ATTACHMENT JC-1 PWS_0100000_0200000_1502000.pdf

PDF 6 MB Posted

Attached to
Demolition services to housing units, facilities, and miscellaneous structures at various military installations on Naval Base Guam
Solicitation number
N4019222R9100
Issued by

About this file

This is a solicitation for demolition services at various military installations on Guam. The solicitation will result in an indefinite-delivery requirements contract for demolition services at Naval Base Guam, Andersen Air Force Base, Marine Corps Base Camp Blaz, and surrounding areas, with a base period plus four option periods and a six-month extension. Services will include demolition of housing units, facilities, and miscellaneous structures. The NAICS code is 238910 and the size standard is $16.5 million. The Performance Work Statement follows templates for Facility Support Contract and Base Operations Support services, including Annex 0100000 for general information, Annex 0200000 for management and administration, and Annex 1502000 for demolition services. The place of performance will be at various military facilities on Guam.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.

N40192-22-R-9100

DEMOLITION SERVICES

VARIOUS MILITARY INSTALLATIONS, GUAM

ATTACHMENT JC-1

PERFORMANCE WORK STATEMENT

(PWS)

ANNEX 0100000

ANNEX 0200000

ANNEX 1502000

Section C – 0100000 N40192-22-R-9100

General Information

0100000 – General Information

Spec Item Title

1 General Information

1.1 Outline of Services

1.2 Acquisition of Additional Work

1.3 Background Information

1.4 Navy PBSA Approach

1.5 Standard Template

1.6 Related Information

1.7 Verification of Workload and Conditions

1.8 Contractor's Knowledge

1.9 Technical Proposal Certification

Spec Item Title Description

1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work

Statement (PWS) at various U.S. military facilities located on Guam at

Naval Base Guam, Andersen Air Force Base, Marine Corps Base Camp

Blaz, and outlying areas supported by this installation performance-based contract that is comprised of Non-Recurring Work Items.

The PWS is organized into annexes. Annex 1 is "General Information".

Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.

The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page). Also, indicate "N/A" (Not Applicable) for annexes not used.

Annex 1 General Information

Annex 2 Management and Administration

Annex 3 Command and Staff N/A

Annex 4 Public Safety N/A

Annex 5 Air Operations N/A

Annex 6 Port Operations N/A

Annex 7 Ordnance N/A

Annex 8 Range Operations N/A

Annex 9 Health Care Support N/A

Annex 10 Supply N/A

Annex 11 Personnel Support N/A

Annex 12 Morale, Welfare and Recreation Support N/A

Annex 13 Galley N/A

Annex 14 Housing N/A

Annex 15 Facilities Support

1502000 Demolition Services

Annex 16 Utilities N/A

Annex 17 Base Support Vehicles and Equipment N/A

Annex 18 Environmental N/A

1.2 Acquisition of

Additional Work

The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in

Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.3 Background Information Guam, the largest and southernmost island of the Marianas archipelago, is the western most possession of the United States. The island is approximately 6,000 miles west of San Francisco, 3,700 miles west- southwest of Honolulu, 1,500 miles southeast of Tokyo, 2,100 miles southwest of Hong Kong, 1,500 miles east of Manila; and 3,100 miles northwest of Sydney at 13 degrees north latitude and 144 degrees east longitude. The Marianas Trench, the deepest known ocean depth, is located southeast of Guam.

The island of Guam is approximately 30 miles in length with a variable width, ranging from 12 miles to 4 miles at its narrowest point. Approximately 212 square miles, excluding reef formations, the island has two basic geological compositions. The central and northern features are primarily raised limestone with several volcanic formations at Mount Santa Rosa and Mount Mataguak. The northern cliff lines drop precipitously into the sea with an elevation ranging from 300 to 600 feet. The southern features are basically volcanic with an elongated mountain ridge dividing the inland valleys and coastline. The highest point is Mount Lam Lam with an elevation of 1,334 feet.

