Attachment J-2e CDRLs Exhibit B 27MAY20 - SIGNED.docx
DOCX document 222 KB Posted
- Attached to
- Fiscal Year 21-24 Landing Craft, Air Cushion (LCAC) Extended Service Life Extension Program (E-SLEP)
- Solicitation number
- N00024-20-R-2427
About this file
This document contains a Contract Data Requirements List (CDRL) for the Landing Craft, Air Cushion (LCAC) Extended Service Life Extension Program (E-SLEP). The Naval Sea Systems Command is soliciting proposals for up to 18 LCAC availabilities from Fiscal Year 2021 through 2024 to be performed at Assault Craft Unit FIVE in Oceanside, California. The CDRL requires the contractor to submit scientific and technical reports on provisioning technical documentation, government property inventory, alterations and component installation reporting, government material status reports, contractor need dates for government furnished property, and Item Unique Identification marking verification. Reports are due on a recurring basis throughout each availability ranging from initial submissions 30 days after award to final submissions within 14 days of availability completion. The distribution of reports is restricted to the Department of Defense and contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00024-20-R-2427 Amend 0003.docx | DOCX document | |
| N00024-20-R-2427 Amend 0002.docx | DOCX document | |
| N00024-20-R-2427 Amend 0001.docx | DOCX document | |
| Attachment J-4b GFP Performance_13-24 11MAR20.pdf | ||
| Attachment J-2a CDRL Information 26MAY20.docx | DOCX document | |
| Attachment J-2d Exhibit B Index 27MAY20.doc | DOC document | |
| N00024-20-R-2427.docx | DOCX document | |
| Attachment J-4c GFP Performance_25-28 11MAR20.pdf | ||
| Attachment J-2b Exhibit A Index 27MAY20.doc | DOC document | |
| Attachment J-2c CDRLs Exhibit A 27MAY20 - signed.docx | DOCX document | |
| Attachment J-4a GFP Performance_1-12 11MAR20.pdf | ||
| Attachment J-3 Perf Miles Pay Sch 26 May 2020.xlsx | XLSX spreadsheet | |
| Attachment J-1 TDP 26MAY20.DOCX | DOCX document | |
| J-12 Designation of Key Personnel.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LCAC E-SLEP
N00024-20-R-2427 ATTACHMENT J-2e
CONTRACT DATA REQUIREMENTS LIST,
DD FORM 1423
EXHIBIT B
27 MAY 2020
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB NO. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
CLIN 0200
B. EXHIBIT
B
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
LCAC/E-SLEP
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-19: PROVISIONING TECHNICAL DOCUMENTATION (PTD) - CONTRACTOR FURNISHED MATERIAL (CFM) REPORT (SEE BLOCK 16)
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
C.1.1.1.4
6. REQUIRING OFFICE
SUPERVISOR (SWRMC)
18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST SUBMISSION
(SEE BLOCK 16)
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
(SEE BLOCK 16)
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 03 – DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH E-SLEP CRAFT. DATA SUBMISSIONS AS LISTED IN SI 009-19.
BLOCK 09 – DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377), WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP.2401 ET. SEQ.). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25. DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10 – AS SPECIFIED IN SI 009-19.
BLOCK 12 – NLT THAN 30 DAYS AFTER THE AVAILABILITY AWARD.
BLOCK 13 – EVERY 14 DAYS UP TO AVAILABILITY START DATE, WITHIN 10 DAYS AFTER AVAILABILITY START DATE, THEN MONTHLY THEREAFTER TO END OF AVAILABILITY (EOA).
| ACU 5 |
| 0 |
| 1 |
| 0 |
| SUPERVISOR (SWRMC) |
| 0 |
| 1 |
| 0 |
| PMS377 IDE |
| 0 |
| 1 |
| 0 |
| 15. TOTAL |
| 0 |
| 3 |
| 0 |
G. PREPARED BY
PIERCE SCHREIBER
H. DATE
03 MAR 2020
I. APPROVED BY
FORREST SMITH
J. DATE
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-20: GOVERNMENT PROPERTY - TERMINATION OF INVENTORY (SEE BLOCK 16)
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
C.1.1.1.4
6. REQUIRING OFFICE
18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
(SEE BLOCK 16)
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 03 – DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH E-SLEP CRAFT. DATA SUBMISSIONS AS LISTED IN SI 009-20 PARAGRAPH 3.4.
