| ATTACHMENT J-0200000-07 | ATTACHMENT J-0200000-07 | ATTACHMENT J-0200000-07 | ATTACHMENT J-0200000-07 | ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS | EXHIBIT LINE ITEM NUMBERS | EXHIBIT LINE ITEM NUMBERS | EXHIBIT LINE ITEM NUMBERS | EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-22-R-9100 | SOLICITATION/CONTRACT # N40192-22-R-9100 | SOLICITATION/CONTRACT # N40192-22-R-9100 | SOLICITATION/CONTRACT # N40192-22-R-9100 | SOLICITATION/CONTRACT # N40192-22-R-9100 |
| EXHIBIT A | EXHIBIT B | EXHIBIT C | EXHIBIT D | EXHIBIT E |
REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM
| Line Item 0001 - Base Period | | Line Item 0002 - First Option Period | | Line Item 0003 - Second Option Period | | Line Item 0004 - Third Option Period | | Line Item 0004 - Third Option Period | |
| EXHIBIT A | | EXHIBIT B | | EXHIBIT C | | EXHIBIT C | | EXHIBIT C | |
| D | NAME OF OFFEROR OR CONTRACTOR | D | NAME OF OFFEROR OR CONTRACTOR | D | NAME OF OFFEROR OR CONTRACTOR | D | NAME OF OFFEROR OR CONTRACTOR | D | NAME OF OFFEROR OR CONTRACTOR |
| SCHEDULE OF WORK | | | | | | SCHEDULE OF WORK | | | | | | SCHEDULE OF WORK | | | | | | SCHEDULE OF WORK | | | | | | SCHEDULE OF WORK | | | | |
| INDEFINITE QUANTITY WORK | | | | | | INDEFINITE QUANTITY WORK | | | | | | INDEFINITE QUANTITY WORK | | | | | | INDEFINITE QUANTITY WORK | | | | | | INDEFINITE QUANTITY WORK | | | | |
| ELIN NO. | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | AMOUNT | ELIN NO. | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | AMOUNT | ELIN NO. | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | AMOUNT | ELIN NO. | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | AMOUNT | ELIN NO. | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| | | | Base | Total | | SCHEDULE OF WORK | | | 1st Option | Total | | SCHEDULE OF WORK | | | 2nd Option | Total | | SCHEDULE OF WORK | | | 3rd Option | Total | | SCHEDULE OF WORK | | | 4th Option | Total |
| | | | Unit Price | Amount | | INDEFINITE QUANTITY WORK | | | Unit Price | Amount | | INDEFINITE QUANTITY WORK | | | Unit Price | Amount | | INDEFINITE QUANTITY WORK | | | Unit Price | Amount | | INDEFINITE QUANTITY WORK | | | Unit Price | Amount |
| A001 | Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling | | | | B001 | Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling | | | | C001 | Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling | | | | D001 | Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling | | | | E001 | Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A00101 | Concrete | 2,800,000 | CF | $ - 0 | B00101 | Concrete | 2,800,000 | CF | $ - 0 | C00101 | Concrete | 2,800,000 | CF | $ - 0 | D00101 | Concrete | 2,800,000 | CF | $ - 0 | E00101 | Concrete | 2,800,000 | CF | $ - 0 |
| A00102 | Metal Sidings, Roof, and Framing with Concrete Foundation | 300,000 | SF | $ - 0 | B00102 | Metal Sidings, Roof, and Framing with Concrete Foundation | 300,000 | SF | $ - 0 | C00102 | Metal Sidings, Roof, and Framing with Concrete Foundation | 300,000 | SF | $ - 0 | D00102 | Metal Sidings, Roof, and Framing with Concrete Foundation | 300,000 | SF | $ - 0 | E00102 | Metal Sidings, Roof, and Framing with Concrete Foundation | 300,000 | SF | $ - 0 |
| A00103 | Mixture of Type | 600,000 | CF | $ - 0 | B00103 | Mixture of Type | 600,000 | CF | $ - 0 | C00103 | Mixture of Type | 600,000 | CF | $ - 0 | D00103 | Mixture of Type | 600,000 | CF | $ - 0 | E00103 | Mixture of Type | 600,000 | CF | $ - 0 |
| A00104 | Additive cost for disposal at NBG Landfill C&D | 18,700 | TONS | $ - 0 | B00104 | Additive cost for disposal at NBG Landfill C&D | 18,700 | TONS | $ - 0 | C00104 | Additive cost for disposal at NBG Landfill C&D | 18,700 | TONS | $ - 0 | D00104 | Additive cost for disposal at NBG Landfill C&D | 18,700 | TONS | $ - 0 | E00104 | Additive cost for disposal at NBG Landfill C&D | 18,700 | TONS | $ - 0 |
| A002 | Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | | B002 | Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | | C002 | Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | | D002 | Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | | E002 | Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A00201 | Up to 6-Inch Thick | 25,000 | CY | $ - 0 | B00201 | Up to 6-Inch Thick | 25,000 | CY | $ - 0 | C00201 | Up to 6-Inch Thick | 25,000 | CY | $ - 0 | D00201 | Up to 6-Inch Thick | 25,000 | CY | $ - 0 | E00201 | Up to 6-Inch Thick | 25,000 | CY | $ - 0 |
| A00202 | 7-Inch to 12-Inch Thick | 50,000 | CY | $ - 0 | B00202 | 7-Inch to 12-Inch Thick | 50,000 | CY | $ - 0 | C00202 | 7-Inch to 12-Inch Thick | 50,000 | CY | $ - 0 | D00202 | 7-Inch to 12-Inch Thick | 50,000 | CY | $ - 0 | E00202 | 7-Inch to 12-Inch Thick | 50,000 | CY | $ - 0 |
| A00203 | Additive cost for disposal at NBG Landfill C&D | 13,500 | TONS | $ - 0 | B00203 | Additive cost for disposal at NBG Landfill C&D | 13,500 | TONS | $ - 0 | C00203 | Additive cost for disposal at NBG Landfill C&D | 13,500 | TONS | $ - 0 | D00203 | Additive cost for disposal at NBG Landfill C&D | 13,500 | TONS | $ - 0 | E00203 | Additive cost for disposal at NBG Landfill C&D | 13,500 | TONS | $ - 0 |
| A003 | Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling | | | | B003 | Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling | | | | C003 | Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling | | | | D003 | Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling | | | | E003 | Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A00301 | Up to 2-Inch Thick | 500 | CY | $ - 0 | B00301 | Up to 2-Inch Thick | 500 | CY | $ - 0 | C00301 | Up to 2-Inch Thick | 500 | CY | $ - 0 | D00301 | Up to 2-Inch Thick | 500 | CY | $ - 0 | E00301 | Up to 2-Inch Thick | 500 | CY | $ - 0 |
