Attachment Price Breakdown Improve Water Pressure.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 36C26126R0044
About this file
This is a Price Breakdown Template for construction services related to the "Improve Water Pressure" project at the VA Southern Nevada Healthcare System (VASNHS) in North Las Vegas, Nevada, under Solicitation Number 36C26126R0044 and Project Number 459-26-003. The template is structured to capture labor and material costs across multiple construction divisions in accordance with the MasterFormat specification system.
The template encompasses 28 construction divisions spanning general requirements, site work, building systems, and specialized installations. Key cost categories include Division 01 (General Requirements) with labor roles such as Project Manager, Superintendent/SSHO, and QA/QC Personnel; Division 22 (Plumbing) with copper piping, drain systems, isolation valves, and fixtures; Division 23 (HVAC) with ductwork and registers; Division 26 (Electrical) with new service and lighting; Division 27 (Communications) with nurse call systems; and Division 28 (Electrical Safety/Security) with fire alarm components. The template allows bidders to itemize labor and material costs separately for each line item and division, with subtotals for labor, materials, and division totals, ultimately rolling up to firm overhead, profit, insurance and taxes, and a proposal grand total. All cost fields are currently populated with $0.00, indicating this is a blank template awaiting contractor pricing input.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tigerflow Booster Pump Submittal.pdf | ||
| VA CBOC RFQ_May 2026.docx | DOCX document | |
| AS CBOC Plumbing Floor Plan.pdf | ||
| 36C26126R0044 0003.docx | DOCX document | |
| 36C26126R0044 0002.docx | DOCX document | |
| RFI.docx | DOCX document | |
| 36C26126R0044 0001.docx | DOCX document | |
| 01 32 16-15 Project Schedules.docx | DOCX document | |
| 01 35 26 Safety Requirements.docx | DOCX document | |
| 01 00 00 General Requirements.docx | DOCX document | |
| Statement of Work.docx | DOCX document | |
| 2026 04 20 - BiddingPurposes PCRA - AS CBOC Domestic Water Pump.pdf | ||
| Attachment REQUEST FOR INFORMATION FORM.docx | DOCX document | |
| Wage Determination American Samoa 01.02.2026.pdf | ||
| 36C26126R0044.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project Title: Improve Water Pressue American Samoa CBOC |
| Project # 459-26-003| Solicitation # 36C26126R0044 |
| Prepared Date: |
| Firm Name: |
| ALL Divisions Total: | $0.00 |
| Overhead: | $0.00 |
| Profit: | $0.00 |
| Insurance & Taxes: | $0.00 |
| Proposal Grand Total: | $0.00 |
| Division Totals | |
| Division 01 - General Requirements | $0.00 |
| Division 02 - Existing Conditions | $0.00 |
| Division 03 - Concrete | $0.00 |
| Division 04 - Masonry | $0.00 |
| Division 05 - Metals | $0.00 |
| Division 06 - Wood and Plastic | $0.00 |
| Division 07 - Therm/Moisture Prot. | $0.00 |
| Division 08 - Doors and Windows | $0.00 |
| Division 09 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 13 - Special Construction | $0.00 |
| Division 14 - Conveying Equipment | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - HVAC | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Elect. Safety/Security | $0.00 |
| Division 31 - Earthwork | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| Division 33 - Utilities | $0.00 |
| Division 34 - Transportation | $0.00 |
| Division 48 - Electrical Power Gen. | $0.00 |
| Division 01 - General Requirements | Labor | Material | ||
| Project Mananger | $0.00 | $0.00 | ||
| Superintendent/SSHO | $0.00 | $0.00 | ||
| QA/QC Personnel | $0.00 | $0.00 | ||
| ICRA - Lvl 4 | $0.00 | $0.00 | ||
| ICRA - Lvl 2 - Soft Barrier (6mil 10x100', ZipLock 12-pk) | $0.00 | $0.00 | ||
| Mobilization | $0.00 | $0.00 | ||
| Dumpster Rental | $0.00 | $0.00 | ||
| Scissor lift rental | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 02 -Existing Conditions | Labor | Material | ||
| GPR Scanning | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 03 - Concrete | Labor | Material | ||
| Core drilling | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 07 - Therm/Moisture Protection | Labor | Material | ||
| fireproofing through walls | $0.00 | $0.00 | ||
| Core Drilling Fire Proofing | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 08 - Doors and Windows | Labor | Material | ||
| New Exam room Door | $0.00 | $0.00 | ||
| Door Hardware | $0.00 | $0.00 | ||
| Door Frame | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 09 - Finishes | Labor | Material | ||
| General Conditions - Repair, Replace, Patch, Paint, etc | $0.00 | $0.00 | ||
| Gypsum Board | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 22 - Plumbing | Labor | Material | ||
| HW/CW Copper Piping (3/4'') | $0.00 | $0.00 | ||
| Drain Piping (2'') (coated cast iron pipe) | $0.00 | $0.00 | ||
| Vent Piping (2'') (coated cast iron pipe) | $0.00 | $0.00 | ||
| Isolation Valves (globe/check/gate) 3/4'' | $0.00 | $0.00 | ||
| Mixing Valves | $0.00 | $0.00 | ||
| Fixtures | $0.00 | $0.00 | ||
| Solid interceptor | $0.00 | $0.00 | ||
| Lavatory, (P-507) | $0.00 | $0.00 | ||
| Lavatory, wall mounted (P-418) (including rough in) | $0.00 | $0.00 | ||
| Plumbing Plans - Stamped | $0.00 | $0.00 | ||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 23 - HVAC | Labor | Material | ||
| HVAC Ductwork | $0.00 | $0.00 | ||
| HVAC Register | $0.00 | $0.00 | ||
| HVAC Plans -Stamped | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 26 - Electrical | Labor | Material | ||
| New electrical Service - Mtl Included | $0.00 | $0.00 | ||
| Lighting Fixtures | $0.00 | $0.00 | ||
| Electrical Plans - Stamped | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 27 - Communications | Labor | Material | ||
| Nurse call system | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
| Division 28- Elect. Safety/Security | Labor | Material | ||
| Fire Alarm speaker | $0.00 | $0.00 | ||
| Fire Alarm Plans | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| Labor Total | $0.00 | Materal Total | $0.00 | |
| Division Total: | $0.00 |
File details come from the government source that posted it. Updated .