Earthquakes also occur frequently near Guam and can cause damage to property. Guam is located in Seismic Zone 4.

1.4 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.5 Standard Template Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.

The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification

Item 3 will always contain the Recurring Work requirements.

Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item

3 standards apply to all recurring work specification items. Specification

Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with

Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated to the Exhibit Line Items.

1.6 Related Information There are four types of Related Information that can be found in the

Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked

“Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not

0100000 – General Information

Spec Item Title Description rely upon the "Informational Notes" as material representations of the

Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.7 Verification of

Workload and

Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided.

All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.

As prescribed in FAR 52.237-1, offerors’ or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.8 Contractor's Knowledge The Navy expects to receive insightful management from its contractors.

This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.9 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

Section C – 0200000 N40192-22-R-9100

Management and Administration

0200000 – Management and Administration

2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Reserved

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Directives, Instructions, and References

2.3.8 Invoicing Procedures

2.3.9 Forms

2.4 Government-Furnished Items

2.4.1 Government-Furnished Property (GFP)

2.4.2 Reserved

2.4.3 Reserved

2.4.4 Government-Furnished Utilities

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Safeguarding Information

2.6.2 Dissemination of Information

2.6.3 Work Reception

2.6.4 Work Control

2.6.5 Work Schedule

2.6.6 Deliverables

2.6.7 Service Interruptions

2.6.7.1 Utilities Disconnections

2.6.7.2 Utility and Other Disconnection Requirements

2.6.8 Reserved

2.6.9 Quality Management System (QMS)

2.6.9.1 Quality Management (QM) Plan

2.6.9.2 Quality Inspection and Surveillance

2.6.9.3 Quality Inspection and Surveillance Report

2.6.10 Property Management Plan

2.6.11 Reserved

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.2.1 Quality Control Personnel

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.4 Environmental/Energy Manager

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Service Contract Reporting (SCR)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.1.1 DBIDS Andersen Air Force Base

2.8.4.1.2 DBIDS Naval Base Guam

2.8.4.2 DBIDS Credentials

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Reserved

2.8.9 Reserved

2.8.10 Reserved

2.8.11 Employee Status

2.9 Contractor Safety Program

2.9.1 Contractor Safety Requirements

2.9.1.1 Experience Modification Rate (EMR)

2.9.1.2 OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) Rate

2.9.2 Accident Prevention Plan (APP)

2.9.3 Activity Hazard Analysis (AHA)

2.9.4 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.4.1 Alcohol and Drug Abuse Prevention Plan

2.9.4.2 Chemical Hazard Communication Program

2.9.4.3 Confined Space Program

2.9.4.4 Critical Lift Plan

2.9.4.5 Fall Prevention and Protection Plan

2.9.4.6 Pathogen Exposure

2.9.4.7 Control of Hazardous Energy (lockout/tagout)

2.9.4.8 Demolition Plan

2.9.4.9 Pre-Demolition Survey

2.9.5 Crane Operations

2.9.5.1 Crane Inspections

2.9.5.2 Rigging Gear

2.9.5.3 Crane Operators

2.9.6 Accident and Damage Reporting

2.9.6.1 Accident Reporting and Notification Criteria

2.9.7 Fire Protection

2.9.8 Monthly On-Site Labor Report

2.9.9 OSHA Citations and Violations

2.9.10 Safety Inspections and Monitoring

2.9.11 Safety Certification

2.9.12 Safety Apparel on Jobsites

2.9.13 Emergency Medical Treatment

2.9.14 Excavations

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.1.1 Water Conservation Plan

