ATTACHMENT Demolition 1502000 ELINS.xlsx

XLSX spreadsheet 80 KB Posted

Attached to
Demolition services to housing units, facilities, and miscellaneous structures at various military installations on Naval Base Guam
Solicitation number
N4019222R9100
Issued by

About this file

This document outlines a solicitation for demolition services at various military installations on Naval Base Guam. The Navy seeks to award an indefinite-delivery requirements contract for a base period plus four option periods to provide all labor, equipment, materials, and supervision necessary to perform demolition of housing units, facilities, and miscellaneous structures. Services will be performed at Naval Base Guam, Andersen Air Force Base, Marine Corps Base Camp Blaz, and other outlying areas. The NAICS code is 238910 for site preparation contractors with a small business size standard of $16.5 million. The performance work statement covers facility support, base operations support, and demolition annexes.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALL OPTIONS

ATTACHMENT J-0200000-07ATTACHMENT J-0200000-07ATTACHMENT J-0200000-07ATTACHMENT J-0200000-07ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERSEXHIBIT LINE ITEM NUMBERSEXHIBIT LINE ITEM NUMBERSEXHIBIT LINE ITEM NUMBERSEXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-22-R-9100SOLICITATION/CONTRACT # N40192-22-R-9100SOLICITATION/CONTRACT # N40192-22-R-9100SOLICITATION/CONTRACT # N40192-22-R-9100SOLICITATION/CONTRACT # N40192-22-R-9100
EXHIBIT AEXHIBIT BEXHIBIT CEXHIBIT DEXHIBIT E

REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM

Line Item 0001 - Base PeriodLine Item 0002 - First Option PeriodLine Item 0003 - Second Option PeriodLine Item 0004 - Third Option PeriodLine Item 0004 - Third Option Period
EXHIBIT AEXHIBIT BEXHIBIT CEXHIBIT CEXHIBIT C
DNAME OF OFFEROR OR CONTRACTORDNAME OF OFFEROR OR CONTRACTORDNAME OF OFFEROR OR CONTRACTORDNAME OF OFFEROR OR CONTRACTORDNAME OF OFFEROR OR CONTRACTOR
SCHEDULE OF WORKSCHEDULE OF WORKSCHEDULE OF WORKSCHEDULE OF WORKSCHEDULE OF WORK
INDEFINITE QUANTITY WORKINDEFINITE QUANTITY WORKINDEFINITE QUANTITY WORKINDEFINITE QUANTITY WORKINDEFINITE QUANTITY WORK
ELIN NO.DESCRIPTIONESTIMATED QUANTITYUNITUNIT PRICEAMOUNTELIN NO.DESCRIPTIONESTIMATED QUANTITYUNITUNIT PRICEAMOUNTELIN NO.DESCRIPTIONESTIMATED QUANTITYUNITUNIT PRICEAMOUNTELIN NO.DESCRIPTIONESTIMATED QUANTITYUNITUNIT PRICEAMOUNTELIN NO.DESCRIPTIONESTIMATED QUANTITYUNITUNIT PRICEAMOUNT
BaseTotalSCHEDULE OF WORK1st OptionTotalSCHEDULE OF WORK2nd OptionTotalSCHEDULE OF WORK3rd OptionTotalSCHEDULE OF WORK4th OptionTotal
Unit PriceAmountINDEFINITE QUANTITY WORKUnit PriceAmountINDEFINITE QUANTITY WORKUnit PriceAmountINDEFINITE QUANTITY WORKUnit PriceAmountINDEFINITE QUANTITY WORKUnit PriceAmount
A001Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and TopsoilingB001Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and TopsoilingC001Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and TopsoilingD001Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and TopsoilingE001Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling
A00101Concrete2,800,000CF$ - 0B00101Concrete2,800,000CF$ - 0C00101Concrete2,800,000CF$ - 0D00101Concrete2,800,000CF$ - 0E00101Concrete2,800,000CF$ - 0
A00102Metal Sidings, Roof, and Framing with Concrete Foundation300,000SF$ - 0B00102Metal Sidings, Roof, and Framing with Concrete Foundation300,000SF$ - 0C00102Metal Sidings, Roof, and Framing with Concrete Foundation300,000SF$ - 0D00102Metal Sidings, Roof, and Framing with Concrete Foundation300,000SF$ - 0E00102Metal Sidings, Roof, and Framing with Concrete Foundation300,000SF$ - 0
A00103Mixture of Type600,000CF$ - 0B00103Mixture of Type600,000CF$ - 0C00103Mixture of Type600,000CF$ - 0D00103Mixture of Type600,000CF$ - 0E00103Mixture of Type600,000CF$ - 0
A00104Additive cost for disposal at NBG Landfill C&D18,700TONS$ - 0B00104Additive cost for disposal at NBG Landfill C&D18,700TONS$ - 0C00104Additive cost for disposal at NBG Landfill C&D18,700TONS$ - 0D00104Additive cost for disposal at NBG Landfill C&D18,700TONS$ - 0E00104Additive cost for disposal at NBG Landfill C&D18,700TONS$ - 0
A002Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and TopsoilingB002Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and TopsoilingC002Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and TopsoilingD002Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and TopsoilingE002Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling
A00201Up to 6-Inch Thick25,000CY$ - 0B00201Up to 6-Inch Thick25,000CY$ - 0C00201Up to 6-Inch Thick25,000CY$ - 0D00201Up to 6-Inch Thick25,000CY$ - 0E00201Up to 6-Inch Thick25,000CY$ - 0
A002027-Inch to 12-Inch Thick50,000CY$ - 0B002027-Inch to 12-Inch Thick50,000CY$ - 0C002027-Inch to 12-Inch Thick50,000CY$ - 0D002027-Inch to 12-Inch Thick50,000CY$ - 0E002027-Inch to 12-Inch Thick50,000CY$ - 0
A00203Additive cost for disposal at NBG Landfill C&D13,500TONS$ - 0B00203Additive cost for disposal at NBG Landfill C&D13,500TONS$ - 0C00203Additive cost for disposal at NBG Landfill C&D13,500TONS$ - 0D00203Additive cost for disposal at NBG Landfill C&D13,500TONS$ - 0E00203Additive cost for disposal at NBG Landfill C&D13,500TONS$ - 0
A003Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and TopsoilingB003Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and TopsoilingC003Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and TopsoilingD003Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and TopsoilingE003Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling
A00301Up to 2-Inch Thick500CY$ - 0B00301Up to 2-Inch Thick500CY$ - 0C00301Up to 2-Inch Thick500CY$ - 0D00301Up to 2-Inch Thick500CY$ - 0E00301Up to 2-Inch Thick500CY$ - 0
A003022-1/2-Inch Thick to 4-Inch Thick4,500CY$ - 0B003022-1/2-Inch Thick to 4-Inch Thick4,500CY$ - 0C003022-1/2-Inch Thick to 4-Inch Thick4,500CY$ - 0D003022-1/2-Inch Thick to 4-Inch Thick4,500CY$ - 0E003022-1/2-Inch Thick to 4-Inch Thick4,500CY$ - 0
A003034-1/2-Inch Thick to 6-Inch Thick100CY$ - 0B003034-1/2-Inch Thick to 6-Inch Thick100CY$ - 0C003034-1/2-Inch Thick to 6-Inch Thick100CY$ - 0D003034-1/2-Inch Thick to 6-Inch Thick100CY$ - 0E003034-1/2-Inch Thick to 6-Inch Thick100CY$ - 0
A00304Additive cost for disposal at NBG Landfill C&D920TONS$ - 0B00304Additive cost for disposal at NBG Landfill C&D920TONS$ - 0C00304Additive cost for disposal at NBG Landfill C&D920TONS$ - 0D00304Additive cost for disposal at NBG Landfill C&D920TONS$ - 0E00304Additive cost for disposal at NBG Landfill C&D920TONS$ - 0
A004Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and TopsoilingB004Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and TopsoilingC004Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and TopsoilingD004Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and TopsoilingE004Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling
A004011-Inch to 4-Inch Diameter5,000LF$ - 0B004011-Inch to 4-Inch Diameter5,000LF$ - 0C004011-Inch to 4-Inch Diameter5,000LF$ - 0D004011-Inch to 4-Inch Diameter5,000LF$ - 0E004011-Inch to 4-Inch Diameter5,000LF$ - 0
A004027-Inch to 8-Inch Diameter1,500LF$ - 0B004027-Inch to 8-Inch Diameter1,500LF$ - 0C004027-Inch to 8-Inch Diameter1,500LF$ - 0D004027-Inch to 8-Inch Diameter1,500LF$ - 0E004027-Inch to 8-Inch Diameter1,500LF$ - 0
A00403Additive cost for disposal at NBG Landfill C&D20TONS$ - 0B00403Additive cost for disposal at NBG Landfill C&D20TONS$ - 0C00403Additive cost for disposal at NBG Landfill C&D20TONS$ - 0D00403Additive cost for disposal at NBG Landfill C&D20TONS$ - 0E00403Additive cost for disposal at NBG Landfill C&D20TONS$ - 0