BLOCK 09 – DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377), WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE., SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP.2401 ET. SEQ.). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25. DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10, 12 – WHEN DIRECTED BY THE SUPERVISOR, OR IN ANY CASE, IMMEDIATELY FOLLOWING THE COMPLETION OF EACH AVAILABILITY.
BLOCK 13 – SUBMIT FINAL TERMINATION OF INVENTORY REPORT WITHIN 14 DAYS AFTER COMPLETION OF AVAILABILITY.
| ACU 5 |
| 0 |
| 1 |
| 0 |
| SUPERVISOR (SWRMC) |
| 0 |
| 1 |
| 0 |
| PMS377 IDE |
| 0 |
| 1 |
| 0 |
| 15. TOTAL |
| 0 |
| 3 |
| 0 |
G. PREPARED BY
H. DATE
03 MAR 2020
I. APPROVED BY
FORREST SMITH
J. DATE
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-21: REPORTING THE INSTALLATION, MODIFICATION OR REMOVAL OF CRAFT ALTERATIONS, GFM AND CFM (SEE BLOCK 16)
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
C.1.1.1.4
6. REQUIRING OFFICE
18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
(SEE BLOCK 16)
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 03 – DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH E-SLEP CRAFT. DATA SUBMISSIONS AS LISTED IN SI 009-21.
BLOCK 09 – DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377), WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP.2401 ET. SEQ.). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25. DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
CDRL DATA STANDARD ITEM 009-21 REFERENCE
B003-A REPORTING FOR ALTERATIONS 3.1
BLOCK 10, 12, 13 – COMPLETED ATTACHMENTS A THROUGH C OF THE APPROVED SPREADSHEET WITHIN 3 DAYS AFTER ALTERATION INSTALLATION. APPROVED SPREADSHEET IS ATTACHED.
B003-B REPORTING FOR GFM/CFM 3.2
BLOCK 10, 12, 13 – COMPLETE ATTACHMENT D OF THE APPROVED SPREADSHEET WITHIN 5 DAYS AFTER INSTALLATION OR REMOVAL OF GFM AND CFM EQUIPMENT OR COMPONENTS FROM SHIPBOARD SYSTEM. APPROVED SPREADSHEET IS ATTACHED.
| ACU 5 |
| 0 |
| 1 |
| 0 |
| SUPERVISOR (SWRMC) |
| 0 |
| 1 |
| 0 |
| PMS377 IDE |
| 0 |
| 1 |
| 0 |
| 15. TOTAL |
| 0 |
| 3 |
| 0 |
G. PREPARED BY
H. DATE
03 MAR 2020
I. APPROVED BY
FORREST SMITH
J. DATE
COVER SHEET
CRAFT
SSB #
UIC
Report Submission date
Highlight in yellow all newly reported or edited lines or block for each report submission.
