Attachment_L_Lab_Furnishing_and_Equipment_Plan_-_9-2-21.pdf
PDF 10 MB Posted
- Attached to
- VSD Campus Master Plan Analysis
- Solicitation number
- 2025-RFP-009
- Issued by
- Riverside County, Huntington Beach City, California
About this file
This is a Laboratory Furnishings and Equipment Plan document prepared by SGH Architects Inc. for the Valley Sanitary District's New Water Laboratory project located at 45-500 Van Buren Street, Indio, California. The plan, dated September 2, 2021 (Draft Progress Print for Review), provides detailed architectural drawings and specifications for laboratory equipment layout and installation. The document includes multiple elevations showing the placement of specialized laboratory equipment such as benchtop autoclaves, muffle furnaces, water baths, centrifuges, BOD incubators, ovens, spectrophotometers, COD reactors, and a glass washer. The plan designates specific areas within the laboratory (Room 210) for equipment positioning, utility connections, and safety features, including ADA-compliant workstations and emergency equipment locations. Additional components addressed in the plan include vacuum pump cabinets, electrical specifications (208V and 230V connections), water supply systems with bottled water provisions, exhaust ducting, and storage facilities. The document also identifies items requiring confirmation regarding ADA workstation placement, sink specifications, standby generator locations, cabinet selections, and benchtop materials, with notes indicating that certain components are "OFOI" (Owner Furnished or Owner Installed).
The plan includes dimensional specifications and equipment staging with references to related design documents (LF-001, LF-002, LF-100, and LF-101) and coordination with other building divisions for infrastructure integration. The document demonstrates coordination with Division 10 (equipment), Division 22 (plumbing and piping), and Division 23 (mechanical systems) for comprehensive laboratory buildout. Class II Type A biosafety cabinets are specified with provisions for future coolers and equipment expansion. The plan serves as a foundational document for equipment procurement, utility planning, and contractor coordination during the laboratory construction phase, establishing the technical requirements necessary for proper functionality and safety of the water laboratory facility.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/2/2021 DRAFT PROGRESS PRINT FOR REVIEW
48244824
48244824
5'ACFH
SS
EW
SK4
SK2
W C
J3
G
G
D
G
G
G
S
G
G
G
G
G36 KO36
KO36L36
J4
G
G
G
G
J3
G
G
G36L36G36 G36L36CS36* CS24R*
G36G30C18*KO36G30
G36
SK2
G36 KO36
L36
J3
G36
C18*
VP36
KO36
VP36
FS
G36 G36 S30
K O
A
SK3
KO36
SK2
1.0
2.0
A.0B.0
4' B
S C
C
LA
S S
II
, T
Y P
E A
(F
U T
U R
E
COOLERS OFOI
BALANCES
OFOI
COAT HOOKS
UNDER DIV 10
EQUIP
SPACE
REF OFOI
BENCHTOP MUFFLE
FURNACE OFOI
42" DOOR FOR EASE OF
MOVING EQUIPMENT
AND DELIVERIES
D O
O R
D O
O R
U.C. GLASS
WASHER CFCI
OPEN30
OPEN30
HWCW
OPEN30
OPEN30
HWCW
HWCW
HWCW
HWCW
EW
BENCHTOP
AUTOCLAVE
OFOI
D,SB+43"
REF
OFOI
D
MICRO BIO
ELECTRICAL
RESTROOM
JANITOR
BALANCE
LABORATORY
HALL
WATER STORAGE
LAB STORAGE
INTAKE
OFFICE
+108"
+18"
CART
OFOI
CART
OFOI
+43"
+43"
REF OFOI
D,SB+43"+26"
+26"
E +34"
E +36"
LV
(2
LV
72"x36"
8V
,1 P
,2 0A
0V
,1 P
,2 0A
E +36"
FIRST-AID +
FIRE BLANKET
OFOI
LG SHUT OFF
VALVE BOX BY
DIV 22
FEC BY DIV 10
E +36"
O P
E N
CONFIRM:
• ADA WORKSTATION AND
SINK LOCATION
• SINK SIZES & MATERIALS
• STANDBY GENERATOR
LOCATIONS
• CABINET SELECTIONS
• GLASSWARE WASHER
BASIS OF DESIGN &
WATER SUPPLY
• LOCKS ON CABINETS
• CASEWORK MATERIALS
• BENCHTOP MATERIALS
BENCHTOP EQUIPMENT TYPICAL OFOI
• WATER BATH
• CENTRIFUGE
• BOD INCUBATOR (WITH STANDBY)
• 104 OVEN (WITH STANDBY)
• 180 OVEN (WITH STANDBY)
• SPECTROPHOTOMETER
• COD REACTOR (HOT BLOCK)
LF-100
LF-1001
LF-100
LF-1004
LF-100
LG
LG
208V,1P,20A,+18"
+43"
CANOPY HOOD
ON/OFF SWITCH
+34"
+36" +36"
E EE
E +36" E +36"
E +36" E +36"
A +1
8" +1
8" A
SBSBSB
LF-100
LF-100 9
LF-100
D
ICW(VB)+18"
PW(VB)+18"
IHW(VB)+18"
BOTTLED WATER
IN CABINET FOR
WASHER OFOI
LV
BENCHTOP
EQUIP
BENCHTOP
EQUIP
PIPING TO VACUUM
PUMP TO BENCHTOP
FITTING BY DIV 22
VACUUM PUMP CABINET
EXHAUST DUCT IN ISLAND
CHASE UNDER DIV 23
PIPING TO VACUUM
PUMP TO BENCHTOP
FITTING BY DIV 22
VACUUM PUMP CABINET
EXHAUST DUCT IN ISLAND
CHASE UNDER DIV 23
VACUUM PUMP IN
BASE CABINET - OFOI
(TYPICAL OF 2)
BOD INC
OFOI
THELCO
INC OFOI
SB
104 OVEN
OFOI
180 OVEN
OFOI
P R
O J E
C T
N U
M B
E R
D A
T E
R
E V
IS
IO
N
D E
S C
R
IP
T
IO
N
P R
O J E
C T
S T
A T
U S
P R
O J E
C T
I S
S U
E D
S
G H
A R
C H
IT
E
C T
S I
N C
A
L L
R
IG
H T
S R
E S
E R
V E
D
S E
A L S
C
O N
S U
L T
A N
T
/2
/2
:0
:5
P
M
-4
-0
L A
B O
R A
T O
R Y
F U
R N
IS
H
IN
G
S A
N D
E Q
U
IP
M E
N T
P L A
N
LF-100
N E
W W
A T
E R
L A
B O
R A
T O
R Y
-5
V A
N B
U R
E N
S T
R E
E T
, I N
D
IO
C
A
-V A
LL
E
Y S
A N
IT
A
R Y
D
IS
T R
IC
T
S D
/1
/2
1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation 1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation 1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation
1/2" = 1'-0"
Elevation
P R
O J E
C T
N U
M B
E R
D A
T E
R
E V
IS
IO
N
D E
S C
R
IP
T
IO
N
P R
O J E
C T
S T
A T
U S
P R
O J E
C T
I S
S U
E D
S
G H
A R
C H
IT
E
C T
S I
N C
A
L L
R
IG
H T
S R
E S
E R
V E
D
S E
A L S
C
O N
S U
L T
A N
T
/2
/2
:1
:0
P
M
-4
-0
U n n a m e d
LF-101
N E
W W
A T
E R
L A
B O
R A
T O
R Y
-5
V
A N
B U
R E
N S
T R
E E
T
IN
D
IO
C
A
-V A
L L
E Y
S A
N
IT
A R
Y D
IS
T
R
IC
T
S D
/3
/2
| LF001 LF-001 (1) |
| LF002 Layout1 (1) |
| LF100 |
| Sheets |
| LF-100 - LABORATORY FURNISHINGS AND EQUIPMENT PLAN |
| LF101 |
| Sheets |
| LF-101 - Unnamed |
File details come from the government source that posted it. Updated .