A005Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and TopsoilingB005Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and TopsoilingC005Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and TopsoilingD005Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and TopsoilingE005Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling
A00501Up to 6-Feet High8,500LF$ - 0B00501Up to 6-Feet High8,500LF$ - 0C00501Up to 6-Feet High8,500LF$ - 0D00501Up to 6-Feet High8,500LF$ - 0E00501Up to 6-Feet High8,500LF$ - 0
A005028-Feet to 10-Feet High1,500LF$ - 0B005028-Feet to 10-Feet High1,500LF$ - 0C005028-Feet to 10-Feet High1,500LF$ - 0D005028-Feet to 10-Feet High1,500LF$ - 0E005028-Feet to 10-Feet High1,500LF$ - 0
A00503Additive cost for disposal at NBG Landfill C&D30TONS$ - 0B00503Additive cost for disposal at NBG Landfill C&D30TONS$ - 0C00503Additive cost for disposal at NBG Landfill C&D30TONS$ - 0D00503Additive cost for disposal at NBG Landfill C&D30TONS$ - 0E00503Additive cost for disposal at NBG Landfill C&D30TONS$ - 0
A006Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and TopsoilingB006Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and TopsoilingC006Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and TopsoilingD006Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and TopsoilingE006Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling
A00601Up to 30-Feet to 35-Feet High25EA$ - 0B00601Up to 30-Feet to 35-Feet High25EA$ - 0C00601Up to 30-Feet to 35-Feet High25EA$ - 0D00601Up to 30-Feet to 35-Feet High25EA$ - 0E00601Up to 30-Feet to 35-Feet High25EA$ - 0
A0060240-Feet to 55-Feet High5EA$ - 0B0060240-Feet to 55-Feet High5EA$ - 0C0060240-Feet to 55-Feet High5EA$ - 0D0060240-Feet to 55-Feet High5EA$ - 0E0060240-Feet to 55-Feet High5EA$ - 0
A00603Additive cost for disposal at NBG Landfill C&D40TONS$ - 0B00603Additive cost for disposal at NBG Landfill C&D40TONS$ - 0C00603Additive cost for disposal at NBG Landfill C&D40TONS$ - 0D00603Additive cost for disposal at NBG Landfill C&D40TONS$ - 0E00603Additive cost for disposal at NBG Landfill C&D40TONS$ - 0
A007Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and TopsoilingB007Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and TopsoilingC007Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and TopsoilingD007Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and TopsoilingE007Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling
A00701Up to 30-Feet High8EA$ - 0B00701Up to 30-Feet High8EA$ - 0C00701Up to 30-Feet High8EA$ - 0D00701Up to 30-Feet High8EA$ - 0E00701Up to 30-Feet High8EA$ - 0
A0070240-Feet to 55-Feet High12EA$ - 0B0070240-Feet to 55-Feet High12EA$ - 0C0070240-Feet to 55-Feet High12EA$ - 0D0070240-Feet to 55-Feet High12EA$ - 0E0070240-Feet to 55-Feet High12EA$ - 0
A00703Additive cost for disposal at NBG Landfill C&D25TONS$ - 0B00703Additive cost for disposal at NBG Landfill C&D25TONS$ - 0C00703Additive cost for disposal at NBG Landfill C&D25TONS$ - 0D00703Additive cost for disposal at NBG Landfill C&D25TONS$ - 0E00703Additive cost for disposal at NBG Landfill C&D25TONS$ - 0
A008Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic100,000SF$ - 0B008Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic100,000SF$ - 0C008Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic100,000SF$ - 0D008Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic100,000SF$ - 0E008Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic100,000SF$ - 0
A00801Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive50,000SF$ - 0B00801Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive50,000SF$ - 0C00801Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive50,000SF$ - 0D00801Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive50,000SF$ - 0E00801Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive50,000SF$ - 0
A00802Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound150,000SF$ - 0B00802Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound150,000SF$ - 0C00802Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound150,000SF$ - 0D00802Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound150,000SF$ - 0E00802Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound150,000SF$ - 0
A009Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and AccessoriesB009Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and AccessoriesC009Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and AccessoriesD009Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and AccessoriesE009Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories
A009014-Inch to 8-inch Diameter3,000LF$ - 0B009014-Inch to 8-inch Diameter3,000LF$ - 0C009014-Inch to 8-inch Diameter3,000LF$ - 0D009014-Inch to 8-inch Diameter3,000LF$ - 0E009014-Inch to 8-inch Diameter3,000LF$ - 0
A0090210-inch to 12-Inch Diameter1,000LF$ - 0B0090210-inch to 12-Inch Diameter1,000LF$ - 0C0090210-inch to 12-Inch Diameter1,000LF$ - 0D0090210-inch to 12-Inch Diameter1,000LF$ - 0E0090210-inch to 12-Inch Diameter1,000LF$ - 0
A010Removal and Disposal of Bulk Asbestos MaterialsB010Removal and Disposal of Bulk Asbestos MaterialsC010Removal and Disposal of Bulk Asbestos MaterialsD010Removal and Disposal of Bulk Asbestos MaterialsE010Removal and Disposal of Bulk Asbestos Materials
A01001Transite Metal Sidings10,000SF$ - 0B01001Transite Metal Sidings10,000SF$ - 0C01001Transite Metal Sidings10,000SF$ - 0D01001Transite Metal Sidings10,000SF$ - 0E01001Transite Metal Sidings10,000SF$ - 0
A01002Transite Metal Roof12,000SF$ - 0B01002Transite Metal Roof12,000SF$ - 0C01002Transite Metal Roof12,000SF$ - 0D01002Transite Metal Roof12,000SF$ - 0E01002Transite Metal Roof12,000SF$ - 0
A01003Ceiling Tiles, Glued or Suspended20,000SF$ - 0B01003Ceiling Tiles, Glued or Suspended20,000SF$ - 0C01003Ceiling Tiles, Glued or Suspended20,000SF$ - 0D01003Ceiling Tiles, Glued or Suspended20,000SF$ - 0E01003Ceiling Tiles, Glued or Suspended20,000SF$ - 0
A01004Boiler Breeching or Flue Insulation500SF$ - 0B01004Boiler Breeching or Flue Insulation500SF$ - 0C01004Boiler Breeching or Flue Insulation500SF$ - 0D01004Boiler Breeching or Flue Insulation500SF$ - 0E01004Boiler Breeching or Flue Insulation500SF$ - 0
A01005Duct Insulation1,000SF$ - 0B01005Duct Insulation1,000SF$ - 0C01005Duct Insulation1,000SF$ - 0D01005Duct Insulation1,000SF$ - 0E01005Duct Insulation1,000SF$ - 0

