About this file

This solicitation is for replacement of the HVAC system at the Farmingdale Republic Airport Traffic Control Tower (ATCT) facility and Base Building located in Farmingdale, New York. The Federal Aviation Administration requires removal and replacement of the existing HVAC. A site visit is scheduled for March 15, 2022 and all questions must be received by March 22, 2022. Proposals are due by 5:00 PM ET on March 29, 2022. This is a competitive small business set-aside requiring registration on SAM.gov and inclusion of all documents outlined in Sections L and M of the solicitation. The Davis-Bacon Act and attached wage determination apply. The FAA intends to make a single-award firm-fixed-price contract to a small business. No payment will be made for any response information or costs.

View the file

Other files for this federal contract opportunity

Other files attached to Farmingdale HVAC Replacement, newest first.
File Type Posted
697DCK-22-R-00045 Amendment 0001.pdf PDF
Questions and Responses_March 29 2022.pdf PDF
Site Visit Attendee Log_Redacted.pdf PDF
Questions and Responses_March 23 2022.pdf PDF
Attachment J-1a FRG HVAC Drawings.pdf PDF
Attachment J-1a FRG HVAC Drawings.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-1 FRG HVAC Specifications.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
697DCK-22-R-00045.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

NY

09/15/2021 1701201

FRG-1701201-M004

C O

N S

T R

U

IO

ENGINEERING SERVICES

TERMINAL

ATCT

BASE BUILDING HVAC REPLACEMENT

REPUBLIC AIRPORTFARMINGDALE

PROJECT ENGINEER MGR: ENGINEERING - CENTER B

fr g -1

-m

.d n

DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

HVAC - LINK AND TOWER

PART PLANS

E D

M

IS

F

SCALE: 1/4" = 1'-0"

4' 8'04'

DT#18787

90 CFM

EH

20x8

14x8 8x8

14x8EH

FER

Q

T

BASE BUILDING

VESTIBULE

CABLE CHASE

STAIR

UP

ELEVATOR

G05G01.2

ROOM

PUMP

LINK

TOWER

G01

LOBBY

ELEVATORM

A

H

LI

P E

L

LE

TOWER LINK PLAN

EXISTING GROUND LEVEL PLAN

SCALE: 1/4" = 1'-0" ELEV. 0'-0"

TYPICAL

100% DESIGN

COORDINATE WITH COTR/RE.

PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK.

AND GENERAL NOTES.

REFER TO SHEET M001 FOR ABBREVIATIONS, SYMBOLS

ENTIRE ACU-2 SYSTEM.

TEST, ADJUST AND RE-BALANCE AIRFLOWS OF THE

BY ACU-2.

CLEAN AND SANITIZE ALL EXISTING DUCTWORK SERVED

AS PER SCHEDULE.

FURNISH AND INSTALL NEW CEILING SUPPLY DIFFUSER

2.

1.

GENERAL NOTES:

SHEET NOTE:

/0

/2

:4

:0 lo tt e d b y

V

-C

G -E

B

8 7 6 5 4 3 2 1

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

REDLINE

APVD

frg-1701201-m004

2022-01-05T13:49:01-0500

SANDRA L PIETTRO

2022-01-06T12:33:40-0500

BRIAN A BISRAM

FRG-1701201-M005

HVAC BASE BUILDING ROOF PLAN

ACU-2

TO REMAIN

SERVICE PLATFORM

DUNNAGE STEEL AND

EXISTING

CCU-1B

CCU-1A

(2) 7/8"RD DN

(2) 1/2"RL DN

DUNNAGE FRAMING

MOUNTED ON STEEL

CONDENSING UNITS

EF-1

TX-1

1 1/2" GAS PIPE

M006

EXISTING ROOF PLAN

1 3

COORDINATE WITH RE.

SHEET NOTES:

LOCAL SSC PERSONNEL.

SHALL BE COORDINATED IN ADVANCE WITH THE RE AND THE

A NIGHT SHIFT IS REQUIRED FOR THE POWER SHUT DOWN, IT

IN ADVANCE WITH THE RE AND THE LOCAL SSC PERSONNEL. IF

PANEL AND GENERATOR OPERATION SHALL BE COORDINATED

THE POWER SHUTDOWN FOR THE MAIN POWER DISTRIBUTION

TO PREVENT IGNITER FLAMEOUT DURING COMBUSTION.

PROVIDE WIND SHIELD/DEFLECTOR ON EXHAUST SIDE OF ACU-2

DISCONNECT SWITCH WITH 110 AMP RK5 TIME-DELAY FUSES.

FURNISH & INSTALL A NEW 200 AMP, NEMA 3R HEAVY DUTY

USE EXISTING WIRES AND RACEWAYS.

RESIDENT ENGINEER.

RETURN THE REMOVED 125A/3 POLE CIRCUIT BREAKER TO THE

125A/3 POLE BREAKER IS GE THQD TYPE CIRCUIT BREAKER.

WITH NEW 110AMP CIRCUIT BREAKER IN MDPN-5. THE EXISTING

MDPN-5 (PANEL MDPN LOCATED IN GENERATOR ROOM). REPLACE

REMOVE THE EXISTING 3 POLE 125 AMP CIRCUIT BREAKER FROM

EXISTING 15 AMP 1 POLE CIRCUIT BREAKER 120V CIRCUIT.

SYSTEM DEVICES TO THE EXISTING PANEL NPA, CIRCUIT NUMBER 42-

FURNISH & INSTALL 2 #12 & 1 #12G IN 3/4" CONDUIT FROM IONIZATION

IN EACH FOR AIR CLEANING.

IONIZATION SYSTEM IN SUPPLY AIR HOT AND COLD DECKS, ONE

FURNISH AND INSTALL (2) AUTO CLEANING NEEDLEPOINT BIPOLAR

FIELD VERIFY PRIOR TO INSTALLATION.

EXISTING HOT AND COLD DECK'S SUPPLY AIR DUCTS (2) 22X22.

PROVIDE TRANSITION FROM UNIT'S 79X20 OPENING DOWN TO

PROVIDE NEW GAS PIPING SHUT-OFF VALVE TO UNIT.

RATED AND HAVE A R-8 VALUE.

DUCTWORK ABOVE ROOF.INSULATION SHALL BE OUTDOOR

REPLACE ALL EXISTING EXPOSED INSULATION ON SA AND RA

FLEXIBLE CONNECTION. FIELD VERIFY PRIOR TO INSTALLATION.

OPENING DOWN TO EXISTING 40X18 RETURN AIR DUCT WITH

PROVIDE NEW DUCTWORK TRANSITION FROM UNIT'S 24X24

SCHEDULE.

FURNISH AND INSTALL NEW PACKAGED ROOFTOP UNIT AS PER

45678

X

CONN.

