Attachment J-2b Exhibit A Index 27MAY20.doc

DOC document 143 KB Posted

Attached to
Fiscal Year 21-24 Landing Craft, Air Cushion (LCAC) Extended Service Life Extension Program (E-SLEP)
Solicitation number
N00024-20-R-2427
Issued by

About this file

This attachment to a solicitation outlines 24 Contract Data Requirements Lists (CDRLs) requiring reports to be submitted by the contractor. Key reports include condition found reports, quality management system documentation, welding certifications, integrated total ship testing plans, safety plans, compartment closeout inspection reports, and problem identification reports. The solicitation seeks proposals for up to 18 Landing Craft Air Cushion (LCAC) Extended Service Life Extension Program (E-SLEP) availabilities from fiscal year 2021 through 2024. The work will extend the crafts' service life through repairs and installation of hull structures, machinery, electrical systems, electronics, and piping systems at Assault Craft Unit FIVE in Oceanside, California. Proposers must access the technical data package through the Integrated Data Environment following the instructions provided. Proposals are due as outlined in the final solicitation to be issued by the Naval Sea Systems Command.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LCAC E-SLEP

N00024-20-R-2427 ATTACHMENT J-2b

CONTRACT DATA REQUIREMENTS LIST,

DD FORM 1423

EXHIBIT A INDEX

27 MAY 2020

ELIN
DESCRIPTION/SUBJECT
AUTHORITY
APPROVAL CDRL
CONTRACT REF
POSTING OF CDRL SUBMITTAL TO

LCAC IDE

A001
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

A001-A
GENERAL CRITERIA - CONDITION FOUND REPORT
A001-B
GENERAL CRITERIA - REQUEST FOR DEVIATION

REQUIRED

A001-C
GENERAL CRITERIA - MATERIAL SAFETY DATA SHEET
A002
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A
YES
C.1.1.1.4
A002-A
QUALITY MANAGEMENT SYSTEM - QUALITY MANAGEMENT SYSTEM MANUAL AND PROCEDURES

REQUIRED

A002-B
QUALITY MANAGEMENT SYSTEM - CORRECTIVE ACTION RESPONSES

REQUIRED

A003
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A
YES
C.1.1.1.4

PROCESS CONTROL PROCEDURE

REQUIRED

A004
CERTIFICATION/DATA REPORT
DI-MISC-80678

C.1.2.11

WELDING, FABRICATION, AND INSPECTION REQUIREMENTS – PERSONNEL QUALIFICATIONS

A005
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

A005-A
INTERFERENCES - REPORT OF ADDITIONAL INTERFERENCES TO BE REMOVED
A005-B
INTERFERENCES - REPORT OF PREVIOUSLY DAMAGED OR DETERIORATED INTERFERENCES
A006
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

REQUIREMENTS FOR CONTRACTOR CRANES, MULTI-PURPOSE MACHINES AND MATERIAL HANDLING EQUIPMENT AT NAVAL FACILITIES – ACCIDENT REPORT

A007
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.2.7

A007-A
SCHEDULE AND ASSOCIATED REPORTS FOR AVAILABILTIES OVER 9 WEEKS IN DURATION - PRODUCTION SCHEDULE

REQUIRED

A007-B
SCHEDULE AND ASSOCIATED REPORTS FOR AVAILABILTIES OVER 9 WEEKS IN DURATION – CRITICAL PATH AND CONTROLLING WORK ITEMS

REQUIRED

A007-C
SCHEDULE AND ASSOCIATED REPORTS FOR AVAILABILITIES OVER 9 WEEKS IN DURATION – MILESTONE AND KEY EVENT LISTING

REQUIRED

A007-D
SCHEDULE AND ASSOCIATED REPORTS FOR AVAILABILITIES OVER 9 WEEKS IN DURATION – MANPOWER MANAGEMENT INFORMATION

REQUIRED

A007-E
SCHEDULE AND ASSOCIATED REPORTS FOR AVAILABILTIES OVER 9 WEEKS IN DURATION – MANPOWER UTILIZATION REPORT

REQUIRED

A007-F
SCHEDULE AND ASSOCIATED REPORTS FOR AVAILABILTIES OVER 9 WEEKS IN DURATION – LIST OF SUBCONTRACTORS BY WORK ITEMS

REQUIRED

A007-G
SCHEDULE AND ASSOCIATED REPORTS FOR AVAILABILTIES OVER 9 WEEKS IN DURATION – LIST OF PLANNED WORK DAYS AND HOLIDAYS

REQUIRED

A007-H
SCHEDULE AND ASSOCIATED REPORTS FOR AVAILABILTIES OVER 9 WEEKS IN DURATION – PRODUCTION SCHEDULE CHANGE CONTROL DOCUMENT

REQUIRED

A008
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

LUBRICATING OILS AND HYDRAULIC FLUIDS – ANALYSIS REPORT

A009
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

A009-A
INTEGRATED TOTAL SHIP TESTING - COMPREHENSIVE TEST PLAN

REQUIRED

A009-B
INTEGRATED TOTAL SHIP TESTING - INTEGRATED TOTAL SHIP TEST PLAN

REQUIRED

A010
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

HEAVY WEATHER PLAN

A011
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

SHIPBOARD ELECTRICAL/ELECTRONIC/FIBER OPTIC CABLE – TEST REPORT

A012
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

OCCUPATIONAL, SAFETY AND HEALTH REQUIREMENTS -SAFETY PLAN

A013
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

COMPARTMENT CLOSEOUT SCHEDULE – COMPARTMENT CLOSEOUT INSPECTION REPORT

REQUIRED

A014
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.1.1.4

DATA REQUIREMENTS WHEN INSTALLING AN EQUAL COMPONENT VICE SPECIFIED COMPONENT – COMPONENT REPLACEMENT REPORT DATA

REQUIRED

A015
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A
YES
C.1.1.1.4

SHIP DEPARTURE REPORT

REQUIRED

A016
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.2.1.4

PRE-INDUCTION SURVEY REPORT

REQUIRED

A017
CONTRACTOR’S PROGRESS, STATUS AND MANAGEMENT REPORT
DI-MGMT-81928

C.1.2.6.2

QUARTERLY PROGRESS MEETING PRESENTATION

REQUIRED

A018
CERTIFICATION/DATA REPORT:
DI-MISC-80678
C.1.2.10.2
REQUIRED

READINESS FOR COMMUNICATION SYSTEMS VALIDATION

A019
NOTIFICATION OF TEST/TRIALS:
DI-MISC-81624
C.1.2.13.3.2
REQUIRED

NOTIFICATION OF INSURV TRIAL DATES

A020
CERTIFICATION/DATA REPORT:
DI-MISC-80678

C.1.2.13.3.3

READINESS FOR INSURV TRIAL

REQUIRED

A021
SHIP TRIAL AGENDA:

INSURV TRIAL AGENDA

DI-MGMT-81643

C.1.2.13.3.3

A022
CONTRACTOR’S PROGRESS, STATUS AND MANAGEMENT REPORT
DI-MGMT-81928

C.1.2.7.9

CONTRACT PROBLEM IDENTIFICATION REPORT

REQUIRED

A023
CONTRACTOR’S PROGRESS, STATUS AND MANAGEMENT REPORT
DI-MGMT-81928

C.1.2.7.11

TIME IMPACT DELAY ANALYSIS REPORT

REQUIRED

A024
SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A

C.1.2.9

ACCEPTANCE TEST PROCEDURE STATUS REPORT

REQUIRED

Attachment J-2b