A011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0 B011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0 C011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0 D011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0 E011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0

A012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0 B012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0 C012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0 D012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0 E012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0

A013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0 B013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0 A013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0 D013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0 E013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0

A014Spread, and Compact Backfill MaterialsB014Spread, and Compact Backfill MaterialsC014Spread, and Compact Backfill MaterialsD014Spread, and Compact Backfill MaterialsE014Spread, and Compact Backfill Materials
A01401Up to 6-Inches Thick1,300CY$ - 0B01401Up to 6-Inches Thick1,300CY$ - 0C01401Up to 6-Inches Thick1,300CY$ - 0D01401Up to 6-Inches Thick1,300CY$ - 0E01401Up to 6-Inches Thick1,300CY$ - 0
A014027-Inches to 12-Inches Thick1,200CY$ - 0B014027-Inches to 12-Inches Thick1,200CY$ - 0C014027-Inches to 12-Inches Thick1,200CY$ - 0D014027-Inches to 12-Inches Thick1,200CY$ - 0E014027-Inches to 12-Inches Thick1,200CY$ - 0
A0140312-Inches to 24-Inches Thick800CY$ - 0B0140312-Inches to 24-Inches Thick800CY$ - 0C0140312-Inches to 24-Inches Thick800CY$ - 0D0140312-Inches to 24-Inches Thick800CY$ - 0E0140312-Inches to 24-Inches Thick800CY$ - 0
A0140424-Inches to 36-Inches Thick14,500CY$ - 0B0140424-Inches to 36-Inches Thick14,500CY$ - 0C0140424-Inches to 36-Inches Thick14,500CY$ - 0D0140424-Inches to 36-Inches Thick14,500CY$ - 0E0140424-Inches to 36-Inches Thick14,500CY$ - 0
A015Spread and Compact 4-Inch Thick Topsoil4,000CY$ - 0B015Spread and Compact 4-Inch Thick Topsoil4,000CY$ - 0C015Spread and Compact 4-Inch Thick Topsoil4,000CY$ - 0D015Spread and Compact 4-Inch Thick Topsoil4,000CY$ - 0E015Spread and Compact 4-Inch Thick Topsoil4,000CY$ - 0
A01501Spread and Compact 8-Inch Thick Topsoil2,100CY$ - 0B01501Spread and Compact 8-Inch Thick Topsoil2,100CY$ - 0C01501Spread and Compact 8-Inch Thick Topsoil2,100CY$ - 0D01501Spread and Compact 8-Inch Thick Topsoil2,100CY$ - 0E01501Spread and Compact 8-Inch Thick Topsoil2,100CY$ - 0

A016 Hydro-Seeding 27,500 SY $ - 0 B016 Hydro-Seeding 27,500 SY $ - 0 C016 Hydro-Seeding 27,500 SY $ - 0 D016 Hydro-Seeding 27,500 SY $ - 0 E016 Hydro-Seeding 27,500 SY $ - 0

A017 Seeding 75,000 SY $ - 0 B017 Seeding 75,000 SY $ - 0 C017 Seeding 75,000 SY $ - 0 D017 Seeding 75,000 SY $ - 0 E017 Seeding 75,000 SY $ - 0