| A00302 | 2-1/2-Inch Thick to 4-Inch Thick | 4,500 | CY | $ - 0 | B00302 | 2-1/2-Inch Thick to 4-Inch Thick | 4,500 | CY | $ - 0 | C00302 | 2-1/2-Inch Thick to 4-Inch Thick | 4,500 | CY | $ - 0 | D00302 | 2-1/2-Inch Thick to 4-Inch Thick | 4,500 | CY | $ - 0 | E00302 | 2-1/2-Inch Thick to 4-Inch Thick | 4,500 | CY | $ - 0 |
| A00303 | 4-1/2-Inch Thick to 6-Inch Thick | 100 | CY | $ - 0 | B00303 | 4-1/2-Inch Thick to 6-Inch Thick | 100 | CY | $ - 0 | C00303 | 4-1/2-Inch Thick to 6-Inch Thick | 100 | CY | $ - 0 | D00303 | 4-1/2-Inch Thick to 6-Inch Thick | 100 | CY | $ - 0 | E00303 | 4-1/2-Inch Thick to 6-Inch Thick | 100 | CY | $ - 0 |
| A00304 | Additive cost for disposal at NBG Landfill C&D | 920 | TONS | $ - 0 | B00304 | Additive cost for disposal at NBG Landfill C&D | 920 | TONS | $ - 0 | C00304 | Additive cost for disposal at NBG Landfill C&D | 920 | TONS | $ - 0 | D00304 | Additive cost for disposal at NBG Landfill C&D | 920 | TONS | $ - 0 | E00304 | Additive cost for disposal at NBG Landfill C&D | 920 | TONS | $ - 0 |
| A004 | Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling | | | | B004 | Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling | | | | C004 | Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling | | | | D004 | Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling | | | | E004 | Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling | | | |
| A00401 | 1-Inch to 4-Inch Diameter | 5,000 | LF | $ - 0 | B00401 | 1-Inch to 4-Inch Diameter | 5,000 | LF | $ - 0 | C00401 | 1-Inch to 4-Inch Diameter | 5,000 | LF | $ - 0 | D00401 | 1-Inch to 4-Inch Diameter | 5,000 | LF | $ - 0 | E00401 | 1-Inch to 4-Inch Diameter | 5,000 | LF | $ - 0 |
| A00402 | 7-Inch to 8-Inch Diameter | 1,500 | LF | $ - 0 | B00402 | 7-Inch to 8-Inch Diameter | 1,500 | LF | $ - 0 | C00402 | 7-Inch to 8-Inch Diameter | 1,500 | LF | $ - 0 | D00402 | 7-Inch to 8-Inch Diameter | 1,500 | LF | $ - 0 | E00402 | 7-Inch to 8-Inch Diameter | 1,500 | LF | $ - 0 |
| A00403 | Additive cost for disposal at NBG Landfill C&D | 20 | TONS | $ - 0 | B00403 | Additive cost for disposal at NBG Landfill C&D | 20 | TONS | $ - 0 | C00403 | Additive cost for disposal at NBG Landfill C&D | 20 | TONS | $ - 0 | D00403 | Additive cost for disposal at NBG Landfill C&D | 20 | TONS | $ - 0 | E00403 | Additive cost for disposal at NBG Landfill C&D | 20 | TONS | $ - 0 |
| A005 | Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling | | | | B005 | Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling | | | | C005 | Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling | | | | D005 | Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling | | | | E005 | Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A00501 | Up to 6-Feet High | 8,500 | LF | $ - 0 | B00501 | Up to 6-Feet High | 8,500 | LF | $ - 0 | C00501 | Up to 6-Feet High | 8,500 | LF | $ - 0 | D00501 | Up to 6-Feet High | 8,500 | LF | $ - 0 | E00501 | Up to 6-Feet High | 8,500 | LF | $ - 0 |
| A00502 | 8-Feet to 10-Feet High | 1,500 | LF | $ - 0 | B00502 | 8-Feet to 10-Feet High | 1,500 | LF | $ - 0 | C00502 | 8-Feet to 10-Feet High | 1,500 | LF | $ - 0 | D00502 | 8-Feet to 10-Feet High | 1,500 | LF | $ - 0 | E00502 | 8-Feet to 10-Feet High | 1,500 | LF | $ - 0 |
| A00503 | Additive cost for disposal at NBG Landfill C&D | 30 | TONS | $ - 0 | B00503 | Additive cost for disposal at NBG Landfill C&D | 30 | TONS | $ - 0 | C00503 | Additive cost for disposal at NBG Landfill C&D | 30 | TONS | $ - 0 | D00503 | Additive cost for disposal at NBG Landfill C&D | 30 | TONS | $ - 0 | E00503 | Additive cost for disposal at NBG Landfill C&D | 30 | TONS | $ - 0 |
| A006 | Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | | B006 | Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | | C006 | Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | | D006 | Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | | E006 | Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | |
| A00601 | Up to 30-Feet to 35-Feet High | 25 | EA | $ - 0 | B00601 | Up to 30-Feet to 35-Feet High | 25 | EA | $ - 0 | C00601 | Up to 30-Feet to 35-Feet High | 25 | EA | $ - 0 | D00601 | Up to 30-Feet to 35-Feet High | 25 | EA | $ - 0 | E00601 | Up to 30-Feet to 35-Feet High | 25 | EA | $ - 0 |
| A00602 | 40-Feet to 55-Feet High | 5 | EA | $ - 0 | B00602 | 40-Feet to 55-Feet High | 5 | EA | $ - 0 | C00602 | 40-Feet to 55-Feet High | 5 | EA | $ - 0 | D00602 | 40-Feet to 55-Feet High | 5 | EA | $ - 0 | E00602 | 40-Feet to 55-Feet High | 5 | EA | $ - 0 |
| A00603 | Additive cost for disposal at NBG Landfill C&D | 40 | TONS | $ - 0 | B00603 | Additive cost for disposal at NBG Landfill C&D | 40 | TONS | $ - 0 | C00603 | Additive cost for disposal at NBG Landfill C&D | 40 | TONS | $ - 0 | D00603 | Additive cost for disposal at NBG Landfill C&D | 40 | TONS | $ - 0 | E00603 | Additive cost for disposal at NBG Landfill C&D | 40 | TONS | $ - 0 |
| A007 | Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | | B007 | Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | | C007 | Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | | D007 | Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | | E007 | Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | |
| A00701 | Up to 30-Feet High | 8 | EA | $ - 0 | B00701 | Up to 30-Feet High | 8 | EA | $ - 0 | C00701 | Up to 30-Feet High | 8 | EA | $ - 0 | D00701 | Up to 30-Feet High | 8 | EA | $ - 0 | E00701 | Up to 30-Feet High | 8 | EA | $ - 0 |
| A00702 | 40-Feet to 55-Feet High | 12 | EA | $ - 0 | B00702 | 40-Feet to 55-Feet High | 12 | EA | $ - 0 | C00702 | 40-Feet to 55-Feet High | 12 | EA | $ - 0 | D00702 | 40-Feet to 55-Feet High | 12 | EA | $ - 0 | E00702 | 40-Feet to 55-Feet High | 12 | EA | $ - 0 |
