Attachment L-06 Accounting System Checklist.pdf

PDF 819 KB Posted

Attached to
HQ0858-20-R-0014 - TEAMS-Next MDS Engineering Solicitation
Solicitation number
HQ0858-20-R-0014
Issued by

About this file

This document contains a pre-award accounting system checklist and related solicitation for Missile Defense Agency engineering services. The Missile Defense Agency is soliciting proposals for Agency-wide missile defense system engineering support services through a cost-plus-fixed-fee level of effort contract with a base period of three years and two two-year options. Offerors must be registered in the System for Award Management database and complete proposals must be delivered no later than November 6, 2020 to the specified email addresses. Questions should be directed to the listed points of contact. The pre-award accounting system checklist requires prospective contractors to disclose information about their accounting systems, policies, and readiness for a Defense Contract Audit Agency audit to support potential cost-type contracts.

View the file

Other files

File Type Posted
HQ0858-20-R-0014 TN MDS Eng CONFORMED 10.21.20.pdf PDF
Attachment L-05 MDS Engineering EPW 10.13.20.xlsx XLSX spreadsheet
Attachment J-18 Mission Essential Functions (MDSE) 10.15.20.pdf PDF
TEAMS-Next MDS Engineering Section L 10.13.20.pdf PDF
HQ0858-20-R-0014 TN MDS Eng MOD 10.21.20.pdf PDF
Attachment J-14 Quarterly Self Assessment 3.9.20.pdf PDF
TEAMS-Next MDS Engineering Section L 9.15.20.pdf PDF
Attachment J-13 Monthly Manpower Report Template 1.9.20.xlsx XLSX spreadsheet
Attachment L-05 MDS Engineering EPW 9-17-20.xlsx XLSX spreadsheet
Attachment J-03 TERP Procedures 5.19.20.pdf PDF
Exhibit A - Contract Data Requirements List 9.17.20.pdf PDF
Attachment J-15 SOFA Travel Clauses 2.7.20.pdf PDF
Attachment J-09 Authorized ODC Travel by CLIN 1.9.20.xlsx XLSX spreadsheet
Attachment J-01 TEAMS Next MDS Engineering Statement of Work 9.16.20.pdf PDF
Attachment J-08 DD254 8.8.20 redacted.pdf PDF
Attachment J-18 Mission Essential Functions.pdf PDF
Attachment J-05 TERP Pricing Model 9.18.20.xlsx XLSX spreadsheet
Attachment J-06 NDA Individual Contractor 1.9.20.pdf PDF
Attachment L-07 OCI Disclosure Form.pdf PDF
Attachment J-17 IMCP Supplier Compliance Supplement 2.24.20.pdf PDF
Attachment J-04 TERP Form 6.25.20.pdf PDF
TEAMS-Next MDS Engineering Section M 9.15.20.pdf PDF
Attachment J-11 Cost Report Template 3.9.20.xlsx XLSX spreadsheet
HQ0858-20-R-0014 TN MDSE 9.22.20.pdf PDF
Attachment J-12 Travel and ODC Report 2.18.20.xlsx XLSX spreadsheet
Attachment J-21 TEAMS-Next OCI Guiding Principles 9.15.20.pdf PDF
Attachment J-02 G-06 Allotment of Funds HQ0858-20-R-0014 9.9.20.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HQ0858-20-R-0014 Att L6

Preaward Survey of Prospective Contractor Accounting System Checklist

[FAR 16.301-3 states that a cost-reimbursement type contract may be used only when the contractor’s accounting system is adequate for determining costs applicable to the contract. If no information is available in the files to make this determination, a Preaward Survey of

Prospective Contractor’s Accounting System (SF1408) can be requested from DCAA. Before requesting such an audit, it is a good idea to send this checklist to prospective contractor’s for completion to ensure they understand the requirements of the SF1408, and to ensure they are ready for DCAA to come in and perform an audit].

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2, provide a narrative describing how the current accounting system supports your response to each item. Be as descriptive as necessary.

3. Answer the questions on page 3.

Contractor Name:

Point of Contact:

(Name/Ph #/email)

CAGE Code:

DUNS Code:

Yes No N/A Note

1. Is the accounting system in accord with generally accepted accounting principles? 1

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs. 2

b. Identification and accumulation of direct costs by contract. 3

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) 4

d. Accumulation of costs under general ledger control. 5

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. 6

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. 7

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account. 8

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract

Cost Principles and Procedures, or other contract provisions. 9

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. 10

j. Segregation of preproduction costs from production costs. 11

Approved for Public Release 20-MDA-10578 (18 Sep 20)

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost

(FAR 52.232-20 and 21) or limitation on payments (FAR

52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note Narrative

PLEASE ANSWER ALL QUESTIONS BELOW:

ARE YOU PLANNING ON BIDDING ON COST TYPE CONTRACTS? (YES/NO) ______

ARE YOU READY FOR A DCAA AUDIT? (YES/NO) _____________

HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO) ____________

HAVE YOU READ THE "Information for Contractors" DOCUMENT ON DCAA's

WEBSITE (http://www.dcaa.mil/)? (YES/NO) _____________

PLEASE IDENTIFY THE DCAA OFFICE THAT IS COGNIZANT OVER YOUR COMPANY -

(Found on DCAA's website (http://www.dcaa.mil/) _____________________

PLEASE IDENTIFY YOUR COMPANY’S POINT OF CONTACT (Name/ph #/ email)

If an Outside CPA/Consultant/Non DoD agency has reviewed your Accounting System, please provide a copy of the Report.

[Insert name and title of individual responsible for design of the accounting system]

Name: ______________________ Signature: ___________________________

Title: ______________________ Date: ______________________________

Contractor: ______________________________________________________________

File details come from the government source that posted it. Updated .