A018Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and AttachmentsB018Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and AttachmentsC018Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and AttachmentsD018Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and AttachmentsE018Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments
A01801Pole Mounted Transformers2EA$ - 0B01801Pole Mounted Transformers2EA$ - 0C01801Pole Mounted Transformers2EA$ - 0D01801Pole Mounted Transformers2EA$ - 0E01801Pole Mounted Transformers2EA$ - 0
A019Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and TopsoilingB019Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and TopsoilingC019Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and TopsoilingD019Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and TopsoilingE019Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling
A01901Pad Mounted Transformers3EA$ - 0B01901Pad Mounted Transformers3EA$ - 0C01901Pad Mounted Transformers3EA$ - 0D01901Pad Mounted Transformers3EA$ - 0E01901Pad Mounted Transformers3EA$ - 0
A01902Additive cost for disposal at NBG Landfill C&D10TONS$ - 0B01902Additive cost for disposal at NBG Landfill C&D10TONS$ - 0C01902Additive cost for disposal at NBG Landfill C&D10TONS$ - 0D01902Additive cost for disposal at NBG Landfill C&D10TONS$ - 0E01902Additive cost for disposal at NBG Landfill C&D10TONS$ - 0
A020Installation of 6 Mil Polyethylene SheetB020Installation of 6 Mil Polyethylene SheetC020Installation of 6 Mil Polyethylene SheetD020Installation of 6 Mil Polyethylene SheetE020Installation of 6 Mil Polyethylene Sheet
A02001Polyethylene Sheet Plastic (6 MIL Minimum)50,000SF$ - 0B02001Polyethylene Sheet Plastic (6 MIL Minimum)50,000SF$ - 0C02001Polyethylene Sheet Plastic (6 MIL Minimum)50,000SF$ - 0D02001Polyethylene Sheet Plastic (6 MIL Minimum)50,000SF$ - 0E02001Polyethylene Sheet Plastic (6 MIL Minimum)50,000SF$ - 0
A021Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated SoilB021Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated SoilC021Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated SoilD021Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated SoilE021Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil
A02101500 to 1,200 Gallons1EA$ - 0B02101500 to 1,200 Gallons1EA$ - 0C02101500 to 1,200 Gallons1EA$ - 0D02101500 to 1,200 Gallons1EA$ - 0E02101500 to 1,200 Gallons1EA$ - 0
A021021,500 to 5,000 Gallons1EA$ - 0B021021,500 to 5,000 Gallons1EA$ - 0C021021,500 to 5,000 Gallons1EA$ - 0D021021,500 to 5,000 Gallons1EA$ - 0E021021,500 to 5,000 Gallons1EA$ - 0
A021036,000 to 8,000 Gallons1EA$ - 0B021036,000 to 8,000 Gallons1EA$ - 0C021036,000 to 8,000 Gallons1EA$ - 0D021036,000 to 8,000 Gallons1EA$ - 0E021036,000 to 8,000 Gallons1EA$ - 0
A021049,000 to 12,000 Gallons1EA$ - 0B021049,000 to 12,000 Gallons1EA$ - 0C021049,000 to 12,000 Gallons1EA$ - 0D021049,000 to 12,000 Gallons1EA$ - 0E021049,000 to 12,000 Gallons1EA$ - 0
A02105Additive cost for disposal at NBG Landfill C&D16TONS$ - 0B02105Additive cost for disposal at NBG Landfill C&D16TONS$ - 0C02105Additive cost for disposal at NBG Landfill C&D16TONS$ - 0D02105Additive cost for disposal at NBG Landfill C&D16TONS$ - 0E02105Additive cost for disposal at NBG Landfill C&D16TONS$ - 0
A022Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank)12EA$ - 0B022Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank)12EA$ - 0C022Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank)12EA$ - 0D022Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank)12EA$ - 0E022Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank)12EA$ - 0
$ - 0$ - 0
A02201Perform Sampling and Testing of Soil Impacted by Chlordane200EA$ - 0B02201Perform Sampling and Testing of Soil Impacted by Chlordane200EA$ - 0C02201Perform Sampling and Testing of Soil Impacted by Chlordane200EA$ - 0D02201Perform Sampling and Testing of Soil Impacted by Chlordane200EA$ - 0E02201Perform Sampling and Testing of Soil Impacted by Chlordane200EA$ - 0

A023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0 B023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0 C023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0 D023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0 E023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0

A024Cleaning of Underground Storage Tank (UST)B024Cleaning of Underground Storage Tank (UST)C024Cleaning of Underground Storage Tank (UST)D024Cleaning of Underground Storage Tank (UST)E024Cleaning of Underground Storage Tank (UST)
A02401500 to 1,200 Gallons1EA$ - 0B02401500 to 1,200 Gallons1EA$ - 0C02401500 to 1,200 Gallons1EA$ - 0D02401500 to 1,200 Gallons1EA$ - 0E02401500 to 1,200 Gallons1EA$ - 0
A024021,500 to 5,000 Gallons1EA$ - 0B024021,500 to 5,000 Gallons1EA$ - 0C024021,500 to 5,000 Gallons1EA$ - 0D024021,500 to 5,000 Gallons1EA$ - 0E024021,500 to 5,000 Gallons1EA$ - 0
A024036,000 to 8,000 Gallons1EA$ - 0B024036,000 to 8,000 Gallons1EA$ - 0C024036,000 to 8,000 Gallons1EA$ - 0D024036,000 to 8,000 Gallons1EA$ - 0E024036,000 to 8,000 Gallons1EA$ - 0
A024049,000 to 12,000 Gallons1EA$ - 0B024049,000 to 12,000 Gallons1EA$ - 0C024049,000 to 12,000 Gallons1EA$ - 0D024049,000 to 12,000 Gallons1EA$ - 0E024049,000 to 12,000 Gallons1EA$ - 0

A025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0 B025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0 C025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0 D025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0 E025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0

A026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0 B026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0 C026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0 D026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0 E026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0

A027 Engineering Services 1,500 HRS $ - 0 B027 Engineering Services 1,500 HRS $ - 0 C027 Engineering Services 1,500 HRS $ - 0 D027 Engineering Services 1,500 HRS $ - 0 E027 Engineering Services 1,500 HRS $ - 0

A028 Archaeological Monitoring 1,000 HRS $ - 0 B028 Archaeological Monitoring 1,000 HRS $ - 0 C028 Archaeological Monitoring 1,000 HRS $ - 0 D028 Archaeological Monitoring 1,000 HRS $ - 0 E028 Archaeological Monitoring 1,000 HRS $ - 0

A029 Historic American Engineering Recording (HAER) 500 HRS $ - 0 B029 Historic American Engineering Recording (HAER) 500 HRS $ - 0 C029 Historic American Engineering Recording (HAER) 500 HRS $ - 0 D029 Historic American Engineering Recording (HAER) 500 HRS $ - 0 E029 Historic American Engineering Recording (HAER) 500 HRS $ - 0

A030Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling1EA$ - 0B030Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling1EA$ - 0C030Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling1EA$ - 0D030Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling1EA$ - 0E030Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling1EA$ - 0
A03001Additive cost for disposal at NBG Landfill C&D10TONS$ - 0B03001Additive cost for disposal at NBG Landfill C&D10TONS$ - 0C03001Additive cost for disposal at NBG Landfill C&D10TONS$ - 0D03001Additive cost for disposal at NBG Landfill C&D10TONS$ - 0E03001Additive cost for disposal at NBG Landfill C&D10TONS$ - 0