2.10.1.2 Energy Efficient Products

2.10.2 Environmental Protection

2.10.2.1 Sampling, Testing and Laboratory Services

2.10.2.2 ODS Requirements for Refrigerant Recycling

2.10.2.3 Solid Waste Management and Recycling

2.10.2.3.1 Construction Waste (Off-Base Disposal)

2.10.2.3.2 Construction and Demolition Waste (On-Base Disposal)

2.10.2.4 Non-Regulated Waste Disposal

2.10.2.5 Regulated Waste Disposal

2.10.2.6 Universal Waste

2.10.2.7 Spill Prevention, Containment, and Clean-up

2.10.2.8 Hazardous Material Management

2.10.2.9 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.10 Noise Control

2.10.2.10.1 Dust and Debris Control

2.10.2.11 Salvage

2.10.2.11.1 Temporary Construction

2.10.2.12 Asbestos Containing Material (ACM)

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Biobased Products

2.10.3.4 Pre-Final and Final Inspection and Acceptance

2.11 Disaster Preparedness

2.11.1 Tropical Cyclone Condition of Readiness (TCCOR)

2.12 Reserved

2.13 Warranty Management

2.14 Recurring Work Procedures

2.15 Non-Recurring Work

2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor (UPL)Work (Negotiated)

2.15.2.1 Non-recurring Work Preparation of Proposals

2.15.2.1.1 Labor Requirements

2.15.2.1.2 Direct Material and Construction Equipment Requirements

2.15.2.2 Issuance of Final Task Order

2.15.3 Non-Recurring Work ELINS

0200000 - Management and Administration

2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

2.2.1 Government

Regular Working

Hours

The Government's regular working hours are from 0730-1630, five (5) days per week, Monday through Friday, except observed Federal holidays.

Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require

Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours must be authorized by the

KO prior to commencement of work.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin

Luther King Jr.’s Birthday, President’s Day, Memorial Day, Juneteenth Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving

Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor

Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written

Request to Work Outside Government’s Regular Working Hours per Section

F. Excludes work to be performed during specified hours.

2.2.2 Wage

Determinations

A Wage Determination is the listing of wage rates and fringe benefit rates for each classification of laborers which the Administrator of the Wage and Hour

Division of the U.S. Department of Labor have determined to be prevailing in a particular geographic area for a given class of labor and type of projects.

The latest rate is available on line at www.beta.sam.gov. Wage

Determinations are included in J-0200000-02.

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier

(i.e., spec item 3.1) based on the composite work requirements.

2.3 General

Administrative

Requirements

2.3.1 Required

Conferences and

Meetings

The Contractor shall attend administrative and coordination meetings. The

Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two (2) working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence.

Historically, there have been approximately four meetings per week.

2.3.2 Reserved

2.3.3 Partnering The Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who may receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.

The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

The goal of Partnering is to develop a cohesive team with common purpose, commitment and established communication processes.

2.3.3.1 Informal

Partnering

The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and

Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated by

Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract

Partnering

Administration

Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The

Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.

Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract

Partnering Session

Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager

* Quality Manager

Site Safety and Health Officer

2.3.4 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable

Federal, state and local laws and regulations. Evidence of such permits and licenses shall be provided to the KO before work commences and at other times as requested by the KO The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause

52.228-5, INSURANCE – WORK ON A GOVERNMENT

INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company per Section F prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum

Insurance

Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law

2.3.6 Protection of

Government

Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of Contractor negligence under this contract to their original condition at no cost to the

Government.

2.3.7 Directives, Instructions, and

References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of

Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.8 Invoicing

Procedures

Refer to Section G for invoicing instructions. Refer to Invoice Form in J-

0200000-04 for sample.

Invoices shall be submitted in a format compatible with the most recent

Government installed Microsoft Office Version (currently 2010). Invoice data shall be capable of being sorted by CLIN, annex/sub-annex, spec item, spec item title, and ELIN/Sub-ELIN.

2.3.9 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.

2.4 Government-

Furnished Items

Except for items identified below as Government-Furnished, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services described in this Performance Work Statement (PWS).