ALTERATION
IDENT:
SHIP:
INSTALLING
ACTIVITY:
SPARES SUPPORT WITH /
WITHOUT RIC/PAL# / IRP
COSAL UPDATES:
NOT PROVIDED UPON
COMPLETION:
PMS DOCUMENTATION:
NOT PROVIDED UPON
COMPLETION:
SSRD MARKUPS
NOT ONBOARD
INSTALLATION DRAWINGS
NOT ONBOARD
ONBOARD INITIAL/
DIFFERENCES TRAINING
START
COMPLETE
STATUS / REASON FOR LATE DELIVERY:
ESTIMATED RECEIPT:
HOW WILL THE ILS MATERIAL BE DELIVERED:
ATTACHMENT A
ALTERATION ACCOMP
DATE:
TECHNICAL MANUAL (S)
NOT PROVIDED UPON COMPLETION:
TEST EQUIPMENT:
NOT PROVIDED UPON COMPLETION:
INFORMATION ON HOW AND WHEN THE MISSING ILS WAS ORDERED AND ESTIMATED DELIVERY DATE:
EXCEPTIONS TO ILS VERIFICATION / ITEMIZED DELIVERABLES AS LISTED ON ILS CERTIFICATION
ALTERATION
IDENT:
SHIP:
INSTALLING
ACTIVITY:
EQUIPMENT NOMENCLATURE:
SERIAL NUMBER:
LOCATION:
EIC:
APL/AEL/PAL:
PMS DOCUMENTATION:
REMARKS:
START
COMPLETE
INSTALLED
REMOVED
MODIFIED
DESCRIPTION
ATTACHMENT B
ALTERATION ACCOMP
DATE:
TECHNICAL MANUAL(S):
TEST EQUIPMENT:
EQUIPMENT DISPOSITION:
PHYSICAL CONFIGURATION AUDIT REPORT
Report #
SHIP:
HULL #
SSP #
UIC
FY OF
AVAILABILITY
AVAIL TYPE
ALTERATION NUMBER
BRIEF DESCRIPTION
COMPLETE YES / NO
REMARKS
ALTERATION NUMBER
BRIEF DESCRIPTION
COMPLETE YES / NO
REMARKS
NAVSEA SUMMARY
TYCOM SUMMARY
SHIP ALTERATION COMPLETION REPORT
ATTACHMENT C
SHIP NAME:
SSP #
WORK ITEM:
CRAFT ALT #:
SERIAL NUMBER:
UNIQUE ITEM IDENTIFIER
UII
VALVE MARK /
ELECTRICAL SYMBOL
NUMBER
QUANTITY
LOCATION:
RIC NOMENCLATURE:
PMS DOCUMENTATION
RECEIVED:
OBRP (S) RECEIVED:
INSTALLATION DRAWING
GFM / CFM
REMARKS:
INSTALLED
REMOVED
MODIFIED
MFR:
MFR DWG:
MFR ID:
NSN:
DESCRIPTION
TECHNICAL MANUAL(S) RECEIVED
ACTION
RIC CHARACTERISTICS
EQUIPMENT / COMPONENT LOGISTICS AND TECHNICAL DATA NAVSEA STANDARD ITEM 009-21 INSTALLED / REMOVED DATE
ATTACHMENT D
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
SI 009-79: GOVERNMENT OWNED MATERIAL (GOM) - STATUS REPORT (SEE BLOCK 16)
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
C.1.1.1.4
6. REQUIRING OFFICE
18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
(SEE BLOCK 16)
13. DATE OF SUBSEQUENT SUBMISSION
(SEE BLOCK 16)
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 03 – DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH E-SLEP CRAFT. DATA SUBMISSIONS AS LISTED IN SI 009-79.
BLOCK 09 – DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377), WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP.2401 ET. SEQ.). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25. DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10, 11 – AS SPECIFIED IN SI 009-79.
BLOCK 12, 13 – AS SPECIFIED IN SI 009-79. SUBMIT 14 DAYS PRIOR TO THE 50% AVAILABILITY COMPLETE DATE.
| ACU 5 |
| 0 |
| 1 |
| 0 |
| SUPERVISOR (SWRMC) |
| 0 |
| 1 |
| 0 |
| PMS377 IDE |
| 0 |
| 1 |
| 0 |
| 15. TOTAL |
| 0 |
| 3 |
| 0 |
G. PREPARED BY
H. DATE
03 MAR 2020
I. APPROVED BY
FORREST SMITH
J. DATE
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B005
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
CONTRACTOR'S NEED DATE FOR GOVERNMENT
FURNISHED PROPERTY (INCORPORATION) (SEE BLOCK 16)
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A (SEE BLOCK 16)
5. CONTRACT REFERENCE
C.1.1.5.2
6. REQUIRING OFFICE
18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
ONE TIME PER CRAFT
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
(SEE BLOCK 16)
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 03 – DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH E-SLEP CRAFT.
