Questions and Responses_March 29 2022.pdf

PDF 71 KB Posted

Attached to
Farmingdale HVAC Replacement Federal contract opportunity
Solicitation number
697DCK-22-R-00045
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document outlines a federal contract opportunity for HVAC replacement services at the Farmingdale Airport Traffic Control Tower and base building facilities in Farmingdale, New York. The Federal Aviation Administration is seeking to replace the HVAC systems and is hosting a pre-bid site visit on March 15, 2022. Interested vendors must register for the site visit by March 8 and submit any questions by March 22. Proposals are due by March 29, 2022. The contract is a small business set-aside requiring Davis-Bacon Act compliant wages. The FAA anticipates a single-award contract and will select the winning vendor in accordance with federal small business contracting guidelines. Vendors must register in SAM.gov and include all proposal documents outlined in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Farmingdale HVAC Replacement, newest first.
File Type Posted
697DCK-22-R-00045 Amendment 0001.pdf PDF
Questions and Responses_March 23 2022.pdf PDF
Site Visit Attendee Log_Redacted.pdf PDF
Attachment J-1a FRG HVAC Drawings.pdf PDF
Attachment J-1a FRG HVAC Drawings.pdf PDF
697DCK-22-R-00045.pdf PDF
Attachment J-1a FRG HVAC Drawings.pdf PDF
Attachment J-1 FRG HVAC Specifications.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
Attachment J-2 Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & RESPONES

697DCK-22-R-00045

March 29, 2022

No. Question Response

What length of run should be carried for the electrical wiring for the 2x Nema 4 Platform Convenience safety lights to nearest platform (M-006, note 4)

The lights shall be powered from the same NPA panel that the ionization systems are going to. There are spare breakers on the panel. The actual electrical details depend on the type of light provided. If it is a LED light then it needs to meet the requirements to provide no interference with the ATCT radios and electronic equipment. FAA will provide more specifications prior to start of work.

File details come from the government source that posted it. Updated .