RFI 55-56.docx
DOCX document 16 KB Posted
- Attached to
- Y1PZ--Repair B19 and B20 Sidewalks
- Solicitation number
- 36C26126R0051
About this file
This is a Request for Information (RFI) document containing seven numbered inquiries and corresponding responses related to a VA Southern Nevada Healthcare System sidewalk repair project (Solicitation 36C26126R0051).
The RFI addresses staffing requirements, site management, and project logistics. Key clarifications include: (1) Quality Control Manager, Site Safety and Health Officer, and Site Superintendent positions are all required, with the superintendent permitted to perform SSHO duties but not QCM duties; (2) contractors must remove tree roots up to 6 inches beneath the sidewalk footprint through root pruning without requiring ISA-certified arborists; (3) no environmental testing or special disposal requirements apply to demolished concrete, asphalt, or excavated soils; (4) the workspace area must be fenced; (5) the contractor must provide a traffic control plan addressing pedestrian and vehicular detours with signage, though a licensed traffic control subcontractor is not required; (6) underground utility locating and potholing are not mandatory, but the VA will provide utility scanning drawings if available by construction Notice to Proceed with the caveat that contractors remain responsible for repairing any damaged utilities at no cost to the Government; and (7) the 852.219-75 form is available in the SAM.gov solicitation attachments. The solicitation closing date is June 15, 2026 at 10:00 AM Pacific Time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI List 1-25.docx | DOCX document | |
| RFI 36-54.docx | DOCX document | |
| 36C26126R0051 0004.docx | DOCX document | |
| RFI 26-35.docx | DOCX document | |
| RFI 57.docx | DOCX document | |
| 852.219-75 Fillable 36C26126R0051.pdf | ||
| 36C26126R0051 0003.docx | DOCX document | |
| 36C26126R0051 0002.docx | DOCX document | |
| SITE VISIT LOG 36C26126R0051 05-11-2026.pdf | ||
| 36C26126R0051 0001.docx | DOCX document | |
| 852.219-75.docx | DOCX document | |
| 36C26126R0051 corrected.docx | DOCX document | |
| Attachment 02 - Specifications.pdf | ||
| Attachment 01 - Sidewalk Location.pdf | ||
| Attachment REQUEST FOR INFORMATION FORM.docx | DOCX document | |
| Attachment Price Breakdown Repair Sidewalks.xlsx | XLSX spreadsheet | |
| 36C26126R0051.docx | DOCX document | |
| Site Visit Location Map.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI #55 –Can you please confirm which of the following positions are required for this project: Quality Control Manager (QCM), Site Safety and Health Officer (SSHO), and/or Site Superintendent? Additionally, if any of these positions are required, please confirm whether any of the roles may be combined and performed by the same individual.
QCM, SSHO, and Site Superintendent are required. The superintendent may also perform as the SSHO. The superintendent may not be the QCM as well.
RFI #56 – The Statement of Work indicates the contractor shall address site issues such as tree roots; however, the extent of remediation is not defined. Please clarify whether root pruning is acceptable or if an arborist will be necessary, will they need to be ISA Certified?
The contractor shall remove all tree roots underneath the sidewalk footprint up to 6 inches in depth, which is the depth of existing subgrade that shall be removed and re-compacted (section 2.A of SOW). Root pruning is acceptable. An arborist is not necessary.
RFI #3 – Are you able to provide a 852.219-75 form? There is not currently one included with the solicitation documents.
852.219-75 form can be found under Attachments/Links of the solicitation at: https://sam.gov/workspace/contract/opp/fcd34152ec324846a5cd62db7f126dba/view
RFI #4 – Please confirm whether any environmental testing or special disposal requirements apply to demolished concrete, asphalt, or excavated soils prior to off-site disposal.
No, environmental testing or special disposal requirements do not apply.
RFI #5 – Will the workspace area need to be fenced in while working?
Yes, the workspace will need to be fenced in.
RFI #6 - Please clarify the specific requirements for the traffic control and pedestrian detour plan, including whether a licensed traffic control subcontractor is required and whether the VA has standard details or specifications that must be followed for ADA-compliant temporary pedestrian access routes.
The contractor shall provide a traffic control plan for work that will impact pedestrian route of travel or roadway access, including construction vehicles parked in the roadway. showing any vehicle or pedestrian detours. This shall include signage and direction of alternate routes. A licensed traffic control subcontractor is not required.
RFI #7 - Please confirm whether underground utility locating, potholing, or other utility investigation work will be required prior to excavation and whether existing utility as-built drawings will be provided to the contractor.
Underground utility locating, potholing, etc. is not a requirement. We are currently conducting utility scanning throughout campus and can supply drawings if available by construction NTP. However, the drawings would be supplied as a reference and are not to be assumed correct. Contractor will still be responsible for repairing any damaged utilities at no expense to the Government.
*Add additional as necessary