Attachment_K_Lab_Bldg_Schematic_Design_Package_-_4-8-21.pdf

PDF 2 MB Posted

Attached to
VSD Campus Master Plan Analysis
Solicitation number
2025-RFP-009
Issued by
Riverside County, Huntington Beach City, California

About this file

This is a schematic design package for a new laboratory building prepared by Valley Sanitary District for their facility located at 45-100 Van Buren Street in Indio, California. The document, dated April 8, 2021, was prepared by SGH Architecture with approval from District Engineer Ron Buchwald and General Manager Beverli A. Marshall. The schematic design includes comprehensive architectural drawings depicting a single-story laboratory building with a total height to parapet of 18 feet 8 inches, featuring a floor plan with multiple functional spaces including a main laboratory (Room 105), intake area (Room 103), office (Room 104), water storage (Room 101), laboratory storage (Room 102), balance room (Room 106), microbiology area (Room 107), janitor closet (Room 109), restroom (Room 108), and electrical room (Room 110). The design incorporates multiple exterior elevations utilizing precision CMU accent materials and split-face CMU construction, with interior sections showing the laboratory and hall configurations.

The schematic design package includes detailed laboratory furnishings and equipment plans specifying owner-furnished and owner-installed equipment such as biological safety cabinets, chemical fume hoods, laboratory sinks with eyewash stations, safety showers, benchtop autoclaves, muffle furnaces, glassware washers, adjustable shelving systems, desk units, and storage solutions. The design incorporates specialized infrastructure including pipe drop enclosures with drying racks, canopy exhaust hoods, and 42-inch doors for equipment and delivery access. The architectural drawings are scaled at 1/8 inch equals 1 foot and include comprehensive site plans, floor plans, and sectional details depicting the building's integration within the campus environment at Valley Sanitary District's main facility in Indio, California.

View the file

Other files

File Type Posted
VSD_Campus_Master_Plan_Analysis.pdf PDF
VSD_Campus_Master_Plan_Analysis.pdf PDF
VSD_Campus_Master_Plan_Analysis.pdf PDF
VSD_Campus_Master_Plan_Analysis_RFP.pdf PDF
VSD_Campus_Master_Plan_Analysis_RFP.pdf PDF
VSD_Campus_Master_Plan_Analysis_RFP.pdf PDF
Attachment_I_50%_Design_Plans_-_11-19-21.pdf PDF
Attachment_J_Lab_Bldg_Schematic_Design_Cost_Estimate_-_4-19-21.pdf PDF
Attachment_C_VSD_WRF_Master_Plan_2025_-_Draft.pdf PDF
Attachment_E_Earth_Systems_Geotechnical_Report_Jan_2022.pdf PDF
Attachment_C_VSD_WRF_Master_Plan_2025_-_Draft.pdf PDF
Attachment_G_Geotech_Report_for_Lystek_2024-12-11.pdf PDF
Attachment_H_Leighton_Geotechnical_Report_-_11-20-2020.pdf PDF
Attachment_J_Lab_Bldg_Schematic_Design_Cost_Estimate_-_4-19-21.pdf PDF
Attachment_L_Lab_Furnishing_and_Equipment_Plan_-_9-2-21.pdf PDF
Attachment_C_VSD_WRF_Master_Plan_2025_-_Draft.pdf PDF
Attachment_A_Scope_of_Work.pdf PDF
Attachment_D_VSD_Site_CAD_File_-_Work_in_Progress.dwg DWG drawing
Attachment_A_Scope_of_Work.pdf PDF
Attachment_F_Geotech_Report_-_Lab_Building_2021.pdf PDF
Attachment_I_50%_Design_Plans_-_11-19-21.pdf PDF
Attachment_K_Lab_Bldg_Schematic_Design_Package_-_4-8-21.pdf PDF
Attachment_D_VSD_Site_CAD_File_-_Work_in_Progress.dwg DWG drawing
Attachment_H_Leighton_Geotechnical_Report_-_11-20-2020.pdf PDF
Attachment_K_Lab_Bldg_Schematic_Design_Package_-_4-8-21.pdf PDF
Attachment_L_Lab_Furnishing_and_Equipment_Plan_-_9-2-21.pdf PDF
Attachment_M_Training_and_Lab_Building_100%_Cost_Estimate_-_11-01-2021.pdf PDF
Attachment_F_Geotech_Report_-_Lab_Building_2021.pdf PDF
Attachment_I_50%_Design_Plans_-_11-19-21.pdf PDF
Attachment_M_Training_and_Lab_Building_100%_Cost_Estimate_-_11-01-2021.pdf PDF
Attachment_E_Earth_Systems_Geotechnical_Report_Jan_2022.pdf PDF
Attachment_M_Training_and_Lab_Building_100%_Cost_Estimate_-_11-01-2021.pdf PDF
Attachment_A_Scope_of_Work.pdf PDF
Attachment_E_Earth_Systems_Geotechnical_Report_Jan_2022.pdf PDF
Attachment_F_Geotech_Report_-_Lab_Building_2021.pdf PDF
Attachment_G_Geotech_Report_for_Lystek_2024-12-11.pdf PDF
VSD_SAMPLE_CONTRACT.pdf PDF
Attachment_G_Geotech_Report_for_Lystek_2024-12-11.pdf PDF
Attachment_H_Leighton_Geotechnical_Report_-_11-20-2020.pdf PDF
Attachment_J_Lab_Bldg_Schematic_Design_Cost_Estimate_-_4-19-21.pdf PDF
Attachment_L_Lab_Furnishing_and_Equipment_Plan_-_9-2-21.pdf PDF
VSD_SAMPLE_CONTRACT.pdf PDF
Attachment_D_VSD_Site_CAD_File_-_Work_in_Progress.dwg DWG drawing
VSD_SAMPLE_CONTRACT.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