BLOCK 04 – FURTHER REQUIREMENTS ADDRESSED IN SECTION C, GOVERNMENT FURNISHED PROPERTY (GFP) (INCORPORATION).
BLOCK 09 – DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377), WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP.2401 ET. SEQ.). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
BLOCK 12 – FIFTEEN (15) DAYS PRIOR TO THE INDUCTION DATE OF THE FIRST E-SLEP CRAFT.
BLOCK 13 – FIFTEEN (15) DAYS PRIOR TO THE INDUCTION DATE OF EACH SUBSEQUENT E-SLEP CRAFT.
| ACU 5 |
| 0 |
| 1 |
| 0 |
| SUPERVISOR (SWRMC) |
| 0 |
| 1 |
| 0 |
| PMS377 IDE |
| 0 |
| 1 |
| 0 |
| 15. TOTAL |
| 0 |
| 3 |
| 0 |
G. PREPARED BY
H. DATE
03 MAR 2020
I. APPROVED BY
FORREST SMITH
J. DATE
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B006
2. TITLE OF DATA ITEM
ITEM UNIQUE IDENTIFICATION (IUID) MARKING AND
VERIFICATION REPORT
3. SUBTITLE
UII DATA FOR EMBEDDED COMPONENTS
17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81858
5. CONTRACT REFERENCE
C.1.2.4.1
6. REQUIRING OFFICE
18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
9. DIST STMT RQD
D (SEE BLOCK 16)
10. FREQUENCY
(SEE BLOCK 16)
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
(SEE BLOCK 16)
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLOCK 03 – DATA SUBMISSION REQUIREMENTS ARE APPLICABLE TO EACH E-SLEP CRAFT.
BLOCK 04 – PARA 3: REORDER/RENAME FIELD FOR UII DATA ELEMENTS AS FOLLOWS:
A. UII OF THE ITEM DELIVERED THAT CONTAINS THE EMBEDDED SUBASSEMBLY, COMPONENT OR PART
B. UID OF THE EMBEDDED SUBASSEMBLY, COMPONENT OR PART
C. UII TYPE
D. ISSUING AGENCY CODE
E. ENTERPRISE IDENTIFIER
F. ORIGINAL PART NUMBER
G. SERIAL NUMBER
H. UNIT OF MEASURE
I. DESCRIPTION
J – K. NOT USED
BLOCK 09 – DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DEPARTMENT OF
DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY; (CRITICAL TECHNOLOGY), (DATE OF
PUBLICATION). OTHER REQUESTS SHALL BE REFERRED TO PEO SHIPS (PMS377), WASHINGTON NAVY YARD, 1333 ISAAC HULL AVE, SE, WASHINGTON, DC 20376-2101.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C. SEC. 2751, ET. SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, (TITLE 50, U.S.C., APP.2401 ET. SEQ.). VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25. DESTROY THIS DOCUMENT BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
BLOCK 10, 12, 13 – CONCURRENT WITH THE ASSOCIATED END ITEM DELIVERY.
| ACU 5 |
| 0 |
| 1 |
| 0 |
| SUPERVISOR (SWRMC) |
| 0 |
| 1 |
| 0 |
| PMS377 IDE |
| 0 |
| 1 |
| 0 |
| 15. TOTAL |
| 0 |
| 3 |
| 0 |
G. PREPARED BY
H. DATE
03 MAR 2020
I. APPROVED BY
FORREST SMITH
J. DATE