SD. 10 ORTHO 2,400 SQFT.

NON SLEEPING

PATIENT CARE

SD. 11 UROLOGY 5,000 SQFT.

NON SLEEPING

PATIENT CARE

SD. 12

RENAL /

NEPHROLOGY

5,400 SQFT.

NON SLEEPING

PATIENT CARE

SD. 13

COMPENSATION

& PENSION

5,000 SQFT.

NON

PATIENT CARE

SD. 14

WOMENS

HEALTH

10,000 SQFT.

NON SLEEPING

PATIENT CARE

X'-X"

EMERGENCY LIGHT

FIRE EXTINGUISHER CABINET

EXIT

FIRE ALARM - MANUAL PULL STATION

EXIT PASSAGEWAY

LINEN CHUTE

TRASH CHUTE

HORIZONTAL EXIT PASSAGEWAY

SPRINKLER / FIRE ALARM ZONE

EGRESS DIRECTIONAL ARROW

ILLUMINATED EXIT SIGN / DIRECTION

TRAVEL DISTANCE START CIRCLE

MAXIMUM TRAVEL DISTANCE

2 HOUR FIRE/SMOKE ZONE BARRIER

2 HOUR FIRE BARRIER

SMOKE ZONE BARRIER

1 HOUR FIRE/SMOKE BARRIER

1 HOUR FIRE BARRIER

NON-RATED SMOKE ZONE

PARTITION

HEALTH CARE OCCUPANCY

CORRIDORS

SPRINKLER AND FIRE ALARM

ZONE BOUNDARY

PHASING BOUNDARY

CONTRACTOR ACCESS

1 HOUR FIRE BARRIER

HAZARDOUS ROOM ENCLOSURE

SMOKE RESISTIVE

HAZARDOUS ROOM ENCLOSURE

EXIT STAIRWELL / PASSAGEWAY

AREA OPEN TO CORRIDOR WITH

SMOKE DETECTION

SUITE DESIGNATION

NO SCOPE OF WORK

F

EP

LC

TC

HE

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Spinklered

NORTH

FULLY SPRINKLERED

B

IM

/V

IS

N

L a s V e g a s R e p la c e

F lo o r

S p e c C lin ic s /L a s V e g a s R e p la c e F lo o r

S p e c C lin ic s

V

.r v t

/1

/2

:5

:0

A

M

RCO DRC

593-19-310

GI201

593 - NORTH LAS VEGAS, NV

MARCH 19, 2024

01-

THIRD LEVEL OVERALL LIFE SAFETY PLAN 100% CONSTRUCTION

DOCUMENT SUBMISSION

REPLACE FLOORING IN OR, PACU,

AND SPECIAL PROCEDURES

1" = 20'-0"