Government-Furnished Items will be provided in "AS-IS" condition and their use is at the option of the Contractor. The total or partial breakdown or failure of Government-Furnished Items shall not relieve the Contractor of the responsibility to perform the requirements of this contract.

The Contractor shall provide periodic servicing, maintenance, and repair of the Government-Furnished Items accepted for use at no additional cost to the

Government. Servicing, maintenance, and repair shall be provided in accordance with the manufacturer’s recommendations. The Contractor shall keep records for all servicing, maintenance, and repair activities performed on

Government-Furnished Items and records shall be made available to the

Government within twenty-four (24) hours of request.

At the completion of the contract, all Government-Furnished Items shall be returned to the Government in the same condition as received, except for reasonable wear and tear. Government-Furnished Items, which becomes worn out due to normal wear and tear, shall be returned to the Government and its replacement shall be the responsibility of the Contractor at no additional cost to the Government. The Contractor shall be responsible for the cost of any repairs or replacement caused by Contractor negligence or abuse.

The Government may inspect Government-Furnished Items at any time and without notice.

2.4.1 Government-

Furnished Property

(GFP)

Per FAR 45.101, “Property in the possession of, or directly acquired by, the

Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification.” Government owned equipment being taken off installation by a contractor is GFP. Example: Items being fixed + spare parts + any materials given to industry are all considered GFP.

Real property, government facilities, inventory/supplies consumed in performance of requirement, vehicles and equipment used only on federal installations - could be considered incidental to performance, or consumables

– not GFP.

2.4.2 Reserved

2.4.3 Reserved

2.4.4 Government-

Furnished Utilities

Power and water are available in most buildings requiring service in this contract for Contractor’s use. There may be some buildings, however, that do not have power and water available.

The Contractor shall have readily available power, water, and other items necessary to perform the services required in the buildings that do not have utilities. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site.

Provide and maintain meters, backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions.

Services required by the Contractor, for which there are no available

Government outlets, shall be provided by the Contractor at no cost to the

Government.

The Contractor is responsible for the costs of consuming Government furnished power and water in the performance of the contract.

The Contractor shall contact the NAVFACMAR Comptroller (349-4244) for the prevailing rates.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.

Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data

Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Safeguarding

Information

The Contractor shall safeguard controlled unclassified information and information associated with Government property in accordance with the latest revision of CNSSI 1253, DoDI 8582.01, NIST SP 800-53, NIST SP

800-171, SECNAV Defense Industrial Base (DIB) Memo, and applicable contract clauses. At a minimum, this information shall be protected at the moderate confidentiality level as defined in NIST SP 800-171.

Contractor information and data systems that contain information associated with Government property shall comply with DoD Risk Management

Framework (RMF).

2.6.2 Dissemination of

Information

DoD policy limits the dissemination of certain information. Instructions, Directives, and References not releasable to the public, e.g., Floor Plans, Maps, Post Orders, and Standard Operating Procedures, will be made available after contract award to the successful offeror with appropriate credentials and a need to know.

2.6.3 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.4 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the

Government. A status update of any item of work must be provided within two (2) hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

The Contractor shall provide work schedules for Non-Recurring Work per

Section F. At a minimum, work schedules shall include:

Description of service(s) to be accomplished

Location

Date service(s) are scheduled to be accomplished

2.6.5 Work Schedule Proposed work schedules for each scheduled service shall be submitted to the

Contracting Officer Representative (COR) in calendar form per Section F for approval at least 15 calendar days prior to the start of work. Work schedules shall be broken down per month. Schedules shall be compatible and acceptable to the Government and shall indicate the date when services will be performed. Any modification(s) to this contract warrants a new and updated work schedule that shall be provided to the COR 10 calendar days after award of the modification. Approved schedules shall be strictly adhered to, and notification provided to customers by Contractor 14 calendar days in advance. Any proposed changes must be submitted for the COR’s approval at least seven (7) calendar days in advance. The Contractor shall not commence work until approval has been received. The Contractor shall not change approved work schedules without the prior consent of the KO. Deviation is permissible only when approved by the KO. For all unscheduled work, the contractor shall obtain the KO’s approval. No work shall be scheduled on a holiday. Work outside regular working hours may be required under this contract.

