Attachment_L_Lab_Furnishing_and_Equipment_Plan_-_9-2-21.pdf
PDF 10 MB Posted
- Attached to
- VSD Campus Master Plan Analysis
- Solicitation number
- 2025-RFP-009
- Issued by
- Riverside County, Huntington Beach City, California
About this file
The documents are draft architectural and engineering design plans for a New Water Laboratory for the Valley Sanitary District located at 45-500 Van Buren Street in Indio, California. The plans, dated 9/2/2021, include detailed schematics for laboratory furnishings, equipment placement, electrical and plumbing configurations, and interior layouts. The drawings provide comprehensive views of the laboratory space, including floor plans, elevation drawings, and 3D renderings that showcase the proposed design for the facility.
The design includes specific details for laboratory workstations, cabinet configurations, electrical and ADA clearances, and equipment placement. Key elements include multiple specialized zones such as electrical rooms, restrooms, storage areas, and laboratory spaces. The plans indicate provisions for various laboratory equipment like autoclaves, ovens, incubators, centrifuges, and specialized cabinetry. Notations suggest careful consideration of equipment positioning, electrical requirements, and workflow optimization, with multiple confirmation points noted for ADA workstation locations, sink specifications, and equipment placement. The project number is 20-49101-00, and the drawings were prepared by SGH Architects.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/2/2021 DRAFT PROGRESS PRINT FOR REVIEW
48244824
48244824
5'ACFH
SS
EW
SK4
SK2
W C
J3
G
G
D
G
G
G
S
G
G
G
G
G36 KO36
KO36L36
J4
G
G
G
G
J3
G
G
G36L36G36 G36L36CS36* CS24R*
G36G30C18*KO36G30
G36
SK2
G36 KO36
L36
J3
G36
C18*
VP36
KO36
VP36
FS
G36 G36 S30
K O
A
SK3
KO36
SK2
1.0
2.0
A.0B.0
4' B
S C
C
LA
S S
II
, T
Y P
E A
(F
U T
U R
E
COOLERS OFOI
BALANCES
OFOI
COAT HOOKS
UNDER DIV 10
EQUIP
SPACE
REF OFOI
BENCHTOP MUFFLE
FURNACE OFOI
42" DOOR FOR EASE OF
MOVING EQUIPMENT
AND DELIVERIES
D O
O R
D O
O R
U.C. GLASS
WASHER CFCI
OPEN30
OPEN30
HWCW
OPEN30
OPEN30
HWCW
HWCW
HWCW
HWCW
EW
BENCHTOP
AUTOCLAVE
OFOI
D,SB+43"
REF
OFOI
D
MICRO BIO
ELECTRICAL
RESTROOM
JANITOR
BALANCE
LABORATORY
HALL
WATER STORAGE
LAB STORAGE
INTAKE
OFFICE
+108"
+18"
CART
OFOI
CART
OFOI
+43"
+43"
REF OFOI
D,SB+43"+26"
+26"
E +34"
E +36"
LV
(2
LV
72"x36"
8V
,1 P
,2 0A
0V
,1 P
,2 0A
E +36"
FIRST-AID +
FIRE BLANKET
OFOI
LG SHUT OFF
VALVE BOX BY
DIV 22
FEC BY DIV 10
E +36"
O P
E N
CONFIRM:
• ADA WORKSTATION AND
SINK LOCATION
• SINK SIZES & MATERIALS
• STANDBY GENERATOR
LOCATIONS
• CABINET SELECTIONS
• GLASSWARE WASHER
BASIS OF DESIGN &
WATER SUPPLY
• LOCKS ON CABINETS
• CASEWORK MATERIALS
• BENCHTOP MATERIALS
BENCHTOP EQUIPMENT TYPICAL OFOI
• WATER BATH
• CENTRIFUGE
• BOD INCUBATOR (WITH STANDBY)
• 104 OVEN (WITH STANDBY)
• 180 OVEN (WITH STANDBY)
• SPECTROPHOTOMETER
• COD REACTOR (HOT BLOCK)
LF-100
LF-1001
LF-100
LF-1004
LF-100
LG
LG
208V,1P,20A,+18"
+43"
CANOPY HOOD
ON/OFF SWITCH
+34"
+36" +36"
E EE
E +36" E +36"
E +36" E +36"
A +1
8" +1
8" A
SBSBSB
LF-100
LF-100 9
LF-100
D
ICW(VB)+18"
PW(VB)+18"
IHW(VB)+18"
BOTTLED WATER
IN CABINET FOR
WASHER OFOI
LV
BENCHTOP
EQUIP
BENCHTOP
EQUIP
PIPING TO VACUUM
PUMP TO BENCHTOP
FITTING BY DIV 22
VACUUM PUMP CABINET
EXHAUST DUCT IN ISLAND
CHASE UNDER DIV 23
PIPING TO VACUUM
PUMP TO BENCHTOP
FITTING BY DIV 22
VACUUM PUMP CABINET
EXHAUST DUCT IN ISLAND
CHASE UNDER DIV 23
VACUUM PUMP IN
BASE CABINET - OFOI
(TYPICAL OF 2)
BOD INC
OFOI
THELCO
INC OFOI
SB
104 OVEN
OFOI
180 OVEN
OFOI
P R
O J E
C T
N U
M B
E R
D A
T E
R
E V
IS
IO
N
D E
S C
R
IP
T
IO
N
P R
O J E
C T
S T
A T
U S
P R
O J E
C T
I S
S U
E D
S
G H
A R
C H
IT
E
C T
S I
N C
A
L L
R
IG
H T
S R
E S
E R
V E
D
S E
A L S
C
O N
S U
L T
A N
T
/2
/2
:0
:5
P
M
-4
-0
L A
B O
R A
T O
R Y
F U
R N
IS
H
IN
G
S A
N D
E Q
U
IP
M E
N T
P L A
N
LF-100
N E
W W
A T
E R
L A
B O
R A
T O
R Y
-5
V A
N B
U R
E N
S T
R E
E T
, I N
D
IO
C
A
-V A
LL
E
Y S
A N
IT
A
R Y
D
IS
T R
IC
T
S D
/1
/2
1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation 1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation 1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation
P R
O J E
C T
N U
M B
E R
D A
T E
R
E V
IS
IO
N
D E
S C
R
IP
T
IO
N
P R
O J E
C T
S T
A T
U S
P R
O J E
C T
I S
S U
E D
S
G H
A R
C H
IT
E
C T
S I
N C
A
L L
R
IG
H T
S R
E S
E R
V E
D
S E
A L S
C
O N
S U
L T
A N
T
/2
/2
:1
:0
P
M
-4
-0
U n n a m e d
LF-101
N E
W W
A T
E R
L A
B O
R A
T O
R Y
-5
V
A N
B U
R E
N S
T R
E E
T
IN
D
IO
C
A
-V A
L L
E Y
S A
N
IT
A R
Y D
IS
T
R
IC
T
S D
/3
/2
| LF001 LF-001 (1) |
| LF002 Layout1 (1) |
| LF100 |
| Sheets |
| LF-100 - LABORATORY FURNISHINGS AND EQUIPMENT PLAN |
| LF101 |
| Sheets |
| LF-101 - Unnamed |
File details come from the government source that posted it. Updated .