Attachment Price Breakdown Repair Sidewalks.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Y1PZ--Repair B19 and B20 Sidewalks
- Solicitation number
- 36C26126R0051
About this file
This is a Price Breakdown Template for the "Repair Sidewalks" project (Project #459-26-003, Solicitation #36C26126R0051) issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The template is designed for contractors to submit pricing proposals for construction services at the VA Southern Nevada Healthcare System located at 6900 North Pecos Road, North Las Vegas, Nevada. The project involves reconfiguring existing administrative spaces into standardized general-purpose examination rooms to support the Outpatient Surgery Department's growing capacity needs for podiatry, orthopedic, vascular, and ENT services.
The template provides a structured format organized by construction divisions (CSI MasterFormat) including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal/Moisture Protection, Doors and Windows, Finishes, Plumbing, HVAC, Electrical, Communications, and Electrical Safety/Security. Each division section contains line items separated into Labor and Material costs, with specific work items such as core drilling, fireproofing, door hardware, gypsum board repairs, plumbing fixtures (lavatories and piping), HVAC ductwork, electrical service and lighting, and fire alarm systems. The template includes summary fields for overhead, profit, insurance and taxes, and a proposal grand total. All pricing fields currently display $0.00, indicating this is a blank template awaiting contractor completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI List 1-25.docx | DOCX document | |
| RFI 36-54.docx | DOCX document | |
| 36C26126R0051 0004.docx | DOCX document | |
| RFI 26-35.docx | DOCX document | |
| RFI 57.docx | DOCX document | |
| 852.219-75 Fillable 36C26126R0051.pdf | ||
| RFI 55-56.docx | DOCX document | |
| 36C26126R0051 0003.docx | DOCX document | |
| 36C26126R0051 0002.docx | DOCX document | |
| SITE VISIT LOG 36C26126R0051 05-11-2026.pdf | ||
| 36C26126R0051 0001.docx | DOCX document | |
| 36C26126R0051 corrected.docx | DOCX document | |
| 852.219-75.docx | DOCX document | |
| Attachment 02 - Specifications.pdf | ||
| Attachment 01 - Sidewalk Location.pdf | ||
| Attachment REQUEST FOR INFORMATION FORM.docx | DOCX document | |
| 36C26126R0051.docx | DOCX document | |
| Site Visit Location Map.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project Title: Repair Sidewalks |
| Project # 459-26-003| Solicitation # 36C26126R0051 |
| Prepared Date: |
| Firm Name: |
| ALL Divisions Total: | $0.00 |
| Overhead: | $0.00 |
| Profit: | $0.00 |
| Insurance & Taxes: | $0.00 |
| Proposal Grand Total: | $0.00 |
| Division Totals | |
| Division 01 - General Requirements | $0.00 |
| Division 02 - Existing Conditions | $0.00 |
| Division 03 - Concrete | $0.00 |
| Division 04 - Masonry | $0.00 |
| Division 05 - Metals | $0.00 |
| Division 06 - Wood and Plastic | $0.00 |
| Division 07 - Therm/Moisture Prot. | $0.00 |
| Division 08 - Doors and Windows | $0.00 |
| Division 09 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 13 - Special Construction | $0.00 |
| Division 14 - Conveying Equipment | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - HVAC | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Elect. Safety/Security | $0.00 |
| Division 31 - Earthwork | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| Division 33 - Utilities | $0.00 |
| Division 34 - Transportation | $0.00 |
| Division 48 - Electrical Power Gen. | $0.00 |
| Division 01 - General Requirements | Labor | Material | ||
| Project Mananger | $0.00 | $0.00 | ||
| Superintendent/SSHO | $0.00 | $0.00 | ||
| QA/QC Personnel | $0.00 | $0.00 | ||
| ICRA - Lvl 4 | $0.00 | $0.00 | ||
| ICRA - Lvl 2 - Soft Barrier (6mil 10x100', ZipLock 12-pk) | $0.00 | $0.00 | ||
| Mobilization | $0.00 | $0.00 | ||
| Dumpster Rental | $0.00 | $0.00 | ||
| Scissor lift rental | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 02 -Existing Conditions | Labor | Material | ||
| GPR Scanning | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 03 - Concrete | Labor | Material | ||
| Core drilling | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 07 - Therm/Moisture Protection | Labor | Material | ||
| fireproofing through walls | $0.00 | $0.00 | ||
| Core Drilling Fire Proofing | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 08 - Doors and Windows | Labor | Material | ||
| New Exam room Door | $0.00 | $0.00 | ||
| Door Hardware | $0.00 | $0.00 | ||
| Door Frame | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 09 - Finishes | Labor | Material | ||
| General Conditions - Repair, Replace, Patch, Paint, etc | $0.00 | $0.00 | ||
| Gypsum Board | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 22 - Plumbing | Labor | Material | ||
| HW/CW Copper Piping (3/4'') | $0.00 | $0.00 | ||
| Drain Piping (2'') (coated cast iron pipe) | $0.00 | $0.00 | ||
| Vent Piping (2'') (coated cast iron pipe) | $0.00 | $0.00 | ||
| Isolation Valves (globe/check/gate) 3/4'' | $0.00 | $0.00 | ||
| Mixing Valves | $0.00 | $0.00 | ||
| Fixtures | $0.00 | $0.00 | ||
| Solid interceptor | $0.00 | $0.00 | ||
| Lavatory, (P-507) | $0.00 | $0.00 | ||
| Lavatory, wall mounted (P-418) (including rough in) | $0.00 | $0.00 | ||
| Plumbing Plans - Stamped | $0.00 | $0.00 | ||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 23 - HVAC | Labor | Material | ||
| HVAC Ductwork | $0.00 | $0.00 | ||
| HVAC Register | $0.00 | $0.00 | ||
| HVAC Plans -Stamped | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 26 - Electrical | Labor | Material | ||
| New electrical Service - Mtl Included | $0.00 | $0.00 | ||
| Lighting Fixtures | $0.00 | $0.00 | ||
| Electrical Plans - Stamped | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 27 - Communications | Labor | Material | ||
| Nurse call system | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 28- Elect. Safety/Security | Labor | Material | ||
| Fire Alarm speaker | $0.00 | $0.00 | ||
| Fire Alarm Plans | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
File details come from the government source that posted it. Updated .