45-100 VAN BUREN ST. INDIO, CA 92201

APRIL 8, 2020 // VALLEY SANITARY DISTRICT

Schematic Design Documents

Ron Buchwald, PE ___________________Date:

District Engineer

Beverli A. Marshall ___________________Date:

General Manager

707 BROOKSIDE AVENUE

REDLANDS, CA 92373

P: 909 373 3030 sgharch.com

NEW LABORATORY

707 BROOKSIDE AVENUE W

REDLANDS CA 92373

P: 909 375 3030 sgharch.comApril 08, 2021

NEW LABORATORY BUILDING SCHEMATIC DESIGN

45-100 Van Buren St. Indio, CA 92201

VALLEY SANITARY DISTRICT

0’ 8’ 16’

FLOOR PLAN

SCALE: 1/8” = 1’

SITE PLAN

NTS

B

A

P: 909 375 3030 sgharch.comDECEMBER 4. 2020

NEW LABORATORY BUILDING SCHEMATIC DESIGN

45-100 Van Buren St. Indio, CA 92201

VALLEY SANITARY DISTRICT

0’ 8’ 16’

NORTH ELEVATION

SCALE: 1/8” = 1’

SOUTH ELEVATION

SCALE: 1/8” = 1’

EAST ELEVATION

SCALE: 1/8” = 1’

T.O. PARAPET

18’ - 8”

T.O. PARAPET

18’ - 8”

T.O. PARAPET

18’ - 8”

T.O. PARAPET

18’ - 8”

F.F.

0”

F.F.

0”

F.F.

0”

F.F.

0”

PRECISION CMU

ACCENT 1

PRECISION CMU

ACCENT 2 SPLIT FACE CMU

WEST ELEVATION

SCALE: 1/8” = 1’

P: 909 375 3030 sgharch.comDECEMBER 4. 2020

NEW LABORATORY BUILDING SCHEMATIC DESIGN

45-100 Van Buren St. Indio, CA 92201

VALLEY SANITARY DISTRICT

0’ 8’ 16’

SECTION A

SCALE: 1/8” = 1’

LABORATORYINTAKE

3/8” / 12”

SECTION B

SCALE: 1/8” = 1’

LABORATORY HALL

T.O. PARAPET

18’ - 8”

T.O. PARAPET

18’ - 8”

F.F.

0”

F.F.

0”

9’

9’

4’

3’

” 7’

7’

DECEMBER 4, 2020

REDLANDS CA 92373

P: 909 375 3030 sgharch.com

NEW LABORATORY BUILDING SCHEMATIC DESIGN

45-100 Van Buren St. Indio, CA 92201

VALLEY SANITARY DISTRICT

REDLANDS CA 92373

P: 909 375 3030 sgharch.com

NEW LABORATORY BUILDING SCHEMATIC DESIGN

45-100 Van Buren St. Indio, CA 92201

REDLANDS CA 92373

P: 909 375 3030 sgharch.com

NEW LABORATORY BUILDING SCHEMATIC DESIGN

45-100 Van Buren St. Indio, CA 92201

VALLEY SANITARY DISTRICT

SCHEMATIC DESIGN

707 BROOKSIDE AVENUE

REDLANDS, CA 92373

P:909 375 3030 sgharch.com

LABORATORY FURNISHINGS

AND EQUIPMENT PLAN 03/18/21LF-100

CART

OFOI

CART

OFOI

'CFH

SS

SK1

SK1

CART

OFOI

CS30*

INTAKE

OFFICE

LABORATORY

BENCH

FURNITURE

COUNTERTOP &

STORAGE OFOI

FURNITURE

DESK UNITS

OFOI

BENCH

OOD WITH

ORAGE

LAB SINK

PIPEDROP

ENCLOSURE

WITH DRYING

RACK - TYP

SAFETY

SHOWER /

EYEWASH UNIT

ADJUSTABLE

WALL SHELVING

COMPUTER

OFOI

REF

OFOI

ADJUSTABLE

WALL SHELVING

CHAIR

REF

OFOI

REF

OFOI

CE OFOI

CANOPY

EXHAUST HOOD

EDROP ENCLOSURE WITH DRYING RACK

USTABLE WALL SHELVING

USTABLE ISLAND SHELVING

AVY DUTY INDUSTRIAL SHELVING

ORATORY SINK

NER FURNISHED, OWNER INSTALLED EQUIPMENT

LOGICAL SAFETY CABINET - OWNER FURNISHED, OWNER INSTALLED

EMICAL FUME HOOD

DESCRIPTION

RY SYMBOLS LEGEND

SCHEMATIC DESIGN

707 BROOKSIDE AVENUE

REDLANDS, CA 92373

P:909 375 3030 sgharch.com

LABORATORY FURNISHINGS

AND EQUIPMENT PLAN 03/18/21LF-100

SK1

48244824

CART

OFOI

CART

OFOI

5'CFH

SS

EW

SK1

SK1

CART

OFOI

SK4

SK1

WC

KO

E3

CS30*CS30*

HALL

WATER STORAGE

LAB. STORAGE

INTAKE

OFFICE

LABORATORY

BALANCE RM

MICRO BIO

JANITOR

RESTROOM

ELEC.

4'

BS

C

CL

AS

S

II,

TY

PE

A

OF

OI

COOLERS OFOI

INDUSTRIAL

SHELVING UNITS

BENCH

FURNITURE

COUNTERTOP &

STORAGE OFOI

FURNITURE

DESK UNITS

OFOI

BENCH

BENCH

FUME HOOD WITH

ACID STORAGE

BELOW

ISLAND BENCH

ISLAND BENCH

SHELVING

LAB SINK

PIPEDROP

ENCLOSURE

WITH DRYING

RACK - TYP

SAFETY

SHOWER /

EYEWASH UNIT

LAB SINK

BENCH

BENCH

BENCH

ADJUSTABLE

WALL SHELVING

BALANCES OFOI

ADJUSTABLE

WALL SHELVING

LAB SINK W/

EYEWASH

FUTURE

BIOLOGICAL

SAFETY CABINET

COAT HOOKS

UNDER DIV 10

WATER

HEATER

EQUIP

SPACE

EQUIP

SPACE

REF

OFOI

ADJUSTABLE

WALL SHELVING

COMPUTER

OFOI

REF

OFOI

ADJUSTABLE

WALL SHELVING

CHAIR

ADJUSTABLE

WALL SHELVING

BENCHTOP

EQUIPMENT

TYPICAL OFOI

REF

OFOI

REF

OFOI

ADJUSTABLE

WALL SHELVING

BENCHTOP

AUTOCLAVE

OFOI

BENCHTOP

MUFFLE

FURNACE OFOI

CANOPY

EXHAUST HOOD

PIPEDROP

ENCLOSURE

WITH DRYING

RACK - TYP

42" DOOR FOR EASE OF

MOVING EQUIPMENT

AND DELIVERIES

" D

OO

R

" D

OO

R

UNDER

COUNTER

GLASSWARE

WASHER

PIPEDROP ENCLOSURE WITH DRYING RACK

ADJUSTABLE WALL SHELVING

ADJUSTABLE ISLAND SHELVING

HEAVY DUTY INDUSTRIAL SHELVING

DESCRIPTIONSYMBOL LEGEND

LABORATORY SYMBOLS LEGEND

CART

OFOI

CART

OFOI

5'CFH

SK1

CART

OFOI

SK4

SK1

CS30*CS30*

SK

5'CFH

OFFICE

LABORATORY

FURNITURE

DESK UNITS

OFOI

BENCH

BENCH

FUME HOOD WITH

ACID STORAGE

BELOW

ISLAND BENCH

SHELVING

LAB SINK

LAB SINK

ADJUSTABLE

WALL SHELVING

CHAIR

ADJUSTABLE

WALL SHELVING

BENCHTOP

EQUIPMENT

TYPICAL OFOI

REF

OFOI

PIPEDROP

ENCLOSURE

WITH DRYING

RACK - TYP

PIPEDROP ENCLOSURE WITH DRYING RACK

ADJUSTABLE WALL SHELVING

ADJUSTABLE ISLAND SHELVING

HEAVY DUTY INDUSTRIAL SHELVING

LABORATORY SINK

OWNER FURNISHED, OWNER INSTALLED EQUIPMENT

BIOLOGICAL SAFETY CABINET - OWNER FURNISHED, OWNER INSTALLED

CHEMICAL FUME HOOD

DESCRIPTIONSYMBOL LEGEND

LABORATORY SYMBOLS LEGEND

NEW WATER LABORATORY

45-500 VAN BUREN STREET, INDIO, CA 92201

File details come from the government source that posted it. Updated .