| A00703 | Additive cost for disposal at NBG Landfill C&D | 25 | TONS | $ - 0 | B00703 | Additive cost for disposal at NBG Landfill C&D | 25 | TONS | $ - 0 | C00703 | Additive cost for disposal at NBG Landfill C&D | 25 | TONS | $ - 0 | D00703 | Additive cost for disposal at NBG Landfill C&D | 25 | TONS | $ - 0 | E00703 | Additive cost for disposal at NBG Landfill C&D | 25 | TONS | $ - 0 |
| A008 | Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic | 100,000 | SF | $ - 0 | B008 | Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic | 100,000 | SF | $ - 0 | C008 | Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic | 100,000 | SF | $ - 0 | D008 | Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic | 100,000 | SF | $ - 0 | E008 | Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic | 100,000 | SF | $ - 0 |
| A00801 | Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive | 50,000 | SF | $ - 0 | B00801 | Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive | 50,000 | SF | $ - 0 | C00801 | Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive | 50,000 | SF | $ - 0 | D00801 | Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive | 50,000 | SF | $ - 0 | E00801 | Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive | 50,000 | SF | $ - 0 |
| A00802 | Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound | 150,000 | SF | $ - 0 | B00802 | Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound | 150,000 | SF | $ - 0 | C00802 | Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound | 150,000 | SF | $ - 0 | D00802 | Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound | 150,000 | SF | $ - 0 | E00802 | Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound | 150,000 | SF | $ - 0 |
| A009 | Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories | | | | B009 | Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories | | | | C009 | Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories | | | | D009 | Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories | | | | E009 | Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories | | | |
| A00901 | 4-Inch to 8-inch Diameter | 3,000 | LF | $ - 0 | B00901 | 4-Inch to 8-inch Diameter | 3,000 | LF | $ - 0 | C00901 | 4-Inch to 8-inch Diameter | 3,000 | LF | $ - 0 | D00901 | 4-Inch to 8-inch Diameter | 3,000 | LF | $ - 0 | E00901 | 4-Inch to 8-inch Diameter | 3,000 | LF | $ - 0 |
| A00902 | 10-inch to 12-Inch Diameter | 1,000 | LF | $ - 0 | B00902 | 10-inch to 12-Inch Diameter | 1,000 | LF | $ - 0 | C00902 | 10-inch to 12-Inch Diameter | 1,000 | LF | $ - 0 | D00902 | 10-inch to 12-Inch Diameter | 1,000 | LF | $ - 0 | E00902 | 10-inch to 12-Inch Diameter | 1,000 | LF | $ - 0 |
| A010 | Removal and Disposal of Bulk Asbestos Materials | | | | B010 | Removal and Disposal of Bulk Asbestos Materials | | | | C010 | Removal and Disposal of Bulk Asbestos Materials | | | | D010 | Removal and Disposal of Bulk Asbestos Materials | | | | E010 | Removal and Disposal of Bulk Asbestos Materials | | | |
| A01001 | Transite Metal Sidings | 10,000 | SF | $ - 0 | B01001 | Transite Metal Sidings | 10,000 | SF | $ - 0 | C01001 | Transite Metal Sidings | 10,000 | SF | $ - 0 | D01001 | Transite Metal Sidings | 10,000 | SF | $ - 0 | E01001 | Transite Metal Sidings | 10,000 | SF | $ - 0 |
| A01002 | Transite Metal Roof | 12,000 | SF | $ - 0 | B01002 | Transite Metal Roof | 12,000 | SF | $ - 0 | C01002 | Transite Metal Roof | 12,000 | SF | $ - 0 | D01002 | Transite Metal Roof | 12,000 | SF | $ - 0 | E01002 | Transite Metal Roof | 12,000 | SF | $ - 0 |
| A01003 | Ceiling Tiles, Glued or Suspended | 20,000 | SF | $ - 0 | B01003 | Ceiling Tiles, Glued or Suspended | 20,000 | SF | $ - 0 | C01003 | Ceiling Tiles, Glued or Suspended | 20,000 | SF | $ - 0 | D01003 | Ceiling Tiles, Glued or Suspended | 20,000 | SF | $ - 0 | E01003 | Ceiling Tiles, Glued or Suspended | 20,000 | SF | $ - 0 |
| A01004 | Boiler Breeching or Flue Insulation | 500 | SF | $ - 0 | B01004 | Boiler Breeching or Flue Insulation | 500 | SF | $ - 0 | C01004 | Boiler Breeching or Flue Insulation | 500 | SF | $ - 0 | D01004 | Boiler Breeching or Flue Insulation | 500 | SF | $ - 0 | E01004 | Boiler Breeching or Flue Insulation | 500 | SF | $ - 0 |
| A01005 | Duct Insulation | 1,000 | SF | $ - 0 | B01005 | Duct Insulation | 1,000 | SF | $ - 0 | C01005 | Duct Insulation | 1,000 | SF | $ - 0 | D01005 | Duct Insulation | 1,000 | SF | $ - 0 | E01005 | Duct Insulation | 1,000 | SF | $ - 0 |
A011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0 B011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0 C011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0 D011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0 E011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0
A012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0 B012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0 C012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0 D012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0 E012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0
A013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0 B013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0 A013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0 D013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0 E013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0
| A014 | Spread, and Compact Backfill Materials | | | | B014 | Spread, and Compact Backfill Materials | | | | C014 | Spread, and Compact Backfill Materials | | | | D014 | Spread, and Compact Backfill Materials | | | | E014 | Spread, and Compact Backfill Materials | | | |
| A01401 | Up to 6-Inches Thick | 1,300 | CY | $ - 0 | B01401 | Up to 6-Inches Thick | 1,300 | CY | $ - 0 | C01401 | Up to 6-Inches Thick | 1,300 | CY | $ - 0 | D01401 | Up to 6-Inches Thick | 1,300 | CY | $ - 0 | E01401 | Up to 6-Inches Thick | 1,300 | CY | $ - 0 |