A031 Clearing and Grubbing 5 AC $ - 0 B031 Clearing and Grubbing 5 AC $ - 0 C031 Clearing and Grubbing 5 AC $ - 0 D031 Clearing and Grubbing 5 AC $ - 0 E031 Clearing and Grubbing 5 AC $ - 0

TOTAL PRICE (ELIN E001 THRU E031) $ - 0 TOTAL PRICE (ELIN E001 THRU E033) $ - 0 TOTAL PRICE (ELIN E001 THRU E031) $ - 0 TOTAL PRICE (ELIN E001 THRU E031) $ - 0 TOTAL PRICE (ELIN E001 THRU E031) $ - 0

EXHIBIT A

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40192-22-R-9100
EXHIBIT A

REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM

EXHIBIT A
DNAME OF OFFEROR OR CONTRACTOR
SCHEDULE OF WORK
INDEFINITE QUANTITY WORK
ELIN NO.DESCRIPTIONESTIMATED QUANTITYUNITUNIT PRICEAMOUNT
BaseTotal
Unit PriceAmount
A001Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling
A00101Concrete2,800,000CF$ - 0
A00102Metal Sidings, Roof, and Framing with Concrete Foundation300,000SF$ - 0
A00103Mixture of Type600,000CF$ - 0
A00104Additive cost for disposal at NBG Landfill C&D18,700TONS$ - 0
A002Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling
A00201Up to 6-Inch Thick25,000CY$ - 0
A002027-Inch to 12-Inch Thick50,000CY$ - 0
A00203Additive cost for disposal at NBG Landfill C&D13,500TONS$ - 0
A003Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling
A00301Up to 2-Inch Thick500CY$ - 0
A003022-1/2-Inch Thick to 4-Inch Thick4,500CY$ - 0
A003034-1/2-Inch Thick to 6-Inch Thick100CY$ - 0
A00304Additive cost for disposal at NBG Landfill C&D920TONS$ - 0
A004Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling
A004011-Inch to 4-Inch Diameter5,000LF$ - 0
A004027-Inch to 8-Inch Diameter1,500LF$ - 0
A00403Additive cost for disposal at NBG Landfill C&D20TONS$ - 0
A005Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling
A00501Up to 6-Feet High8,500LF$ - 0
A005028-Feet to 10-Feet High1,500LF$ - 0
A00503Additive cost for disposal at NBG Landfill C&D30TONS$ - 0
A006Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling
A00601Up to 30-Feet to 35-Feet High25EA$ - 0
A0060240-Feet to 55-Feet High5EA$ - 0
A00603Additive cost for disposal at NBG Landfill C&D40TONS$ - 0
A007Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling
A00701Up to 30-Feet High8EA$ - 0
A0070240-Feet to 55-Feet High12EA$ - 0
A00703Additive cost for disposal at NBG Landfill C&D25TONS$ - 0
A008Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic100,000SF$ - 0
A00801Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive50,000SF$ - 0
A00802Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound150,000SF$ - 0
A009Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories
A009014-Inch to 8-inch Diameter3,000LF$ - 0
A0090210-inch to 12-Inch Diameter1,000LF$ - 0
A010Removal and Disposal of Bulk Asbestos Materials
A01001Transite Metal Sidings10,000SF$ - 0
A01002Transite Metal Roof12,000SF$ - 0
A01003Ceiling Tiles, Glued or Suspended20,000SF$ - 0
A01004Boiler Breeching or Flue Insulation500SF$ - 0
A01005Duct Insulation1,000SF$ - 0

A011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0

A012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0

A013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0

A014Spread, and Compact Backfill Materials
A01401Up to 6-Inches Thick1,300CY$ - 0
A014027-Inches to 12-Inches Thick1,200CY$ - 0
A0140312-Inches to 24-Inches Thick800CY$ - 0
A0140424-Inches to 36-Inches Thick14,500CY$ - 0
A015Spread and Compact 4-Inch Thick Topsoil4,000CY$ - 0
A01501Spread and Compact 8-Inch Thick Topsoil2,100CY$ - 0

A016 Hydro-Seeding 27,500 SY $ - 0

A017 Seeding 75,000 SY $ - 0

A018Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments
A01801Pole Mounted Transformers2EA$ - 0
A019Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling
A01901Pad Mounted Transformers3EA$ - 0
A01902Additive cost for disposal at NBG Landfill C&D10TONS$ - 0
A020Installation of 6 Mil Polyethylene Sheet
A02001Polyethylene Sheet Plastic (6 MIL Minimum)50,000SF$ - 0
A021Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil
A02101500 to 1,200 Gallons1EA$ - 0
A021021,500 to 5,000 Gallons1EA$ - 0
A021036,000 to 8,000 Gallons1EA$ - 0
A021049,000 to 12,000 Gallons1EA$ - 0
A02105Additive cost for disposal at NBG Landfill C&D16TONS$ - 0
A022Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank)12EA$ - 0
$ - 0
A02201Perform Sampling and Testing of Soil Impacted by Chlordane200EA$ - 0

