Attachment J-1 Specifications for CBR-D Decontamination Station.pdf

PDF 154 KB Posted

Attached to
Special Time Charter for Marine Support Vessel Federal contract opportunity
Solicitation number
N3220522R4100
Issued by
Department of the Navy Military Sealift Command

About this file

This document provides specifications for installing a chemical, biological and radiological defense decontamination station aboard a marine vessel. The specifications require the contractor to install a decontamination station as depicted in a Navy plan, including constructing it near the main deck, installing incandescent lighting providing 10 foot candles of illumination, mounting switches, applying phenolic nameplates, painting surfaces according to Navy standards, restoring disturbed areas to original condition, preparing and painting steel, applying paint according to manufacturer recommendations, stenciling piping 1-1/2 inches or larger, removing obsolete plates and markings, using joiner materials, submitting drawings of the proposed and as-built station, and performing the work to regulatory body and Navy standards. The related federal contract opportunity is a solicitation for a special time charter of a marine support vessel for the Department of the Navy's Military Sealift Command.

View the file

Other files for this federal contract opportunity

Other files attached to Special Time Charter for Marine Support Vessel, newest first.
File Type Posted
DD 254 SOUTHCOM SSM 1 Sep 22.pdf PDF
A0001 22R4100.pdf PDF
Damen Interceptor 1102 FRP.pdf PDF
RFP 22R4100.pdf PDF
Attachment T - Shipyard Info Sheet.xls XLS spreadsheet
Attachment N-2 CDRL DD1423-2 Item 0002 - 0003 CBRN and CBRN Inventory.pdf PDF
Attachment N - CDRL.docx DOCX document
Attachment M - MSC SOM.pdf PDF
Attachment J-3 Drawing CBRD Vari-Nozzle Hose Clip.pdf PDF
33 Safeboat Drawings.pdf PDF
CRI 40 CIB.pdf PDF
Attachment Q - Technical Evaluation Worksheet.xlsx XLSX spreadsheet
Attachment G- PWS.pdf PDF
Attachment E - DD 254.pdf PDF
38 Safeboat Drawings.pdf PDF
Attachment P - MECSP Worksheet.docx DOCX document
Attachment N-3 CDRL DD1423-2 Items 0004 Cost Report.pdf PDF
Attachment N-1 CDRL DD 1423-2 Item 0001 - NEURS.pdf PDF
Attachment L - SFLLL.pdf PDF
Attachment J- CBRD.pdf PDF
Attachment D - Basic Pricing Data.xlsx XLSX spreadsheet
Attachment B - DOL WD.txt TXT text file
CB-OTH.pdf PDF
CBP 41 Safeboat.pdf PDF
FS_2016_InterimMidnightExpress_07_06_16_0.pdf PDF
Boston Whaler Interceptor.pdf PDF
Attachment J-2 Drawings Decon Station.pdf PDF
Attachment H - Clarification and Ques Form.docx DOCX document
Attachment F - Crew Complement.docx DOCX document
Attachment C- GFP.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS FOR CHEMICAL, BIOLOGICAL AND RADIOLOGICAL DEFENSE (CBR-

D) DECONTAMINATION STATION

Decontamination Station:

I-1 Description of Work:

The Contractor shall install a decontamination station as depicted in MSC Plan No. STD-802- 4844759 contained in COMSCINST 3541.5 Series, Part 1, Appendix C “CBR-D Policy”. This plan is to be used as guidance for all future installations and upgrades unless it is superseded by new technical developments and specifications from the Navy/Government experts and approved by COMSC. The Contractor is responsible for accomplishing all the work described herein. The Contractor shall perform all removals, relocations, alterations, and installations, provide all staging, cranes, gas freeing, transportation, etc., necessary to accomplish the intent of this specification. The work shall be performed to the satisfaction of the regulatory bodies indicated and the MSC representative. The cost of this system is for the Contractor’s account and not reimbursable.

I-2 Location:

The decontamination station shall be constructed in or near an existing passageway as close to the main deck level as the Vessel's arrangement allows.

I-3 Electrical Modifications:

Incandescent watertight fixtures shall be installed in the decontamination station. The fixtures are to provide an illumination level of 10-foot candles in both the shower and the outer garment removal space. The incandescent watertight fixtures shall be controlled by two 3-way switches; one of these switches shall be mounted in the existing passageway next to the new door to the decontamination station as depicted in MSC Plan No. STD-802-4844759.

I-4 Nameplates:

Phenolic nameplates with black lettering will be mounted adjacent to the appropriate devices for identification.

I-5 Painting General:

The entire exposed surface of all new, modified and disturbed spaces, including all overheads, decks, bulkheads, fixtures, stanchions, railings, piping, ducts, etc., will be painted. New steel bulkheads, deck, etc., will be painted in accordance with COMSCINST 4750.2 Series, and MSC Plan No. STD- 802-4844759 for the decontamination station. All new steel will be suitably blasted and primed with an inorganic zinc primer, and top-coated with a compatible finish coat. Paint type and color schemes will be in accordance with COMSCINST 4750.2 Series for shower space, passageway and exterior deckhouse, as appropriate, and MSC Plan No. STD-802-4844759 for the decontamination station. All existing steel modified or disturbed by this work will be properly cleaned, primed, touched-up and restored to original condition.

I-6 Restoration to Original Condition:

All areas, such as stairwells, passageways, and spaces disturbed by the Contractor in the performance of this specification, will also be painted to restore to original color and condition.

I-7 Preparation of Surfaces:

Prior to painting, all surfaces will be thoroughly cleaned and all rust, preservative, grease, oil, and other foreign matter will be completely removed. All loose and blistered paint and rusted areas will be thoroughly scraped and power wire brushed to a clean and smooth surface, free of rust, scale and foreign matter. All rough and jagged edges will be power wire brushed and sanded to a smooth and tapered finish.

I-8 Application:

Paint will be applied with care and necessary steps will be taken to prevent paint from coming in contact with nameplates, grease fittings, tile, doors and trim, valve stems, machine threads, brass, chromium, aluminum and other bright metal surfaces, rubber gaskets, knife edges on door frames and hatches, and unpainted parts and fittings. All paints will be applied in accordance with manufacturer's recommendation.

I-9 Condition:

All paints supplied for this work will be delivered to the job in sealed containers, plainly marked by the manufacturer, identifying type and grade of paint. The U.S. Government reserves the right to request evidence that paints were manufactured in accordance with formulas specified.

I-10 Stenciling and Lettering:

Required stenciling, marking and/or lettering that has been overpainted will be redone to conform with USCG regulations, MSC requirements, and paragraph (iv) below.

I-11 Spray Painting:

Spraying of paint is acceptable provided that masking procedures are properly performed and approved by an MSC representative prior to applying any paint. Excessive use of thinner will not be permitted.

I-12 Identification Plates/Markings:

Plates and markings for all new and/or altered spaces, piping, valves, controls, will be installed in accordance with MSC Plan No. STD-802-4844759, COMSCINST 4750.2 Series and COMSCINST

9280.3 Series, and as specified herein.

I-13 Stenciling of Piping:

New or modified piping, 1 1/2 IPS or larger will be labeled at their terminus on the weather deck.

Identification will be by stenciling, in contrasting color, 1 inch high lettering, on an adjacent bulkhead or by attaching a brass or plastic label engraved with 1.4-inch lettering.

I-14 Removal of Obsolete Plates and Markings:

Existing nameplates and markings made obsolete shall be removed.

I-16 Contaminated Clothing Disposal Locker Identification Plate:

The watertight scuttle and watertight door for the contaminated clothing disposal locker will have a label plate reading "CONTAMINATED CLOTHING DISPOSAL LOCKER - KEEP TIGHTLY

SEALED".

I-17 Quality of Workmanship:

Workmanship and materials used for this alteration will be in accordance with the best commercial marine practices. All installations and modifications of this specification will conform to the rules outlined in the regulatory bodies found in paragraph (4) below. Joiner materials shall not be used on the interior surfaces of the DECON Station. All work shall be templated from the Vessel; minor variations from the specification may be approved by the MSC representative. Surfaces in way of removals and alterations will be left free of sharp edges, burrs, and openings. Plates shall be carefully fitted with fair and smooth surfaces. Cuts shall be regular in outline with ragged edges removed and corners rounded. Prior to welding existing steel, the Contractor shall wire brush or blast to bare metal.

Welding and faying surfaces shall be carefully cleaned and prepared prior to assembly. Items and equipment damaged or disturbed resulting from modification work shall be repaired or replaced to the satisfaction of the MSC representative. All new and disturbed surfaces resulting from modification work, except stainless steel, rubber, knife edges, brightwork, etc., shall be thoroughly cleaned of rust, preservative coatings, grease, oil and other foreign matter to bare metal. The surfaces shall be primed and painted to match surroundings with a coating of the same type and color as on adjacent surfaces.

I-18 Drawing:

A drawing of the proposed decontamination station shall be submitted as a part of the Offeror’s Proposal and a drawing submitted to the KO and COR of the new “as built” decontamination station. Drawing should be submitted in accordance with RFP Box 75 Part X FAR 52.212-1 Instructions to Offerors”

SPECIFICATIONS FOR CHEMICAL, BIOLOGICAL AND RADIOLOGICAL DEFENSE (CBR-D) DECONTAMINATION STATION

File details come from the government source that posted it. Updated .