| A01402 | 7-Inches to 12-Inches Thick | 1,200 | CY | $ - 0 | B01402 | 7-Inches to 12-Inches Thick | 1,200 | CY | $ - 0 | C01402 | 7-Inches to 12-Inches Thick | 1,200 | CY | $ - 0 | D01402 | 7-Inches to 12-Inches Thick | 1,200 | CY | $ - 0 | E01402 | 7-Inches to 12-Inches Thick | 1,200 | CY | $ - 0 |
| A01403 | 12-Inches to 24-Inches Thick | 800 | CY | $ - 0 | B01403 | 12-Inches to 24-Inches Thick | 800 | CY | $ - 0 | C01403 | 12-Inches to 24-Inches Thick | 800 | CY | $ - 0 | D01403 | 12-Inches to 24-Inches Thick | 800 | CY | $ - 0 | E01403 | 12-Inches to 24-Inches Thick | 800 | CY | $ - 0 |
| A01404 | 24-Inches to 36-Inches Thick | 14,500 | CY | $ - 0 | B01404 | 24-Inches to 36-Inches Thick | 14,500 | CY | $ - 0 | C01404 | 24-Inches to 36-Inches Thick | 14,500 | CY | $ - 0 | D01404 | 24-Inches to 36-Inches Thick | 14,500 | CY | $ - 0 | E01404 | 24-Inches to 36-Inches Thick | 14,500 | CY | $ - 0 |
| A015 | Spread and Compact 4-Inch Thick Topsoil | 4,000 | CY | $ - 0 | B015 | Spread and Compact 4-Inch Thick Topsoil | 4,000 | CY | $ - 0 | C015 | Spread and Compact 4-Inch Thick Topsoil | 4,000 | CY | $ - 0 | D015 | Spread and Compact 4-Inch Thick Topsoil | 4,000 | CY | $ - 0 | E015 | Spread and Compact 4-Inch Thick Topsoil | 4,000 | CY | $ - 0 |
| A01501 | Spread and Compact 8-Inch Thick Topsoil | 2,100 | CY | $ - 0 | B01501 | Spread and Compact 8-Inch Thick Topsoil | 2,100 | CY | $ - 0 | C01501 | Spread and Compact 8-Inch Thick Topsoil | 2,100 | CY | $ - 0 | D01501 | Spread and Compact 8-Inch Thick Topsoil | 2,100 | CY | $ - 0 | E01501 | Spread and Compact 8-Inch Thick Topsoil | 2,100 | CY | $ - 0 |
A016 Hydro-Seeding 27,500 SY $ - 0 B016 Hydro-Seeding 27,500 SY $ - 0 C016 Hydro-Seeding 27,500 SY $ - 0 D016 Hydro-Seeding 27,500 SY $ - 0 E016 Hydro-Seeding 27,500 SY $ - 0
A017 Seeding 75,000 SY $ - 0 B017 Seeding 75,000 SY $ - 0 C017 Seeding 75,000 SY $ - 0 D017 Seeding 75,000 SY $ - 0 E017 Seeding 75,000 SY $ - 0
| A018 | Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments | | | | B018 | Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments | | | | C018 | Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments | | | | D018 | Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments | | | | E018 | Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments | | | |
| A01801 | Pole Mounted Transformers | 2 | EA | $ - 0 | B01801 | Pole Mounted Transformers | 2 | EA | $ - 0 | C01801 | Pole Mounted Transformers | 2 | EA | $ - 0 | D01801 | Pole Mounted Transformers | 2 | EA | $ - 0 | E01801 | Pole Mounted Transformers | 2 | EA | $ - 0 |
| A019 | Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | | B019 | Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | | C019 | Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | | D019 | Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | | E019 | Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A01901 | Pad Mounted Transformers | 3 | EA | $ - 0 | B01901 | Pad Mounted Transformers | 3 | EA | $ - 0 | C01901 | Pad Mounted Transformers | 3 | EA | $ - 0 | D01901 | Pad Mounted Transformers | 3 | EA | $ - 0 | E01901 | Pad Mounted Transformers | 3 | EA | $ - 0 |
| A01902 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 | B01902 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 | C01902 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 | D01902 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 | E01902 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 |
| A020 | Installation of 6 Mil Polyethylene Sheet | | | | B020 | Installation of 6 Mil Polyethylene Sheet | | | | C020 | Installation of 6 Mil Polyethylene Sheet | | | | D020 | Installation of 6 Mil Polyethylene Sheet | | | | E020 | Installation of 6 Mil Polyethylene Sheet | | | |
| A02001 | Polyethylene Sheet Plastic (6 MIL Minimum) | 50,000 | SF | $ - 0 | B02001 | Polyethylene Sheet Plastic (6 MIL Minimum) | 50,000 | SF | $ - 0 | C02001 | Polyethylene Sheet Plastic (6 MIL Minimum) | 50,000 | SF | $ - 0 | D02001 | Polyethylene Sheet Plastic (6 MIL Minimum) | 50,000 | SF | $ - 0 | E02001 | Polyethylene Sheet Plastic (6 MIL Minimum) | 50,000 | SF | $ - 0 |
| A021 | Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil | | | | B021 | Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil | | | | C021 | Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil | | | | D021 | Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil | | | | E021 | Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil | | | |
| A02101 | 500 to 1,200 Gallons | 1 | EA | $ - 0 | B02101 | 500 to 1,200 Gallons | 1 | EA | $ - 0 | C02101 | 500 to 1,200 Gallons | 1 | EA | $ - 0 | D02101 | 500 to 1,200 Gallons | 1 | EA | $ - 0 | E02101 | 500 to 1,200 Gallons | 1 | EA | $ - 0 |
| A02102 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 | B02102 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 | C02102 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 | D02102 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 | E02102 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 |
| A02103 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 | B02103 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 | C02103 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 | D02103 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 | E02103 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 |
| A02104 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 | B02104 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 | C02104 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 | D02104 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 | E02104 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 |
| A02105 | Additive cost for disposal at NBG Landfill C&D | 16 | TONS | $ - 0 | B02105 | Additive cost for disposal at NBG Landfill C&D | 16 | TONS | $ - 0 | C02105 | Additive cost for disposal at NBG Landfill C&D | 16 | TONS | $ - 0 | D02105 | Additive cost for disposal at NBG Landfill C&D | 16 | TONS | $ - 0 | E02105 | Additive cost for disposal at NBG Landfill C&D | 16 | TONS | $ - 0 |
