This document provides the level of effort hours and labor classifications for the Safety and Mission Assurance Support Services IV (SMASS IV) contract. The SMASS IV contract includes a base period from February 2023 through September 2024, option period one from October 2024 through September 2026, and option period two from October 2026 through January 2028. The document identifies the government-provided level of effort hours organized by labor classification for each contract period. Labor classifications included are SMA Engineer levels one through five, Specialist levels two and three, and Analyst. The level of effort hours will be used to support requirements of the National Aeronautics and Space Administration Kennedy Space Center Safety and Mission Assurance Directorate, including system safety engineering, quality assurance, mission assurance, reliability, software assurance, range safety, independent assessment, and other areas.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title Page

SAFETY AND MISSION ASSURANCE SUPPORT SERVICES IV
(SMASS) IV
CONTRACT

ATTACHMENT L-02

LEVEL OF EFFORT HOURS

&"Arial,Regular"&12 SMASS IV 80KSC022R0010DRFP

&"Arial,Regular"&12Page &P of &N

Introduction

&"Arial,Regular"&12LEVEL OF EFFORT
HOURS&"Arial,Regular"&12ATTACHMENT L-02

&"Arial,Regular"&12Page &P of &N

INTRODUCTION

This document identifies the Government-provided Level of Effort (LOE) hours for the for the SMASS IV contract.

The "BASE" tables provide the base LOE hours organized by the labor classifications.

Note: SMASS IV Base Contract Period of Performance (PoP) includes CLIN 1 for Base Period (2/1/2023-9/30/2024), CLIN 2 for Option Period 1 (10/1/2024-9/30/2026), and CLIN 3 for Option Period 2 (10/1/2026-1/31/2028).

Note: The offeror has the ability to utilize the "Other - Labor Classification Title " row for any proposed Key Personnel and/or PMO positions which are not included in the Attachement L-02, Level of Effort Hours.

The "FLEX" table provides the flex hours available by labor classification.

BASE - By Labor Classification SMASS IV LEVEL OF EFFORT (LOE) HOURS - BASE Contract By Labor Classification Labor Classification Base Period Option Period 1 Option Period 2 Total

SMA Engineer 13,8373,8482,57310,258
SMA Engineer 28,9495,7722,57317,294
SMA Engineer 339,66739,44224,441103,550
SMA Engineer 449,26547,61928,300125,184
SMA Engineer 53,1993,8482,5739,620
Specialist 224,0426,7342,57333,349
Specialist 330,70725,01215,43671,155
Analyst6,3997,6965,14519,240
Other0

BASE HOURS 166,064 139,971 83,613 389,648

&"Arial,Regular"&12LEVEL OF EFFORT
HOURS&"Arial,Regular"&12ATTACHMENT L-02

&"Arial,Regular"&12Page &P of &N

FLEX

SMASS IV LEVEL OF EFFORT (LOE) HOURS - FLEX

By Labor Category Labor Classification Base Period Option Period 1 Option Period 2 Total

SMA Engineer 13,3454,3742,93710,656
SMA Engineer 29,40213,2839,36932,054
SMA Engineer 326,58038,54928,54793,676
SMA Engineer 432,54744,23331,023107,803
SMA Engineer 55,1886,2984,22415,710
Specialist 11113
Specialist 222,24035,24624,29181,777
Specialist 321,96931,30421,48274,755
Analyst3,9784,8993,30212,179
Other0

FLEX HOURS 125,250 178,188 125,175 428,613

&"Arial,Regular"&12LEVEL OF EFFORT
HOURS&"Arial,Regular"&12ATTACHMENT L-02

&"Arial,Regular"&12Page &P of &N

TOTAL

SMASS IV LEVEL OF EFFORT (LOE) HOURS - TOTAL
Base PeriodOption Period 1Option Period 2Total
BASE HOURS166,064139,97183,613389,648
FLEX HOURS125,250178,188125,175428,613

TOTAL HOURS 291,315 318,159 208,788 818,261

&"Arial,Regular"&12LEVEL OF EFFORT
HOURS&"Arial,Regular"&12ATTACHMENT L-02

&"Arial,Regular"&12Page &P of &N

File details come from the government source that posted it. Updated .