This is a price breakdown template for the "Install Sinks Outpatient Surgery" project at the VA Medical Center in Las Vegas, Nevada (Project #593-26-305, Solicitation #36C26126R0020). The spreadsheet is designed to capture labor and material costs across multiple construction divisions organized by the MasterFormat classification system, including general requirements, existing conditions, concrete, masonry, metals, wood and plastic, thermal/moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electrical safety/security, earthwork, exterior improvements, utilities, transportation, and electrical power generation.
The template outlines specific line items relevant to the project scope, including plumbing fixtures (lavatories, isolation valves, mixing valves, copper piping, drain and vent piping), HVAC components (ductwork and registers), electrical systems (service and lighting fixtures), communications systems (nurse call system), fire alarm systems, doors and hardware, gypsum board, general conditions work, and stamped design plans for plumbing, HVAC, electrical, and fire alarm systems. The spreadsheet is configured to calculate subtotals for labor and materials within each division, division totals, overhead, profit, insurance and taxes, and a proposal grand total. All cost fields are currently set at $0.00, indicating this is a blank template awaiting cost data entry from the contractor bidding on this VA facility renovation project.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project Title: Install Sinks Outpatient Surgery |
| Project # 593-26-305 | Solicitation # 36C26126R0020 |
| Prepared Date: |
| Firm Name: |
| ALL Divisions Total: | $0.00 |
| Overhead: | $0.00 |
| Profit: | $0.00 |
| Insurance & Taxes: | $0.00 |
| Proposal Grand Total: | $0.00 |
| Division Totals | |
| Division 01 - General Requirements | $0.00 |
| Division 02 - Existing Conditions | $0.00 |
| Division 03 - Concrete | $0.00 |
| Division 04 - Masonry | $0.00 |
| Division 05 - Metals | $0.00 |
| Division 06 - Wood and Plastic | $0.00 |
| Division 07 - Therm/Moisture Prot. | $0.00 |
| Division 08 - Doors and Windows | $0.00 |
| Division 09 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 13 - Special Construction | $0.00 |
| Division 14 - Conveying Equipment | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - HVAC | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Elect. Safety/Security | $0.00 |
| Division 31 - Earthwork | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| Division 33 - Utilities | $0.00 |
| Division 34 - Transportation | $0.00 |
| Division 48 - Electrical Power Gen. | $0.00 |
| Division 01 - General Requirements | Labor | Material | ||
| Project Mananger | $0.00 | $0.00 | ||
| Superintendent/SSHO | $0.00 | $0.00 | ||
| QA/QC Personnel | $0.00 | $0.00 | ||
| ICRA - Lvl 4 | $0.00 | $0.00 | ||
| ICRA - Lvl 2 - Soft Barrier (6mil 10x100', ZipLock 12-pk) | $0.00 | $0.00 | ||
| Mobilization | $0.00 | $0.00 | ||
| Dumpster Rental | $0.00 | $0.00 | ||
| Scissor lift rental | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 02 -Existing Conditions | Labor | Material | ||
| GPR Scanning | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 03 - Concrete | Labor | Material | ||
| Core drilling | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 07 - Therm/Moisture Protection | Labor | Material | ||
| fireproofing through walls | $0.00 | $0.00 | ||
| Core Drilling Fire Proofing | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 08 - Doors and Windows | Labor | Material | ||
| New Exam room Door | $0.00 | $0.00 | ||
| Door Hardware | $0.00 | $0.00 | ||
| Door Frame | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 09 - Finishes | Labor | Material | ||
| General Conditions - Repair, Replace, Patch, Paint, etc | $0.00 | $0.00 | ||
| Gypsum Board | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 22 - Plumbing | Labor | Material | ||
| HW/CW Copper Piping (3/4'') | $0.00 | $0.00 | ||
| Drain Piping (2'') (coated cast iron pipe) | $0.00 | $0.00 | ||
| Vent Piping (2'') (coated cast iron pipe) | $0.00 | $0.00 | ||
| Isolation Valves (globe/check/gate) 3/4'' | $0.00 | $0.00 | ||
| Mixing Valves | $0.00 | $0.00 | ||
| Fixtures | $0.00 | $0.00 | ||
| Solid interceptor | $0.00 | $0.00 | ||
| Lavatory, (P-507) | $0.00 | $0.00 | ||
| Lavatory, wall mounted (P-418) (including rough in) | $0.00 | $0.00 | ||
| Plumbing Plans - Stamped | $0.00 | $0.00 | ||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 23 - HVAC | Labor | Material | ||
| HVAC Ductwork | $0.00 | $0.00 | ||
| HVAC Register | $0.00 | $0.00 | ||
| HVAC Plans -Stamped | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 26 - Electrical | Labor | Material | ||
| New electrical Service - Mtl Included | $0.00 | $0.00 | ||
| Lighting Fixtures | $0.00 | $0.00 | ||
| Electrical Plans - Stamped | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 27 - Communications | Labor | Material | ||
| Nurse call system | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 28- Elect. Safety/Security | Labor | Material | ||
| Fire Alarm speaker | $0.00 | $0.00 | ||
| Fire Alarm Plans | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
File details come from the government source that posted it. Updated .