The Contractor's work shall not interfere with normal Government business.

In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The

Contractor shall provide written notification of any difficulty in scheduling work due to Government controls within 24 hours of occurrence, per Section

F. At a minimum, the notification shall include the following:

The date and time the work was initially coordinated.

The name and phone number of the Government person with whom the work was initially coordinated.

The name and phone number of the Government person who prevented the work from being performed as previously coordinated.

The alternative date and time, the Government person requested the work be accomplished.

Demolition Service in Housing Area: Where demolition service is to be performed in housing areas, adjacent occupied buildings or housing units shall remain accessible to tenants. Access to all units during demolition work shall be coordinated with the housing tenants by the Contractor by means of a written notice taped on the front door, in a conspicuous location per Section

F.

The written notice entitled “Demolition Service in Housing Area” shall be prepared by the Contractor for the Andersen Air Force Base (AAFB) and

Naval Base Guam (NBG) Family Housing Office’s approval twenty-one (21) calendar days prior to the first delivery. The Contractor shall coordinate with housing office personnel and shall indicate the housing area, street name, type of work to be done, start and completion, and if any necessary shutdown or interruption of utility systems. Prior to start of the delivery of the first notice, a list of units to be served with the written notice shall be submitted to the

Contracting Officer Representative and a courtesy copy prepared for the

AAFB and NBG Family Housing Office.

The Contractor shall deliver the written notices to the tenants. Delivery schedule of written notice to tenants by the Contractor shall be done on three occasions and shall be as follows:

1st Notice: 14 calendar days prior to impending start of work within the area.

2nd Notice: Seven (7) calendar days prior to impending start of work within the area.

3rd Notice: 24 hours prior to start of work within the area to confirm the intent of the Contractor that will work will start the following day.

2.6.6 Deliverables Except where otherwise stated, deliverable requirements are specified in

Sections C, F, H, I, J, and within the Directives, Instructions, and References.

The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify deliverables, as directed by the KO, at no additional cost to the Government.

Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.

Deliverables shall include the company name, contract number, contract title, date, and shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and

ELIN/Sub-ELIN or clause. All formulas shall be traceable.

Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The

Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website. Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.

2.6.7 Service

Interruptions

If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, COR, affected tenants, and customers 15 calendar days prior to interruption, per Section F.

If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, COR, affected tenants, and customers as soon as practicable and provide the status of repairs, as directed by the KO, until normal operation is restored.

Scheduled utility outages and interruptions to equipment, system(s) operation, or other services shall be scheduled after hours of operation.

The Contractor shall shutdown, restart, and perform operational checks on all equipment affected by both scheduled and unscheduled utility outages and service interruptions, at no additional cost to the Government.

Contractors are required to apply for utility outages at least 30 calendar days in advance per Section F. As a minimum, the request should include the location of the outage, utilities being affected, duration of outage and any necessary sketches. Special requirements for electrical outage requests are contained elsewhere in this specification section. Once approved, and prior to beginning work on the utility system requiring shut down, the Contractor shall attend a pre-outage coordination meeting with the Contracting Officer, Contracting Officer Representative(s), government reps, Base Operations

Support Contractor (BOSC), and customers to review the scope of work and the lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist.

2.6.7.1 Utilities

Disconnections

The Contractor shall provide a one (1) year warranty on all utilities disconnections. The Contractor is responsible for ensuring that all utilities have been properly disconnected and secured one (1) year after disconnections have been performed. The Contractor shall submit data including utility drawings showing terminations of sewer and water lines, the warranty period (dates), and points-of-contacts with names, addresses and telephone numbers. Submit data with the last or final invoice of each task order, per Section F.

