Attachment J-1a FRG HVAC Drawings.pdf
PDF 8 MB Posted
- Attached to
- Farmingdale HVAC Replacement Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00045
About this file
This solicitation is for replacement of the HVAC system at the Farmingdale Republic Airport Traffic Control Tower (ATCT) facility and Base Building located in Farmingdale, New York. The Federal Aviation Administration requires removal and replacement of the existing HVAC. A site visit is scheduled for March 15, 2022 and all questions must be received by March 22, 2022. Proposals are due by 5:00 PM ET on March 29, 2022. This is a competitive small business set-aside requiring registration on SAM.gov and inclusion of all documents outlined in Sections L and M of the solicitation. The Davis-Bacon Act and attached wage determination apply. The FAA intends to make a single-award firm-fixed-price contract to a small business. No payment will be made for any response information or costs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-22-R-00045 Amendment 0001.pdf | ||
| Questions and Responses_March 29 2022.pdf | ||
| Site Visit Attendee Log_Redacted.pdf | ||
| Questions and Responses_March 23 2022.pdf | ||
| Attachment J-1a FRG HVAC Drawings.pdf | ||
| Attachment J-1a FRG HVAC Drawings.pdf | ||
| Attachment J-2 Wage Determination.pdf | ||
| Attachment J-1 FRG HVAC Specifications.pdf | ||
| PAST PERFORMANCE QUESTIONNAIRE.pdf | ||
| 697DCK-22-R-00045.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
NY
09/15/2021 1701201
FRG-1701201-M004
C O
N S
T R
U
IO
ENGINEERING SERVICES
TERMINAL
ATCT
BASE BUILDING HVAC REPLACEMENT
REPUBLIC AIRPORTFARMINGDALE
PROJECT ENGINEER MGR: ENGINEERING - CENTER B
fr g -1
-m
.d n
DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
HVAC - LINK AND TOWER
PART PLANS
E D
M
IS
F
SCALE: 1/4" = 1'-0"
4' 8'04'
DT#18787
90 CFM
EH
20x8
14x8 8x8
14x8EH
FER
Q
T
BASE BUILDING
VESTIBULE
CABLE CHASE
STAIR
UP
ELEVATOR
G05G01.2
ROOM
PUMP
LINK
TOWER
G01
LOBBY
ELEVATORM
A
H
LI
P E
L
LE
TOWER LINK PLAN
EXISTING GROUND LEVEL PLAN
SCALE: 1/4" = 1'-0" ELEV. 0'-0"
TYPICAL
100% DESIGN
COORDINATE WITH COTR/RE.
PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK.
AND GENERAL NOTES.
REFER TO SHEET M001 FOR ABBREVIATIONS, SYMBOLS
ENTIRE ACU-2 SYSTEM.
TEST, ADJUST AND RE-BALANCE AIRFLOWS OF THE
BY ACU-2.
CLEAN AND SANITIZE ALL EXISTING DUCTWORK SERVED
AS PER SCHEDULE.
FURNISH AND INSTALL NEW CEILING SUPPLY DIFFUSER
2.
1.
GENERAL NOTES:
SHEET NOTE:
/0
/2
:4
:0 lo tt e d b y
V
-C
G -E
B
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
frg-1701201-m004
2022-01-05T13:49:01-0500
SANDRA L PIETTRO
2022-01-06T12:33:40-0500
BRIAN A BISRAM
FRG-1701201-M005
HVAC BASE BUILDING ROOF PLAN
ACU-2
TO REMAIN
SERVICE PLATFORM
DUNNAGE STEEL AND
EXISTING
CCU-1B
CCU-1A
(2) 7/8"RD DN
(2) 1/2"RL DN
DUNNAGE FRAMING
MOUNTED ON STEEL
CONDENSING UNITS
EF-1
TX-1
1 1/2" GAS PIPE
M006
EXISTING ROOF PLAN
1 3
COORDINATE WITH RE.
SHEET NOTES:
LOCAL SSC PERSONNEL.
SHALL BE COORDINATED IN ADVANCE WITH THE RE AND THE
A NIGHT SHIFT IS REQUIRED FOR THE POWER SHUT DOWN, IT
IN ADVANCE WITH THE RE AND THE LOCAL SSC PERSONNEL. IF
PANEL AND GENERATOR OPERATION SHALL BE COORDINATED
THE POWER SHUTDOWN FOR THE MAIN POWER DISTRIBUTION
TO PREVENT IGNITER FLAMEOUT DURING COMBUSTION.
PROVIDE WIND SHIELD/DEFLECTOR ON EXHAUST SIDE OF ACU-2
DISCONNECT SWITCH WITH 110 AMP RK5 TIME-DELAY FUSES.
FURNISH & INSTALL A NEW 200 AMP, NEMA 3R HEAVY DUTY
USE EXISTING WIRES AND RACEWAYS.
RESIDENT ENGINEER.
RETURN THE REMOVED 125A/3 POLE CIRCUIT BREAKER TO THE
125A/3 POLE BREAKER IS GE THQD TYPE CIRCUIT BREAKER.
WITH NEW 110AMP CIRCUIT BREAKER IN MDPN-5. THE EXISTING
MDPN-5 (PANEL MDPN LOCATED IN GENERATOR ROOM). REPLACE
REMOVE THE EXISTING 3 POLE 125 AMP CIRCUIT BREAKER FROM
EXISTING 15 AMP 1 POLE CIRCUIT BREAKER 120V CIRCUIT.
SYSTEM DEVICES TO THE EXISTING PANEL NPA, CIRCUIT NUMBER 42-
FURNISH & INSTALL 2 #12 & 1 #12G IN 3/4" CONDUIT FROM IONIZATION
IN EACH FOR AIR CLEANING.
IONIZATION SYSTEM IN SUPPLY AIR HOT AND COLD DECKS, ONE
FURNISH AND INSTALL (2) AUTO CLEANING NEEDLEPOINT BIPOLAR
FIELD VERIFY PRIOR TO INSTALLATION.
EXISTING HOT AND COLD DECK'S SUPPLY AIR DUCTS (2) 22X22.
PROVIDE TRANSITION FROM UNIT'S 79X20 OPENING DOWN TO
PROVIDE NEW GAS PIPING SHUT-OFF VALVE TO UNIT.
RATED AND HAVE A R-8 VALUE.
DUCTWORK ABOVE ROOF.INSULATION SHALL BE OUTDOOR
REPLACE ALL EXISTING EXPOSED INSULATION ON SA AND RA
FLEXIBLE CONNECTION. FIELD VERIFY PRIOR TO INSTALLATION.
OPENING DOWN TO EXISTING 40X18 RETURN AIR DUCT WITH
PROVIDE NEW DUCTWORK TRANSITION FROM UNIT'S 24X24
SCHEDULE.
FURNISH AND INSTALL NEW PACKAGED ROOFTOP UNIT AS PER
45678
X
CONN.
DRAIN
DX1
24"
79"2
99"
ID
93"
& RACEWAYS)
(USE EXISTING WIRES
IN 1 1/2"C
4 #1 AWG, 1 #1G
NOTES , &
(208V/3 PHASE)
MDPN-5
TIME-DELAY FUSES)
SWITCH WITH 110 AMP RK5
HEAVY DUTY DISCONNECT
200 AMP, NEMA 3R
(120V/1 PHASE)
NPA-42
(NOTE )
IONIZATION SYSTEM DEVICES
NEEDLE POINT BIPOLAR
2 #12, 1 #12G IN 3/4"C FOR
SYSTEM DEVICES
NEW IONIZATION
8 9 10
:1 lo tt e frg-1701201-m005
2022-01-05T14:03:33-0500
SANDRA L PIETTRO
2022-01-06T12:34:49-0500
BRIAN A BISRAM
FRG-1701201-M006
ACU-2 ELEVATION AND
AIR FLOW DIAGRAM
SCALE: 1/2" = 1'-0"
5'1' 2'01'
OA
(165)
(40)
(250)
(3,640)
RA
(280)
(150)
(120)
ZONE 5
ZONE 4
ZONE 3
ZONE 2
ZONE 1
ZONE 6
(4,075)
SA
(125)(40) (400)
ZONE 7
ZONE 8
(180)(220) (220) (220)
(300)(300)
(220)
(1125)
(615)
(330)
(490)
(790)
(65)
(120)
DD-1
DD-2
DD-3
DD-4
DD-5
DD-6
DD-7
DD-8
(50)
4,075 MAX
435 MIN.
14 8
FC FC
CEILING
ROOF
12x14
& HOT)
(COLD
22x22 SA
12x14 SA (HOT)
12x20 SA (COLD)
TRAY ABOVE
DATA CABLE
18x40
DECK CONNECTIONS
TO ACU HOT/COLD
NEW TRANSITION
ACU-2 ELEVATION
SCALE: 1/2" = 1'-0"
ACU-2 AIR FLOW DIAGRAM
NOT TO SCALE (FOR REFERENCE & BALANCING)
WITH COR/RE.
PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE
NOTES.
REFER TO SHEET M001 FOR ABBREVIATIONS, SYMBOLS AND GENERAL
GENERAL SHEET NOTES:
ATTENUATOR
3' L SOUND
TO RA DUCT
NEW TRANSITION
INSTALLING NEW UNIT ON EXISTING DUNNAGE.
OF RUST AND PAINT WITH COLD GALVANIZING PAINT PRIOR TO
DETERIORATION ONCE OLD UNIT IS REMOVED. WIRE BRUSH AREAS
THE CONTRACTOR SHALL CHECK STEEL DUNNAGE FOR RUST AND
AND TIMES OF THE TRAINING.
COORDINATE WITH THE RE AND SSC REPRESENTATIVE AS TO THE DATES
ENABLE ALL SSC PERSONNEL TO ATTEND THE TRAINING. THE GC SHALL
HOURS AND THE SAME SHALL BE HELD ON TWO DIFFERENT DAYS TO
MANUFACTURER'S REPRESENTATIVE. TRAINING SHALL BE A MINIMUM OF 4
AND MAINTENANCE OF THE NEW UNIT FOR SSC PERSONNEL BY A QUALIFIED
GC SHALL COORDINATE AND ARRANGE FOR TRAINING ON THE OPERATION
THE NEW UNIT: ONE SET OF FLAME DETECTORS, ONE SET OF IGNITERS.
THE GC SHALL PROVIDE TO THE SSC THE FOLLOWING SPARE PARTS FOR
APPROVED BY RE.
SIZED AS PER NEC, FROM NEAREST ELECTRICAL PANEL AS
WIRING TO BE INSTALLED IN NEW RIGID GALVANIZED STEEL CONDUIT,
LIGHTS UP ON ROOF PLATFORM. LOCATION TO BE DETERMINED BY RE.
FURNISH AND INSTALL TWO NEMA 4 PLATFORM CONVENIENCE SAFETY
NEAREST ELECTRICAL PANEL AS APPROVED BY RE.
IN NEW RIGID GALVANIZED STEEL CONDUIT, SIZED AS PER NEC, FROM
LOCATION TO BE DETERMINED BY RE. WIRING TO BE INSTALLED
OUTDOOR WEATHERPROOF OUTLET BOXES UP ON ROOF PLATFORM.
FURNISH AND INSTALL TWO NEW GFCI CONVENIENCE OUTLETS IN
R-8 MINIMUM.
REPLACE INSULATION WITH NEW OUTDOOR RATED INSULATION,
8 TOTAL. DEFLECTION SHALL BE 2".
REPLACE SEISMIC SPRING TYPE VIBRATION ISOLATORS,
SA RA
K
.5
GRATING
NO
GRATING
NO
20GA GALV
33"30" 135"
PL8
30"
IFG2
33"
FAN1
54"
FAN2
48"
CN1
46"
PL11
24"
FILT2
9"
DX1
20GA GALV
36"
44.875"
8670 LBS
(1) 244"
FOR REFERENCE AND TAB PURPOSES ONLY DURING BALANCING
ACU-2 AIR FLOW DIAGRAM IS
lo tt e frg-1701201-m006
2022-01-05T13:53:55-0500
SANDRA L PIETTRO
2022-01-06T12:35:52-0500
BRIAN A BISRAM
FRG-1701201-M007
AND ENERGY COMPLIANCE
HVAC DETAILS
CLEANOUT PLUG
NIPPLE
TEE
DRAIN PAN
PITCH
NOTES:
3.
6.
5.
4.
UP TO FORM INITIAL DRAIN SEAL.
FILL TRAP MANUALLY PRIMED BEFORE START-
AND CONDENSATE OVERFLOW.
DRAIN LINES SUPPORTED TO PREVENT SAG
DISCHARGE TO APPROVED RECEPTACLE.
DRAIN PITCHED FOR PROPER RUN-OFF AND
SEE NOTE 1
DROP
SEE NOTE 2
LEG
BEND
RETURN
OF DRAIN PAN
BELOW LEVEL
DISCHARGE
(1-1/4" FPT MINIMUM)
DRAIN CONNECTION
ALLOWED FOR TRAP.
SUFFICIENT SPACE BELOW DRAIN PAN
AT FAN INLET.
X = NEGATIVE INTERVAL STATIC PRESSURE
X/2 + 1" = LEG FOR DRAW-THRU UNIT WHERE
Y = DISCHARGE PRESSURE OF FAN.
Y + 1" = LEG FOR BLOW-THRU UNIT WHERE
FITTINGS SHOWN EXCEEDS THIS MINIMUM.
1" MIN. DROP REQUIRED USE OF STANDARD
ACU-2 CONDENSATE DRAIN DETAIL
NOT TO SCALE
M007
GENERAL SHEET NOTES:
PROPOSED ACU-2 3D DETAIL
BIPOLAR IONIZATION
GAS CONNECTION TO EQUIPMENT DETAIL
(DRIP LEG)
6" TRAP
SUPPLY
FROM GAS
FROM GAS
CONTROLS
TO EQUIPMENT/
UNION
GROUND JOINT
COCK
GAS
TO THE APPLIANCE
THE GAS SUPPLY CONNECTION
BE INSTALLED UPSTREAM OF
TEST GAGE CONNECTION TO
TAPPING ACCESSIBLE FOR
WITH AN 1/8" N.P.T. PLUGGED
MANUAL SHUT-OFF VALVE
:2 lo tt e frg-1701201-m007
2022-01-05T14:18:53-0500
SANDRA L PIETTRO
2022-01-06T12:37:03-0500
BRIAN A BISRAM
FRG-1701201-M008
AND CONTROL DIAGRAM
HVAC DDCP POINT FUNCTION SCHEDULE
EA
N.C.