| A022 | Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) | 12 | EA | $ - 0 | B022 | Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) | 12 | EA | $ - 0 | C022 | Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) | 12 | EA | $ - 0 | D022 | Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) | 12 | EA | $ - 0 | E022 | Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) | 12 | EA | $ - 0 |
| | | | $ - 0 | | | | | | | | | | | | | | | | | | | | $ - 0 |
| A02201 | Perform Sampling and Testing of Soil Impacted by Chlordane | 200 | EA | $ - 0 | B02201 | Perform Sampling and Testing of Soil Impacted by Chlordane | 200 | EA | $ - 0 | C02201 | Perform Sampling and Testing of Soil Impacted by Chlordane | 200 | EA | $ - 0 | D02201 | Perform Sampling and Testing of Soil Impacted by Chlordane | 200 | EA | $ - 0 | E02201 | Perform Sampling and Testing of Soil Impacted by Chlordane | 200 | EA | $ - 0 |
A023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0 B023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0 C023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0 D023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0 E023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0
| A024 | Cleaning of Underground Storage Tank (UST) | | | | B024 | Cleaning of Underground Storage Tank (UST) | | | | C024 | Cleaning of Underground Storage Tank (UST) | | | | D024 | Cleaning of Underground Storage Tank (UST) | | | | E024 | Cleaning of Underground Storage Tank (UST) | | | |
| A02401 | 500 to 1,200 Gallons | 1 | EA | $ - 0 | B02401 | 500 to 1,200 Gallons | 1 | EA | $ - 0 | C02401 | 500 to 1,200 Gallons | 1 | EA | $ - 0 | D02401 | 500 to 1,200 Gallons | 1 | EA | $ - 0 | E02401 | 500 to 1,200 Gallons | 1 | EA | $ - 0 |
| A02402 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 | B02402 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 | C02402 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 | D02402 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 | E02402 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 |
| A02403 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 | B02403 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 | C02403 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 | D02403 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 | E02403 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 |
| A02404 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 | B02404 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 | C02404 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 | D02404 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 | E02404 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 |
A025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0 B025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0 C025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0 D025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0 E025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0
A026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0 B026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0 C026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0 D026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0 E026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0
A027 Engineering Services 1,500 HRS $ - 0 B027 Engineering Services 1,500 HRS $ - 0 C027 Engineering Services 1,500 HRS $ - 0 D027 Engineering Services 1,500 HRS $ - 0 E027 Engineering Services 1,500 HRS $ - 0
A028 Archaeological Monitoring 1,000 HRS $ - 0 B028 Archaeological Monitoring 1,000 HRS $ - 0 C028 Archaeological Monitoring 1,000 HRS $ - 0 D028 Archaeological Monitoring 1,000 HRS $ - 0 E028 Archaeological Monitoring 1,000 HRS $ - 0
A029 Historic American Engineering Recording (HAER) 500 HRS $ - 0 B029 Historic American Engineering Recording (HAER) 500 HRS $ - 0 C029 Historic American Engineering Recording (HAER) 500 HRS $ - 0 D029 Historic American Engineering Recording (HAER) 500 HRS $ - 0 E029 Historic American Engineering Recording (HAER) 500 HRS $ - 0
| A030 | Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling | 1 | EA | $ - 0 | B030 | Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling | 1 | EA | $ - 0 | C030 | Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling | 1 | EA | $ - 0 | D030 | Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling | 1 | EA | $ - 0 | E030 | Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling | 1 | EA | $ - 0 |
| A03001 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 | B03001 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 | C03001 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 | D03001 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 | E03001 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 |
A031 Clearing and Grubbing 5 AC $ - 0 B031 Clearing and Grubbing 5 AC $ - 0 C031 Clearing and Grubbing 5 AC $ - 0 D031 Clearing and Grubbing 5 AC $ - 0 E031 Clearing and Grubbing 5 AC $ - 0
TOTAL PRICE (ELIN E001 THRU E031) $ - 0 TOTAL PRICE (ELIN E001 THRU E033) $ - 0 TOTAL PRICE (ELIN E001 THRU E031) $ - 0 TOTAL PRICE (ELIN E001 THRU E031) $ - 0 TOTAL PRICE (ELIN E001 THRU E031) $ - 0
EXHIBIT A
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40192-22-R-9100 |
| EXHIBIT A |
REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM
| EXHIBIT A | |
| D | NAME OF OFFEROR OR CONTRACTOR |
| SCHEDULE OF WORK | | | | |
| INDEFINITE QUANTITY WORK | | | | |
| ELIN NO. | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| | | | Base | Total |
| | | | Unit Price | Amount |
| A001 | Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A00101 | Concrete | 2,800,000 | CF | $ - 0 |
| A00102 | Metal Sidings, Roof, and Framing with Concrete Foundation | 300,000 | SF | $ - 0 |
| A00103 | Mixture of Type | 600,000 | CF | $ - 0 |
| A00104 | Additive cost for disposal at NBG Landfill C&D | 18,700 | TONS | $ - 0 |
| A002 | Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A00201 | Up to 6-Inch Thick | 25,000 | CY | $ - 0 |
| A00202 | 7-Inch to 12-Inch Thick | 50,000 | CY | $ - 0 |
| A00203 | Additive cost for disposal at NBG Landfill C&D | 13,500 | TONS | $ - 0 |
| A003 | Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A00301 | Up to 2-Inch Thick | 500 | CY | $ - 0 |
| A00302 | 2-1/2-Inch Thick to 4-Inch Thick | 4,500 | CY | $ - 0 |
| A00303 | 4-1/2-Inch Thick to 6-Inch Thick | 100 | CY | $ - 0 |
| A00304 | Additive cost for disposal at NBG Landfill C&D | 920 | TONS | $ - 0 |
| A004 | Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling | | | |
| A00401 | 1-Inch to 4-Inch Diameter | 5,000 | LF | $ - 0 |
| A00402 | 7-Inch to 8-Inch Diameter | 1,500 | LF | $ - 0 |
| A00403 | Additive cost for disposal at NBG Landfill C&D | 20 | TONS | $ - 0 |
| A005 | Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A00501 | Up to 6-Feet High | 8,500 | LF | $ - 0 |
| A00502 | 8-Feet to 10-Feet High | 1,500 | LF | $ - 0 |
| A00503 | Additive cost for disposal at NBG Landfill C&D | 30 | TONS | $ - 0 |
| A006 | Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | |
| A00601 | Up to 30-Feet to 35-Feet High | 25 | EA | $ - 0 |
| A00602 | 40-Feet to 55-Feet High | 5 | EA | $ - 0 |
| A00603 | Additive cost for disposal at NBG Landfill C&D | 40 | TONS | $ - 0 |
| A007 | Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | |
| A00701 | Up to 30-Feet High | 8 | EA | $ - 0 |
| A00702 | 40-Feet to 55-Feet High | 12 | EA | $ - 0 |
| A00703 | Additive cost for disposal at NBG Landfill C&D | 25 | TONS | $ - 0 |
| A008 | Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic | 100,000 | SF | $ - 0 |
| A00801 | Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive | 50,000 | SF | $ - 0 |
| A00802 | Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound | 150,000 | SF | $ - 0 |
| A009 | Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories | | | |
| A00901 | 4-Inch to 8-inch Diameter | 3,000 | LF | $ - 0 |
| A00902 | 10-inch to 12-Inch Diameter | 1,000 | LF | $ - 0 |
| A010 | Removal and Disposal of Bulk Asbestos Materials | | | |
| A01001 | Transite Metal Sidings | 10,000 | SF | $ - 0 |
| A01002 | Transite Metal Roof | 12,000 | SF | $ - 0 |
| A01003 | Ceiling Tiles, Glued or Suspended | 20,000 | SF | $ - 0 |
| A01004 | Boiler Breeching or Flue Insulation | 500 | SF | $ - 0 |
| A01005 | Duct Insulation | 1,000 | SF | $ - 0 |
A011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0
A012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0
A013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0
| A014 | Spread, and Compact Backfill Materials | | | |
| A01401 | Up to 6-Inches Thick | 1,300 | CY | $ - 0 |
| A01402 | 7-Inches to 12-Inches Thick | 1,200 | CY | $ - 0 |
| A01403 | 12-Inches to 24-Inches Thick | 800 | CY | $ - 0 |
| A01404 | 24-Inches to 36-Inches Thick | 14,500 | CY | $ - 0 |
| A015 | Spread and Compact 4-Inch Thick Topsoil | 4,000 | CY | $ - 0 |
| A01501 | Spread and Compact 8-Inch Thick Topsoil | 2,100 | CY | $ - 0 |
A016 Hydro-Seeding 27,500 SY $ - 0
A017 Seeding 75,000 SY $ - 0
| A018 | Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments | | | |
| A01801 | Pole Mounted Transformers | 2 | EA | $ - 0 |
| A019 | Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| A01901 | Pad Mounted Transformers | 3 | EA | $ - 0 |
| A01902 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 |
| A020 | Installation of 6 Mil Polyethylene Sheet | | | |
| A02001 | Polyethylene Sheet Plastic (6 MIL Minimum) | 50,000 | SF | $ - 0 |
| A021 | Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil | | | |
| A02101 | 500 to 1,200 Gallons | 1 | EA | $ - 0 |
| A02102 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 |
| A02103 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 |
| A02104 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 |
| A02105 | Additive cost for disposal at NBG Landfill C&D | 16 | TONS | $ - 0 |
| A022 | Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) | 12 | EA | $ - 0 |
| | | | $ - 0 |
| A02201 | Perform Sampling and Testing of Soil Impacted by Chlordane | 200 | EA | $ - 0 |
A023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0
| A024 | Cleaning of Underground Storage Tank (UST) | | | |
| A02401 | 500 to 1,200 Gallons | 1 | EA | $ - 0 |
| A02402 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 |
| A02403 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 |
| A02404 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 |
A025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0
A026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0
A027 Engineering Services 1,500 HRS $ - 0
A028 Archaeological Monitoring 1,000 HRS $ - 0
A029 Historic American Engineering Recording (HAER) 500 HRS $ - 0
| A030 | Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling | 1 | EA | $ - 0 |
| A03001 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 |
A031 Clearing and Grubbing 5 AC $ - 0
TOTAL PRICE (ELIN E001 THRU E031) $ - 0
EXHIBIT B
| A. | | B. Reference of Document Being Continuted |
| EXHIBIT B | | |
| D | NAME OF OFFEROR OR CONTRACTOR | |
| E | F | G | H | I | J |
| ELIN NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY | UNIT | UNIT PRICE | AMOUNT |
REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM
| SCHEDULE OF WORK | 1st Option | Total |
| INDEFINITE QUANTITY WORK | Unit Price | Amount |
| B001 | Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| B00101 | Concrete | 2,800,000 | CF | $ - 0 |
