ATTACHMENT J.5 PAST PERFORMANCE SURVEY.doc

DOC document 60 KB Posted

Attached to
Cleared American Guards (CAGs) and Construction Surveillance Technicians (CSTs)
Solicitation number
19AQMM21R0009
Issued by

About this file

This document contains a past performance survey for federal contractors. The survey includes a section for the offeror to provide details of prior work and a section for the government client to rate performance across 11 criteria. Ratings are on a scale of strongly disagree to strongly agree. Government clients are asked to provide any additional comments and sign and date the completed survey. This type of past performance survey is used by federal agencies to evaluate offerors' prior relevant experience during the source selection process for new contract awards.

This solicitation is seeking proposals for unclassified construction security monitoring services at various overseas State Department facilities. Contractors will provide cleared American guard and construction surveillance technicians to control access, deter unauthorized materials, and surveil uncleared workers during overseas construction projects. The requirement includes implementation of site security personnel to support operations. The solicitation will be available electronically on SAM.gov. The NAICS code is 561612 and small business size standard is $22 million. Proposals are due by the closing date. The Department of State intends to award up to three IDIQ contracts, with one set aside for small business. Active SAM registration is required for offerors to be eligible for consideration.

View the file

Other files

File Type Posted
19AQMM21R0009 0006.pdf PDF
ATTACHMENT J.4 Pricing DocumentREV3.xlsx XLSX spreadsheet
19AQMM21R0009 0005.pdf PDF
ATTACHMENT J.4 Pricing DocumentREV2.xlsx XLSX spreadsheet
ATTACHMENT J.13 Small Business Plan Template.docx DOCX document
19AQMM21R0009 0004.pdf PDF
DSTC SCHEDULE.pdf PDF
19AQMM21R0009 0003.pdf PDF
19AQMM21R0009 0002.pdf PDF
19AQMM21R0009 0001.pdf PDF
ATTACHMENT J.2 PAST PERFORMANCE SURVEY.doc DOC document
ATTACHMENT J.1 DD 254, Contract Security Classification Specification.pdf PDF
19AQMM21R0009.pdf PDF
ATTACHMENT J.4 Pricing Document.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J2

RFP#

PAST PERFORMANCE QUESTIONNAIRE (PPQ)

The Offeror shall complete the requested information within Section 1 of this form only. After completing Section 1, please forward this form to your Government Representative or Client to complete Section 2.. Please instruct them to forward this form back to you the offeror, this form is to be included in you proposal. If you have any questions, please email Keith Westry at Westryk@state.gov and Michael Skufca at SkufcaMJ@state.gov. .

Section 1:

TO BE COMPLETED BY OFFEROR

Name of OFFEROR: ______________________ Project name and contract/task order number:

Brief description of Statement of Work or support provided:

Number of contractor personnel assigned to the project/contract/task order:

Total period of performance (dates):____________________ to _______________________

Total Cost/Price:

Did you inform your client this past performance questionnaire must be completed and returned to you by April 28, 2021?

FORMCHECKBOX

Yes FORMCHECKBOX No

SECTION 2:

TO BE COMPLETED BY GOVERNMENT REPRESENTATIVE or CLIENT. and returned directly to the offeror.

Client’s Organization: ______________________________ Address of Organization: ____________________________ Name and Title of Client or Government Representative Technical Point of Contact (POC): ________________________________ Telephone Number: ______________________ Will the Government Representative’s listed above be willing to address the responses to this questionnaire if contacted?

FORMCHECKBOX

Yes FORMCHECKBOX No Please check the box that best describes the rating that best meets the statement of each category below:

1. The Overall Technical Performance met the minimal contract requirements

FORMCHECKBOX

*Strongly Disagree FORMCHECKBOX *Disagree FORMCHECKBOX Neutral FORMCHECKBOX Agree FORMCHECKBOX Strongly Agree

*If you checked Strongly Disagree or Disagree, please provide a statement on the additional page provided.