2.6.7.2 Utility and Other

Disconnection

Requirements

Before any digging or excavating is performed, the Contractor shall obtain a utilities clearance per Section F from the Base Operations Support Contractor

(BOSC), and/or the government and also a utilities clearance from NBGTS

Base Communication, Guam Telephone Authority (GTA) and Docomo

Pacific (DP) as applicable. The Contractor shall ensure that all power, water, sewer, telephone, cable, and other utilities including but not limited to: steam, is de-energized or isolated prior to start of demolition. The COR shall assist in obtaining this and shall get a copy of the clearance before work commences. BOSC or the Government shall notify the Contractor if digging or excavating work is approved prior to start of work. The Contractor shall take note of the expiration date of the utilities clearances and shall ensure that while work is being performed, the utilities clearance is valid and not expired.

The Contractor shall open an account with BOSC for services to be rendered by BOSC or the Government at an amount to be determined by BOSC or the

Government. These are normally for unforeseen events such as a water break or power de-energizing work that is required from the Government or BOSC.

Prior to start of any demolition work, the Contractor is required to inspect each structure to ensure that all utility service lines are disconnected. The

COR will coordinate utilities disconnection and clearances. Contractor shall coordinate all other disconnections and clearances with GTA and Docomo

Pacific. Do not begin demolition until authorization is received from the

Contracting Officer. Upon receipt of authorization, the Contractor shall submit a letter of commencement to the Guam Environmental Protection

Agency (GEPA) prior to start of demolition work. Remove rubbish and debris from the project site; do not allow accumulations outside the buildings on pavements. Store materials that cannot be removed daily in areas specified by the Contracting Officer.

Power and Water/Sewer: Upon award of contract, the Contractor shall establish an account with the BOSC. The BOSC shall disconnect all power to the service drop of each structure. The Contractor shall coordinate the disconnection of utilities with the BOSC and the designated Government representative. The Contractor will be charged for disconnection services.

The Contractor shall contact the BOSC for the prevailing rates.

The Contractor shall perform disconnection and capping of water and sewer lines. The Contractor shall also place concrete around caps to ensure capping is secured. Coordinate disconnection with BOSC and Utilities and Energy

Management (UEM) by contacting 333-2011 or 339- 4400. The Contractor will be charged for this service. The Contractor shall cap closest to the main or as recommended by BOSC and UEM. Any structure or property damaged by the Contractor as a result of disconnection services shall be repaired or replaced by the Contractor.

Relocation of Water or Sewer Lines: When applicable, the Contractor shall work with BOSC and UEM for the removal and/or reinstallation of sewer or water lines to be relocated with workmen skilled in the trades involved.

Communications: Disconnection of official Navy telephone lines shall be performed by NBGTS Communications Department. Coordinate disconnection by contacting 339-4475. The Contractor shall open an account with NBGTS Communications Department. A disconnection fee shall be assessed to the Contractor.

Automated Data Processing (ADP): Disconnection/clearances of computer lines shall be performed by NBGTS N65 ADP Division personnel.

Coordinate disconnection/clearances by contacting 355-3113. A fee may be assessed to the Contractor.

Telephone: Disconnection of telephone lines shall be performed by GTA.

Coordinate disconnection by contacting: 644-4482 or GTA’s customer service department. A fee may be assessed to the Contractor.

Cable TV: Disconnection of cable TV lines shall be performed by Docomo

Pacific (DP). Coordinate disconnection by calling 969-4628 or DP’s customer service department. A fee may be assessed to the Contractor.

Aside from obtaining utilities clearances from BOSC or other agencies, the

Contractor shall ensure by testing the structure to be demolished that all utilities are de-energized or isolated prior to start of demolition.

During and at completion of work, debris shall not be allowed to spread at any time into adjacent areas nor accumulate in the work area itself. Such debris shall be cleaned up and removed at the completion of the job and/or at the end of each day work is in progress.

