Attachment L-03 Phase-In Template (DRFP).xlsx
XLSX spreadsheet 74 KB Posted
- Solicitation number
- 80KSC021SMASSIVDRFP
About this file
This document provides a draft request for proposal and related phase-in template for the NASA Kennedy Space Center Safety and Mission Assurance Support Services IV contract. The anticipated SMASS IV contract will provide services in areas including system safety engineering and analysis, quality assurance and engineering, mission assurance and integration, reliability and maintainability, software assurance, range safety, independent assessment, and expendable launch vehicle payload safety. The phase-in template requires offerors to provide fully burdened labor rates and hours for up to 30 days of phase-in, as well as pricing for non-labor items such as subcontracts, materials, travel, and training. Comments on the draft RFP are due by March 30, 2022. The final RFP is expected to be released on SAM.gov at a later date.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Page L-03
| Kennedy Space Center |
| Safety and Mission Assurance Support Services IV |
| (SMASS IV) |
| Attachment L-03 |
| Phase-In Template (DRFP) |
&"Arial,Regular"&12SMASS IV 80KSC022R0010DRFP
&P of &N
Instructions
SMASS IV Phase-In Price Template
Preparation Instructions:
| "SMASS IV Phase-In" tab: |
| This worksheet tab requires the following inputs from the offeror: |
| Labor: |
| - Input offeror's name in worksheet tab cell A2. |
| - Input all required offeror Labor Classifications starting in Cell A9. |
| - Input a fully burdened (thru profit) straight time labor rate(s) starting in Cell B9 |
| - Input Labor Hours, by proposed Labor Classification(s), for the 30 days of Phase In, starting in Cells C9. |
| - Total Fully Burdened Labor Dollars (starting in Cell F9) auto populate with no offeror input required. |
| Non-Labor: |
| - Input all required Non-Labor resources (e.g. Subcontracts, Materials, Other Direct Cost (ODC), Travel, Training, etc.) starting in Cell E39 at Price. |
| - Total Phase-In Price (Cell E48) auto populate with no offeror input required. |
| Notes: |
| - The Offeror's Phase-In approach/strategy is to be fully supported/documented in their Mission Suitability Volume and shall be consistent with the pricing provided herein. |
| - The fully burdened labor rates and dollars shall include all compensation (wages and fringe benefits); general and administrative (G&A), overhead, and any other indirect as applicable; and profit. |
| &"Arial,Regular"&12 SMASS IV 80KSC022R0010DRFP | &"Arial,Regular"&12PHASE-IN |
| TEMPLATE | &"Arial,Regular"&12ATTACHMENT L-03 |
&P of &N
SMASS IV Phase-In Offeror:
| SMASS IV - Firm Fixed Price Estimate for Phase-In: | |||
| Elements of Cost | |||
| Labor: | Up to 30 Day Phase-In Period | ||
| Offeror Labor Classification | Fully Burdened S/T Labor Rate (thru profit) | Labor | |
| Hours | Total Labor | ||
| Hours | Total Fully Burdened |
Labor Dollars
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
| 0 | $0.00 |
Total Labor Hours/ Fully Burdened Labor Dollars: 0 0 $0.00
| Non-Labor: | |
| Non-Labor Element (fully burdened thru profit): | Price |
| Subcontracts | |
| Materials | |
| Other Direct Cost (ODC) | |
| Travel | |
| Training | |
| Other #1 | |
| Other #2 | |
| Other #3 |
| Total Phase-In Price (Labor and Non-Labor) | $0.00 |
| Note: The Offeror's Phase-In approach/strategy is to be fully supported/documented in their |
Mission Suitability Volume and shall be consistent with the pricing provided herein.
| &"Arial,Regular"&12 SMASS IV 80KSC022R0010DRFP | &"Arial,Regular"&12PHASE-IN |
| TEMPLATE | &"Arial,Regular"&12ATTACHMENT L-03 |
&P of &N
File details come from the government source that posted it. Updated .