DRAIN

DX1

24"

79"2

99"

ID

93"

& RACEWAYS)

(USE EXISTING WIRES

IN 1 1/2"C

4 #1 AWG, 1 #1G

NOTES , &

(208V/3 PHASE)

MDPN-5

TIME-DELAY FUSES)

SWITCH WITH 110 AMP RK5

HEAVY DUTY DISCONNECT

200 AMP, NEMA 3R

(120V/1 PHASE)

NPA-42

(NOTE )

IONIZATION SYSTEM DEVICES

NEEDLE POINT BIPOLAR

2 #12, 1 #12G IN 3/4"C FOR

SYSTEM DEVICES

NEW IONIZATION

8 9 10

:1 lo tt e frg-1701201-m005

2022-01-05T14:03:33-0500

SANDRA L PIETTRO

2022-01-06T12:34:49-0500

BRIAN A BISRAM

FRG-1701201-M006

ACU-2 ELEVATION AND

AIR FLOW DIAGRAM

SCALE: 1/2" = 1'-0"

5'1' 2'01'

OA

(165)

(40)

(250)

(3,640)

RA

(280)

(150)

(120)

ZONE 5

ZONE 4

ZONE 3

ZONE 2

ZONE 1

ZONE 6

(4,075)

SA

(125)(40) (400)

ZONE 7

ZONE 8

(180)(220) (220) (220)

(300)(300)

(220)

(1125)

(615)

(330)

(490)

(790)

(65)

(120)

DD-1

DD-2

DD-3

DD-4

DD-5

DD-6

DD-7

DD-8

(50)

4,075 MAX

435 MIN.

14 8

FC FC

CEILING

ROOF

12x14

& HOT)

(COLD

22x22 SA

12x14 SA (HOT)

12x20 SA (COLD)

TRAY ABOVE

DATA CABLE

18x40

DECK CONNECTIONS

TO ACU HOT/COLD

NEW TRANSITION

ACU-2 ELEVATION

SCALE: 1/2" = 1'-0"

ACU-2 AIR FLOW DIAGRAM

NOT TO SCALE (FOR REFERENCE & BALANCING)

WITH COR/RE.

PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE

NOTES.

REFER TO SHEET M001 FOR ABBREVIATIONS, SYMBOLS AND GENERAL

GENERAL SHEET NOTES:

ATTENUATOR

3' L SOUND

TO RA DUCT

NEW TRANSITION

INSTALLING NEW UNIT ON EXISTING DUNNAGE.

OF RUST AND PAINT WITH COLD GALVANIZING PAINT PRIOR TO

DETERIORATION ONCE OLD UNIT IS REMOVED. WIRE BRUSH AREAS

THE CONTRACTOR SHALL CHECK STEEL DUNNAGE FOR RUST AND

AND TIMES OF THE TRAINING.

COORDINATE WITH THE RE AND SSC REPRESENTATIVE AS TO THE DATES

ENABLE ALL SSC PERSONNEL TO ATTEND THE TRAINING. THE GC SHALL

HOURS AND THE SAME SHALL BE HELD ON TWO DIFFERENT DAYS TO

MANUFACTURER'S REPRESENTATIVE. TRAINING SHALL BE A MINIMUM OF 4

AND MAINTENANCE OF THE NEW UNIT FOR SSC PERSONNEL BY A QUALIFIED

GC SHALL COORDINATE AND ARRANGE FOR TRAINING ON THE OPERATION

THE NEW UNIT: ONE SET OF FLAME DETECTORS, ONE SET OF IGNITERS.

THE GC SHALL PROVIDE TO THE SSC THE FOLLOWING SPARE PARTS FOR

APPROVED BY RE.

SIZED AS PER NEC, FROM NEAREST ELECTRICAL PANEL AS

WIRING TO BE INSTALLED IN NEW RIGID GALVANIZED STEEL CONDUIT,

LIGHTS UP ON ROOF PLATFORM. LOCATION TO BE DETERMINED BY RE.

FURNISH AND INSTALL TWO NEMA 4 PLATFORM CONVENIENCE SAFETY

NEAREST ELECTRICAL PANEL AS APPROVED BY RE.

IN NEW RIGID GALVANIZED STEEL CONDUIT, SIZED AS PER NEC, FROM

LOCATION TO BE DETERMINED BY RE. WIRING TO BE INSTALLED

OUTDOOR WEATHERPROOF OUTLET BOXES UP ON ROOF PLATFORM.

FURNISH AND INSTALL TWO NEW GFCI CONVENIENCE OUTLETS IN

R-8 MINIMUM.

REPLACE INSULATION WITH NEW OUTDOOR RATED INSULATION,

8 TOTAL. DEFLECTION SHALL BE 2".

REPLACE SEISMIC SPRING TYPE VIBRATION ISOLATORS,

SA RA

K

.5

GRATING

NO

GRATING

NO

20GA GALV

33"30" 135"

PL8

30"

IFG2

33"

FAN1

54"

FAN2

48"

CN1

46"

PL11

24"

FILT2

9"

DX1

20GA GALV

36"

44.875"

8670 LBS

(1) 244"

FOR REFERENCE AND TAB PURPOSES ONLY DURING BALANCING

ACU-2 AIR FLOW DIAGRAM IS

lo tt e frg-1701201-m006

2022-01-05T13:53:55-0500

SANDRA L PIETTRO

2022-01-06T12:35:52-0500

BRIAN A BISRAM

FRG-1701201-M007

AND ENERGY COMPLIANCE

HVAC DETAILS

CLEANOUT PLUG

NIPPLE

TEE

DRAIN PAN

PITCH

NOTES:

3.

6.

5.

4.

UP TO FORM INITIAL DRAIN SEAL.

FILL TRAP MANUALLY PRIMED BEFORE START-

AND CONDENSATE OVERFLOW.

DRAIN LINES SUPPORTED TO PREVENT SAG

DISCHARGE TO APPROVED RECEPTACLE.

DRAIN PITCHED FOR PROPER RUN-OFF AND

SEE NOTE 1

DROP

SEE NOTE 2

LEG

BEND

RETURN

OF DRAIN PAN

BELOW LEVEL

DISCHARGE

(1-1/4" FPT MINIMUM)

DRAIN CONNECTION

ALLOWED FOR TRAP.

SUFFICIENT SPACE BELOW DRAIN PAN

AT FAN INLET.

X = NEGATIVE INTERVAL STATIC PRESSURE

X/2 + 1" = LEG FOR DRAW-THRU UNIT WHERE

Y = DISCHARGE PRESSURE OF FAN.

Y + 1" = LEG FOR BLOW-THRU UNIT WHERE

FITTINGS SHOWN EXCEEDS THIS MINIMUM.

1" MIN. DROP REQUIRED USE OF STANDARD

ACU-2 CONDENSATE DRAIN DETAIL

NOT TO SCALE

M007

GENERAL SHEET NOTES:

PROPOSED ACU-2 3D DETAIL

BIPOLAR IONIZATION

GAS CONNECTION TO EQUIPMENT DETAIL

(DRIP LEG)

6" TRAP

SUPPLY

FROM GAS

FROM GAS

CONTROLS

TO EQUIPMENT/

UNION

GROUND JOINT

COCK

GAS

TO THE APPLIANCE

THE GAS SUPPLY CONNECTION

BE INSTALLED UPSTREAM OF

TEST GAGE CONNECTION TO

TAPPING ACCESSIBLE FOR

WITH AN 1/8" N.P.T. PLUGGED

MANUAL SHUT-OFF VALVE

:2 lo tt e frg-1701201-m007

2022-01-05T14:18:53-0500

SANDRA L PIETTRO

2022-01-06T12:37:03-0500

BRIAN A BISRAM

FRG-1701201-M008

AND CONTROL DIAGRAM

HVAC DDCP POINT FUNCTION SCHEDULE

EA

N.C.

CD

N.O.

TS

AVE

AO DO

AI AIAIDI DI

DO

DI AI

AO

AI AI

AODO

DI

PART OF DIRECT DIGITAL CONTROL PANEL (DDCP)

DP

PDI

STARTER

MOTOR

SS

STARTER

MOTOR

AHU-2

AX

SS AX SS AX

2 STAGE

CONDENSOR

INTERLOCK

ELECTRIC

GAS FURNACE

MODULATING

SYSTEM

FIRE ALARM

TO

HOT DECK

COLD DECK

SYSTEM

ALARM

FIRE

TO

MIXING BOXES

DUAL DUCTS TO

GENERATOR START-UP.

SHUT DOWN OF ACU-2 UPON

IS STARTED. POINT CONTROLS

RELAY N.O. UNTIL ENGINE

THE ENGINE GENERATOR.

TO RUN RELAY IN HEAD OF

RF-1

ACU-2 CONTROL SCHEMATIC DIAGRAM

NOT TO SCALE BASE BUILDING - ACU-2

M008

LOCATION OF SPACE TEMPERATURE SENSORS.

SEE MECHANICAL FLOOR PLAN ON DRAWING M003 FOR1.

OPERATION.

SEE SPECIFICATION SECTION 15975 FOR SEQUENCE OF

EXISTING DDCP POINT FUNCTION SCHEDULE

IN

W

/C

ZONE SPACE TEMPERATURE

SUPPLY AIR TEMPERATURE

COLD DECK TEMPERATURE

HOT DECK TEMPERATURE

MIXED AIR TEMPERATURE

FILTER DIFFERENTIAL PRESSURE

RETURN AIR TEMPERATURE

RETURN FAN STATUS

SUPPLY FAN STATUS

SUPPLY FAN START-STOP

ROOFTOP AIR CONDITIONING UNIT ACU-2

XX

IL

IG

IT

I

IM

IC

D

IR

FAIL MODEHARDWAREPOINT DESCRIPTION

-D

-D

IZ

J

IR

Y

IZ

IE

NOTESGRAPHICSSOFTWARE

TYPICAL FOR (2)

XAXDX COOLING STATUS

SSDX COOLING CONTROL X

X X

X X X

ACU-2 EXISTING DDC POINT FUNCTION SCHEDULEA

M008

CONTROL NOTES:

ALARM ACTIVATION.

UNIT TO ENSURE IT WILL SHUT DOWN AS REQUIRED ON FIRE

ALARM SYSTEM. TEST FIRE ALARM SYSTEM WITH NEW HVAC

AS FOLLOWS: CONNECT NEW HVAC SYSTEM TO EXISTING FIRE

ON FAA AS-BUILT DRAWINGS DATED 04/10/2000.

CONTROL DIAGRAMS SHOW EXISTING DEVICES. THIS IS BASED

ON DWG. D003.

ACU-2 ARE EXISTING AND SHALL BE REUSED. REFER TO NOTE 6

WITH A NEW JOHNSON CONTROLS SYSTEM. ALL POINTS FOR

THE FACILITY'S DDC SYSTEM WAS REPLACED 5-6 YEARS AGO

BP

DI DI

BP

BIPOLAR IONIZATION STATUS BP X TYPICAL FOR (2)

LEGEND:

EXISTING DDC POINT

NEW DDC POINT

:3 lo tt e frg-1701201-m008

2022-01-05T14:22:43-0500

SANDRA L PIETTRO

2022-01-06T12:38:23-0500

BRIAN A BISRAM

SITE LAYOUT PLAN

NYREPUBLIC AIRPORTFARMINGDALE

PROJECT ENGINEER MGR: CONSTRUCTION - NEW YORK

FRG-1701201-C001

-c

78'-0"

10'-0" 4' 16'-0"

CONC. CURB

EXIST.

FAA SECURITY CHAINLINK FENCE

LEGEND:

PIVOT LIFTING GATE

EXISTING 13'-0" VERTICAL

PIVOT LIFTING GATE

EXISTING VERTICAL

DOUBLE SWING GATE

EXISTING MANUAL 22'-0"

ADMINISTRATIVE

CONCRETE WALKWAY

CHAIN LINK FENCE

-W

-W

STORAGE, AND VEHICLE PARKING

CONTRACTOR STAGING, MATERIAL

PROPOSED DESIGNATED AREA FOR

SCALE: 1" = 20'

20' 40'020'

SITE LAYOUT PLAN

SCALE: 1" = 20'-0"

-c

:5 lo tt e frg-1701201-c001

2022-01-05T13:45:52-0500

SANDRA L PIETTRO

2022-01-06T12:18:04-0500

BRIAN A BISRAM

FRG-1701201-D001

-d

GROUND FLOOR PLAN

HVAC DEMOLITION - EXISTING BASE BUILDING

TS TSHS HS

TS TS

34x14 24x14 x

300 CFM

40 CFM

165 CFM

280 CFM

120 CFM

525 CFM EA.

REGISTERS

(2)8"X18" SUPPLY

615 CFM

1125 CFM

330 CFM

490 CFM

790 CFM

TO ACU-2

NEW 40x18 RA UP

165 CFM EA.

250 CFM

12x8 TR

ACU-2 HOT DECK

22x22 SA UP TO

12x8 x

6x4

CAC-1B

34x18 x x x x x x

14x8 14x8 x x

10x8

12x6

200 CFM 200 CFM OVERALL

8'L x 6"W x 10"H PLENUM,

(1) 1/2" SLOT, 25 CFM/L.FT.,

8'L LINEAR DIFFUSER -

10x10

10x6

125 CFM

12x10

8x6

18x8

W/WMS

END DUCT

46x20 OPEN

34x20 RA OPEN

34x20

46x20

16x8

A B

10x10 UP TO

ABOVE CEILING (TYPICAL)

RA TRANSFER DUCT W/FD

24x22

CAC-1A

40x22

UH-4

UH

FD/AD

FD/AD FD/AD

TO CAC-1B

1-1/8"RD DROP

5/8"RL AND

TO CAC-1A

EQ. SPLIT

M M

3 WAY

65 CFM

2-WAY

50 CFM

FD

DDC

60 CFM

6x6 CR

80 CFM

70 CFM

10x4

14x121 x

MATCHLINE

ACP

PREVENTER

BACKFLOW

RPZ TYPE

4"VTR

22X10

TELCO

GENERATOR ROOM

ENGINE

EQUIPMENT

STORAGE

TRAINING

CONFERENCE

MECHANICAL

EPDS

CHIEF

SECRETARY

OFFICE

CORRIDOR

AF

WOMEN

JANITOR

CLOSET

MEN

LOCKER

BREAK

COMPUTER

BMS FRONT-END

DUCT

12x6 TRANSFER

ABOVE CEILING

CABLE TRAY

SPIGOT

EXTERIOR

DOWN TO

DEMOLITION NOTES:

INSTALLATION OF THE NEW WORK.

DEVIATIONS IN DUCTWORK INDICATED PRIOR TO THE

NEW HVAC SYSTEM. NOTIFY RE OF ANY SIGNIFICANT

CLEAN ALL DUCTWORK THEN RE-BALANCE AND TEST

TO INSTALLATION OF NEW GRILLES AND DIFFUSERS,

CEILINGS AND HAS NOT BEEN FIELD VERIFIED. PRIOR

EXISTING DUCT LAYOUT SHOWN IS ABOVE THE DROP

REMOVE LINEAR SUPPLY SLOT DIFFUSER.

DEMOLISH CEILING RETURN.

DEMOLISH CEILING SUPPLY DIFFUSER.

OTHERWISE NOTED)

(TYPICAL UNLESS

24x24 CG

ACTUATOR

LF24S SPRING RETURN

INTAKE DAMPER W/ BELIMO

24"X72" COMBUSTION AIR

600 CFM EA.

(6)8"X18"

DECK

ACU-2 COLD

ON ROOF

CCU-1A & CCU-1B

(2)1-1/8"RD UP TO

(2)5/8"RL UP

EXISTING BASE PLAN

DUCTS

TRANSFER

FOR CAC UNITS

AND HUMIDITY SENSORS

ROOM TEMPERATURE

AND STORAGE RM.

INTO 4" VTR IN WALL B/T MECH. RM

PREVENTER DRAIN LINES EMPTY

CAC-1A/B AND RPZ BACKFLOW

SUPPLY TRUNK

TO 22X10 LINK

EF-1 ON ROOF

SPRING RETURN ACTUATOR

EX. FAN W/ BELIMO LF24S

INTAKE DAMPER FOR E/G ROOM

12"X12" MOTORIZED FRESH AIR

COORDINATE WITH RE.

(TYPICAL)

1 (TYPICAL)

2 (TYPICAL)

DEMOLITION WORK

:3 lo tt e frg-1701201-d001

2022-01-05T13:40:24-0500

SANDRA L PIETTRO

2022-01-06T12:22:00-0500

BRIAN A BISRAM

FRG-1701201-D002

PART PLANS

HVAC DEMOLITION - LINK AND TOWER

lo tt e

20x8

14x8 8x8

14x8EH

FER

T

STAIR

UP

G05G01.2

PUMP

TOWER

G01

LOBBY

LI

E

LE

TOWER LINK PLAN

EXISTING GROUND LEVEL PLAN

SCALE: 1/4" = 1'-0" ELEV. 0'-0"

DEMOLITION NOTE:

PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE WITH RE.

REFER TO SHEET M001 FOR ABBREVIATIONS, SYMBOLS AND GENERAL NOTES.

INDICATED PRIOR TO THE INSTALLATION OF NEW WORK.

NOTIFY COTR OF ANY SIGNIFICATION DEVIATIONS IN DUCTWORK

DUCTWORK CLEANING AND RE-BALANCING OF HVAC SYSTEM,

VERIFIED. UPON DEMOLITION OF DIFFUSERS, GRILLES,

IS BASED ON AS-BUILT DRAWINGS AND HAS NOT BEEN FIELD

EXISTING DUCT LAYOUT SHOWN ABOVE ALL DROP CEILINGS

DEMOLISH CEILING SUPPLY DIFFUSER.

CABLE CHASE

DEMOLITION WORK

frg-1701201-d002

2022-01-05T13:28:25-0500

SANDRA L PIETTRO

2022-01-06T12:24:52-0500

BRIAN A BISRAM

FRG-1701201-D003

BASE BUILDING ROOF PLAN

HVAC DEMOLITION

CCU-1B

CCU-1A

DUNNAGE FRAMING

MOUNTED ON STEEL

CONDENSING UNITS

EF-1

EXISTING ROOF PLAN

EMAIL: MORECONTRACTING@OPTONLINE.NET

FAX: (631) 924-5514

TEL: (631) 924-1414

PORT JEFFERSON STATION, NY 11776

19 BERGER PLACE

MORE CONTRACTING & CONSULTING, INC.

ANY ROOF RELATED WORK AFFECTED BY THIS CONTRACT. GC SHALL CONTACT:

THIS ROOF MUST BE PROTECTED AT ALL TIMES TO MAINTAIN ITS WARRANTY. FOR

PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE WITH RE.

REFER TO SHEET M001 FOR ABBREVIATIONS, SYMBOLS AND GENERAL NOTES.

ACU-2 AND INTERLOCK WITH FACP AND SHUTDOWN OF UNIT.

EXISTING DUCT SMOKE DETECTORS AND WIRING SHALL REMAIN FOR NEW

TO EXISTING DDC PANEL.

PRIOR TO REMOVAL AND HAVE THEM TAGGED FOR FUTURE CONNECTION

DISCONNECT AND KEEP ALL CONTROL WIRING ASSOCIATED WITH ACU-2

SEAMS SHALL BE RESEALED PRIOR TO NEW INSULATION INSTALLATION.

LEAKAGE INTO DUCTWORK AFTER INSULATION IS REMOVED. ALL JOINTS AND

EXPOSED ABOVE ROOF. CONTRACTOR SHALL VERIFY THERE IS NO WATER

DEMOLISH AND REMOVE SUPPLY AND RETURN AIR DUCTWORK INSULATION

REMAIN FOR NEW UNIT.

EXISTING SUPPLY AND RETURN AIR DUCTWORK CONNECTIONS/TIE-IN SHALL

EXISTING 1.5”GAS SERVICE CONNECTION SHALL REMAIN FOR NEW UNIT.

UNIT.

EXISTING DUNNAGE STEEL AND SERVICE PLATFORM SHALL REMAIN FOR NEW

ENTIRETY.

DEMOLISH AND REMOVE EXISTING PACKAGED ROOF-TOP UNIT (ACU-2) IN ITS

DEMOLITION NOTES:

ONE DAY AFTER ITS USE.

BE USED. THE CRANE SHALL BE REMOVED FROM THE SITE NO MORE THAN

CRANE SHALL NOT BE BROUGHT ON SITE UNTIL THE DAY BEFORE IT IS TO

THERE IS LIMITED SPACE AVAILABLE FOR THE STAGING OF THE CRANE. THE

WITH THE NEW ACU-2.

STORED ON A FLATBED TRUCK ON SITE, SHOULD THERE BE ANY ISSUES

REMOVING THE OLD ACU-2 FROM THE SITE COMPLETELY. IT SHALL BE

THE NEW ACU-2 SHALL REMAIN OPERATIONAL FOR 48 HOURS PRIOR TO

CRANE SHALL BE MARKED/LIGHTED IN ACCORDANCE WITH FAA AC 70/7460-1.

FILING OF 7460 MINIMUM OF 90 DAYS BEFORE CRANE WILL BE MOBILIZED.

CONTRACTOR SHALL PROVIDE RE WITH CRANE HEIGHT AND LOCATION FOR

THE PRE-CONSTRUCTION MEETING.

C001 FOR PROPOSED LOCATION. FINAL LOCATION SHALL BE DETERMINED AT

OPERATIONS AS DETERMINED AND APPROVED BY THE SSC AND AT. REFER TO

A STAGING AREA SHALL BE PROVIDED FOR THE GC FOR THE CRANE RIGGING

DATE/TIME FOR THE CRANE WORK TO OCCUR.

WITH THE LOCAL SSC AND AT REPRESENTATIVES TO DETERMINE THE BEST

THE CRANE ACTIVITIES ARE EXPECTED TO START. THE RE WILL COORDINATE

THE GC SHALL PROVIDE A MINIMUM OF TWO WEEKS PRIOR NOTICE OF WHEN

WITHIN 5 HOURS.

TO MINIMIZE DOWNTIME. THE UNIT MUST BE RIGGED AND OPERATIONAL

ALL PREP WORK SHALL BE COMPLETED PRIOR TO THE REMOVAL OF ACU-2

IN THEIR BID PRICE.

YEAR THE WORK IS OCCURRING. THE GC SHALL INCLUDE THIS POSSIBILTY

DURING DAY TIME OR OVER NIGHT HOURS DEPENDING UPON THE TIME OF

WORK MAY BE REQUIRED TO BE DONE ON A WEEKDAY OR WEEKEND AND

THE FRG ATCT IS CLOSED FROM 11:00PM TO 7:00AM, DAILY. THE CRANE

REQUIRED TO BE DONE DURING A PERIOD OF LEAST AIRCRAFT ACTIVITY.

BUILDING ROOF IS DEPENDENT ON AIR TRAFFIC AT THE FACILITY AND IS

THE CRANE ERECTION, RIGGING AND REMOVAL OF ACU-2 FROM THE BASE

7.

6.

5.

4.

DEMOLITION STAGING NOTES:

lo tt e frg-1701201-d003

2022-01-05T13:32:25-0500

SANDRA L PIETTRO

2022-01-06T12:26:08-0500

BRIAN A BISRAM

FRG-1701201-G001

-g

COVER SHEET AND DRAWING INDEX

T OF TRANSPO

T A

OF

STATES

TM

EN

AVIA

TRAT

SI

NI

FARMINGDALE, NEW YORK

REPUBLIC AIRPORT

DRAWING INDEX

DRAWING NO. DRAWING TITLE

GENERAL

FRG-1701201-G001 COVER SHEET AND DRAWING INDEX

DEMOLITION

FRG-1701201-D003

FRG-1701201-D002

FRG-1701201-D001

HVAC DEMOLITION - BASE BUILDING ROOF PLAN

HVAC DEMOLITION - LINK AND TOWER PART PLANS

HVAC DEMOLITION - EXISTING BASE BUILDING GROUND FLOOR PLAN

FRG-1701201-M008

FRG-1701201-M007

FRG-1701201-M006

FRG-1701201-M005

FRG-1701201-M004

FRG-1701201-M003

FRG-1701201-M002

FRG-1701201-M001

HVAC DDCP POINT FUNCTION SCHEDULE AND CONTROL DIAGRAM

HVAC - DETAILS AND ENERGY COMPLIANCE

ACU-2 ELEVATION AND AIR FLOW DIAGRAM

HVAC BASE BUILDING ROOF PLAN

HVAC - LINK AND TOWER PART PLANS

HVAC BASE BUILDING GROUND FLOOR PLAN

HVAC EQUIPMENT SCHEDULES

HVAC LEGEND, SYMBOLS AND ABBREVIATIONS

VICINITY SKETCH

BUILDING

BASE

CIVIL

FRG-1701201-C001 SITE LAYOUT PLAN

-g lo tt e frg-1701201-g001

2022-01-05T13:18:33-0500

SANDRA L PIETTRO

2022-01-06T12:27:52-0500

BRIAN A BISRAM

FRG-1701201-M001

HVAC LEGEND, SYMBOLS AND ABBREVIATIONS

CONSTRUCTION STAGING PLAN NOTES

DAMAGE INCLUDING BUT NOT LIMITED TO DAMAGE CAUSE BY IMPACT, WATER, DEBRIS AND DUST.

G1. PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING FROM

G. EQUIPMENT PROTECTION

LEADING TO THE CAB FROM 6:00AM TO 11:00PM.

OF ANY WORKERS, BUILDING MATERIALS, CONSTRUCTION DEBRIS, ETC.) TO THE STAIRWELL

MUST BE PROVIDED, AND FAA STAFF MUST HAVE UNOBSTRUCTED ACCESS (FREE AND CLEAR

F1. A CLEAR PATH FROM TEMPORARY PARKING AREAS TO THE BUILDING ENTRANCE DOOR

F. FACILITY ACCESS FOR FAA STAFF

ANY DUST CREATED DURING DEMOLITION/CONSTRUCTION WORK AROUND FAA EQUIPMENT.

E3. TEMPORARY PARTITIONS OR OTHER APPROVED METHODS SHALL BE USED TO CAPTURE

CONSTRUCTION ACTIVITIES.

SAFELY. ALL DEBRIS SHALL BE REMOVED AND AREA CLEAN OF DUST CREATED FROM

DEMOLITION WORK WILL BE COMPLETED DAILY TO A STAGE WHICH LEAVES THE AREA

THIS FACILITY. WORK SCHEDULES WILL BE COORDINATED WITH THE FAA RE DAILY. ANY

E2. FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT

6:00AM AND 11:00PM.

DEMOLITION AND CONSTRUCTION NOISE SHALL BE MINIMIZED BETWEEN THE HOURS OF

E1. AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY SHALL NOT BE INTERFERED WITH.

E. WORK HOURS

FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DUMPSTER MUST BE COVERED.

AND PLACED IN THE DUMPSTER. THE AREA AROUND THE DUMPSTER SHALL BE KEPT CLEAN AND

CONSTRUCTION AREA. CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE FACILITY DAILY

D1. A DUMPSTER FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED WITHIN THE

D. CONSTRUCTION DEBRIS

NOTIFY COTR IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL SERVICES.

BUT NOT LIMITED TO DISRUPTION OF POWER TO UNITS SHALL BE PROVIDED AT ALL TIMES.

OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS,

DURATION OF THIS CONTRACT. CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL

C3. EXISTING FAA AIR TRAFFIC EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT THE

COORDINATED WITH COTR. DISRUPTION OF THIS FACILITY SHALL NOT BE PERMITTED.

C2. EXERCISE GREAT CARE AND CAUTION WHILE WORKING IN THIS FACILITY. WORK SHALL BE

CONSTRUCTION AREA.

C1. THE SITE IS A SECURED AREA AND ALL WORKERS MUST STAY WITHIN THE DESIGNATED

C. FAA SECURITY REQUIREMENTS

THEN BROUGHT TO THE FACILITY.

TAKEN TO UNLOAD AND STAGE MATERIALS IN THE CONSTRUCTION STAGING AREA AND

VEHICLES. DUE TO THE SPACE LIMITATIONS AROUND THE BUILDING, EFFORTS SHALL BE

RE . PARKING IS LIMITED AND EFFORTS SHALL BE TAKEN TO MINIMIZE THE NUMBER OF

B1. PARKING SHALL BE LIMITED TO CONSTRUCTION STAGING AREA AS DESIGNATED BY THE

B. CONTRACTOR PARKING AND MATERIAL STORAGE

FOR ACCESS TO THE FAA SITE.

A1. VEHICLES, PEDESTRIANS AND DELIVERIES SHALL CONTACT AND COORDINATE WITH RE

A. CONSTRUCTION ACCESS

BE COORDINATED WITH FAA RE.

CONSTRUCTION ACCESS, PARKING AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA SHALL

AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS.

REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS

THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL

REFRIGERANT HOT GASRHGRHG

ANCHOR

FLUID FLOW DIRECTION

PIPE TURNING UP

PIPE TURNING DOWN

PLUGGED PIPE/OUTLET

CONCENTRIC REDUCER

ECCENTRIC REDUCER

CAPPED PIPE/OUTLET

GATE VALVE

ANGLE VALVE

GLOBE VALVE

CHECK VALVE

BALL VALVE

UNION

FLOOR DRAIN

CW DOMESTIC COLD WATER

BV

GV

AV

GLV

CV

SIZE TYPE

ALIGNMENT GUIDE

EXPANSION JOINT

FLEXIBLE PIPE CONNECTOR

VALVE AND BLIND FLANGE

PIPE HEADER WITH BLIND FLANGE

SIGHT GLASS

FLOW METER

STRAP-ON SENSOR

SOLENOID VALVE

STRAINER WITH BLOWDOWN VALVE

FILTER

LOUVER

BACKDRAFT DAMPER

HEATING COIL

MOTORIZED OPPOSED

BLADE DAMPER

FIRE/SMOKE DAMPER

HUMIDIFIER

AI

DIGITAL OUTPUT FROM DDCP

ANALOG INPUT TO DDCP

ANALOG OUTPUT FROM DDCPAO

UNIT HEATER

FAN

FAN STARTER

S AIR FLOW MEASURING

STATION/STATIC PRESSURE

MEASURING STATION

MOTORIZED PARALLEL

BLADE DAMPER

ED

DC

AX AUXILIARY CONTACT

START STOP CONTROL

ENABLE DISABLE CONTROL

DRY CONTACT

CI CONTROL INTERFACE

RC

SPA

RELAY CONTROL

SET POINT ADJUSTMENT

(OR CONTROL POINT ADJUSTMENT)

BUTTERFLY VALVEBFV

D D CONDENSATE DRAIN

FAN WITH VARIABLE

FREQ. MOTOR CONTROLLER

PRESSURE GAUGEPI

X DDCP DATA INPUT/OUTPUT TO

MICROPROCESSOR CONTROLLERS

MC MICROPROCESSOR CONTROLLER

DIRECT EXPANSION

COOLING COIL

DIGITAL INPUT TO DDCP

RS

RL

REFRIGERANT SUCTION

REFRIGERANT LIQUID

HUMIDIFIER CONTROL OVERRIDE TOGGLE SWITCHHC

DUCT STATIC PRESSURE SENSORSPS

CRAC

CFM

WMS

VAV

TR

TAB

SST

SSC

SDT

RTU

RG

RD

LD

HVAC

GC

FC

EF

CU

CG

AT

ACC

AC

TO EXISTING

POINT OF CONNECTION

SYMBOL

NUMBER

EQUIPMENT DESIGNATION

SINGLE LINE DUCTWORK INSTRUMENTATION

ABBREVATIONS

PIPING

SYMBOL ABBREVIATION DESCRIPTION

MECHANICAL GENERAL NOTES

FIRE DAMPER

EQUIPMENT TO REMAIN

SINGLE DUCTWORK OR

EQUIPMENT TO BE REMOVED

EXISTING DUCTWORK OR

LINING

DUCTWORK WITH ACOUSTICAL

NEW DUCTWORK OR EQUIPMENT

POINT OF DISCONNECTION

RESIDENT ENGINEERRE

ADMINISTRATIVE

COTR

REPRESENTATIVE

CONTRACTING OFFICER'S TECHNICAL

AHU

1A

INSULATION THICKNESS.

WITH INTERNAL INSULATION, INCREASE SHEET METAL DIMENSIONS TO ALLOW FOR

DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. FOR DUCTWORK

THROWAWAY FILTERS.

PROVIDE ONE SET OF REPLACEMENT FILTERS FOR ALL EQUIPMENT FURNISHED WITH

PROVIDE ONE SET OF SPARE BELTS FOR ALL BELT DRIVEN EQUIPMENT.

ALL UNIT COMPRESSORS SHALL INCLUDE AN EXTENDED 5 YEARS WARRANTY.

EQUIPMENT SUPPLIED.

CONTRACTOR'S WARRANTY ON INSTALLATION, AND MANUFACTURER'S WARRANTIES ON

FURNISHED, A LIST OF EQUIPMENT SUPPLIERS, COPIES OF SERVICE CONTRACTS,

AND MAINTENANCE MANUAL INCLUDING MANUFACTURER'S MANUALS FOR ALL EQUIPMENT

AT PROJECT CLOSE OUT, THE CONTRACTOR SHALL FORWARD AN OWNER'S OPERATING

PROMPTLY REPAIRED.

SETTLEMENTS OF SURFACES THAT MAY OCCUR WITHIN THAT PERIOD SHALL ALSO BE

FAILURES OR WEAR DUE TO FAULTY MATERIALS, WORKMANSHIP OR EQUIPMENT. ALL

SHALL, AT HIS OWN EXPENSE, PROMPTLY CORRECT AND REPAIR ANY AND ALL BREAKS,

FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK TO THE OWNER. THE CONTRACTOR

WARRANTED BY THE CONTRACTOR FOR MECHANICAL WORK FOR A PERIOD OF ONE YEAR

EQUIPMENT, MATERIALS AND WORKMANSHIP OF THE MECHANICAL INSTALLATION SHALL BE

OWNER FOR RECORD.

COPIES OF ALL PERMITS AND INSPECTION CERTIFICATES SHALL BE FORWARDED TO THE

OBTAIN ALL PERMITS, PAY ALL PERMIT FEES, AND SCHEDULE ALL REQUIRED INSPECTIONS.

INSTALLATION SHOWN OR DESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS.

PROVIDE ALL MATERIAL, TOOLS, SUPERVISION, AND LABOR REQUIRED FOR THE MECHANICAL

CLEAN AIR ACT OF 1990 AND ALL APPROPRIATE REGULATORY AGENCIES.

WILL INCLUDE THE PROPER RECOVERY OF ALL REFRIGERANT IN ACCORDANCE WITH THE

THE DEMOLITION OF ANY EXISTING EQUIPMENT OR PIPING WHICH CONTAINS REFRIGERANT

SLAB OR WALL.

COMING INTO THE SPACE. THESE ITEMS SHALL BE CAPPED OFF WITHIN THE EXISTING

THE CONTRACTOR SHALL REMOVE, RE-ROUTE, AND/OR CAP OFF ALL UNUSED UTILITIES

COMPANY, THE OWNER, OR OTHER AGENCY INVOLVED.

OR PROTECTING SAME, IN ACCORDANCE WITH THE REQUIREMENTS OF THE UTILITY

AT THE SITE AND DETERMINE METHODS FOR DISCONNECTING, CAPPING, REMOVING,

PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL REVIEW EXISTING UTILITIES

CONSTRUCTION.

EXISTING FLOORING, WALLS, CEILINGS, AND FINISHES DURING DEMOLITION AND

MAKE ALL REPAIRS AND REPLACEMENTS NECESSARY. COVER AND PROTECT ALL

OBJECTS DESIGNATED TO REMAIN, AND IN THE EVENT OF DAMAGE, IMMEDIATELY

THE CONTRACTOR SHALL USE ALL MEANS NECESSARY TO PROTECT EXISTING

DISCREPANCIES OR QUESTIONABLE ITEMS.

OBJECTS TO BE REMOVED AND PRESERVED, AND REPORT TO THE ENGINEER ANY

BEFORE COMMENCING WORK, THE CONTRACTOR MUST VERIFY AT THE SITE ALL

THE DRAWINGS DO NOT PURPORT TO SHOW ALL OBJECTS EXISTING AT THE SITE.

THE OWNER.

CORRESPONDING HARDWARE REMOVED DURING CONSTRUCTION TO BE RETAINED BY

CONTRACTOR SHALL COORDINATE WITH THE OWNER ANY HVAC EQUIPMENT AND

DURING DEMOLITION.

ACCUMULATE. THE PREMISES SHALL BE KEPT AS CLEAN AND EMPTY AS POSSIBLE

CONTRACTOR WILL NOT BE ALLOWED TO LET RUBBISH AND ITEMS TO BE REMOVED

PIPING, WIRING, ETC. WHICH IS NOT TO BE REUSED WILL NOT BE PERMITTED.

REUSED AND WILL BECOME OBSOLETE. ABANDONING OF EQUIPMENT, DUCTWORK,

DUCTWORK, WIRING, ETC. WHICH IS DESIGNATED TO BE REMOVED, OR IS NOT TO BE

REMOVE, AND DISPOSE OF IN A LEGAL MANNER ALL EXISTING HVAC EQUIPMENT, PIPING,

UNLESS OTHERWISE DIRECTED BY THE OWNER, THE CONTRACTOR SHALL DISCONNECT,

RATED ASSEMBLY.

ASSEMBLIES. RATING OF SEALANT SHALL BE EQUAL TO OR EXCEED RATING OF FIRE

PROVIDE UL FIRE RATED SEALANT AT PIPE PENETRATIONS THROUGH FIRE RATED

TECHNICAL REPRESENTATIVE (RE) FOR APPROVAL, PRIOR TO INSTALLATION.

SPECIFIC EQUIPMENT. RESUBMIT PROPOSED EQUIPMENT TO CONTRACTING OFFICER'S

CLEARANCES AND CONFIGURATION AS COMPARED TO SPACE ALLOCATED TO HOUSE

VERIFICATION OF CONFORMANCE PER THE REQUIREMENTS OF LOCATION, SIZE

OF SUCH EQUIPMENT MANUFACTURERS WILL REQUIRE THE CONTRACTORS PRIOR

BASED ON SPECIFIC SCHEDULED MANUFACTURERS AND MODEL NUMBERS. SUBSTITUTION

LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT SHOWN ARE

INSTRUCTIONS.

EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND

AT 30 FEET ABOVE SEA LEVEL.

AIR FLOW QUANTITIES SHOWN ON THE DRAWINGS ARE ACTUAL FLOW QUANTITIES

SHALL NOT BE USED AS A GROUND.

METAL TO BE WELDED TO A GOOD EARTH GROUND. FACILITY STRUCTURAL STEEL

NO WELDING SHALL BE POWERED FROM FACILITY ELECTRICAL SYSTEM. CONNECT

HYGIENISTS.

AND CONFORMING TO THE AMERICAN CONFERENCE OF GOVERNMENT INDUSTRIAL

MECHANICAL VENTILATION DURING WELDING DUCTED TO OUTSIDE, APPROVED BY FAA

FOR WELDING THAT MUST BE PERFORMED INSIDE THE BUILDING, PROVIDE LOCAL

LOCATION TO BE DETERMINED BY RE.

WRITING WITH COTR AND SHALL BE PERFORMED OUTSIDE OF FACILITY OR IN SAFE

FIRE EXTINGUISHERS DURING CONSTRUCTION. WELDING SHALL BE SCHEDULED IN

STANDARDS FOR WELDING IN 29 CFR-1910 AND 29 CFR-1926. PROVIDE TEMPORARY

BE SAME INDIVIDUAL THAT IS PERFORMING WELDING OPERATIONS. COMPLY WITH OSHA

AND CUTTING OPERATIONS. PERSON PERFORMING FIRE PROTECTION DUTIES SHALL NOT

DESIGNATE A PERSON TO BE RESPONSIBLE FOR FIRE PROTECTION DURING WELDING

ADEQUATE CLEARANCES FOR DIRECT ACCESS.

FILTERS, AND OTHER DEVICES. ACCESS DOORS SHALL BE INSTALLED TO PROVIDE

INSTALLATION SHALL PROVIDE READY ACCESS TO VALVES, DAMPERS, COILS AND

PROJECT.

DESIGN. NOT ALL SYMBOLS AND ABBREVIATIONS SHOWN MAY BE USED ON THIS

HVAC LEGEND IS THE STANDARD LEGEND WHICH IS USED FOR FAA FACILITIES

Z.

Y.

X.

W.

V.

U.

T.

S.

R.

Q.

P.

N.

M.

L.

K.

J.

I.

H.

G.

F.

E.

D.

C.

B.

A.

SD

PDI

PD

N.O.

HS

HOA

FZ

CO

BO

BI

AUTO

TEMPERATURE SENSOR

THERMOSTAT

DUCT SMOKE DETECTOR

DIFFERENTIAL PRESSURE INDICATOR

DIFFERENTIAL PRESSURE SENSOR

NORMALLY OPEN

NORMALLY CLOSED

MOTOR/ACTUATOR

HUMIDITY SENSOR

HUMIDISTAT

HAND-OFF-AUTO

FREEZESTAT

DIFFERENTIAL PRESSURE SWITCH

DAMPER POSITION INDICATOR

CARBON DIOXIDE SENSOR

CONTROL DAMPER

BINARY OUTPUT

BINARY INPUT

AUTOMATIC MODE

AIR FLOW SENSOR

EXISTING FIRE DAMPER

NEW FIRE DAMPER

COMPUTER ROOM AIR CONDITIONING UNIT

CUBIC FEET PER MINUTE

WIRE MESH SCREEN

VARIABLE AIR VOLUME

UNIT HEATER

TOP REGISTER

TESTING, ADJUSTING & BALANCING

SATURATED SUCTION TEMPERATURE

SYSTEM SUPPORT CENTER

SATURATED DISCHARGE TEMPERATURE

SUPPLY AIR

ROOF TOP UNIT

REFRIGERANT SUCTION

REFRIGERANT LIQUID

RETURN GRILLE

RELIEF DAMPER

RETURN AIR

OUTDOOR AIR

MOTORIZED DAMPER

LEAK DETECTOR

HEATING, VENTILATION AND AIR CONDITIONING

HUMIDIFIER

GENERAL CONTRACTOR

FLEXIBLE CONNECTION

EXHAUST FAN

DIRECT DIRECT CONTROLS

CONDENSING UNIT

CEILING GRILLE

CEILING DIFFUSERS

AIR TRAFFIC

AIR COOLED CONDENSING UNIT (OUTDOOR)

AIR CONDITIONING UNIT

lo tt e frg-1701201-m001

2022-01-05T13:42:11-0500

SANDRA L PIETTRO

2022-01-06T12:30:12-0500

BRIAN A BISRAM

FRG-1701201-M002

HVAC EQUIPMENT SCHEDULES

OFFICE 104DD-4

DD-2 CONFERENCE/TRAINING ROOM

OFFICE 105DD-1

OFFICE 102

OFFICE 109/AF

LOCATION SERVED

ANEMOSTAT DU-1A

TOWER LINK

BREAK/LOCKER ROOM

RECEPTION

HOTCOLD

165 125

590790

280 210

370490

280 210

250330

1125 1125

615615 8

COLD HOT

INLET DIA. (IN.)

<15

1.5" PMIN. P

DISCHARGE NC RADIATED NC

MIN. P

ANEMOSTAT DU-1C

ANEMOSTAT DU-1B

ANEMOSTAT DU-1B

ANEMOSTAT DU-1D

MAX.

<15 <15

NEW AIR OUTLET SCHEDULE

AS NOTED

22x22 501-1000 24x24

AS NOTED

55 CFM/L.FT.

NECK SIZETYPE CFM RANGE

SAC3LD<20 <0.1

S2VO<20 <0.1

X3HOD<20 <0.1

SLAD-FS-100VERTICAL <30 <0.1

DIRECTION NC MANUFACTURER MODEL

AS NOTED AS NOTED

375 - 500 24x24

250 - 375 24x24

150 - 250 24x24

80 - 150 24x24

<25

(NOTE 5) <0.1

(NOTE 5) <25 <0.1 ANEMOSTAT

EXISTING DUAL DUCT TERMINAL UNIT SCHEDULE

JOB NO.

NEW PACKAGED ROOFTOP AIR CONDITIONING UNIT SCHEDULE - GAS HEAT/ELECTRIC COOL

PLENUM

LOCATION

4000ACU-2

TYPEMHPRPM

SERVICE

SUPPLY FAN DATA

208/3/60

MANUFACTURER/MODEL

FLAV/PH/HZ

ELECTRICAL DATA

TOTAL

CAPACITY (MBH)

AIR DATA FOR DX COOLING COIL HEATING - NATURAL GAS

FLAT

TYPE

30%

INIT. FIN.

0.1 0.4

RETURN FAN DATA

MCA MOP

UNIT

(IN. WG)

E.S.P.

2.36 3.01,642

SENSIBLE

ROWS

NO.

6 10

F.P.I.

NO.

(SQ.FT.)

AREA

FACE

11.4 384

(FPM)

VEL.

FACE

0.47

(IN. W.G.)

DROP

PRESS

(IN.)

SP

0.12 56

EAT LAT

INPUT

(MBH)

CAPACITY

OUTPUT

(MBH)

CAPACITY

(IN. W.G)

PRESS.

GAS

STEPS

NO. OF

MODULATING

ROOF

BUILDING

BASE

MIN.

PLENUM

TYPEMHPRPM

E.S.P.

0.63 1.0978 80.9

EDB

65.5

EWB

53.8

LDB

53.2

LWB

52.1-1992

ASHRAE

EFF.

MIN AVG

FILTER DATA***

PD

OUTDOOR AIR CONDITIONS:

UNIT

.5" P

.5" P 1.5" P

MAKE MODEL

SUPPLY DIFFUSER

LINEAR DIFFUSER

LD

SUPPLY REGISTER

TR

RET/EXH REGISTER

CR

RETURN GRILLE

CG

FACE SIZE

DEFLECTION

DOUBLE

PRESSURE

STATIC

ANEMOSTAT

EPL

NOTES:

4. DIFFUSER WITH 4-WAY BLOW UNLESS OTHERWISE NOTED. FACTORY-INSTALLED BLANK-OFF PLATES PROVIDED WHERE REQ'D.

3. FRAME PROVIDED TO MATCH CEILING/WALL CONSTRUCTION.

2. DIFFUSERS CONSTRUCTED OF ALUMINUM, SUPPLIED WHITE PRIME FINISH, BLACK ANODIZED IN CAB CEILING.

1. DIFFUSERS SUPPLIED WITH OPPOSED BLADE DAMPERS.

119.3150.2 313.2 250.6 5-13.5 86 92

BUILD UNIT

MAMMOTH CUSTOM

FOR REFERENCE AND TAB PURPOSES.1

ZM335-10-02

lo tt e lo tt e frg-1701201-m002

2022-01-05T13:43:41-0500

SANDRA L PIETTRO

2022-01-06T12:31:26-0500

BRIAN A BISRAM

FRG-1701201-M003

HVAC BASE BUILDING GROUND FLOOR PLAN

TS TSHS HS

TS TS

34x14 24x14 x

165 CFM

615 CFM

1125 CFM

330 CFM

490 CFM

790 CFM

TO ACU-2

NEW 40x18 RA UP

165 CFM EA.

ACU-2 HOT DECK

6 6

6x4

CAC-1B

x x x x x x

14x8 14x8 x x

10x8

200 CFM

125 CFM

18x8

46x20 OPEN

34x20 RA OPEN

46x20

16x8

A B

ABOVE CEILING (TYPICAL)

RA TRANSFER DUCT W/FD

CAC-1A

40x22

UH-4

FD/AD FD/AD

TO CAC-1B

TO CAC-1A

M M

3 WAY

65 CFM

2-WAY

60 CFM

80 CFM

70 CFM

10x4

14x121 x

MATCHLINE

ACP

PREVENTER

BACKFLOW

RPZ TYPE

4"VTR

SUPPLY TRUNK

TO 22X10 LINK

22X10

TELCO

GENERATOR ROOM

ENGINE

STORAGE

TRAINING

CONFERENCE

EPDS

CHIEF

SECRETARY

CORRIDOR

WOMEN

JANITOR

CLOSET

MEN

LOCKER

BREAK

COMPUTER

BMS FRONT-END

DUCT

12x6 TRANSFER

ABOVE CEILING

CABLE TRAY

SPIGOT

EXTERIOR

DOWN TO

OTHERWISE NOTED)

(TYPICAL UNLESS

24x24 CG

ACTUATOR

LF24S SPRING RETURN

INTAKE DAMPER W/ BELIMO

24"X72" COMBUSTION AIR

RETURN ACTUATOR

EX. FAN W/ BELIMO LF24S SPRING

INTAKE DAMPER FOR E/G ROOM

12"X12" MOTORIZED FRESH AIR

10x10 UP TO EF-1

600 CFM EA.

(6)8"X18"

DECK

ACU-2 COLD

CCU-1A & CCU-1B

(2)1-1/8"RD UP TO

(2)5/8"RL UP

EXISTING BASE PLAN

FOR CAC UNITS

AND HUMIDITY SENSORS

ROOM TEMPERATURE

AND STORAGE RM.

INTO 4" VTR IN WALL B/T MECH. RM

PREVENTER DRAIN LINES EMPTY

CAC-1A/B AND RPZ BACKFLOW

DUCTS

TRANSFER

SYSTEM ACTIVATES.

TO ENSURE IT SHUTS DOWN AS REQUIRED WHEN FIRE ALARM

TEST NEW HVAC SYSTEM WITH EXISTING FIRE ALARM SYSTEM

ENTIRE ACU-2 SYSTEM.

TEST, ADJUST AND RE-BALANCE AIRFLOWS OF THE

TO STARTING.

AND COORDINATED WITH THE RE FOR APPROVAL PRIOR

LOCATIONS IN CEILING SHALL BE FIELD DETERMINED

IS CLOSED FOR OPERATIONS. DUCTWORK ACCESS

BY ACU-2. THIS WORK SHALL BE DONE WHEN THE ATCT

CLEAN AND SANITIZE ALL EXISTING DUCTWORK SERVED

SCHEDULE.

FURNISH AND INSTALL NEW CEILING RETURN AS PER

AS PER SCHEDULE.

FURNISH AND INSTALL NEW CEILING SUPPLY DIFFUSER

2 (TYPICAL)

525 CFM EA.

(2) 8"X18" SUPPLY

NPA

PANEL

:0 lo tt e frg-1701201-m003

2022-01-05T13:57:08-0500

SANDRA L PIETTRO

2022-01-06T12:32:33-0500

BRIAN A BISRAM

File details come from the government source that posted it. Updated .