2.6.8 Reserved

2.6.9 Quality

Management

System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The

Contractor's QMS program shall address:

Accurate documentation of work processes, procedures, and output measures.

A systematic procedure for assessing compliance with performance objectives and standards.

Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.9.1 Quality

Management

(QM) Plan

The Contractor shall develop and submit a QM Plan per Section F. The QM

Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, the

Contractor shall submit the revised QM Plan for acceptance, per Section F.

The Contractor’s QM Plan shall include, at a minimum, the following:

• Policy and objectives of Quality Management System (QMS)

• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications

• Approach to assuring quality of services provided and conformance with performance objectives and standards

• Methods and procedures for effective planning, operation and control of processes and performance of work

• Procedures for inspection and surveillance of services to include all contractual requirements.

o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work

• Documentation and records management

• Communication with government (customers)

2.6.9.2 Quality Inspection

and Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF

SERVICES – FIXED PRICE and FAR Clause 52.246-13, INSPECTION, DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS, to ensure that the work performed conforms to the contract requirements.

The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the COR after completion/termination of the contract per Section F.

2.6.9.3 Quality Inspection

and Surveillance

Report

The Contractor shall submit a copy of the Contractor Quality Inspection and

Surveillance Report per Section F. The Contractor Quality Inspection and

Surveillance Report shall include a narrative of events, a tabulated summary and results of the quality inspection and surveillance events performed, inspection-driven corrective actions taken and the results attained, and management process adjustments during the previous month. The

Government may adjust the frequency of the submittal based on the

Contractor’s quality of performance.

2.6.10 Property

Management Plan

The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished-Items, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, key control, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property

Management Plan shall be submitted per Section F.

2.6.11 Reserved

2.7 Personnel

Requirements

The Contractor shall comply with the personnel requirements stated below:

2.7.1 Key Personnel Within 15 calendar days after award of the contract, for other than qualification requirements required to be submitted with the offer, the

Contractor shall submit to the Contracting Officer a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO or COR necessary to validate their qualifications.

Within fifteen (15) calendar days after award of the contract, the Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

The Contractor shall provide complete resumes for proposed substitutes and any additional information requested by the KO. Proposed substitutes shall have comparable qualifications to those of the persons being replaced. The

KO will notify the Contractor within 15 calendar days after receipt of all required information of the consent on substitutions. No change in fixed unit prices may occur as a result of key personnel substitutions.

2.7.1.1 Project Manager

(PM)

The Contractor shall provide a PM and designated alternate, as applicable, who shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the

Government's regular working hours and shall be available on-site within one

(1) hour after the Government's regular working hours.

The PM shall have at least five (5) years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate who shall be on-site at all times when the Contractor is performing work during the Government's regular working hours and shall be available on-site within two (2) hours after the Government’s regular working hours. The Quality

Manager or designated alternate shall report directly to a senior corporate official and shall not report directly to the Project Manager.

The Quality Manager or designated alternate shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality

Manager under this contract.

The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract. The Quality Manager shall, at a minimum, attend and satisfactorily complete the Construction Quality Management (CQM) course offered by the

Government or Guam Contractor’s Association to be deemed qualified. A copy of the valid CQM certificate shall be submitted with the QC Plan.

The Quality Manager or designated alternate shall have a current CMQ/OE certification and at least five years of experience in preparing and enforcing

QMS programs on contracts of similar size, scope and complexity. The

Quality Manager or designated alternate shall not be the same person as the

SSHO.

2.7.1.3 Site Safety and

Health Officer

(SSHO)

The SSHO must meet the most current requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project.

Provide a Safety oversight team that includes a minimum of one (1)

Competent Person at each project site to function as the Site Safety and

Health Officer (SSHO). The SSHO or an equally-qualified Designated

Representative/alternate shall be on-site at all times when work is being performed to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .