This is a Laboratory Furnishings and Equipment Plan document prepared for the Valley Sanitary District's New Water Laboratory project located at 45-500 Van Buren Street, Indio, California 92201. The plan, dated September 2, 2021, and marked as a draft progress print for review, provides detailed architectural and equipment specifications for the laboratory facility's design and layout. The document includes comprehensive floor plans, equipment placement diagrams, and multiple elevation views showing the arrangement of laboratory workstations, casework, benchtop equipment, and specialized facilities such as a Class II Type A (future) biosafety cabinet, water storage area, balance room, and janitor closet. Key equipment specified includes water baths, centrifuges, BOD incubators with standby capabilities, 104°F and 180°F ovens with standby units, a spectrophotometer, COD reactor with hot block, benchtop autoclave, benchtop muffle furnace, and a glassware washer. The plan incorporates multiple utility connections including hot water, cold water, electrical service (208V and 230V circuits), vacuum pump systems, and exhaust ducting integrated into island chase systems. Design considerations noted for confirmation include ADA workstation and sink location, sink sizes and materials, standby generator locations, cabinet and casework material selections, benchtop materials, cabinet locks, and the glassware washer basis of design and water supply specifications.
The document identifies multiple items requiring coordination with other divisions, designated as "OFOI" (Owner Furnished or Owner Installed), including coolers, balances, coat hooks, equipment space references, benchtop furnaces, autoclave units, and various carts. The plan specifies 42-inch doors to facilitate equipment movement and deliveries, open workspace areas designated at specific heights, and detailed piping and electrical requirements throughout the laboratory. The drawings include seven distinct elevation views presenting different sections of the laboratory at a scale of 1/2 inch equals 1 foot, with annotations referencing project number 20-4910-00 and consultant SGH Architects Inc. The document was prepared as part of the broader VSD Campus Master Plan initiative, which includes relocation of the certified laboratory facility and incorporates modernization and sustainability elements in the overall campus improvement strategy.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/2/2021 DRAFT PROGRESS PRINT FOR REVIEW
48244824
48244824
5'ACFH
SS
EW
SK4
SK2
W C
J3
G
G
D
G
G
G
S
G
G
G
G
G36 KO36
KO36L36
J4
G
G
G
G
J3
G
G
G36L36G36 G36L36CS36* CS24R*
G36G30C18*KO36G30
G36
SK2
G36 KO36
L36
J3
G36
C18*
VP36
KO36
VP36
FS
G36 G36 S30
K O
A
SK3
KO36
SK2
1.0
2.0
A.0B.0
4' B
S C
C
LA
S S
II
, T
Y P
E A
(F
U T
U R
E
COOLERS OFOI
BALANCES
OFOI
COAT HOOKS
UNDER DIV 10
EQUIP
SPACE
REF OFOI
BENCHTOP MUFFLE
FURNACE OFOI
42" DOOR FOR EASE OF
MOVING EQUIPMENT
AND DELIVERIES
D O
O R
D O
O R
U.C. GLASS
WASHER CFCI
OPEN30
OPEN30
HWCW
OPEN30
OPEN30
HWCW
HWCW
HWCW
HWCW
EW
BENCHTOP
AUTOCLAVE
OFOI
D,SB+43"
REF
OFOI
D
MICRO BIO
ELECTRICAL
RESTROOM
JANITOR
BALANCE
LABORATORY
HALL
WATER STORAGE
LAB STORAGE
INTAKE
OFFICE
+108"
+18"
CART
OFOI
CART
OFOI
+43"
+43"
REF OFOI
D,SB+43"+26"
+26"
E +34"
E +36"
LV
(2
LV
72"x36"
8V
,1 P
,2 0A
0V
,1 P
,2 0A
E +36"
FIRST-AID +
FIRE BLANKET
OFOI
LG SHUT OFF
VALVE BOX BY
DIV 22
FEC BY DIV 10
E +36"
O P
E N
CONFIRM:
• ADA WORKSTATION AND
SINK LOCATION
• SINK SIZES & MATERIALS
• STANDBY GENERATOR
LOCATIONS
• CABINET SELECTIONS
• GLASSWARE WASHER
BASIS OF DESIGN &
WATER SUPPLY
• LOCKS ON CABINETS
• CASEWORK MATERIALS
• BENCHTOP MATERIALS
BENCHTOP EQUIPMENT TYPICAL OFOI
• WATER BATH
• CENTRIFUGE
• BOD INCUBATOR (WITH STANDBY)
• 104 OVEN (WITH STANDBY)
• 180 OVEN (WITH STANDBY)
• SPECTROPHOTOMETER
• COD REACTOR (HOT BLOCK)
LF-100
LF-1001
LF-100
LF-1004
LF-100
LG
LG
208V,1P,20A,+18"
+43"
CANOPY HOOD
ON/OFF SWITCH
+34"
+36" +36"
E EE
E +36" E +36"
E +36" E +36"
A +1
8" +1
8" A
SBSBSB
LF-100
LF-100 9
LF-100
D
ICW(VB)+18"
PW(VB)+18"
IHW(VB)+18"
BOTTLED WATER
IN CABINET FOR
WASHER OFOI
LV
BENCHTOP
EQUIP
BENCHTOP
EQUIP
PIPING TO VACUUM
PUMP TO BENCHTOP
FITTING BY DIV 22
VACUUM PUMP CABINET
EXHAUST DUCT IN ISLAND
CHASE UNDER DIV 23
PIPING TO VACUUM
PUMP TO BENCHTOP
FITTING BY DIV 22
VACUUM PUMP CABINET
EXHAUST DUCT IN ISLAND
CHASE UNDER DIV 23
VACUUM PUMP IN
BASE CABINET - OFOI
(TYPICAL OF 2)
BOD INC
OFOI
THELCO
INC OFOI
SB
104 OVEN
OFOI
180 OVEN
OFOI
P R
O J E
C T
N U
M B
E R
D A
T E
R
E V
IS
IO
N
D E
S C
R
IP
T
IO
N
P R
O J E
C T
S T
A T
U S
P R
O J E
C T
I S
S U
E D
S
G H
A R
C H
IT
E
C T
S I
N C
A
L L
R
IG
H T
S R
E S
E R
V E
D
S E
A L S
C
O N
S U
L T
A N
T
/2
/2
:0
:5
P
M
-4
-0
L A
B O
R A
T O
R Y
F U
R N
IS
H
IN
G
S A
N D
E Q
U
IP
M E
N T
P L A
N
LF-100
N E
W W
A T
E R
L A
B O
R A
T O
R Y
-5
V A
N B
U R
E N
S T
R E
E T
, I N
D
IO
C
A
-V A
LL
E
Y S
A N
IT
A
R Y
D
IS
T R
IC
T
S D
/1
/2
1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation 1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation 1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation
P R
O J E
C T
N U
M B
E R
D A
T E
R
E V
IS
IO
N
D E
S C
R
IP
T
IO
N
P R
O J E
C T
S T
A T
U S
P R
O J E
C T
I S
S U
E D
S
G H
A R
C H
IT
E
C T
S I
N C
A
L L
R
IG
H T
S R
E S
E R
V E
D
S E
A L S
C
O N
S U
L T
A N
T
/2
/2
:1
:0
P
M
-4
-0
U n n a m e d
LF-101
N E
W W
A T
E R
L A
B O
R A
T O
R Y
-5
V
A N
B U
R E
N S
T R
E E
T
IN
D
IO
C
A
-V A
L L
E Y
S A
N
IT
A R
Y D
IS
T
R
IC
T
S D
/3
/2
| LF001 LF-001 (1) |
| LF002 Layout1 (1) |
| LF100 |
| Sheets |
| LF-100 - LABORATORY FURNISHINGS AND EQUIPMENT PLAN |
| LF101 |
| Sheets |
| LF-101 - Unnamed |
File details come from the government source that posted it. Updated .