Attachment_L_Lab_Furnishing_and_Equipment_Plan_-_9-2-21.pdf

PDF 10 MB Posted

Attached to
VSD Campus Master Plan Analysis
Solicitation number
2025-RFP-009
Issued by
Riverside County, Huntington Beach City, California

About this file

This is a Laboratory Furnishings and Equipment Plan document prepared by SGH Architects Inc. for the Valley Sanitary District's New Water Laboratory project located at 45-500 Van Buren Street, Indio, California. The plan, dated September 2, 2021 (Draft Progress Print for Review), provides detailed architectural drawings and specifications for laboratory equipment layout and installation. The document includes multiple elevations showing the placement of specialized laboratory equipment such as benchtop autoclaves, muffle furnaces, water baths, centrifuges, BOD incubators, ovens, spectrophotometers, COD reactors, and a glass washer. The plan designates specific areas within the laboratory (Room 210) for equipment positioning, utility connections, and safety features, including ADA-compliant workstations and emergency equipment locations. Additional components addressed in the plan include vacuum pump cabinets, electrical specifications (208V and 230V connections), water supply systems with bottled water provisions, exhaust ducting, and storage facilities. The document also identifies items requiring confirmation regarding ADA workstation placement, sink specifications, standby generator locations, cabinet selections, and benchtop materials, with notes indicating that certain components are "OFOI" (Owner Furnished or Owner Installed).

The plan includes dimensional specifications and equipment staging with references to related design documents (LF-001, LF-002, LF-100, and LF-101) and coordination with other building divisions for infrastructure integration. The document demonstrates coordination with Division 10 (equipment), Division 22 (plumbing and piping), and Division 23 (mechanical systems) for comprehensive laboratory buildout. Class II Type A biosafety cabinets are specified with provisions for future coolers and equipment expansion. The plan serves as a foundational document for equipment procurement, utility planning, and contractor coordination during the laboratory construction phase, establishing the technical requirements necessary for proper functionality and safety of the water laboratory facility.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/2/2021 DRAFT PROGRESS PRINT FOR REVIEW

48244824

48244824

5'ACFH

SS

EW

SK4

SK2

W C

J3

G

G

D

G

G

G

S

G

G

G

G

G36 KO36

KO36L36

J4

G

G

G

G

J3

G

G

G36L36G36 G36L36CS36* CS24R*

G36G30C18*KO36G30

G36

SK2

G36 KO36

L36

J3

G36

C18*

VP36

KO36

VP36

FS

G36 G36 S30

K O

A

SK3

KO36

SK2

1.0

2.0

A.0B.0

4' B

S C

C

LA

S S

II

, T

Y P

E A

(F

U T

U R

E

COOLERS OFOI

BALANCES

OFOI

COAT HOOKS

UNDER DIV 10

EQUIP

SPACE

REF OFOI

BENCHTOP MUFFLE

FURNACE OFOI

42" DOOR FOR EASE OF

MOVING EQUIPMENT

AND DELIVERIES

D O

O R

D O

O R

U.C. GLASS

WASHER CFCI

OPEN30

OPEN30

HWCW

OPEN30

OPEN30

HWCW

HWCW

HWCW

HWCW

EW

BENCHTOP

AUTOCLAVE

OFOI

D,SB+43"

REF

OFOI

D

MICRO BIO

ELECTRICAL

RESTROOM

JANITOR

BALANCE

LABORATORY

HALL

WATER STORAGE

LAB STORAGE

INTAKE

OFFICE

+108"

+18"

CART

OFOI

CART

OFOI

+43"

+43"

REF OFOI

D,SB+43"+26"

+26"

E +34"

E +36"

LV

(2

LV

72"x36"

8V

,1 P

,2 0A

0V

,1 P

,2 0A

E +36"

FIRST-AID +

FIRE BLANKET

OFOI

LG SHUT OFF

VALVE BOX BY

DIV 22

FEC BY DIV 10

E +36"

O P

E N

CONFIRM:

• ADA WORKSTATION AND

SINK LOCATION

• SINK SIZES & MATERIALS

• STANDBY GENERATOR

LOCATIONS

• CABINET SELECTIONS

• GLASSWARE WASHER

BASIS OF DESIGN &

WATER SUPPLY

• LOCKS ON CABINETS

• CASEWORK MATERIALS

• BENCHTOP MATERIALS

BENCHTOP EQUIPMENT TYPICAL OFOI

• WATER BATH

• CENTRIFUGE

• BOD INCUBATOR (WITH STANDBY)

• 104 OVEN (WITH STANDBY)

• 180 OVEN (WITH STANDBY)

• SPECTROPHOTOMETER

• COD REACTOR (HOT BLOCK)

LF-100

LF-1001

LF-100

LF-1004

LF-100

LG

LG

208V,1P,20A,+18"

+43"

CANOPY HOOD

ON/OFF SWITCH

+34"

+36" +36"

E EE

E +36" E +36"

E +36" E +36"

A +1

8" +1

8" A

SBSBSB

LF-100

LF-100 9

LF-100

D

ICW(VB)+18"

PW(VB)+18"

IHW(VB)+18"

BOTTLED WATER

IN CABINET FOR

WASHER OFOI

LV

BENCHTOP

EQUIP

BENCHTOP

EQUIP

PIPING TO VACUUM

PUMP TO BENCHTOP

FITTING BY DIV 22

VACUUM PUMP CABINET

EXHAUST DUCT IN ISLAND

CHASE UNDER DIV 23

PIPING TO VACUUM

PUMP TO BENCHTOP

FITTING BY DIV 22

VACUUM PUMP CABINET

EXHAUST DUCT IN ISLAND

CHASE UNDER DIV 23

VACUUM PUMP IN

BASE CABINET - OFOI

(TYPICAL OF 2)

BOD INC

OFOI

THELCO

INC OFOI

SB

104 OVEN

OFOI

180 OVEN

OFOI

P R

O J E

C T

N U

M B

E R

D A

T E

R

E V

IS

IO

N

D E

S C

R

IP

T

IO

N

P R

O J E

C T

S T

A T

U S

P R

O J E

C T

I S

S U

E D

S

G H

A R

C H

IT

E

C T

S I

N C

A

L L

R

IG

H T

S R

E S

E R

V E

D

S E

A L S

C

O N

S U

L T

A N

T

/2

/2

:0

:5

P

M

-4

-0

L A

B O

R A

T O

R Y

F U

R N

IS

H

IN

G

S A

N D

E Q

U

IP

M E

N T

P L A

N

LF-100

N E

W W

A T

E R

L A

B O

R A

T O

R Y

-5

V A

N B

U R

E N

S T

R E

E T

, I N

D

IO

C

A

-V A

LL

E

Y S

A N

IT

A

R Y

D

IS

T R

IC

T

S D

/1

/2

1/2" = 1'-0"

Elevation

1/2" = 1'-0"

Elevation 1/2" = 1'-0"

Elevation

1/2" = 1'-0"

Elevation 1/2" = 1'-0"

Elevation

1/2" = 1'-0"

Elevation

1/2" = 1'-0"

Elevation

1/2" = 1'-0"

Elevation

P R

O J E

C T

N U

M B

E R

D A

T E

R

E V

IS

IO

N

D E

S C

R

IP

T

IO

N

P R

O J E

C T

S T

A T

U S

P R

O J E

C T

I S

S U

E D

S

G H

A R

C H

IT

E

C T

S I

N C

A

L L

R

IG

H T

S R

E S

E R

V E

D

S E

A L S

C

O N

S U

L T

A N

T

/2

/2

:1

:0

P

M

-4

-0

U n n a m e d

LF-101

N E

W W

A T

E R

L A

B O

R A

T O

R Y

-5

V

A N

B U

R E

N S

T R

E E

T

IN

D

IO

C

A

-V A

L L

E Y

S A

N

IT

A R

Y D

IS

T

R

IC

T

S D

/3

/2

LF001 LF-001 (1)
LF002 Layout1 (1)
LF100
Sheets
LF-100 - LABORATORY FURNISHINGS AND EQUIPMENT PLAN
LF101
Sheets
LF-101 - Unnamed

File details come from the government source that posted it. Updated .