A023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0

A024Cleaning of Underground Storage Tank (UST)
A02401500 to 1,200 Gallons1EA$ - 0
A024021,500 to 5,000 Gallons1EA$ - 0
A024036,000 to 8,000 Gallons1EA$ - 0
A024049,000 to 12,000 Gallons1EA$ - 0

A025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0

A026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0

A027 Engineering Services 1,500 HRS $ - 0

A028 Archaeological Monitoring 1,000 HRS $ - 0

A029 Historic American Engineering Recording (HAER) 500 HRS $ - 0

A030Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling1EA$ - 0
A03001Additive cost for disposal at NBG Landfill C&D10TONS$ - 0

A031 Clearing and Grubbing 5 AC $ - 0

TOTAL PRICE (ELIN E001 THRU E031) $ - 0

EXHIBIT B

A.B. Reference of Document Being Continuted
EXHIBIT B
DNAME OF OFFEROR OR CONTRACTOR
EFGHIJ
ELIN NO.SUPPLIES/SERVICESESTIMATED QUANTITYUNITUNIT PRICEAMOUNT

REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM

SCHEDULE OF WORK1st OptionTotal
INDEFINITE QUANTITY WORKUnit PriceAmount
B001Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling
B00101Concrete2,800,000CF$ - 0
B00102Metal Sidings, Roof, and Framing with Concrete Foundation300,000SF$ - 0
B00103Mixture of Type600,000CF$ - 0
B00104Additive cost for disposal at NBG Landfill C&D18,700TONS$ - 0
B002Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling
B00201Up to 6-Inch Thick25,000CY$ - 0
B002027-Inch to 12-Inch Thick50,000CY$ - 0
B00203Additive cost for disposal at NBG Landfill C&D13,500TONS$ - 0
B003Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling
B00301Up to 2-Inch Thick500CY$ - 0
B003022-1/2-Inch Thick to 4-Inch Thick4,500CY$ - 0
B003034-1/2-Inch Thick to 6-Inch Thick100CY$ - 0
B00304Additive cost for disposal at NBG Landfill C&D920TONS$ - 0
B004Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling
B004011-Inch to 4-Inch Diameter5,000LF$ - 0
B004027-Inch to 8-Inch Diameter1,500LF$ - 0
B00403Additive cost for disposal at NBG Landfill C&D20TONS$ - 0
B005Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling
B00501Up to 6-Feet High8,500LF$ - 0
B005028-Feet to 10-Feet High1,500LF$ - 0
B00503Additive cost for disposal at NBG Landfill C&D30TONS$ - 0
B006Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling
B00601Up to 30-Feet to 35-Feet High25EA$ - 0
B0060240-Feet to 55-Feet High5EA$ - 0
B00603Additive cost for disposal at NBG Landfill C&D40TONS$ - 0
B007Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling
B00701Up to 30-Feet High8EA$ - 0
B0070240-Feet to 55-Feet High12EA$ - 0
B00703Additive cost for disposal at NBG Landfill C&D25TONS$ - 0
B008Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic100,000SF$ - 0
B00801Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive50,000SF$ - 0
B00802Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound150,000SF$ - 0
B009Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories
B009014-Inch to 8-inch Diameter3,000LF$ - 0
B0090210-inch to 12-Inch Diameter1,000LF$ - 0
B010Removal and Disposal of Bulk Asbestos Materials
B01001Transite Metal Sidings10,000SF$ - 0
B01002Transite Metal Roof12,000SF$ - 0
B01003Ceiling Tiles, Glued or Suspended20,000SF$ - 0
B01004Boiler Breeching or Flue Insulation500SF$ - 0
B01005Duct Insulation1,000SF$ - 0

B011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0

B012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0

B013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0

B014Spread, and Compact Backfill Materials
B01401Up to 6-Inches Thick1,300CY$ - 0
B014027-Inches to 12-Inches Thick1,200CY$ - 0
B0140312-Inches to 24-Inches Thick800CY$ - 0
B0140424-Inches to 36-Inches Thick14,500CY$ - 0
B015Spread and Compact 4-Inch Thick Topsoil4,000CY$ - 0
B01501Spread and Compact 8-Inch Thick Topsoil2,100CY$ - 0

B016 Hydro-Seeding 27,500 SY $ - 0

B017 Seeding 75,000 SY $ - 0

B018Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments
B01801Pole Mounted Transformers2EA$ - 0
B019Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling
B01901Pad Mounted Transformers3EA$ - 0
B01902Additive cost for disposal at NBG Landfill C&D10TONS$ - 0
B020Installation of 6 Mil Polyethylene Sheet
B02001Polyethylene Sheet Plastic (6 MIL Minimum)50,000SF$ - 0
B021Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil
B02101500 to 1,200 Gallons1EA$ - 0
B021021,500 to 5,000 Gallons1EA$ - 0
B021036,000 to 8,000 Gallons1EA$ - 0
B021049,000 to 12,000 Gallons1EA$ - 0
B02105Additive cost for disposal at NBG Landfill C&D16TONS$ - 0

B022 Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) 12 EA $ - 0

B02201 Perform Sampling and Testing of Soil Impacted by Chlordane 200 EA $ - 0

B023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0

B024Cleaning of Underground Storage Tank (UST)
B02401500 to 1,200 Gallons1EA$ - 0
B024021,500 to 5,000 Gallons1EA$ - 0
B024036,000 to 8,000 Gallons1EA$ - 0
B024049,000 to 12,000 Gallons1EA$ - 0