THIRD LEVEL OVERALL LIFE SAFETY PLAN

5 5

3D101 3D103

D

3D104

3D111

3D109

3D110

C

C3-65 C3-66

3D105

C3-49

3D180

3D164

3D167

3D165

C

C3-54

3D162

3D159

3D157

3D155

3D153

3D149

3D147

3D148

3D168

3D166

3D160

C

3D113

3D112

3D114

3D116

3D120

3D122

3D128

3D130

3D132

3D126

C A

3D115

3D117

C3-52

3D119

3D125

3D123

3D154 3D127

3D152

3D131

3D133

3D150

3D146

C3-55

C3-63

C3-88

3D141

3D151

3D140 3D144

3D136 3D134

3D231 3D232

3D230 3D229

C3-56

3D225

3D239

3D237

3D235 3D2333D2273D223

3D222

3D221

3D221A

C3-58

3D220

3D218

3D219

3D226

C3-62

3D234

3D236

3D238

3D201

3D203

D

3D204

3D214 3D212 3D210 3D208 3D206

C3-91

C3-90

C

C3-93

3D484 3D4823D4863D4883D4903D492

3D493

3D494

3D405

3D403

3D401

D

3D404

C3-69 3D309

3D3083D307

3D310A

3D311

3D316

3D317 3D319

3D303

3D301

3D304

C3-70

D

3D305

3D108 3D333

3D335

3D331

3D337 3D339 3D341

C3-73

3D334 3D336 3D338 3D340 3D342

3D332

3D343

3D349 3D174 C3-73A 3D318

3D322

C3-72

3D320

3D389 3D391

3D388

C3-77

3D348

3D3463D344

C

3D324

3D321

3D323

3D326

3D392A

3D393

3D392

3D395

3D397

3D399

3D411

3D390

3D417

3D413

3D415

D

3D394

3D414

3D419

3D432

3D430

3D386

3D398

3D384 3D383

3D382

3D436

3D427

3D434

3D421

3D4163D409

3D410

3D422 3D244

3D240

3D246B

3D246

3D426B

3D426A

3D426

3D246A

3D472

3D328

D

3D352

3D353 3D355 3D357 3D359 3D361 3D363 3D365

3D471

3D470

3D468 3D466 3D464 3D462

3D460

3D458

3D456

3D454

C3-84

C3-86

C3-79

C3-82 C3-80

C3-81

C3-85

3D429

3D356 3D358

3D475

3D473

3D461

3D459

C3-83

3D453

3D4793D477

3D4443D446

3D354

3D374

3D372

3D377

3D375

3D373

3D364

3D366

3D368

3D370

3D367

3D360

3D440

3D381

3D369

3D362

3D371

3D437

3D435

3D433

3D431

3D442

3D448

3D452

3D450

P-4

P-7

P-5

P-6

P-8

P-9

S-1

S-2

S-8

S-7

3D325

C3-73B

S-6

STAIR

ELECTRICAL

ROOM

IT

TELECOM

V E S T

IB

U L E

FACILITIES

SYSTEM

WAIT

WAIT

WAIT

C O R R

ID

O R

CORRIDOR CORRIDOR

PIPE

RISER

CORRIDOR

HAC

OFFICE

EXAM

EXAM

C O R R

ID

O R

CORRIDOR

EXAM

EXAM

EXAM

EXAM

CARDIAC

REHAB

OFFICE

OFFICE

STAFF

LOUNGE

EXAM

EXAM

EXAM

C O R R

ID

O R

RECEPTION

EXAM

EXAM

EXAM

EXAM

EXAM

ECHO

ECHO

TEE

PACE/

HOLTER

C O R R

ID

O R

PHARMACIST

MEDS

CORRIDOR

NURSES

STATION

CLEAN

UTILITY/EQUIP

STOR. SOILED

UTILITY

PATIENT

TOILET

PATIENT

TOILET

OFFICE

TREADMILL/ECG

STRESS/ECHO

PACEMAKER

CHECK

OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

STAFF

TOILET

ELEC

PATIENT

TOILET

EXAM/

TEST

HAC HAC

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

NURSE

STATION

CORRIDOR

CLEAN

UTILITY/EQUIP

STOR

OFFICE

OFFICE

OFFICESOILED

UTILITY

CORRIDOR

BLOOD GAS

LAB

STAFF

TOILET

LOCKERS

LOCKERS

STAFF

TOILET

CORRIDOR

SCRUB

CONTROL

READING

CARDIAC

CATH

CORRIDOR

DATA

CONTROL

HEAD

NURSE

ELECTRICAL

ROOM

FACILITIES

SYSTEMS

PIPE

RISER

V E S T

IB

U L E

IT

TELECOM

OFFICE OFFICE OFFICE OFFICE OFFICE

SERVICE

ELEVATOR

LOBBY

CORRIDOR

P A T

IE

N T

T R A N S F E R

E L E V A T O R

L O B B Y

CORRIDOR

OFFICE OFFICEOFFICEOFFICEOFFICE

SCRUB

DISPENSE

OFFICE

FLOOR

MACHINE

ROOM

PIPE

RISER

IT

TELECOM

ELECTRICAL

ROOM

V E S T

IB

U L E

FACILITIES

SYSTEMS

PASSENGERELEVATOR

LOBBY

OFFICE

PUBLIC

TOILETMENS

PUBLIC

TOILETWOMEN

STAFF

LOUNGE

STAFF

TOILET

BRONCH

EGD EGD

IT

TELECOM

ELECTRICAL

ROOM

STAIR

FACILITIES

SYSTEMS

CORRIDOR

V E S T

IB

U L E

PIPE

RISER

RECEPTION PATIENT

TOILET

RECOV

LINEN

ALCOVE

RECOV

RECOV RECOV

CORRIDOR

RECOV RECOV RECOV RECOV RECOV

SOILED

UTILITY

NURSE

STATION

PREP PREP

CORRIDOR MEDS

LINEN

ALCOVE

CORRIDOR

HAC

HAC GURNEY

SCRUB

CORRIDOR

GOWNED

WAITING

PATIENT

TOILET

PATIENT

TOILET

C O R R

ID

O R

SCOPE

CLEAN

EGD

EGD

SCOPE

CLEAN

CONTROL

PLASTER

ANDSPLINT

STOR

CYSTO

O.R

SCRUB

GURNEY

O.R

SUB-STERILE

O.R

SCRUB

GURNEY

E L E C

EQUIP

STOR

GURNEY

SCRUB

SCRUB

O.R

O.R

INST

PREP/STORAGE

SCRUB

SUB

STERILEOPT

A

O.R

O.R

CLEAN

CORE

SUB-STERILE

SUB-STERILE

SOILED

HOLDINGVESTIBULE

BOTTLE

STORAGE

ANESTHESIA

WORKROOM

LOUNGE/DICTATION

ELEC

STAFF

FACILITIES

MALE

STAFF

FACILITIES

MALE

STAFF

FACILITIES

FEMALE

STAFF

FACILITIES

FEMALE

STAFF

FACILITIES

FEMALE

STAFF

FACILITIES

MALE

STAFF

TOILET

CLEAN

SUPPLY

E L E C

PATIENT

TOILET

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

ELEC

RECOV

RECOV RECOV RECOV RECOV

RECOV

RECOV

RECOV

RECOV

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

STORAGE

PATIENT

TOILET

PATIENT

TOILET

ANTE

ROOM

ISOLATION

MEDS NURSE

STATION

CORRIDOR

ALCOVE

RECOVRECOV

RECOVRECOV

NURSE

STATION

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

ALCOVE

PREP/

RECOV

PREP/

RECOV

PREP/

RECOV

PREP/RECOV

PREP/

RECOV

DICTATION

GURNEY

NURSE

STATION

MEDS/NOURISH

PATIENT

TOILET

VESTIBULE

HAC

GURNEY

X-RAY-STOR

PATIENT

TOILET

SOILED

UTILITY

STAFF

TOILET

CLEAN

SUPPLY/STORAGE

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ELEVATOR

ALCOVE

ALCOVE

STAIR

STAIR

STAIR

STAIR

DUMBWAITER

55.04.00.05.0

55.04.00.05.0 55.04.00.05.0

LIFE SAFETY NOTES

LIFE SAFETY LEGEND

KEY PLAN

PHASING EGRESS LEGEND

S1

S2

P1

P2

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

ZONE 3-7

ZONE 3-8

ZONE 3-7ZONE 3-5

PHASE 3

PHASE 1

PHASE 2

DEDUCTIVE ALTERNATE 3

DEDUCTIVE ALTERNATE 1 DEDUCTIVE ALTERNATE 2

1. THE LIFE SAFETY PLANS ARE "DIAGRAMMATIC ONLY". THEIR PURPOSE IS SOLELY

TO REPRESENT THE LIFE SAFETY COMPONENTS FOR THE PROJECT. THE

GENERAL CONTRACTOR SHALL USE THE CONSTRUCTION DOCUMENTS (NOT THE

LIFE SAFETY PLANS) FOR THE IMPLEMENTATION OF THE OF THE REQUIRED LIFE

S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .