This document is Appendix C to a technical manual providing procedures for assembly, disassembly, and inspection of the Flexible Pedestrian Legform Impactor (FlexPLI), a specialized testing device used in pedestrian safety compliance testing. The procedures are prepared for the National Highway Traffic Safety Administration (NHTSA) under UNECE Addendum 126 Regulation Number 127 Revision 1.

The FlexPLI comprises three main assemblies—femur, tibia, and knee—along with a flesh system consisting of neoprene and rubber components. The document provides detailed step-by-step assembly procedures for each component, including torque specifications (ranging from 3 Nm to 8 Nm depending on fastener type), specific part numbers, and bone clamp configurations. Key procedures include securing bone segments with spacers and shims to achieve proper fit tolerances, installing cable assemblies and side links, and integrating instrumentation including string potentiometers for ligament elongation measurement and accelerometers. The complete leg assembly weighs 13.2 ± 0.40 kg (including flesh system), with the femur weighing 2.46 ± 0.12 kg, knee 4.28 ± 0.21 kg, and tibia 2.64 ± 0.13 kg. Standard instrumentation includes 12 channels measuring tibia and femur bending moments, knee ligament elongations, and acceleration, with optional 24-channel configurations available. The document emphasizes protective measures for instrumentation wires, proper routing of data acquisition system cables, and detailed flesh cover assembly to ensure impact protection and proper test device function.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX C

Procedures for Assembly, Disassembly, and Inspection

(PADI)

of the Flexible Pedestrian Legform

Impactor (FlexPLI)

December 2019

Brian Suntay David Hyder

Transportation Research Center Inc.

C1

Table of Contents

List of Figures

List of Tables

1. Introduction

1.1. Purpose

1.2. Part Numbers

1.3. Abbreviations

1.4. Torque Specifications

2. Construction

3. Clothing

4. Available Instrumentation

5. Procedures for Assembly, Disassembly, and Inspection

5.1. Femur

5.1.1. Femur Assembly

5.1.2. Femur Disassembly

5.2. Tibia

5.2.1. Tibia Assembly

5.2.2. Tibia Disassembly

5.3. Knee

5.3.1. Knee Assembly

5.4. Leg Assembly

5.4.1. Fitting the Flesh and Covers

6. External Dimensions

7. Mass Specifications

C2

List of Figures

Figure 1. FlexPLI assembly components (from FlexPLI User Manual – see footnote 1) Figure 2. Femur assembly components (from FlexPLI User Manual – see footnote 1) Figure 3. Tibia/femur base tool fitted with bone clamp Figure 4. Tibia/femur base tool with inner knee segment Figure 5. Bone clamp over the rear bone Figure 6. Insertion of bone and clamp into the base Figure 7. Blue segment with thick bone contact spacer Figure 8. First blue segment over the bone with a thick spacer on the impact side Figure 9. Fitting a thin bone spacer and shims into the first blue segment Figure 10. Fitting the spacer-shim assembly using thumb force Figure 11. Tightening the segment fasteners to 3 Nm Figure 12. Femur assembly with the inner knee segment and five blue segments Figure 13. Last blue segment, top femur segment, and thick bone clamp Figure 14. Thick and thin bone clamps fitted into the last blue segment Figure 15. Sliding the last two segments over the bone Figure 16. Addition of 0.05 mm shims to the non-impact side bone clamp Figure 17. Top plate with underside rubber buffer Figure 18. Attachment of the femur top plate Figure 19. Installation of femur side links Figure 20. Insertion of stainless steel cable, washers, and Nylok nut Figure 21. Setting the gap and tightening the Nylok nut Figure 22. Bone wire strain relief Figure 23. Tibia assembly components ( from FlexPLI User Manual – see footnote 1) Figure 24. Tibia/femur base tool fitted with bone clamp Figure 25. Tibia/femur base tool with bone clamp and inner knee segment Figure 26. Thin bone clamp being placed over the rear, non-impact side of the bone Figure 27. Insertion of the thin bone clamp and bone into the tibia base Figure 28. Thick bone contact spacer in the first blue segment of the tibia Figure 29. Fitting of the first blue segment over the tibia bone Figure 30. Thin bone contact spacer and shims for non-impact side Figure 31. Fitting the spacer-shim assembly to the non-impact side Figure 32. Tightening of the first tibia blue segment Figure 33. Tibia assembly with the tibia/femur base tool, inner knee segment, and seven blue segments Figure 34. Rubber buffer inside the aluminum tibia bottom segment Figure 35. Thick bone clamp fitted to the last blue segment and bottom tibia segment Figure 36. Fitting of the thin bone clamp to the bottom two segments Figure 37. Orientation and installation of the last two tibia segments Figure 38. Thin bone clamp and shim combination to tighten the fit of the last two tibia segments Figure 39. Installation of the tibia side links Figure 40. Insertion of stainless steel cable, washers, and Nylok nut Figure 41. Setting the 10.3 mm gap between the Nylok nut and washer using the spacer tool ... 33 Figure 42. Knee assembly components (from FlexPLI User Manual – see footnote 1)

C3

Figure 43. Installation of the string potentiometers onto the meniscus assembly Figure 44. Close up view of the string potentiometer orientation and pull wire routing Figure 45. Electrical cable routing through a central hole and retaining plate Figure 46. Fitting the meniscus assembly over the tibia knee block Figure 47. Attachment of the meniscus assembly to the tibia knee block Figure 48. String potentiometer attachment plate with spacers Figure 49. Springs, washers, and wires inserted into the femur knee block Figure 50. Joining of the femur and tibia knee block Figure 51. Wire alignment across the knee Figure 52. Installation of the springs, washers, and nuts into the tibia knee block Figure 53. Fixing the string potentiometer attachment plate and removal of the spacer Figure 54. Installation of the 18 x 80 springs into the tibia knee block Figure 55. Spring protrusion on the femur knee block should be 3 mm Figure 56. Insertion of the femur assembly into the femur knee block Figure 57. Insertion of the tibia assembly into the tibia knee block Figure 58. DAS and sensor connections within the knee Figure 59. Aluminum side covers to protect instrumentation wires inside the knee Figure 60. Knee accelerometer location on tibia knee block Figure 61. Installation of blue impact covers located on the knee Figure 62. Routing of onboard DAS disconnect cable Figure 63. Outer neoprene cover, rubber buffer sheet assembly, and Velcro straps Figure 64. Positioning of thigh and leg neoprene covers Figure 65. Orientation of leg assembly and flesh covers Figure 66. Zipping up the thigh and leg neoprene covers Figure 67. Securing the rubber assembly with the Velcro straps Figure 68. Zipping up the outer neoprene cover Figure 69. FlexPLI dimensions (ECE/TRANS/WP.29/2014/38)

C4

List of Tables

Table 1. Abbreviations for threaded fasteners Table 2. Assembly torque requirements Table 3. Standard instrumentation channels Table 4. FlexPLI assembly components Table 5. Femur assembly components Table 6. Tibia assembly components Table 7. Knee assembly components Table 8. FlexPLI mass specifications

C5

1. Introduction

This document was prepared for the National Highway Traffic Safety Administration (NHTSA) under the title “Procedures for Assembly, Disassembly, and Inspection (PADI) of the Flexible Pedestrian Legform Impactor (FlexPLI).”

1.1. Purpose

This document contains the procedures for assembly and disassembly of the flexible pedestrian legform impactor (FlexPLI) for the purpose of inspection and preparation for testing.

Certification tests are specified in a UNECE Addendum 126 Regulation Number 127 Revision 1 Annex 6 Section 1. The details of this test are also specified in the NHTSA companion document “Qualification Procedures for Pedestrian Test Devices December 2019.” The FlexPLI user will periodically perform the qualification tests to assure that the legform is maintained at the specified performance levels.

1.2. Part Numbers

All part numbers in this document refer to the drawing package entitled “Flexible Pedestrian Legform Impactor Drawing Package December 2019”.

1.3. Abbreviations

The abbreviations for threaded fasteners used throughout the PADI are listed in Table 1.

Table 1. Abbreviations for threaded fasteners Abbreviation Description SHCS Socket Head Cap Screw BHCS Button Head Cap Screw FHCS Flat Head Cap Screw SHSS Socket Head Shoulder Screw MSSFP Metric Socket Setscrew Flat Point

1.4. Torque Specifications

The torque requirements for the assembly of the FlexPLI are listed in Table 2.

Table 2. Assembly torque requirements Description Torque (Nm) Leg attachment to knee front M8 BHCS 8 Leg attachment to knee rear M8 MSSFP 8 All segment M6 BHCS 3 Shoulder link screws M10 3

C6

2. Construction

Some of the design highlights of the Flexible Pedestrian Legform Impactor (FlexPLI) include:

• Biomechanically based femur, tibia, and knee design

• Biofidelic bending characteristics

• Knee ligaments that are represented according to human anthropometry

• Flesh system of neoprene and rubber sheets

• Symmetric design to represent either a left or right leg

• Standard 12 channels of instrumentation with an option of 24 channels

3. Clothing

The FlexPLI utilizes several layers of neoprene and rubber sheets and is described in more detail in the leg assembly section 5.4.1.

4. Available Instrumentation

Standard instrumentation of the FlexPLI includes 12 channels to measure tibia and femur bending moments, knee ligament elongations, and acceleration of the bottom of the knee in the direction of impact. The standard instrumentation channels are listed in Table 3 below. The channels that are used for injury assessment include: four tibia bending moments, knee Medial Collateral Ligament (MCL) elongation, Anterior Cruciate Ligament (ACL) elongation, and Posterior Cruciate Ligament (PCL) elongation. Femur bending moments, the Lateral Collateral Ligament (LCL) elongation, and the knee bottom acceleration are used as a check to make sure the leg is functioning properly.

Table 3. Standard instrumentation channels Instrumentation Channel Purpose Number

Femur Moment Leg Performance 3 Tibia Moment Injury Assessment 4 Knee Bottom Acceleration Leg Performance 1 MCL Elongation Injury Assessment 1 ACL Elongation Injury Assessment 1 PCL Elongation Injury Assessment 1 LCL Elongation Leg Performance 1 Total 12

There are several options for data acquisition systems (DAS). The most basic version is an off-board system in which cables from the legform are directly connected to a static laboratory DAS.

The use of an off-board DAS is not recommended as the off-board cables may affect the free flight trajectory of the FlexPLI. In addition, the cables are susceptible to damage when the FlexPLI lands after rebound from the vehicle. The preferred option is the use of an onboard

C7

DAS). Installation and use of the different onboard DAS options are described in the FlexPLI User Manual1.

5. Procedures for Assembly, Disassembly, and Inspection

The components in Table 4 are included in the FlexPLI assembly. Figure 1 shows a drawing of the FlexPLI assembly components with parts labeled as listed in Table 4.

Table 4. FlexPLI assembly components Part Description Quantity Part Number Item # Knee Assembly 1 133-5300 1 Tibia Assembly 1 133-5500 2 Femur Assembly 1 133-5100 3 Buffer Sheet Assembly, Leg (Not Shown) 1 133-5020 4 Cover, Inner, Femur (Not Shown) 1 133-5013 5 Cover, Outer, Femur (Not Shown) 1 133-5014 6 Cover, Inner, Tibia (Not Shown) 1 133-5015 7 Cover, Outer, Tibia (Not Shown) 1 133-5016 8 Cover, Leg (Not Shown) 1 133-5017 9 Velcro Bundle Tie (Not Shown) 6 133-5019 10

1 Humanetics Innovative Solutions. 133-9900 User Manual FLEX PLI GTR Rev H. 2015. Various onboard DAS installations are also described in UNECE working document GTR9-9-07e version of user manual located at https://wiki.unece.org/display/trans/GTR9-2+9th+session.

C8

Figure 1. FlexPLI assembly components

C9

5.1. Femur

The components in Table 5 are included in the femur assembly. Figure 2 shows a drawing of the femur assembly components with parts labeled as listed in Table 5.

Table 5. Femur assembly components

Femur Bone Assembly Tested & Certified 1 133-5165 1 Bone Clamp Thin, Knee 1 133-5508 2 Bone Clamp, Thin, Femur/Tibia 1 133-5503 3 Bone Clamp Thick, Knee 1 133-5506 4 Bone Clamp Thick, Femur/Tibia 1 133-5502 5 Spacer, Bone Contact, Thick 5 133-5505 6 Shim, Bone Clamp (0.4 Thick) Optional 1 133-5504 7 Rubber Buffer, Femur/Tibia End 1 133-5510 8 Spacer, bone Contact, Thin 5 133-5507 9 Shim (0.4 Thick) Optional 5 133-5509 10 Inner Segment, Knee 1 133-5514 11 Inner Segment Assembly Closest To Knee 1 133-5535 12 Inner Segment Assembly 5 133-5534 13 Screw, BHCS M6 x 1 x 18 28 5000848 14 Link 14 133-5515 15 Segment Top, Femur 1 133-5108 16 Plate, Top 1 133-5102 17 Launch Guide 1 133-5103 18 Washer, 12 ID x 26 OD x 3 4 133-5104 19 Shoulder Bolt 16 133-5106 20 Washer, Flat M6 (6.7 ID x 12.5 OD x 1.0 Thick) 2 5000094 21 Screw, SHCS M6 x 1 x 14 2 5000847 22 Screw, SHCS M6 x 1 x 30 1 5000849 23 Roller 1 133-5107 24 Washer, Cable 8 133-5521 25 Cable Assembly, Femur 4 133-5110 26 Hex Nut, M5 x 0.8 Nylok 4 5000522 27 End Cover 1 133-5516 28 Screw, BHCS M6 x 1 x 16 6 5000072 29 Screw, BHCS M5 x 0.8 x 8 4 5000845 30 Screw, SHCS M3 x 0.5 x 6 4 5000843 31 Screw, MSSFP M8 x 16 2 5000769 32 Tape, Impact Segment (Not Shown) 6 133-5025 33 Tape, End Cover, 12 x 24 (Not Shown) 1 133-5028 34 Tape, End Cover, 10 x 12 (Not Shown) 4 133-5027 35 Tape, End Cover, 12 x 16 (Not Shown) 2 133-5026 36 Cover, End Impact 1 133-5518 37 Cover, End Impact (Knee End) 1 133-5519 38 Impact Segment 6 133-5517 39 Shim, (T0-5) Optional (Not Shown) 5 133-5001 40 Shim, Bone Clamp (T0-05) Optional (Not Shown) 2 133-5002 41 Shim, Bone Clamp (T0-5) Optional (Not Shown) 2 133-5003 42 Shim, Bone Clamp (T0-6) Optional (Not Shown) 2 133-5004 43 Shim, (T0-6) Optional (Not Shown) 5 133-5005 44 Shim, (.05) Optional (Not Shown) 15 133-5012 45

C10

Figure 2. Femur assembly components

C11

5.1.1. Femur Assembly

Start the femur assembly from the knee end of the bone.

Place bone clamp 133-5506 inside the tibia/femur base tool 133-8129 (used for assembly purposes and removed later) with the curved end upwards and the grooved side inwards.

Loosely tighten with two M8 x 20 fasteners – as shown in Figure 3.

Figure 3. Tibia/femur base tool fitted with bone clamp

Place the inner knee segment 133-5514 over the clamp and loosely tighten with two M6 x 16 BHCS – as shown in Figure 4.

Figure 4. Tibia/femur base tool with inner knee segment

C12

Place bone clamp 133-5508 over the bone (on the rear, non-impact side of the leg) with the curved end upwards – as shown in Figure 5.

Figure 5. Bone clamp over the rear bone

Insert the bone and clamp into the base. Place two M8 x 12 SSFP fasteners into the fixture base and two M8 x 16 SSFP fasteners into segment 133-5514. Then tighten all fasteners to 3 Nm – as shown in Figure 6. Lay the strain gage exit wire to the side.

Figure 6. Insertion of bone and clamp into the base

C13

Place a thick bone contact spacer 133-5505 to segment 133-5535 (blue segment with rubber buffers on both sides) and secure using two M6 x 18 BHCS fasteners – as shown in Figure 7.

Figure 7. Blue segment with thick bone contact spacer

Slide the segment over the bone with the thick spacer on the impact side. Do not damage the black strain gage cover running down the center of the bone – as shown in Figure 8.

Figure 8. First blue segment over the bone with a thick spacer on the impact side

C14

Place a thin bone contact spacer 133-5507 and thin shim 133-5012 into the gap between the bone and the blue bone segment on the non-impact side – as shown in Figure 9.

Figure 9. Fitting a thin bone spacer and shims into the first blue segment

When fitting the spacer-shim assembly, push down on top of the assembly using thumb force only. The user should feel high resistance when pushing the spacer-shim assembly in – as shown in Figure 10.

Figure 10. Fitting the spacer-shim assembly using thumb force

C15

Check for fit by rotating the blue segment about the bone z-axis. If there is any play, change the shim configuration by adding additional thin shims, using thicker shims (133-5029 or 133-5030), or by using any combination of shims. When the spacer-shim assembly fits as tight as possible with thumb pressure, align the screw holes and tighten both the front and rear fasteners with two M6 x 18 BHCS to 3 Nm – as shown in Figure 11.

Figure 11. Tightening the segment fasteners to 3 Nm

For the next segment, attach a thick bone contact spacer 133-5505 to a blue bone segment 133- 5534 using two M6 x 18 BHCS as per the previous segment. Slide this segment over the bone with the rubber buffer on the top side and the thick spacer on the impact side. Try using the same spacer-shim configuration as the previous segment. Adjust the spacer-shim configuration if loose. Align the screw holes and tighten both front and rear fasteners with two M6 x 18 BHCS to 3 Nm. Repeat for the next three segments. Figure 12 shows the Femur assembly with the tibia/femur base tool, inner knee segment, and five blue segments.

Figure 12. Femur assembly with the inner knee segment and five blue segments

C16

For the last two segments, on the impact side, place a thick bone clamp 133-5502 to the last blue segment 133-5534 and to the top femur (aluminum) segment 133-5108 using two M6 x 18 BHCS for the blue segment and two M6 x 16 BHCS for the top aluminum segment – as shown in Figure 13.

Figure 13. Last blue segment, top femur segment, and thick bone clamp

On the non-impact side of the last two segments, fix a thin bone clamp 133-5503 using two M6 x 18 BHCS for the blue segment and two M6 x 16 BHCS for the top aluminum segment – as shown in Figure 14.

Figure 14. Thick and thin bone clamps fitted into the last blue segment

C17

Slide and push the last two segments over the top of the bone as shown in Figure 15 below.

Figure 15. Sliding the last two segments over the bone

If the fit is loose, add 0.05 mm shims (133-5012) until the fit is tight as shown in Figure 16.

Once the fit is tight, tighten all fasteners to 3 Nm.

Figure 16. Addition of 0.05 mm shims to the non-impact side bone clamp

The distance from the top of the bone to the top of the aluminum segment should be between 1.5 mm and 2 mm and should match the small rubber buffer glued to the underside of the top plate 133-5102 – as shown in Figure 17.

C18

Figure 17. Top plate with underside rubber buffer

Tighten the top plate with four M6 x 18 BHCS – as shown in Figure 18.

Figure 18. Attachment of the femur top plate

Pass the bone strain gage wire through a side link 133-5515. Starting from the knee, tighten all 14 links 133-5515 and four end washers 133-5104 using the shoulder bolts 133-5106. Torque all shoulder bolts to 3 Nm – as shown in Figure 19.

Figure 19. Installation of femur side links

C19

Remove the base tool 133-8129. Place a washer 133-5521 over each of the four stainless steel cables 133-5110. Starting at the knee end, feed each of the cables through the corner holes of the leg segments. Place a washer 133-5521 over the threaded fitting of each of the cables and fit four M5 Nylok nuts 5000522 – as shown in Figure 20.

Figure 20. Insertion of stainless steel cable, washers, and Nylok nut

Set the gap between the Nylok nut and washer to 9.1 mm using the spacer tool 133-5112 – as shown in Figure 21.

Figure 21. Setting the gap and tightening the Nylok nut

Clean and degrease the fronts of the six middle femur segments and fit with the six double sided tape profiles 133-5025. Fit the impact covers 133-5517 to the middle segments by locating them over the two BHCS. Clean and degrease the fronts of the two aluminum end segments and fit with double sided tape profiles 133-5026, 133-5027, and 133-5028 according to Figure 2. Fix four M3 x 8 SHCS to the front of the two aluminum end segments. Fit impact cover 133-5519 to the knee-end aluminum segment and impact cover 133-5518 to the opposite end aluminum segment.

C20

At the knee-end of the femur, where the bone strain gage wire comes out through the link, attach two cable ties, one on the link and another on the wire as shown in Figure 22 to provide strain relief to the wire.

Figure 22. Bone wire strain relief

5.1.2. Femur Disassembly

To disassemble the Femur, reverse the process described in section 5.1.1.

C21

5.2. Tibia

The components in Table 6 are included in the tibia assembly. Figure 23 shows a drawing of the tibia assembly components with parts labeled as listed in Table 6.

Table 6. Tibia assembly components

Tibia Bone Assembly Tested & Certified 1 133-5565 1 Bone Clamp Thick, Femur/Tibia (Not Shown) 1 133-5502 2 Bone Clamp Thin, Femur/Tibia (Not Shown) 1 133-5503 3 Shim, Bone Clamp (0.4 Thick) (Not Shown) 1 133-5504 4 Spacer, Bone Contact, Thick 7 133-5505 5 Bone Clamp Thick, Knee 1 133-5506 6 Spacer, Bone Contact, Thin 7 133-5507 7 Bone Clamp Thin, Knee 1 133-5508 8 Shim (0.4 Thick) 7 133-5509 9 Rubber Buffer, Femur/Tibia End (Not Shown) 1 133-5510 10 Segment Bottom, Tibia 1 133-5511 11 Inner Segment Assembly 7 133-5534 12 Inner Segment Assembly Closest To Knee 1 133-5535 13 Inner Segment, Knee 1 133-5514 14 Link 18 133-5515 15 Washer, 12 ID x 26 OD x 3 4 133-5104 16 Shoulder Bolt 20 133-5106 17 Washer, Cable 8 133-5521 18 Cable Assembly, Tibia 4 133-5530 19 Screw, BHCS M6 x 1 x 18 32 5000848 20 Hex Nut, M5 x 0.8 Nylok 4 5000522 21 End Cover 1 133-5516 22 Screw, BHCS M6 x 1 x 16 6 5000072 23 Screw, BHCS M5 x 0.8 x 8 4 5000845 24 Screw, SHCS M3 x 0.5 x 6 4 5000843 25 Screw, MSSFP M8 x 16 2 5000769 26 Tape, Impact Segment (Not Shown) 8 133-5025 27 Tape, End Cover, 12 x 24 (Not Shown) 1 133-5028 28 Tape, End Cover, 10 x 12 (Not Shown) 4 133-5027 29 Tape, End Cover, 12 x 16 (Not Shown) 2 133-5026 30 Cover, End Impact, Knee End 1 133-5519 31 Impact Segment 8 133-5517 32 Cover, End Impact 1 133-5518 33 Shim (T0-5) Optional (Not Shown) 7 133-5001 34 Shim, Bone Clamp (T0-05) Optional (Not Shown) 2 133-5002 35 Shim, Bone Clamp (T0-5) Optional (Not Shown) 2 133-5003 36 Shim, Bone Clamp (T0-6) Optional (Not Shown) 2 133-5004 37 Shim (T0-6) Optional (Not Shown) 7 133-5005 38 Shim (0.05) Optional (Not Shown) 21 133-5012 39 Wire Exit Base 2 133-5522 40 Wire Exit Clamp 2 133-5523 41 Screw, BHCS M5 x 0.8 x 12 2 5000846 42

C22

Figure 23. Tibia assembly components

C23

5.2.1. Tibia Assembly

Start the assembly from the knee end of the bone.

Place bone clamp 133-5506 inside the tibia/femur base tool 133-8129 with the curved end upwards and the grooved side inwards. Loosely tighten with two M8 x 20 fasteners – as shown in Figure 24.

Figure 24. Tibia/femur base tool fitted with bone clamp

Place the knee inner segment 133-5514 over the bone clamp and loosely tighten with two M6 x 16 BHCS – as shown in Figure 25.

Figure 25. Tibia/femur base tool with bone clamp and inner knee segment

C24

Place the thin bone clamp 133-5508 over the rear, non-impact side of the bone– as shown in Figure 26.

Figure 26. Thin bone clamp being placed over the rear, non-impact side of the bone

Insert the bone and clamp together into the base, making sure that it is on the non-impact side of the leg. Place two M8 x 12 MSSFP fasteners into the fixture base and two M8 x 16 MSSFP fasteners into segment 133-5514. Tighten all fasteners to 3 Nm – as shown in Figure 27. Lay the strain gage exit wire to the side.

Figure 27. Insertion of the thin bone clamp and bone into the tibia base

C25

Place a thick bone contact spacer 133-5505 into segment 133-5535 (blue segment with rubber buffers on both sides) and tighten with two M6 x 18 BHCS fasteners – as shown in Figure 28.

Figure 28. Thick bone contact spacer in the first blue segment of the tibia

Slide the segment over the bone with the thick spacer on the impact side. Be careful not to damage the black strain gage cover running down the center of the bone – as shown in Figure 29.

Figure 29. Fitting of the first blue segment over the tibia bone

C26

Insert a thin bone contact spacer 133-5507 and thin shim 133-5012 (as shown in Figure 30) into the gap between the bone and the blue bone segment on the non-impact side.

Figure 30. Thin bone contact spacer and shims for non-impact side

When fitting the spacer-shim assembly, push down on top of the assembly using thumb force only. The user should feel high resistance when pushing in the spacer-shim assembly – as shown in Figure 31.

Figure 31. Fitting the spacer-shim assembly to the non-impact side

C27

Check for fit by rotating the blue segment about the bone z-axis. If the fit is loose, change the shim configuration by adding additional thin shims, using thicker shims (133-5029 or 133-5030), or by using any combination of shims. When the spacer-shim assembly fits as tight as possible with thumb pressure, align the screw holes and tighten both the front and rear fasteners to 3 Nm with two M6 x 18 BHCS – as shown in Figure 32.

Figure 32. Tightening of the first tibia blue segment

For the next segment, attach a thick bone contact spacer 133-5505 to a blue bone segment 133- 5534 using two M6 x 18 BHCS fitted diagonally as per the previous segment. Slide over the bone with the rubber buffer on the top side and the thick spacer on the impact side. Try using the same spacer-shim configuration as the previous segment. Adjust the spacer-shim configuration if loose. Align the screw holes and tighten both front and rear fasteners to 3 Nm with two M6 x 18 BHCS. Repeat for the next five segments. Figure 33 shows the Tibia assembly with the tibia/femur base tool, inner knee segment, and seven blue segments.

C28

Figure 33. Tibia assembly with the tibia/femur base tool, inner knee segment, and seven blue segments

Look inside the bottom tibia segment 133-5511 and ensure that the rubber buffer is still bonded inside the bottom of the part – as shown in Figure 34. If not, the rubber buffer will need to be located and re-bonded to prevent loose fit at the end of the bone. Additional “packing” may be needed to prevent the bone from moving.

Figure 34. Rubber buffer inside the aluminum tibia bottom segment

C29

Place a thick bone clamp 133-5502 on the impact side of both the last blue segment 133-5534 and the bottom tibia segment 133-5511 and tighten with two M6 x 18 BHCS for the blue segment and two M6 x 16 BHCS for the bottom aluminum segment – as shown in Figure 35.

Figure 35. Thick bone clamp fitted to the last blue segment and bottom tibia segment

On the non-impact side of the same two segments, tighten a thin bone clamp 133-5503 using two M6 x 18 BHCS for the blue segment and two M6 x 16 BHCS for the bottom aluminum segment

– as shown in Figure 36.

Figure 36. Fitting of the thin bone clamp to the bottom two segments

C30

Slide and push the last two segments over the top of the bone – as shown in Figure 37 below.

Figure 37. Orientation and installation of the last two tibia segments

Check that there is no gap between the bone and the rubber buffer inside the bottom aluminum segment by looking through the holes in the side of the aluminum segment. If there is a gap, this should be packed so that there is no loose fitting at the end of the bone.

If the fit is loose over either of the last two segments, add 0.05 mm shims (133-5012) until the fit is tight as shown in Figure 38. Once the fit is tight, tighten all fasteners to 3 Nm.

Figure 38. Thin bone clamp and shim combination to tighten the fit of the last two tibia segments

C31

Pass the bone strain gage wire through a side link 133-5515. Starting from the knee, fix all 14 links 133-5515 and four end washers 133-5104 using the shoulder bolts 133-5106. Torque all shoulder bolts to 3 Nm – as shown in Figure 39.

Figure 39. Installation of the tibia side links

Remove the base tool 133-8129. Place a washer 133-5521 over each of the four stainless steel cables 133-5110. Starting at the knee end, feed each of the cables through the corner holes of the leg segments. Place a washer 133-5521 over the threaded fitting of each of the cables and fit four M5 Nylok nuts 5000522. See Figure 40.

Figure 40. Insertion of stainless steel cable, washers, and Nylok nut

C32

Set the gap between the Nylok nut and washer to 10.3 mm using the spacer tool 133-5112 – as shown in Figure 41.

Figure 41. Setting the 10.3 mm gap between the Nylok nut and washer using the spacer tool

Clean and degrease the fronts of the middle six segments and fit with the six double sided tape profiles 133-5025. Place the impact covers 133-5517 to the middle segments locating them over the two BHCS. Clean and degrease the fronts of the two aluminum end segments and fit with double sided tape profiles 133-5026, 133-5027, and 133-5028 according to Figure 23. Fix four M3 x 8 SHCS to the front of the two aluminum end segments. Fit impact cover 133-5519 to the knee-end aluminum segment and impact cover 133-5518 to the opposite end aluminum segment.

5.2.2. Tibia Disassembly

To disassemble the Tibia, reverse the process described in section 5.2.1.

C33

5.3. Knee

The components in Table 7 are included in the knee assembly. Figure 42 shows a drawing of the knee assembly components with parts labeled as listed in Table 7.

Table 7. Knee assembly components

Knee Block, Tibia 1 133-5330 1 Meniscus Assembly 1 133-5313 2 Screw, SHCS M5 x 0.8 x 10, Lowhead (Not Shown)

4 5000774 3

Knee Block, Femur 1 133-5320 4 Attachment Plate, String Pot (Not Shown) 1 133-5302 5 Spring, 12 x 40 8 9003159 6 Spring, 18 x 80 16 9003158 7 Spring Cap Knee Block, Tibia 8 133-5318 8 Cable Washer 8 133-5311 9 Spring Cap Knee Block, Femur 8 133-5310 10 Cable Assembly, Knee ML 8 133-5350 11 Screw, FHCS M3 x 0.5 x 10 (Not Shown) 2 5000203 12 Cover, Knee, Femur Right Side 1 133-5315 13 Cover, Knee 2 133-5306 14 Cover, Knee, Tibia Left Side 1 133-5314 15 Screw, FHCS M4 x 0.7 x 8, Zinc 16 5000844 16 AP Cable Assembly 4 133-5360 17 Hex Nut, M5 x 0.8 Nylok 12 5000522 18 Screw, MSSFP M8 x 30 4 5000770 19 Screw, BHCS M8 x 1.25 x 35, Zinc 4 5000850 20 Tape, Front Cover 4 133-5018 21 Cover, Upper Knee 1 133-5304 22 Cover, Lower Knee 1 133-5305 23 String Potentiometer RH (Not Shown) 2 61-503-05-01-00 String Potentiometer LH (Not Shown) 2 61-507-05-01-00

C34

Figure 42. Knee assembly components

5.3.1. Knee Assembly

Make a note of the string pot serial numbers and their ligament positions. Right hand pull (RH) and left-hand pull (LH) string potentiometers can be identified by their serial number – the RH has an “R” at the end of the number and the LH has an “L”.

Feed the cable connector of one of the right-hand pull string potentiometers (61-503-05-01-00) through the inner side of one of the central holes of the meniscus assembly 133-5313 – as shown in Figure 43 below. Attach the string pot with the #2-56 x ¼ long cap head screws and ensure that the pull wire is directed towards the outer bushing. Feed the cable connector of the other RH pull string potentiometer through the inner side of the opposite central hole. Fit and attach this RH pull string potentiometer in the same way, on the opposite side. The two RH pull string potentiometers should be positioned closest to the main flange of the meniscus. Attach the LH pull string potentiometers (61-507-05-01-00) above the RH pull string potentiometers following

C35 a similar procedure. The pull wires of the LH pull string potentiometers, however, will be oriented directly in line with the two inner bushes. Feed the pull wires through their respective bushings. Figures 43-44 show the orientation of the string potentiometers with the meniscus assembly.

Figure 43. Installation of the string potentiometers onto the meniscus assembly

Figure 44. Close up view of the string potentiometer orientation and pull wire routing

C36

Make sure that all electrical cables are inside the cavity as much as possible. Run the cables through the channels on either side of the meniscus and clamp with the retaining plates – as shown in Figure 45.

Figure 45. Electrical cable routing through a central hole and retaining plate

Place the meniscus assembly over the tibia knee block 133-5330 and make sure that the potentiometer pull wires are in their grooves – as shown in Figure 46.

Figure 46. Fitting the meniscus assembly over the tibia knee block

C37

Attach the meniscus assembly to the tibia knee block using four M5 x 10 low head cap screws.

Low strength thread lock will need to be applied to these cap screws to prevent loosening – as shown in Figure 47.

Figure 47. Attachment of the meniscus assembly to the tibia knee block

With the tibia knee block on the bottom and the meniscus on the top, pass the four ball crimps from the four string potentiometers through the attachment plate 133-5302. Place the two spacers 133-5113 between the attachment plate and the meniscus – as shown in Figure 48.

Figure 48. String potentiometer attachment plate with spacers

C38

Place four of the smaller 12 x 40 springs (9003159) into the femur knee block 133-5320. Place washer 133-5311 on top of each of the springs. Insert wires 133-5360 through the washers and springs – as shown in. See Figure 49.

Figure 49. Springs, washers, and wires inserted into the femur knee block

Make sure that the femur knee and tibia knee blocks are oriented correctly. Take the femur knee block assembly and carefully lower it over the tibia knee block, then position it over the attachment plate and guide the wires across to their designated holes. Make sure that the wires are in their correct aligned holes and not crossed over – as shown in Figures 50-51.

Figure 50. Joining of the femur and tibia knee block

C39

Figure 51. Wire alignment across the knee

Carefully turn the whole assembly onto its side and insert the remaining 12 x 40 springs over the wires. Insert a washer 133-5311 and Nylok nut over each of the springs. Tighten the nuts down using 8 mm and 1/8” wrenches until the washers are exactly flush with the femur knee block – as shown in Figure 52.

Figure 52. Installation of the springs, washers, and nuts into the tibia knee block

C40

Tighten the attachment plate with two M3 x 8 countersunk screws and remove the spacer blocks.

It may be necessary to remove a spacer block to access the screw – as shown in Figure 53.

Figure 53. Fixing the string potentiometer attachment plate and removal of the spacer

Place eight 18 x 80 springs 9003158 into the femur knee block counter bores. Place a washer 133-5310 on top of each of the springs then feed a wire 133-5350 through each of the eight springs. Turn the knee assembly over and insert the remaining eight 18 x 80 springs into their counter bores and over each of the wires. Place a washer 133-5318 and M5 Nylok nut over each of the springs – as shown in Figure 54.

Figure 54. Installation of the 18 x 80 springs into the tibia knee block

C41

Tighten all nuts until all washers are flush with the tibia knee block. Spring protrusion on the femur knee block should be 3 mm – as shown in Figure 55.

Figure 55. Spring protrusion on the femur knee block should be 3 mm

5.4. Leg Assembly

Insert the femur assembly into the femur knee block making sure that the orientation is correct.

Insert two M8 x 35 BHCS into the femur knee block impact side counter bored holes. Insert two M8 x 30 set screws into the non-impact side. Tighten all M8 fasteners to 8 Nm – as shown in Figure 56.

Figure 56. Insertion of the femur assembly into the femur knee block

Insert the tibia assembly into the tibia knee block and make sure that the orientation is correct.

Insert two M8 x 35 BHCS into the tibia knee block impact side counter bored holes. Insert two M8 x 30 set screws into the non-impact side. Tighten all M8 fasteners to 8 Nm.

C42

Figure 57. Insertion of the tibia assembly into the tibia knee block

Connect all the sensors to the DAS – as shown in Figure 58.

Figure 58. DAS and sensor connections within the knee

Install four aluminum side covers and tighten with M4 FHCS. Make sure that the instrumentation wires are not crushed and are free to move when the knee is flexed – as shown in Figure 59.

C43

Figure 59. Aluminum side covers to protect instrumentation wires inside the knee

Install the accelerometer to the impact side of the tibia knee block, connect its wire to the DAS, and route the cable safely – as shown in Figure 60.

Figure 60. Knee accelerometer location on tibia knee block

C44

Clean and degrease the impact side faces of the knee blocks. Place the upper (133-5304) and lower (133-5305) blue knee impact covers over the impact side of the knee blocks and install using double sided tape (133-5018) – as shown in Figure 61.

Figure 61. Installation of blue impact covers located on the knee

If an onboard DAS is used, the disconnect cable will either exit at the top of the leg or just below the knee depending on the brand of DAS. If exiting at the top, make sure that the wire is tied to the side links and has sufficient relief during femur bending – as shown in Figure 62.

Figure 62. Routing of onboard DAS disconnect cable

5.4.1. Fitting the Flesh and Covers

Before testing, place the flesh and covers over the leg. When not in use, remove the flesh and covers from the leg to allow them to rest. The flesh system consists of one large outer neoprene cover 133-5017, two smaller neoprene covers 133-5013 and 133-5014 for the femur (labeled thigh), two smaller neoprene covers 133-5015 and 133-5016 for the tibia (labeled leg), and one rubber buffer sheet assembly 133-5020.

Place the large outer neoprene cover 133-5017 on a flat surface with lettering facing down. Lay 6 strips of Velcro tape 133-5019 on top of the neoprene cover, soft side down, and place the

C45 rubber buffer sheet assembly 133-5020 on top. The larger portion of the rubber sheet is the top of the leg and is the opposite end of where the zipper on the outer neoprene cover starts. Adjust the Velcro strips to line up with the six marks on the rubber – as shown in Figure 63.

Figure 63. Outer neoprene cover, rubber buffer sheet assembly, and Velcro straps

Lay the 2 thigh covers 133-5013 and 133-5014 and the 2 leg covers 133-5015 and 133-5016 as shown in Figure 64 with the “knee end inside” arrows pointing towards each other and allowing a gap for the knee area. Offset the covers so that when zipping up, the zippers are oriented on opposite sides of the leg.

Figure 64. Positioning of thigh and leg neoprene covers

C46

Place the leg assembly on top of the laid-out flesh covers. Position the legform and flesh covers such that the lower edge of the femur neoprene covers and the larger portion of the rubber system are aligned with the top of the femur knee block. Position the leg neoprene covers such that they are aligned with the lower end of the tibia knee block. The outer neoprene cover should be centered along the length of the leg assembly – as shown in Figure 65.

Figure 65. Orientation of leg assembly and flesh covers

Zip up the thigh and leg covers making sure that each zipper is positioned on the side of the leg near the area of the shoulder bolts. No zipper should be at the back or front of the leg as it can interfere with the flat surface of the launch plate or sustain damage upon impact – as shown in Figure 66.

Figure 66. Zipping up the thigh and leg neoprene covers

C47

Wrap the rubber buffer assembly around the leg using the six Velcro straps – as shown in Figure 67.

Figure 67. Securing the rubber assembly with the Velcro straps

Finally, zip up the outer neoprene cover from the bottom of the leg and make sure that the zipper is on the opposite side of the last thigh and leg zippers – as shown in Figure 68.

Figure 68. Zipping up the outer neoprene cover

C48

6. External Dimensions

Dimensions and center of gravity locations for the femur, knee joint, and tibia are shown in Figure 69 (from ECE R127 Regulation ECE/TRANS/WP.29/2014/38).

Figure 69. FlexPLI dimensions (ECE/TRANS/WP.29/2014/38)

C49

7. Mass Specifications

FlexPLI assembly mass and tolerances are given in Table 8.

Table 8. FlexPLI mass specifications Part Mass (kg)

Femur 2.46 ± 0.12 Knee* 4.28 ± 0.21 Tibia 2.64 ± 0.13 Femur, Knee, & Tibia 9.38 ± 0.30 Flesh System** 3.82 ± 0.21 Total Leg Assembly 13.2 ± 0.40 *If off-board DAS used, 0.1 kg allocated for cables **Includes Velcro straps

C50

List of Figures
List of Figures
List of Tables
1. Introduction
1.1. Purpose
This document contains the procedures for assembly and disassembly of the flexible pedestrian legform impactor (FlexPLI) for the purpose of inspection and preparation for testing. Certification tests are specified in a UNECE Addendum 126 Regulation N...
1.2. Part Numbers
1.3. Abbreviations
1.4. Torque Specifications
2. Construction
3. Clothing
4. Available Instrumentation
5. Procedures for Assembly, Disassembly, and Inspection
5.1. Femur
5.1.1. Femur Assembly
5.1.2. Femur Disassembly
5.2. Tibia
5.2.1. Tibia Assembly
5.2.2. Tibia Disassembly
5.3. Knee
5.3.1. Knee Assembly
5.4. Leg Assembly
5.4.1. Fitting the Flesh and Covers
6. External Dimensions
7. Mass Specifications

File details come from the government source that posted it. Updated .