CD
N.O.
TS
AVE
AO DO
AI AIAIDI DI
DO
DI AI
AO
AI AI
AODO
DI
PART OF DIRECT DIGITAL CONTROL PANEL (DDCP)
DP
PDI
STARTER
MOTOR
SS
STARTER
MOTOR
AHU-2
AX
SS AX SS AX
2 STAGE
CONDENSOR
INTERLOCK
ELECTRIC
GAS FURNACE
MODULATING
SYSTEM
FIRE ALARM
TO
HOT DECK
COLD DECK
SYSTEM
ALARM
FIRE
TO
MIXING BOXES
DUAL DUCTS TO
GENERATOR START-UP.
SHUT DOWN OF ACU-2 UPON
IS STARTED. POINT CONTROLS
RELAY N.O. UNTIL ENGINE
THE ENGINE GENERATOR.
TO RUN RELAY IN HEAD OF
RF-1
ACU-2 CONTROL SCHEMATIC DIAGRAM
NOT TO SCALE BASE BUILDING - ACU-2
M008
LOCATION OF SPACE TEMPERATURE SENSORS.
SEE MECHANICAL FLOOR PLAN ON DRAWING M003 FOR1.
OPERATION.
SEE SPECIFICATION SECTION 15975 FOR SEQUENCE OF
EXISTING DDCP POINT FUNCTION SCHEDULE
IN
W
/C
ZONE SPACE TEMPERATURE
SUPPLY AIR TEMPERATURE
COLD DECK TEMPERATURE
HOT DECK TEMPERATURE
MIXED AIR TEMPERATURE
FILTER DIFFERENTIAL PRESSURE
RETURN AIR TEMPERATURE
RETURN FAN STATUS
SUPPLY FAN STATUS
SUPPLY FAN START-STOP
ROOFTOP AIR CONDITIONING UNIT ACU-2
XX
IL
IG
IT
I
IM
IC
D
IR
FAIL MODEHARDWAREPOINT DESCRIPTION
-D
-D
IZ
J
IR
Y
IZ
IE
NOTESGRAPHICSSOFTWARE
TYPICAL FOR (2)
XAXDX COOLING STATUS
SSDX COOLING CONTROL X
X X
X X X
ACU-2 EXISTING DDC POINT FUNCTION SCHEDULEA
M008
CONTROL NOTES:
ALARM ACTIVATION.
UNIT TO ENSURE IT WILL SHUT DOWN AS REQUIRED ON FIRE
ALARM SYSTEM. TEST FIRE ALARM SYSTEM WITH NEW HVAC
AS FOLLOWS: CONNECT NEW HVAC SYSTEM TO EXISTING FIRE
ON FAA AS-BUILT DRAWINGS DATED 04/10/2000.
CONTROL DIAGRAMS SHOW EXISTING DEVICES. THIS IS BASED
ON DWG. D003.
ACU-2 ARE EXISTING AND SHALL BE REUSED. REFER TO NOTE 6
WITH A NEW JOHNSON CONTROLS SYSTEM. ALL POINTS FOR
THE FACILITY'S DDC SYSTEM WAS REPLACED 5-6 YEARS AGO
BP
DI DI
BP
BIPOLAR IONIZATION STATUS BP X TYPICAL FOR (2)
LEGEND:
EXISTING DDC POINT
NEW DDC POINT
:3 lo tt e frg-1701201-m008
2022-01-05T14:22:43-0500
SANDRA L PIETTRO
2022-01-06T12:38:23-0500
BRIAN A BISRAM
SITE LAYOUT PLAN
NYREPUBLIC AIRPORTFARMINGDALE
PROJECT ENGINEER MGR: CONSTRUCTION - NEW YORK
FRG-1701201-C001
-c
78'-0"
10'-0" 4' 16'-0"
CONC. CURB
EXIST.
FAA SECURITY CHAINLINK FENCE
LEGEND:
PIVOT LIFTING GATE
EXISTING 13'-0" VERTICAL
PIVOT LIFTING GATE
EXISTING VERTICAL
DOUBLE SWING GATE
EXISTING MANUAL 22'-0"
ADMINISTRATIVE
CONCRETE WALKWAY
CHAIN LINK FENCE
-W
-W
STORAGE, AND VEHICLE PARKING
CONTRACTOR STAGING, MATERIAL
PROPOSED DESIGNATED AREA FOR
SCALE: 1" = 20'
20' 40'020'
SITE LAYOUT PLAN
SCALE: 1" = 20'-0"
-c
:5 lo tt e frg-1701201-c001
2022-01-05T13:45:52-0500
SANDRA L PIETTRO
2022-01-06T12:18:04-0500
BRIAN A BISRAM
FRG-1701201-D001
-d
GROUND FLOOR PLAN
HVAC DEMOLITION - EXISTING BASE BUILDING
TS TSHS HS
TS TS
34x14 24x14 x
300 CFM
40 CFM
165 CFM
280 CFM
120 CFM
525 CFM EA.
REGISTERS
(2)8"X18" SUPPLY
615 CFM
1125 CFM
330 CFM
490 CFM
790 CFM
TO ACU-2
NEW 40x18 RA UP
165 CFM EA.
250 CFM
12x8 TR
ACU-2 HOT DECK
22x22 SA UP TO
12x8 x
6x4
CAC-1B
34x18 x x x x x x
14x8 14x8 x x
10x8
12x6
200 CFM 200 CFM OVERALL
8'L x 6"W x 10"H PLENUM,
(1) 1/2" SLOT, 25 CFM/L.FT.,
8'L LINEAR DIFFUSER -
10x10
10x6
125 CFM
12x10
8x6
18x8
W/WMS
END DUCT
46x20 OPEN
34x20 RA OPEN
34x20
46x20
16x8
A B
10x10 UP TO
ABOVE CEILING (TYPICAL)
RA TRANSFER DUCT W/FD
24x22
CAC-1A
40x22
UH-4
UH
FD/AD
FD/AD FD/AD
TO CAC-1B
1-1/8"RD DROP
5/8"RL AND
TO CAC-1A
EQ. SPLIT
M M
3 WAY
65 CFM
2-WAY
50 CFM
FD
DDC
60 CFM
6x6 CR
80 CFM
70 CFM
10x4
14x121 x
MATCHLINE
ACP
PREVENTER
BACKFLOW
RPZ TYPE
4"VTR
22X10
TELCO
GENERATOR ROOM
ENGINE
EQUIPMENT
STORAGE
TRAINING
CONFERENCE
MECHANICAL
EPDS
CHIEF
SECRETARY
OFFICE
CORRIDOR
AF
WOMEN
JANITOR
CLOSET
MEN
LOCKER
BREAK
COMPUTER
BMS FRONT-END
DUCT
12x6 TRANSFER
ABOVE CEILING
CABLE TRAY
SPIGOT
EXTERIOR
DOWN TO
DEMOLITION NOTES:
INSTALLATION OF THE NEW WORK.
DEVIATIONS IN DUCTWORK INDICATED PRIOR TO THE
NEW HVAC SYSTEM. NOTIFY RE OF ANY SIGNIFICANT
CLEAN ALL DUCTWORK THEN RE-BALANCE AND TEST
TO INSTALLATION OF NEW GRILLES AND DIFFUSERS,
CEILINGS AND HAS NOT BEEN FIELD VERIFIED. PRIOR
EXISTING DUCT LAYOUT SHOWN IS ABOVE THE DROP
REMOVE LINEAR SUPPLY SLOT DIFFUSER.
DEMOLISH CEILING RETURN.
DEMOLISH CEILING SUPPLY DIFFUSER.
OTHERWISE NOTED)
(TYPICAL UNLESS
24x24 CG
ACTUATOR
LF24S SPRING RETURN
INTAKE DAMPER W/ BELIMO
24"X72" COMBUSTION AIR
600 CFM EA.
(6)8"X18"
DECK
ACU-2 COLD
ON ROOF
CCU-1A & CCU-1B
(2)1-1/8"RD UP TO
(2)5/8"RL UP
EXISTING BASE PLAN
DUCTS
TRANSFER
FOR CAC UNITS
AND HUMIDITY SENSORS
ROOM TEMPERATURE
AND STORAGE RM.
INTO 4" VTR IN WALL B/T MECH. RM
PREVENTER DRAIN LINES EMPTY
CAC-1A/B AND RPZ BACKFLOW
SUPPLY TRUNK
TO 22X10 LINK
EF-1 ON ROOF
SPRING RETURN ACTUATOR
EX. FAN W/ BELIMO LF24S
INTAKE DAMPER FOR E/G ROOM
12"X12" MOTORIZED FRESH AIR
COORDINATE WITH RE.
(TYPICAL)
1 (TYPICAL)
2 (TYPICAL)
DEMOLITION WORK
:3 lo tt e frg-1701201-d001
2022-01-05T13:40:24-0500
SANDRA L PIETTRO
2022-01-06T12:22:00-0500
BRIAN A BISRAM
FRG-1701201-D002
PART PLANS
HVAC DEMOLITION - LINK AND TOWER
lo tt e
20x8
14x8 8x8
14x8EH
FER
T
STAIR
UP
G05G01.2
PUMP
TOWER
G01
LOBBY
LI
E
LE
TOWER LINK PLAN
EXISTING GROUND LEVEL PLAN
SCALE: 1/4" = 1'-0" ELEV. 0'-0"
DEMOLITION NOTE:
PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE WITH RE.
REFER TO SHEET M001 FOR ABBREVIATIONS, SYMBOLS AND GENERAL NOTES.
INDICATED PRIOR TO THE INSTALLATION OF NEW WORK.
NOTIFY COTR OF ANY SIGNIFICATION DEVIATIONS IN DUCTWORK
DUCTWORK CLEANING AND RE-BALANCING OF HVAC SYSTEM,
VERIFIED. UPON DEMOLITION OF DIFFUSERS, GRILLES,
IS BASED ON AS-BUILT DRAWINGS AND HAS NOT BEEN FIELD
EXISTING DUCT LAYOUT SHOWN ABOVE ALL DROP CEILINGS
DEMOLISH CEILING SUPPLY DIFFUSER.
CABLE CHASE
DEMOLITION WORK
frg-1701201-d002
2022-01-05T13:28:25-0500
SANDRA L PIETTRO
2022-01-06T12:24:52-0500
BRIAN A BISRAM
FRG-1701201-D003
BASE BUILDING ROOF PLAN
HVAC DEMOLITION
CCU-1B
CCU-1A
DUNNAGE FRAMING
MOUNTED ON STEEL
CONDENSING UNITS
EF-1
EXISTING ROOF PLAN
EMAIL: MORECONTRACTING@OPTONLINE.NET
FAX: (631) 924-5514
TEL: (631) 924-1414
PORT JEFFERSON STATION, NY 11776
19 BERGER PLACE
MORE CONTRACTING & CONSULTING, INC.
ANY ROOF RELATED WORK AFFECTED BY THIS CONTRACT. GC SHALL CONTACT:
THIS ROOF MUST BE PROTECTED AT ALL TIMES TO MAINTAIN ITS WARRANTY. FOR
PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE WITH RE.
REFER TO SHEET M001 FOR ABBREVIATIONS, SYMBOLS AND GENERAL NOTES.
ACU-2 AND INTERLOCK WITH FACP AND SHUTDOWN OF UNIT.
EXISTING DUCT SMOKE DETECTORS AND WIRING SHALL REMAIN FOR NEW
TO EXISTING DDC PANEL.
PRIOR TO REMOVAL AND HAVE THEM TAGGED FOR FUTURE CONNECTION
DISCONNECT AND KEEP ALL CONTROL WIRING ASSOCIATED WITH ACU-2
SEAMS SHALL BE RESEALED PRIOR TO NEW INSULATION INSTALLATION.
LEAKAGE INTO DUCTWORK AFTER INSULATION IS REMOVED. ALL JOINTS AND
EXPOSED ABOVE ROOF. CONTRACTOR SHALL VERIFY THERE IS NO WATER
DEMOLISH AND REMOVE SUPPLY AND RETURN AIR DUCTWORK INSULATION
REMAIN FOR NEW UNIT.
EXISTING SUPPLY AND RETURN AIR DUCTWORK CONNECTIONS/TIE-IN SHALL
EXISTING 1.5”GAS SERVICE CONNECTION SHALL REMAIN FOR NEW UNIT.
UNIT.
EXISTING DUNNAGE STEEL AND SERVICE PLATFORM SHALL REMAIN FOR NEW
ENTIRETY.
DEMOLISH AND REMOVE EXISTING PACKAGED ROOF-TOP UNIT (ACU-2) IN ITS
DEMOLITION NOTES:
ONE DAY AFTER ITS USE.
BE USED. THE CRANE SHALL BE REMOVED FROM THE SITE NO MORE THAN
CRANE SHALL NOT BE BROUGHT ON SITE UNTIL THE DAY BEFORE IT IS TO
THERE IS LIMITED SPACE AVAILABLE FOR THE STAGING OF THE CRANE. THE
WITH THE NEW ACU-2.
STORED ON A FLATBED TRUCK ON SITE, SHOULD THERE BE ANY ISSUES
REMOVING THE OLD ACU-2 FROM THE SITE COMPLETELY. IT SHALL BE
THE NEW ACU-2 SHALL REMAIN OPERATIONAL FOR 48 HOURS PRIOR TO
CRANE SHALL BE MARKED/LIGHTED IN ACCORDANCE WITH FAA AC 70/7460-1.
FILING OF 7460 MINIMUM OF 90 DAYS BEFORE CRANE WILL BE MOBILIZED.
CONTRACTOR SHALL PROVIDE RE WITH CRANE HEIGHT AND LOCATION FOR
THE PRE-CONSTRUCTION MEETING.
C001 FOR PROPOSED LOCATION. FINAL LOCATION SHALL BE DETERMINED AT
OPERATIONS AS DETERMINED AND APPROVED BY THE SSC AND AT. REFER TO
A STAGING AREA SHALL BE PROVIDED FOR THE GC FOR THE CRANE RIGGING
DATE/TIME FOR THE CRANE WORK TO OCCUR.
WITH THE LOCAL SSC AND AT REPRESENTATIVES TO DETERMINE THE BEST
THE CRANE ACTIVITIES ARE EXPECTED TO START. THE RE WILL COORDINATE
THE GC SHALL PROVIDE A MINIMUM OF TWO WEEKS PRIOR NOTICE OF WHEN
WITHIN 5 HOURS.
TO MINIMIZE DOWNTIME. THE UNIT MUST BE RIGGED AND OPERATIONAL
ALL PREP WORK SHALL BE COMPLETED PRIOR TO THE REMOVAL OF ACU-2
IN THEIR BID PRICE.
YEAR THE WORK IS OCCURRING. THE GC SHALL INCLUDE THIS POSSIBILTY
DURING DAY TIME OR OVER NIGHT HOURS DEPENDING UPON THE TIME OF
WORK MAY BE REQUIRED TO BE DONE ON A WEEKDAY OR WEEKEND AND
THE FRG ATCT IS CLOSED FROM 11:00PM TO 7:00AM, DAILY. THE CRANE
REQUIRED TO BE DONE DURING A PERIOD OF LEAST AIRCRAFT ACTIVITY.
BUILDING ROOF IS DEPENDENT ON AIR TRAFFIC AT THE FACILITY AND IS
THE CRANE ERECTION, RIGGING AND REMOVAL OF ACU-2 FROM THE BASE
7.
6.
5.
4.
DEMOLITION STAGING NOTES:
lo tt e frg-1701201-d003
2022-01-05T13:32:25-0500
SANDRA L PIETTRO
2022-01-06T12:26:08-0500
BRIAN A BISRAM
FRG-1701201-G001
-g
COVER SHEET AND DRAWING INDEX
T OF TRANSPO
T A
OF
STATES
TM
EN
AVIA
TRAT
SI
NI
FARMINGDALE, NEW YORK
REPUBLIC AIRPORT
DRAWING INDEX
DRAWING NO. DRAWING TITLE
GENERAL
FRG-1701201-G001 COVER SHEET AND DRAWING INDEX
DEMOLITION
FRG-1701201-D003
FRG-1701201-D002
FRG-1701201-D001
HVAC DEMOLITION - BASE BUILDING ROOF PLAN
HVAC DEMOLITION - LINK AND TOWER PART PLANS
HVAC DEMOLITION - EXISTING BASE BUILDING GROUND FLOOR PLAN
FRG-1701201-M008
FRG-1701201-M007
FRG-1701201-M006
FRG-1701201-M005
FRG-1701201-M004
FRG-1701201-M003
FRG-1701201-M002
FRG-1701201-M001
HVAC DDCP POINT FUNCTION SCHEDULE AND CONTROL DIAGRAM
HVAC - DETAILS AND ENERGY COMPLIANCE
ACU-2 ELEVATION AND AIR FLOW DIAGRAM
HVAC BASE BUILDING ROOF PLAN
HVAC - LINK AND TOWER PART PLANS
HVAC BASE BUILDING GROUND FLOOR PLAN
HVAC EQUIPMENT SCHEDULES
HVAC LEGEND, SYMBOLS AND ABBREVIATIONS
VICINITY SKETCH
BUILDING
BASE
CIVIL
FRG-1701201-C001 SITE LAYOUT PLAN
-g lo tt e frg-1701201-g001
2022-01-05T13:18:33-0500
SANDRA L PIETTRO
2022-01-06T12:27:52-0500
BRIAN A BISRAM
FRG-1701201-M001
HVAC LEGEND, SYMBOLS AND ABBREVIATIONS
CONSTRUCTION STAGING PLAN NOTES
DAMAGE INCLUDING BUT NOT LIMITED TO DAMAGE CAUSE BY IMPACT, WATER, DEBRIS AND DUST.
G1. PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING FROM
G. EQUIPMENT PROTECTION
LEADING TO THE CAB FROM 6:00AM TO 11:00PM.
OF ANY WORKERS, BUILDING MATERIALS, CONSTRUCTION DEBRIS, ETC.) TO THE STAIRWELL
MUST BE PROVIDED, AND FAA STAFF MUST HAVE UNOBSTRUCTED ACCESS (FREE AND CLEAR
F1. A CLEAR PATH FROM TEMPORARY PARKING AREAS TO THE BUILDING ENTRANCE DOOR
F. FACILITY ACCESS FOR FAA STAFF
ANY DUST CREATED DURING DEMOLITION/CONSTRUCTION WORK AROUND FAA EQUIPMENT.
E3. TEMPORARY PARTITIONS OR OTHER APPROVED METHODS SHALL BE USED TO CAPTURE
CONSTRUCTION ACTIVITIES.
SAFELY. ALL DEBRIS SHALL BE REMOVED AND AREA CLEAN OF DUST CREATED FROM
DEMOLITION WORK WILL BE COMPLETED DAILY TO A STAGE WHICH LEAVES THE AREA
THIS FACILITY. WORK SCHEDULES WILL BE COORDINATED WITH THE FAA RE DAILY. ANY
E2. FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT
6:00AM AND 11:00PM.
DEMOLITION AND CONSTRUCTION NOISE SHALL BE MINIMIZED BETWEEN THE HOURS OF
E1. AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY SHALL NOT BE INTERFERED WITH.
E. WORK HOURS
FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DUMPSTER MUST BE COVERED.
AND PLACED IN THE DUMPSTER. THE AREA AROUND THE DUMPSTER SHALL BE KEPT CLEAN AND
CONSTRUCTION AREA. CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE FACILITY DAILY
D1. A DUMPSTER FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED WITHIN THE
D. CONSTRUCTION DEBRIS
NOTIFY COTR IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL SERVICES.
BUT NOT LIMITED TO DISRUPTION OF POWER TO UNITS SHALL BE PROVIDED AT ALL TIMES.
OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS,
DURATION OF THIS CONTRACT. CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL
C3. EXISTING FAA AIR TRAFFIC EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT THE
COORDINATED WITH COTR. DISRUPTION OF THIS FACILITY SHALL NOT BE PERMITTED.
C2. EXERCISE GREAT CARE AND CAUTION WHILE WORKING IN THIS FACILITY. WORK SHALL BE
CONSTRUCTION AREA.
C1. THE SITE IS A SECURED AREA AND ALL WORKERS MUST STAY WITHIN THE DESIGNATED
C. FAA SECURITY REQUIREMENTS
THEN BROUGHT TO THE FACILITY.
TAKEN TO UNLOAD AND STAGE MATERIALS IN THE CONSTRUCTION STAGING AREA AND
VEHICLES. DUE TO THE SPACE LIMITATIONS AROUND THE BUILDING, EFFORTS SHALL BE
RE . PARKING IS LIMITED AND EFFORTS SHALL BE TAKEN TO MINIMIZE THE NUMBER OF
B1. PARKING SHALL BE LIMITED TO CONSTRUCTION STAGING AREA AS DESIGNATED BY THE
B. CONTRACTOR PARKING AND MATERIAL STORAGE
FOR ACCESS TO THE FAA SITE.
A1. VEHICLES, PEDESTRIANS AND DELIVERIES SHALL CONTACT AND COORDINATE WITH RE
A. CONSTRUCTION ACCESS
BE COORDINATED WITH FAA RE.
CONSTRUCTION ACCESS, PARKING AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA SHALL
AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS.
REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS
THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL
REFRIGERANT HOT GASRHGRHG
ANCHOR
FLUID FLOW DIRECTION
PIPE TURNING UP
PIPE TURNING DOWN
PLUGGED PIPE/OUTLET
CONCENTRIC REDUCER
ECCENTRIC REDUCER
CAPPED PIPE/OUTLET
GATE VALVE
ANGLE VALVE
GLOBE VALVE
CHECK VALVE
BALL VALVE
UNION
FLOOR DRAIN
CW DOMESTIC COLD WATER
BV
GV
AV
GLV
CV
SIZE TYPE
ALIGNMENT GUIDE
EXPANSION JOINT
FLEXIBLE PIPE CONNECTOR
VALVE AND BLIND FLANGE
PIPE HEADER WITH BLIND FLANGE
SIGHT GLASS
FLOW METER
STRAP-ON SENSOR
SOLENOID VALVE
STRAINER WITH BLOWDOWN VALVE
FILTER
LOUVER
BACKDRAFT DAMPER
HEATING COIL
MOTORIZED OPPOSED
BLADE DAMPER
FIRE/SMOKE DAMPER
HUMIDIFIER
AI
DIGITAL OUTPUT FROM DDCP
ANALOG INPUT TO DDCP
ANALOG OUTPUT FROM DDCPAO
UNIT HEATER
FAN
FAN STARTER
S AIR FLOW MEASURING
STATION/STATIC PRESSURE
MEASURING STATION
MOTORIZED PARALLEL
BLADE DAMPER
ED
DC
AX AUXILIARY CONTACT
START STOP CONTROL
ENABLE DISABLE CONTROL
DRY CONTACT
CI CONTROL INTERFACE
RC
SPA
RELAY CONTROL
SET POINT ADJUSTMENT
(OR CONTROL POINT ADJUSTMENT)
BUTTERFLY VALVEBFV
D D CONDENSATE DRAIN
FAN WITH VARIABLE
FREQ. MOTOR CONTROLLER
PRESSURE GAUGEPI
X DDCP DATA INPUT/OUTPUT TO
MICROPROCESSOR CONTROLLERS
MC MICROPROCESSOR CONTROLLER
DIRECT EXPANSION
COOLING COIL
DIGITAL INPUT TO DDCP
RS
RL
REFRIGERANT SUCTION
REFRIGERANT LIQUID
HUMIDIFIER CONTROL OVERRIDE TOGGLE SWITCHHC
DUCT STATIC PRESSURE SENSORSPS
CRAC
CFM
WMS
VAV
TR
TAB
SST
SSC
SDT
RTU
RG
RD
LD
HVAC
GC
FC
EF
CU
CG
AT
ACC
AC
TO EXISTING
POINT OF CONNECTION
SYMBOL
NUMBER
EQUIPMENT DESIGNATION
SINGLE LINE DUCTWORK INSTRUMENTATION
ABBREVATIONS
PIPING
SYMBOL ABBREVIATION DESCRIPTION
MECHANICAL GENERAL NOTES
FIRE DAMPER
EQUIPMENT TO REMAIN
SINGLE DUCTWORK OR
EQUIPMENT TO BE REMOVED
EXISTING DUCTWORK OR
LINING
DUCTWORK WITH ACOUSTICAL
NEW DUCTWORK OR EQUIPMENT
POINT OF DISCONNECTION
RESIDENT ENGINEERRE
ADMINISTRATIVE
COTR
REPRESENTATIVE
CONTRACTING OFFICER'S TECHNICAL
AHU
1A
INSULATION THICKNESS.
WITH INTERNAL INSULATION, INCREASE SHEET METAL DIMENSIONS TO ALLOW FOR
DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. FOR DUCTWORK
THROWAWAY FILTERS.
PROVIDE ONE SET OF REPLACEMENT FILTERS FOR ALL EQUIPMENT FURNISHED WITH
PROVIDE ONE SET OF SPARE BELTS FOR ALL BELT DRIVEN EQUIPMENT.
ALL UNIT COMPRESSORS SHALL INCLUDE AN EXTENDED 5 YEARS WARRANTY.
EQUIPMENT SUPPLIED.
CONTRACTOR'S WARRANTY ON INSTALLATION, AND MANUFACTURER'S WARRANTIES ON
FURNISHED, A LIST OF EQUIPMENT SUPPLIERS, COPIES OF SERVICE CONTRACTS,
AND MAINTENANCE MANUAL INCLUDING MANUFACTURER'S MANUALS FOR ALL EQUIPMENT
AT PROJECT CLOSE OUT, THE CONTRACTOR SHALL FORWARD AN OWNER'S OPERATING
PROMPTLY REPAIRED.
SETTLEMENTS OF SURFACES THAT MAY OCCUR WITHIN THAT PERIOD SHALL ALSO BE
FAILURES OR WEAR DUE TO FAULTY MATERIALS, WORKMANSHIP OR EQUIPMENT. ALL
SHALL, AT HIS OWN EXPENSE, PROMPTLY CORRECT AND REPAIR ANY AND ALL BREAKS,
FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK TO THE OWNER. THE CONTRACTOR
WARRANTED BY THE CONTRACTOR FOR MECHANICAL WORK FOR A PERIOD OF ONE YEAR
EQUIPMENT, MATERIALS AND WORKMANSHIP OF THE MECHANICAL INSTALLATION SHALL BE
OWNER FOR RECORD.
COPIES OF ALL PERMITS AND INSPECTION CERTIFICATES SHALL BE FORWARDED TO THE
OBTAIN ALL PERMITS, PAY ALL PERMIT FEES, AND SCHEDULE ALL REQUIRED INSPECTIONS.
INSTALLATION SHOWN OR DESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS.
PROVIDE ALL MATERIAL, TOOLS, SUPERVISION, AND LABOR REQUIRED FOR THE MECHANICAL
CLEAN AIR ACT OF 1990 AND ALL APPROPRIATE REGULATORY AGENCIES.
WILL INCLUDE THE PROPER RECOVERY OF ALL REFRIGERANT IN ACCORDANCE WITH THE
THE DEMOLITION OF ANY EXISTING EQUIPMENT OR PIPING WHICH CONTAINS REFRIGERANT
SLAB OR WALL.
COMING INTO THE SPACE. THESE ITEMS SHALL BE CAPPED OFF WITHIN THE EXISTING
THE CONTRACTOR SHALL REMOVE, RE-ROUTE, AND/OR CAP OFF ALL UNUSED UTILITIES
COMPANY, THE OWNER, OR OTHER AGENCY INVOLVED.
OR PROTECTING SAME, IN ACCORDANCE WITH THE REQUIREMENTS OF THE UTILITY
AT THE SITE AND DETERMINE METHODS FOR DISCONNECTING, CAPPING, REMOVING,
PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL REVIEW EXISTING UTILITIES
CONSTRUCTION.
EXISTING FLOORING, WALLS, CEILINGS, AND FINISHES DURING DEMOLITION AND
MAKE ALL REPAIRS AND REPLACEMENTS NECESSARY. COVER AND PROTECT ALL
OBJECTS DESIGNATED TO REMAIN, AND IN THE EVENT OF DAMAGE, IMMEDIATELY
THE CONTRACTOR SHALL USE ALL MEANS NECESSARY TO PROTECT EXISTING
DISCREPANCIES OR QUESTIONABLE ITEMS.
OBJECTS TO BE REMOVED AND PRESERVED, AND REPORT TO THE ENGINEER ANY
BEFORE COMMENCING WORK, THE CONTRACTOR MUST VERIFY AT THE SITE ALL
THE DRAWINGS DO NOT PURPORT TO SHOW ALL OBJECTS EXISTING AT THE SITE.
THE OWNER.
CORRESPONDING HARDWARE REMOVED DURING CONSTRUCTION TO BE RETAINED BY
CONTRACTOR SHALL COORDINATE WITH THE OWNER ANY HVAC EQUIPMENT AND
DURING DEMOLITION.
ACCUMULATE. THE PREMISES SHALL BE KEPT AS CLEAN AND EMPTY AS POSSIBLE
CONTRACTOR WILL NOT BE ALLOWED TO LET RUBBISH AND ITEMS TO BE REMOVED
PIPING, WIRING, ETC. WHICH IS NOT TO BE REUSED WILL NOT BE PERMITTED.
REUSED AND WILL BECOME OBSOLETE. ABANDONING OF EQUIPMENT, DUCTWORK,
DUCTWORK, WIRING, ETC. WHICH IS DESIGNATED TO BE REMOVED, OR IS NOT TO BE
REMOVE, AND DISPOSE OF IN A LEGAL MANNER ALL EXISTING HVAC EQUIPMENT, PIPING,
UNLESS OTHERWISE DIRECTED BY THE OWNER, THE CONTRACTOR SHALL DISCONNECT,
RATED ASSEMBLY.
ASSEMBLIES. RATING OF SEALANT SHALL BE EQUAL TO OR EXCEED RATING OF FIRE
PROVIDE UL FIRE RATED SEALANT AT PIPE PENETRATIONS THROUGH FIRE RATED
TECHNICAL REPRESENTATIVE (RE) FOR APPROVAL, PRIOR TO INSTALLATION.
SPECIFIC EQUIPMENT. RESUBMIT PROPOSED EQUIPMENT TO CONTRACTING OFFICER'S
CLEARANCES AND CONFIGURATION AS COMPARED TO SPACE ALLOCATED TO HOUSE
VERIFICATION OF CONFORMANCE PER THE REQUIREMENTS OF LOCATION, SIZE
OF SUCH EQUIPMENT MANUFACTURERS WILL REQUIRE THE CONTRACTORS PRIOR
BASED ON SPECIFIC SCHEDULED MANUFACTURERS AND MODEL NUMBERS. SUBSTITUTION
LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT SHOWN ARE
INSTRUCTIONS.
EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND
AT 30 FEET ABOVE SEA LEVEL.
AIR FLOW QUANTITIES SHOWN ON THE DRAWINGS ARE ACTUAL FLOW QUANTITIES
SHALL NOT BE USED AS A GROUND.
METAL TO BE WELDED TO A GOOD EARTH GROUND. FACILITY STRUCTURAL STEEL
NO WELDING SHALL BE POWERED FROM FACILITY ELECTRICAL SYSTEM. CONNECT
HYGIENISTS.
AND CONFORMING TO THE AMERICAN CONFERENCE OF GOVERNMENT INDUSTRIAL
MECHANICAL VENTILATION DURING WELDING DUCTED TO OUTSIDE, APPROVED BY FAA
FOR WELDING THAT MUST BE PERFORMED INSIDE THE BUILDING, PROVIDE LOCAL
LOCATION TO BE DETERMINED BY RE.
WRITING WITH COTR AND SHALL BE PERFORMED OUTSIDE OF FACILITY OR IN SAFE
FIRE EXTINGUISHERS DURING CONSTRUCTION. WELDING SHALL BE SCHEDULED IN
STANDARDS FOR WELDING IN 29 CFR-1910 AND 29 CFR-1926. PROVIDE TEMPORARY
BE SAME INDIVIDUAL THAT IS PERFORMING WELDING OPERATIONS. COMPLY WITH OSHA
AND CUTTING OPERATIONS. PERSON PERFORMING FIRE PROTECTION DUTIES SHALL NOT
DESIGNATE A PERSON TO BE RESPONSIBLE FOR FIRE PROTECTION DURING WELDING
ADEQUATE CLEARANCES FOR DIRECT ACCESS.
FILTERS, AND OTHER DEVICES. ACCESS DOORS SHALL BE INSTALLED TO PROVIDE
INSTALLATION SHALL PROVIDE READY ACCESS TO VALVES, DAMPERS, COILS AND
PROJECT.
DESIGN. NOT ALL SYMBOLS AND ABBREVIATIONS SHOWN MAY BE USED ON THIS
HVAC LEGEND IS THE STANDARD LEGEND WHICH IS USED FOR FAA FACILITIES
Z.
Y.
X.
W.
V.
U.
T.
S.
R.
Q.
P.
N.
M.
L.
K.
J.
I.
H.
G.
F.
E.
D.
C.
B.
A.
SD
PDI
PD
N.O.
HS
HOA
FZ
CO
BO
BI
AUTO
TEMPERATURE SENSOR
THERMOSTAT
DUCT SMOKE DETECTOR
DIFFERENTIAL PRESSURE INDICATOR
DIFFERENTIAL PRESSURE SENSOR
NORMALLY OPEN
NORMALLY CLOSED
MOTOR/ACTUATOR
HUMIDITY SENSOR
HUMIDISTAT
HAND-OFF-AUTO
FREEZESTAT
DIFFERENTIAL PRESSURE SWITCH
DAMPER POSITION INDICATOR
CARBON DIOXIDE SENSOR
CONTROL DAMPER
BINARY OUTPUT
BINARY INPUT
AUTOMATIC MODE
AIR FLOW SENSOR
EXISTING FIRE DAMPER
NEW FIRE DAMPER
COMPUTER ROOM AIR CONDITIONING UNIT
CUBIC FEET PER MINUTE
WIRE MESH SCREEN
VARIABLE AIR VOLUME
UNIT HEATER
TOP REGISTER
TESTING, ADJUSTING & BALANCING
SATURATED SUCTION TEMPERATURE
SYSTEM SUPPORT CENTER
SATURATED DISCHARGE TEMPERATURE
SUPPLY AIR
ROOF TOP UNIT
REFRIGERANT SUCTION
REFRIGERANT LIQUID
RETURN GRILLE
RELIEF DAMPER
RETURN AIR
OUTDOOR AIR
MOTORIZED DAMPER
LEAK DETECTOR
HEATING, VENTILATION AND AIR CONDITIONING
HUMIDIFIER
GENERAL CONTRACTOR
FLEXIBLE CONNECTION
EXHAUST FAN
DIRECT DIRECT CONTROLS
CONDENSING UNIT
CEILING GRILLE
CEILING DIFFUSERS
AIR TRAFFIC
AIR COOLED CONDENSING UNIT (OUTDOOR)
AIR CONDITIONING UNIT
lo tt e frg-1701201-m001
2022-01-05T13:42:11-0500
SANDRA L PIETTRO
2022-01-06T12:30:12-0500
BRIAN A BISRAM
FRG-1701201-M002
HVAC EQUIPMENT SCHEDULES
OFFICE 104DD-4
DD-2 CONFERENCE/TRAINING ROOM
OFFICE 105DD-1
OFFICE 102
OFFICE 109/AF
LOCATION SERVED
ANEMOSTAT DU-1A
TOWER LINK
BREAK/LOCKER ROOM
RECEPTION
HOTCOLD
165 125
590790
280 210
370490
280 210
250330
1125 1125
615615 8
COLD HOT
INLET DIA. (IN.)
<15
1.5" PMIN. P
DISCHARGE NC RADIATED NC
MIN. P
ANEMOSTAT DU-1C
ANEMOSTAT DU-1B
ANEMOSTAT DU-1B
ANEMOSTAT DU-1D
MAX.
<15 <15
NEW AIR OUTLET SCHEDULE
AS NOTED
22x22 501-1000 24x24
AS NOTED
55 CFM/L.FT.
NECK SIZETYPE CFM RANGE
SAC3LD<20 <0.1
S2VO<20 <0.1
X3HOD<20 <0.1
SLAD-FS-100VERTICAL <30 <0.1
DIRECTION NC MANUFACTURER MODEL
AS NOTED AS NOTED
375 - 500 24x24
250 - 375 24x24
150 - 250 24x24
80 - 150 24x24
<25
(NOTE 5) <0.1
(NOTE 5) <25 <0.1 ANEMOSTAT
EXISTING DUAL DUCT TERMINAL UNIT SCHEDULE
JOB NO.
NEW PACKAGED ROOFTOP AIR CONDITIONING UNIT SCHEDULE - GAS HEAT/ELECTRIC COOL
PLENUM
LOCATION
4000ACU-2
TYPEMHPRPM
SERVICE
SUPPLY FAN DATA
208/3/60
MANUFACTURER/MODEL
FLAV/PH/HZ
ELECTRICAL DATA
TOTAL
CAPACITY (MBH)
AIR DATA FOR DX COOLING COIL HEATING - NATURAL GAS
FLAT
TYPE
30%
INIT. FIN.
0.1 0.4
RETURN FAN DATA
MCA MOP
UNIT
(IN. WG)
E.S.P.
2.36 3.01,642
SENSIBLE
ROWS
NO.
6 10
F.P.I.
NO.
(SQ.FT.)
AREA
FACE
11.4 384
(FPM)
VEL.
FACE
0.47
(IN. W.G.)
DROP
PRESS
(IN.)
SP
0.12 56
EAT LAT
INPUT
(MBH)
CAPACITY
OUTPUT
(MBH)
CAPACITY
(IN. W.G)
PRESS.
GAS
STEPS
NO. OF
MODULATING
ROOF
BUILDING
BASE
MIN.
PLENUM
TYPEMHPRPM
E.S.P.
0.63 1.0978 80.9
EDB
65.5
EWB
53.8
LDB
53.2
LWB
52.1-1992
ASHRAE
EFF.
MIN AVG
FILTER DATA***
PD
OUTDOOR AIR CONDITIONS:
UNIT
.5" P
.5" P 1.5" P
MAKE MODEL
SUPPLY DIFFUSER
LINEAR DIFFUSER
LD
SUPPLY REGISTER
TR
RET/EXH REGISTER
CR
RETURN GRILLE
CG
FACE SIZE
DEFLECTION
DOUBLE
PRESSURE
STATIC
ANEMOSTAT
EPL
NOTES:
4. DIFFUSER WITH 4-WAY BLOW UNLESS OTHERWISE NOTED. FACTORY-INSTALLED BLANK-OFF PLATES PROVIDED WHERE REQ'D.
3. FRAME PROVIDED TO MATCH CEILING/WALL CONSTRUCTION.
2. DIFFUSERS CONSTRUCTED OF ALUMINUM, SUPPLIED WHITE PRIME FINISH, BLACK ANODIZED IN CAB CEILING.
1. DIFFUSERS SUPPLIED WITH OPPOSED BLADE DAMPERS.
119.3150.2 313.2 250.6 5-13.5 86 92
BUILD UNIT
MAMMOTH CUSTOM
FOR REFERENCE AND TAB PURPOSES.1
ZM335-10-02
lo tt e lo tt e frg-1701201-m002
2022-01-05T13:43:41-0500
SANDRA L PIETTRO
2022-01-06T12:31:26-0500
BRIAN A BISRAM
FRG-1701201-M003
HVAC BASE BUILDING GROUND FLOOR PLAN
TS TSHS HS
TS TS
34x14 24x14 x
165 CFM
615 CFM
1125 CFM
330 CFM
490 CFM
790 CFM
TO ACU-2
NEW 40x18 RA UP
165 CFM EA.
ACU-2 HOT DECK
6 6
6x4
CAC-1B
x x x x x x
14x8 14x8 x x
10x8
200 CFM
125 CFM
18x8
46x20 OPEN
34x20 RA OPEN
46x20
16x8
A B
ABOVE CEILING (TYPICAL)
RA TRANSFER DUCT W/FD
CAC-1A
40x22
UH-4
FD/AD FD/AD
TO CAC-1B
TO CAC-1A
M M
3 WAY
65 CFM
2-WAY
60 CFM
80 CFM
70 CFM
10x4
14x121 x
MATCHLINE
ACP
PREVENTER
BACKFLOW
RPZ TYPE
4"VTR
SUPPLY TRUNK
TO 22X10 LINK
22X10
TELCO
GENERATOR ROOM
ENGINE
STORAGE
TRAINING
CONFERENCE
EPDS
CHIEF
SECRETARY
CORRIDOR
WOMEN
JANITOR
CLOSET
MEN
LOCKER
BREAK
COMPUTER
BMS FRONT-END
DUCT
12x6 TRANSFER
ABOVE CEILING
CABLE TRAY
SPIGOT
EXTERIOR
DOWN TO
OTHERWISE NOTED)
(TYPICAL UNLESS
24x24 CG
ACTUATOR
LF24S SPRING RETURN
INTAKE DAMPER W/ BELIMO
24"X72" COMBUSTION AIR
RETURN ACTUATOR
EX. FAN W/ BELIMO LF24S SPRING
INTAKE DAMPER FOR E/G ROOM
12"X12" MOTORIZED FRESH AIR
10x10 UP TO EF-1
600 CFM EA.
(6)8"X18"
DECK
ACU-2 COLD
CCU-1A & CCU-1B
(2)1-1/8"RD UP TO
(2)5/8"RL UP
EXISTING BASE PLAN
FOR CAC UNITS
AND HUMIDITY SENSORS
ROOM TEMPERATURE
AND STORAGE RM.
INTO 4" VTR IN WALL B/T MECH. RM
PREVENTER DRAIN LINES EMPTY
CAC-1A/B AND RPZ BACKFLOW
DUCTS
TRANSFER
SYSTEM ACTIVATES.
TO ENSURE IT SHUTS DOWN AS REQUIRED WHEN FIRE ALARM
TEST NEW HVAC SYSTEM WITH EXISTING FIRE ALARM SYSTEM
ENTIRE ACU-2 SYSTEM.
TEST, ADJUST AND RE-BALANCE AIRFLOWS OF THE
TO STARTING.
AND COORDINATED WITH THE RE FOR APPROVAL PRIOR
LOCATIONS IN CEILING SHALL BE FIELD DETERMINED
IS CLOSED FOR OPERATIONS. DUCTWORK ACCESS
BY ACU-2. THIS WORK SHALL BE DONE WHEN THE ATCT
CLEAN AND SANITIZE ALL EXISTING DUCTWORK SERVED
SCHEDULE.
FURNISH AND INSTALL NEW CEILING RETURN AS PER
AS PER SCHEDULE.
FURNISH AND INSTALL NEW CEILING SUPPLY DIFFUSER
2 (TYPICAL)
525 CFM EA.
(2) 8"X18" SUPPLY
NPA
PANEL
:0 lo tt e frg-1701201-m003
2022-01-05T13:57:08-0500
SANDRA L PIETTRO
2022-01-06T12:32:33-0500
BRIAN A BISRAM
File details come from the government source that posted it. Updated .