ATTACHMENT J.2_BID FORM_IFB_72044020B00001 BH IM2.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
USAID Second Interim Measures for Dioxin Remediation at Bien Hoa Airbase Area (IM2)
Solicitation number
72044020B00001
Issued by

About this file

This solicitation seeks bids for a construction contract to conduct the second phase of interim dioxin remediation measures at Bien Hoa Airbase Area in Vietnam. The United States Agency for International Development (USAID) in Vietnam will award a firm-fixed-price contract for a 20-month period of performance to remove and dispose of contaminated soils, construct long-term storage areas, install temporary storage facilities, and complete other site work. Bids are due by December 15, 2020 and pre-bid conferences will be held on November 17, 2020. Eligible bidders include U.S. and Vietnamese firms registered with sam.gov. The estimated base bid value exceeds $10 million. Questions regarding the solicitation must be submitted by November 12, 2020 and responses will be provided via amendment.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

IFB no. 72044020B00001
USAID SECOND INTERIM MEASURES FOR DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA
ATTACHMENT J.2 BID FORM
Bid Item No.Bid Item DescriptionUnitsQuantityUnit Price (USD)Total Amount (USD)
00 GENERAL$ -
0.01Mobilization and DemobilizationLS1$ -
0.02Environmental MitigationLS1$ -
0.03Health and Safety, Including PPE and Blood MonitoringLS1$ -
0.04Traffic ControlLS1$ -
0.05DecontaminationLS1$ -
10 LONG TERM STORAGE AREA (LTSA)$ -
10.01Movevable Barrier FenceLS1$ -
10.02Clearing and Removal of VegetationLS1$ -
10.03Remove and Stockpile TopsoilLS1$ -
10.04General Excavation, Fill, and CompactionLS1$ -
10.05Fill and Compact Base with Imported SoilLS1$ -
10.06Fill and Compact Embankment with Imported SoilLS1$ -
10.07Non-Woven GeotextileLS1$ -
10.08Double-side Textured HDPE LinerLS1$ -
10.09Cast in Place Concrete with Geocell Reinforcement for Berm LiningLS1$ -
10.10Cast in Place Concrete with Geocell Reiforcement and Crushed Stone for Ditch Lining (A)LS1$ -
10.11Cast in Place Concrete with Geocell Reiforcement and Crushed Stone for Ditch Lining (B)LS1$ -
10.122x1500mm Reinforced Concrete Pipe with Head wallLS1$ -
10.13Precast Concrete for Ditch B Inlet StructureLS1$ -
10.14Rip RapLS1$ -
10.15Detention Pit for Ditch ALS1$ -
10.16Detention Pit for Ditch BLS1$ -
10.17Monitoring WellsEA4$ -
10.18Pumping TestsLS1$ -
10.19Security FencingLS1$ -
10.20Control GateLS1$ -
10.21Concrete Access Road, Including Subgrade Preparation, Subbase, and BaseLS1$ -
10.22Temporary Access RoadLS1$ -
10.23Field OfficeLS1$ -
10.24Aggregate Parking AreaLS1$ -
20 HIGH CONCENTRATION TEMPORARY STORAGE (HCTS)$ -
20.01Movevable Barrier FenceLS1$ -
20.02Prepare Existing Storage Area BaseLS1$ -
20.03Fill for Drainage GradingLS1$ -
20.04Double-Side Textured HDPE LinerLS1$ -
20.05HDPE linerLS1$ -
20.06Non-Woven GeotextileLS1$ -
20.07Secure Cable Ties for Anchoring HDPE LinerLS1$ -
20.08Monitoring WellsEA2$ -
20.09SandbagsLS1$ -
20.10Pumping TestsLS1$ -
30 DIG AND HAUL$ -
30.01Movevable Barrier FenceLS1$ -
30.02Removal of Structures and Obstructions, Including Transport and DisposalLS1$ -
30.03Clearing and Removal of VegetationLS1$ -
30.04Excavation, Dewatering and Drainage, Stockpile, Transport, and Placement, Grade and Compaction of Low Concentration SoilLS1$ -
30.05Supplemental Excavation, Dewatering and Drainage, Stockpile, Transport, Placement, Grade and Compaction of Low Concentration Soilm33,000$ -
30.06Excavation, Dewatering and Drainage, Stockpile, Transport and Placement of High Concentration SoilLS1$ -
30.07Excavation, Dewatering and Drainage, Stockpile, Transport, Placement and Grade of High Concentration SoilLS1$ -
30.08Supplemental Excavation, Dewatering and Drainage, Stockpile, Transport, Placement and Grade of High Concentration Soilm32,000$ -
30.09Backfilling and CompactionLS1$ -
30.10Supplemental Backfilling and Compactionm35,000$ -
30.11TopsoilLS1$ -
30.12SoddingLS1$ -
30.13Hauling Road Maintenance, Patching, Passing Areas, Widening Rebuild FencingLS1$ -
30.14Removal, Disposal, and Rebuilding Existing FencingLS1$ -
40 TEMPORARY FENCING$ -
40.01On-base Temporary Steel Sheet FenceLS1$ -
40.02On-base Gates and Guard ShacksEA2$ -
40.03Off-base Temporary Steel Sheet FenceLS1$ -
40.04Off-base Gates and Guard ShacksEA4$ -
50 ACCESS ROAD$ -
50.01Removal, Transport, and Disposal of Road Base and SurfaceLS1$ -
50.02Asphalt Roadway Replacement Including Subgrade Preparation, Subbase, and BaseLS1$ -
50.03Aggregate RoadwayLS1$ -
50.04Permanent Pavement Striping, Markings and SignsLS1$ -
SUBTOTAL$ -
60 TOTAL DAY WORKS
60.01Total Day Works - The CONTRACTOR is not entitled to any part of the Day Work item, either partially or fully, unless specifically authorized by USAID--$500,000$500,000
TOTAL BASE BID (SUBTOTAL + TOTAL DAY WORKS)$ 500,000