2. The quality of work to include the professionalism of Key personnel hired met the minimal contract requirements.

FORMCHECKBOX

*Strongly Disagree FORMCHECKBOX *Disagree FORMCHECKBOX Neutral FORMCHECKBOX Agree FORMCHECKBOX Strongly Agree

*If you checked Strongly Disagree or Disagree, please provide a statement on the additional page provided.

3. The anticipated performance schedule was adhered to, or was accomplished within an acceptable timeframe.

FORMCHECKBOX

Strongly Disagree FORMCHECKBOX Disagree FORMCHECKBOX Neutral FORMCHECKBOX

*Strongly Agree

*If you checked Strongly Agree, please provide a supporting statement on the additional page provided.

4. Both cost performance was in line with the original proposal and invoices were accurate.

FORMCHECKBOX

Strongly Disagree FORMCHECKBOX Disagree FORMCHECKBOX Neutral FORMCHECKBOX

*If you checked Strongly Agree, please provide a supporting statement on the additional page provided.

5. The contractor complied with the terms of the contract and/or task orders issued.

FORMCHECKBOX

Strongly Disagree FORMCHECKBOX Disagree FORMCHECKBOX Neutral FORMCHECKBOX

*If you checked Strongly Agree, please provide a supporting statement on the additional page provided.

6. The contractor was flexible and amenable during times of change or during difficult situations which required ‘on-the-fly’ adjustments to normal procedures.

FORMCHECKBOX

Strongly Disagree FORMCHECKBOX Disagree FORMCHECKBOX Neutral FORMCHECKBOX

*If you checked Strongly Agree, please provide a supporting statement on the additional page provided

7. The contractor’s turnover (key or field personnel) was higher than expected throughout the period of performance.

FORMCHECKBOX

Strongly Disagree FORMCHECKBOX Disagree FORMCHECKBOX Neutral FORMCHECKBOX

*If you checked Strongly Agree, please provide a supporting statement on the additional page provided

8. For any reason; did the contractor have any work terminated (convenience/default)?

FORMCHECKBOX

No FORMCHECKBOX *Yes

*If you checked YES, please provide a supporting statement on the additional page provided.

9. The contractor’s Management Team was efficient and proactive; requiring little to no supervision from their superiors or assistance from the Client to accomplish the respective tasks.

FORMCHECKBOX

Strongly Disagree FORMCHECKBOX Disagree FORMCHECKBOX Neutral FORMCHECKBOX

*If you checked Strongly Agree, please provide a supporting statement on the additional page provide

10. I would select this contractor to work on contracts that:

(Select all that apply)

FORMCHECKBOX

Are Fast Paced, FORMCHECKBOX

Require Streamlined Processes, FORMCHECKBOX

Require Constant Overseas Logistics and Planning, FORMCHECKBOX

Require short suspense to requests and requirements.

FORMCHECKBOX

Require timely and accurate invoicing

11. Please provide any additional information you believe will assist the evaluation panel with making a more informed decision.

SIGNATURE: __________________________________ DATE:______________________________

SUPPORTING STATEMENTS

1. The Overall Technical Performance met the minimal contract requirements

FORMCHECKBOX

*Strongly Disagree FORMCHECKBOX *Disagree

2. The quality of work to include the professionalism of personnel hired met the minimal contract requirments.

FORMCHECKBOX

*Strongly Disagree FORMCHECKBOX *Disagree

3. The anticipated performance schedule was adhered to, or was accomplished within an acceptable timeframe.

FORMCHECKBOX

*Strongly Agree

4. Both cost performance was in line with the original proposal and invoices were accurate. FORMCHECKBOX

5. The contractor complied with the terms of the contract and/or task orders issued. FORMCHECKBOX *Strongly Agree

6. The contractor was flexible and amenable during times of change or during difficult situations which required ‘on-the-fly’ adjustments to normal procedures. FORMCHECKBOX *Strongly Agree

7. The contractor’s turnover was higher than expected throughout the period of performance. FORMCHECKBOX

8. Did the contractor have any part of work terminated for any reason (convenience/default)? FORMCHECKBOX *Yes

9. The contractor’s Management Team was efficient and proactive; requiring little to no assistance to accomplish tasks issued by the Client. FORMCHECKBOX

File details come from the government source that posted it. Updated .