| B00102 | Metal Sidings, Roof, and Framing with Concrete Foundation | 300,000 | SF | $ - 0 |
| B00103 | Mixture of Type | 600,000 | CF | $ - 0 |
| B00104 | Additive cost for disposal at NBG Landfill C&D | 18,700 | TONS | $ - 0 |
| B002 | Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| B00201 | Up to 6-Inch Thick | 25,000 | CY | $ - 0 |
| B00202 | 7-Inch to 12-Inch Thick | 50,000 | CY | $ - 0 |
| B00203 | Additive cost for disposal at NBG Landfill C&D | 13,500 | TONS | $ - 0 |
| B003 | Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| B00301 | Up to 2-Inch Thick | 500 | CY | $ - 0 |
| B00302 | 2-1/2-Inch Thick to 4-Inch Thick | 4,500 | CY | $ - 0 |
| B00303 | 4-1/2-Inch Thick to 6-Inch Thick | 100 | CY | $ - 0 |
| B00304 | Additive cost for disposal at NBG Landfill C&D | 920 | TONS | $ - 0 |
| B004 | Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling | | | |
| B00401 | 1-Inch to 4-Inch Diameter | 5,000 | LF | $ - 0 |
| B00402 | 7-Inch to 8-Inch Diameter | 1,500 | LF | $ - 0 |
| B00403 | Additive cost for disposal at NBG Landfill C&D | 20 | TONS | $ - 0 |
| B005 | Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| B00501 | Up to 6-Feet High | 8,500 | LF | $ - 0 |
| B00502 | 8-Feet to 10-Feet High | 1,500 | LF | $ - 0 |
| B00503 | Additive cost for disposal at NBG Landfill C&D | 30 | TONS | $ - 0 |
| B006 | Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | |
| B00601 | Up to 30-Feet to 35-Feet High | 25 | EA | $ - 0 |
| B00602 | 40-Feet to 55-Feet High | 5 | EA | $ - 0 |
| B00603 | Additive cost for disposal at NBG Landfill C&D | 40 | TONS | $ - 0 |
| B007 | Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | |
| B00701 | Up to 30-Feet High | 8 | EA | $ - 0 |
| B00702 | 40-Feet to 55-Feet High | 12 | EA | $ - 0 |
| B00703 | Additive cost for disposal at NBG Landfill C&D | 25 | TONS | $ - 0 |
| B008 | Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic | 100,000 | SF | $ - 0 |
| B00801 | Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive | 50,000 | SF | $ - 0 |
| B00802 | Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound | 150,000 | SF | $ - 0 |
| B009 | Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories | | | |
| B00901 | 4-Inch to 8-inch Diameter | 3,000 | LF | $ - 0 |
| B00902 | 10-inch to 12-Inch Diameter | 1,000 | LF | $ - 0 |
| B010 | Removal and Disposal of Bulk Asbestos Materials | | | |
| B01001 | Transite Metal Sidings | 10,000 | SF | $ - 0 |
| B01002 | Transite Metal Roof | 12,000 | SF | $ - 0 |
| B01003 | Ceiling Tiles, Glued or Suspended | 20,000 | SF | $ - 0 |
| B01004 | Boiler Breeching or Flue Insulation | 500 | SF | $ - 0 |
| B01005 | Duct Insulation | 1,000 | SF | $ - 0 |
B011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0
B012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0
B013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0
| B014 | Spread, and Compact Backfill Materials | | | |
| B01401 | Up to 6-Inches Thick | 1,300 | CY | $ - 0 |
| B01402 | 7-Inches to 12-Inches Thick | 1,200 | CY | $ - 0 |
| B01403 | 12-Inches to 24-Inches Thick | 800 | CY | $ - 0 |
| B01404 | 24-Inches to 36-Inches Thick | 14,500 | CY | $ - 0 |
| B015 | Spread and Compact 4-Inch Thick Topsoil | 4,000 | CY | $ - 0 |
| B01501 | Spread and Compact 8-Inch Thick Topsoil | 2,100 | CY | $ - 0 |
B016 Hydro-Seeding 27,500 SY $ - 0
B017 Seeding 75,000 SY $ - 0
| B018 | Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments | | | |
| B01801 | Pole Mounted Transformers | 2 | EA | $ - 0 |
| B019 | Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| B01901 | Pad Mounted Transformers | 3 | EA | $ - 0 |
| B01902 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 |
| B020 | Installation of 6 Mil Polyethylene Sheet | | | |
| B02001 | Polyethylene Sheet Plastic (6 MIL Minimum) | 50,000 | SF | $ - 0 |
| B021 | Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil | | | |
| B02101 | 500 to 1,200 Gallons | 1 | EA | $ - 0 |
| B02102 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 |
| B02103 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 |
| B02104 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 |
| B02105 | Additive cost for disposal at NBG Landfill C&D | 16 | TONS | $ - 0 |
B022 Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) 12 EA $ - 0
B02201 Perform Sampling and Testing of Soil Impacted by Chlordane 200 EA $ - 0
B023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0
| B024 | Cleaning of Underground Storage Tank (UST) | | | |
| B02401 | 500 to 1,200 Gallons | 1 | EA | $ - 0 |
| B02402 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 |
| B02403 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 |
| B02404 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 |
B025 Disposal of Liquid Waste (from tank) - per 55 gallon drum 4 EA $ - 0
B026 Disposal of Sludge (from tank) - per 55 gallon drum 4 EA $ - 0
B027 Engineering Services 1,500 HRS $ - 0
B028 Archaeological Monitoring 1,000 HRS $ - 0
B029 Historic American Engineering Recording (HAER) 500 HRS $ - 0
| B030 | Removal and Disposal of Antenna Tower, 110 FT high, Complete with Concrete Base, Guy Wires and Deadman, Including Backfilling, Compacting, and Topsoiling | 1 | EA | $ - 0 |
| B03001 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 |
B031 Clearing and Grubbing 5 AC $ - 0
TOTAL PRICE (ELIN E001 THRU E033) $ - 0
EXHIBIT C
| A. | | B. Reference of Document Being Continuted |
| EXHIBIT C | | |
| D | NAME OF OFFEROR OR CONTRACTOR | |
| E | F | G | H | I | J |
| ELIN NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY | UNIT | UNIT PRICE | AMOUNT |
REQUIREMENTS CONTRACT FOR DEMOLITION OF BUILDING FACILITIES AND MISCELLANEOUS STRUCTURES AT ALL NAVY COMPLEX ACTIVITIES AND OTHER CUSTOMERS ON GUAM
| SCHEDULE OF WORK | 2nd Option | Total |
| INDEFINITE QUANTITY WORK | Unit Price | Amount |
| C001 | Demolition, Removal and, Disposal of Building Unit(s), Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| C00101 | Concrete | 2,800,000 | CF | $ - 0 |
| C00102 | Metal Sidings, Roof, and Framing with Concrete Foundation | 300,000 | SF | $ - 0 |
| C00103 | Mixture of Type | 600,000 | CF | $ - 0 |
| C00104 | Additive cost for disposal at NBG Landfill C&D | 18,700 | TONS | $ - 0 |
| C002 | Demolition, Removal and, Disposal of Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| C00201 | Up to 6-Inch Thick | 25,000 | CY | $ - 0 |
| C00202 | 7-Inch to 12-Inch Thick | 50,000 | CY | $ - 0 |
| C00203 | Additive cost for disposal at NBG Landfill C&D | 13,500 | TONS | $ - 0 |
| C003 | Demolition, Removal and, Disposal of Flexible Asphalt Pavement, Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| C00301 | Up to 2-Inch Thick | 500 | CY | $ - 0 |
| C00302 | 2-1/2-Inch Thick to 4-Inch Thick | 4,500 | CY | $ - 0 |
| C00303 | 4-1/2-Inch Thick to 6-Inch Thick | 100 | CY | $ - 0 |
| C00304 | Additive cost for disposal at NBG Landfill C&D | 920 | TONS | $ - 0 |
| C004 | Removal and Disposal of Steel Posts and Signs, Including Footings; Including Backfilling, Compacting, and Topsoiling | | | |
| C00401 | 1-Inch to 4-Inch Diameter | 5,000 | LF | $ - 0 |
| C00402 | 7-Inch to 8-Inch Diameter | 1,500 | LF | $ - 0 |
| C00403 | Additive cost for disposal at NBG Landfill C&D | 20 | TONS | $ - 0 |
| C005 | Removal and Disposal of Chain Link Fence, Posts, Gates, Barbed Wires, and Accessories, Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| C00501 | Up to 6-Feet High | 8,500 | LF | $ - 0 |
| C00502 | 8-Feet to 10-Feet High | 1,500 | LF | $ - 0 |
| C00503 | Additive cost for disposal at NBG Landfill C&D | 30 | TONS | $ - 0 |
| C006 | Removal and Disposal of Concrete Power Poles Complete with Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | |
| C00601 | Up to 30-Feet to 35-Feet High | 25 | EA | $ - 0 |
| C00602 | 40-Feet to 55-Feet High | 5 | EA | $ - 0 |
| C00603 | Additive cost for disposal at NBG Landfill C&D | 40 | TONS | $ - 0 |
| C007 | Removal and Disposal of Wooden Power Poles Complete w/Guy Wires and Pole Attachments, Including Backfilling, Compacting, and Topsoiling | | | |
| C00701 | Up to 30-Feet High | 8 | EA | $ - 0 |
| C00702 | 40-Feet to 55-Feet High | 12 | EA | $ - 0 |
| C00703 | Additive cost for disposal at NBG Landfill C&D | 25 | TONS | $ - 0 |
| C008 | Removal and Disposal of Vinyl Asbestos Tiles (VAT) Including Mastic | 100,000 | SF | $ - 0 |
| C00801 | Removal and Disposal of Chrysotile Asbestos Linoleum Including Mastic Adhesive | 50,000 | SF | $ - 0 |
| C00802 | Removal and Disposal of Chrysotile Asbestos Drywall Including Joint Compound | 150,000 | SF | $ - 0 |
| C009 | Removal and Disposal of Asbestos Pipe Insulation Including Pipe, Fittings, and Accessories | | | |
| C00901 | 4-Inch to 8-inch Diameter | 3,000 | LF | $ - 0 |
| C00902 | 10-inch to 12-Inch Diameter | 1,000 | LF | $ - 0 |
| C010 | Removal and Disposal of Bulk Asbestos Materials | | | |
| C01001 | Transite Metal Sidings | 10,000 | SF | $ - 0 |
| C01002 | Transite Metal Roof | 12,000 | SF | $ - 0 |
| C01003 | Ceiling Tiles, Glued or Suspended | 20,000 | SF | $ - 0 |
| C01004 | Boiler Breeching or Flue Insulation | 500 | SF | $ - 0 |
| C01005 | Duct Insulation | 1,000 | SF | $ - 0 |
C011 Removal and Disposal of Lead Containing Materials 30,000 SF $ - 0
C012 Perform Testing of Suspected Asbestos Materials 1,000 EA. $ - 0
A013 Perform Testing of Suspected Lead Materials 1,500 EA. $ - 0
| C014 | Spread, and Compact Backfill Materials | | | |
| C01401 | Up to 6-Inches Thick | 1,300 | CY | $ - 0 |
| C01402 | 7-Inches to 12-Inches Thick | 1,200 | CY | $ - 0 |
| C01403 | 12-Inches to 24-Inches Thick | 800 | CY | $ - 0 |
| C01404 | 24-Inches to 36-Inches Thick | 14,500 | CY | $ - 0 |
| C015 | Spread and Compact 4-Inch Thick Topsoil | 4,000 | CY | $ - 0 |
| C01501 | Spread and Compact 8-Inch Thick Topsoil | 2,100 | CY | $ - 0 |
C016 Hydro-Seeding 27,500 SY $ - 0
C017 Seeding 75,000 SY $ - 0
| C018 | Removal, Transport and Delivery of Pole Mounted Transformers, Complete with Disposal of Wires and Attachments | | | |
| C01801 | Pole Mounted Transformers | 2 | EA | $ - 0 |
| C019 | Demolition, Removal, Transport and Delivery of Pad Mounted Transformers, Complete with Disposal of Wires, Attachments and Reinforced Concrete Slab (Slab on Grade) Including Backfilling, Grading, Compacting, and Topsoiling | | | |
| C01901 | Pad Mounted Transformers | 3 | EA | $ - 0 |
| C01902 | Additive cost for disposal at NBG Landfill C&D | 10 | TONS | $ - 0 |
| C020 | Installation of 6 Mil Polyethylene Sheet | | | |
| C02001 | Polyethylene Sheet Plastic (6 MIL Minimum) | 50,000 | SF | $ - 0 |
| C021 | Removal and Disposal of Underground Storage Tank (UST), Includes Plumbing (piping and hardware), Saw Cutting (concrete and asphalt), Reinforced Concrete and all Attachments Associated Hardware). Also Including Excavation, Backfilling, Grading, Compacting, Topsoiling and Removal of Contaminated Soil | | | |
| C02101 | 500 to 1,200 Gallons | 1 | EA | $ - 0 |
| C02102 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 |
| C02103 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 |
| C02104 | 9,000 to 12,000 Gallons | 1 | EA | $ - 0 |
| C02105 | Additive cost for disposal at NBG Landfill C&D | 16 | TONS | $ - 0 |
C022 Perform Testing of Suspected Contaminated Soil (consisting of three (3) tests per tank) 12 EA $ - 0
C02201 Perform Sampling and Testing of Soil Impacted by Chlordane 200 EA $ - 0
C023 Perform Testing of Underground Storage Tank (consisting of two (2) tests per tank) 8 EA $ - 0
| C024 | Cleaning of Underground Storage Tank (UST) | | | |
| C02401 | 500 to 1,200 Gallons | 1 | EA | $ - 0 |
| C02402 | 1,500 to 5,000 Gallons | 1 | EA | $ - 0 |
| C02403 | 6,000 to 8,000 Gallons | 1 | EA | $ - 0 |