B025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0

B026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0

B027 Engineering Services 1,500 HRS $ - 0

B028 Archaeological Monitoring 1,000 HRS $ - 0

B029 Historic American Engineering Recording (HAER) 500 HRS $ - 0

B030Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling1EA$ - 0
B03001Additive cost for disposal at NBG Landfill C&D10TONS$ - 0

B031 Clearing and Grubbing 5 AC $ - 0

TOTAL PRICE (ELIN E001 THRU E033) $ - 0

EXHIBIT C

A.B. Reference of Document Being Continuted
EXHIBIT C
DNAME OF OFFEROR OR CONTRACTOR
EFGHIJ
ELIN NO.SUPPLIES/SERVICESESTIMATED QUANTITYUNITUNIT PRICEAMOUNT

REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM

SCHEDULE OF WORK2nd OptionTotal
INDEFINITE QUANTITY WORKUnit PriceAmount
C001Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling
C00101Concrete2,800,000CF$ - 0
C00102Metal Sidings, Roof, and Framing with Concrete Foundation300,000SF$ - 0
C00103Mixture of Type600,000CF$ - 0
C00104Additive cost for disposal at NBG Landfill C&D18,700TONS$ - 0
C002Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling
C00201Up to 6-Inch Thick25,000CY$ - 0
C002027-Inch to 12-Inch Thick50,000CY$ - 0
C00203Additive cost for disposal at NBG Landfill C&D13,500TONS$ - 0
C003Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling
C00301Up to 2-Inch Thick500CY$ - 0
C003022-1/2-Inch Thick to 4-Inch Thick4,500CY$ - 0
C003034-1/2-Inch Thick to 6-Inch Thick100CY$ - 0
C00304Additive cost for disposal at NBG Landfill C&D920TONS$ - 0
C004Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling
C004011-Inch to 4-Inch Diameter5,000LF$ - 0
C004027-Inch to 8-Inch Diameter1,500LF$ - 0
C00403Additive cost for disposal at NBG Landfill C&D20TONS$ - 0
C005Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling
C00501Up to 6-Feet High8,500LF$ - 0
C005028-Feet to 10-Feet High1,500LF$ - 0
C00503Additive cost for disposal at NBG Landfill C&D30TONS$ - 0
C006Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling
C00601Up to 30-Feet to 35-Feet High25EA$ - 0
C0060240-Feet to 55-Feet High5EA$ - 0
C00603Additive cost for disposal at NBG Landfill C&D40TONS$ - 0
C007Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling
C00701Up to 30-Feet High8EA$ - 0
C0070240-Feet to 55-Feet High12EA$ - 0
C00703Additive cost for disposal at NBG Landfill C&D25TONS$ - 0
C008Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic100,000SF$ - 0
C00801Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive50,000SF$ - 0
C00802Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound150,000SF$ - 0
C009Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories
C009014-Inch to 8-inch Diameter3,000LF$ - 0
C0090210-inch to 12-Inch Diameter1,000LF$ - 0
C010Removal and Disposal of Bulk Asbestos Materials
C01001Transite Metal Sidings10,000SF$ - 0
C01002Transite Metal Roof12,000SF$ - 0
C01003Ceiling Tiles, Glued or Suspended20,000SF$ - 0
C01004Boiler Breeching or Flue Insulation500SF$ - 0
C01005Duct Insulation1,000SF$ - 0

C011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0

C012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0

A013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0

C014Spread, and Compact Backfill Materials
C01401Up to 6-Inches Thick1,300CY$ - 0
C014027-Inches to 12-Inches Thick1,200CY$ - 0
C0140312-Inches to 24-Inches Thick800CY$ - 0
C0140424-Inches to 36-Inches Thick14,500CY$ - 0
C015Spread and Compact 4-Inch Thick Topsoil4,000CY$ - 0
C01501Spread and Compact 8-Inch Thick Topsoil2,100CY$ - 0

C016 Hydro-Seeding 27,500 SY $ - 0

C017 Seeding 75,000 SY $ - 0

C018Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments
C01801Pole Mounted Transformers2EA$ - 0
C019Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling
C01901Pad Mounted Transformers3EA$ - 0
C01902Additive cost for disposal at NBG Landfill C&D10TONS$ - 0
C020Installation of 6 Mil Polyethylene Sheet
C02001Polyethylene Sheet Plastic (6 MIL Minimum)50,000SF$ - 0
C021Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil
C02101500 to 1,200 Gallons1EA$ - 0
C021021,500 to 5,000 Gallons1EA$ - 0
C021036,000 to 8,000 Gallons1EA$ - 0
C021049,000 to 12,000 Gallons1EA$ - 0
C02105Additive cost for disposal at NBG Landfill C&D16TONS$ - 0

C022 Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) 12 EA $ - 0

C02201 Perform Sampling and Testing of Soil Impacted by Chlordane 200 EA $ - 0

C023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0

C024Cleaning of Underground Storage Tank (UST)
C02401500 to 1,200 Gallons1EA$ - 0
C024021,500 to 5,000 Gallons1EA$ - 0
C024036,000 to 8,000 Gallons1EA$ - 0

This is the start of the file's text. The full file is on GovTribe.