Attachment IV Proposed Pricing Worksheet.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Traffic Systems Preventative Maintenance
Solicitation number
W51AA126QA058
Issued by

About this file

This is a Proposed Pricing Worksheet for a firm-fixed price (FFP) solicitation for Traffic Systems Preventative Maintenance and Repairs services at Tobyhanna Army Depot in Pennsylvania. Offerors must provide pricing for two primary service categories: semi-annual preventive maintenance visits (2 lots per year) and diagnostic assessment service calls (1 lot per year) that require 48-hour on-site response, equipment inspection, root cause identification, and formal repair proposals. The worksheet is structured with a one-year base period followed by four option years, with pricing required for each period under separate Contract Line Item Numbers (CLINs 0001-0002 for base year, CLINs 1001-1002 through 4001-4002 for option years). An additional six-month extension option is included but will be automatically calculated by the worksheet as one-half of the Option Year 4 pricing for evaluation purposes.

Offerors must complete the green-shaded cells in the spreadsheet, providing company information including CAGE code, UEI, and CMMC Unique Identifier, along with unit prices and total prices for each service line item. All services must be performed in accordance with Attachment II, Performance Work Statement (PWS). Service Contract Labor Standards apply to this acquisition per FAR 37.107 and 41 USC Chapter 67, with applicable prevailing wage rates available on SAM.gov. Price evaluation will be based on the total evaluated price across all periods. The worksheet template is designed to automatically calculate total pricing by contract period and overall contract value for evaluation purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Worksheet

ATTACHMENT IV
PROPOSED PRICING WORKSHEET (16-JULY-2026)
W51AA1-26-Q-A058
Traffic Systems Preventative Maintenance and Repairs
INSTRUCTIONS
*This attachment shall be submitted as part of the offeror's proposal.*
Entries are required in the green shaded cells ONLY.
FULL COMPANY NAME:
CAGE CODE:
UEI:
CMMC Unique Identifier (UID):
REMINDER: Service Contract Labor Standards. FAR 37.107 and 41 USC Chapter 67, Service Contract Labor Standards, provides for minimum wages and fringe benefits as well as other conditions of work under certain types of service contracts. Service Contract Labor Standards are applicable to this acquisition and can be located at https://sam.gov.
Contract Line
Item Numbers (CLINs)DescriptionQuantityUnitUnit PriceTotal PriceInstructions
CLIN 0001Base YearFFPTraffic Systems Preventative Maintenance2Lots$0.00Provide a firm-fixed price (FFP) for each semi-annual preventive maintenance visit. All services must be performed in accordance with the Attachment II, Performance Work Statement (PWS) to ensure full system operability.
CLIN 0002Base YearFFPAssessment Visit1Lots$0.00Provide a firm-fixed price (FFP) for each diagnostic assessment service call visit. Each call requires a 48-hour on-site response to inspect equipment, identify the root cause, and provide a formal repair proposal in accordance with Attachment II, Performance Work Statement (PWS).
Total Evaluated Price for the Base Year$0.00
CLIN 1001Option Year 1FFPTraffic Systems Preventative Maintenance2Lots$0.00Provide a firm-fixed price (FFP) for each semi-annual preventive maintenance visit. All services must be performed in accordance with the Attachment II, Performance Work Statement (PWS) to ensure full system operability
CLIN 1002Option Year 1FFPAssessment Visit1Lots$0.00Provide a firm-fixed price (FFP) for each diagnostic assessment service call visit. Each call requires a 48-hour on-site response to inspect equipment, identify the root cause, and provide a formal repair proposal in accordance with Attachment II, Performance Work Statement (PWS).
Total Evaluated Price for Option Year 1$0.00
CLIN 2001Option Year 2FFPTraffic Systems Preventative Maintenance2Lots$0.00Provide a firm-fixed price (FFP) for each semi-annual preventive maintenance visit. All services must be performed in accordance with the Attachment II, Performance Work Statement (PWS) to ensure full system operability
CLIN 2002Option Year 2FFPAssessment Visit1Lots$0.00Provide a firm-fixed price (FFP) for each diagnostic assessmetn service call visit. Each call requires a 48-hour on-site response to inspect equipment, identify the root cause, and provide a formal repair proposal in accordance with Attachment II, Performance Work Statement (PWS).
Total Evaluated Price for Option Year 2$0.00
CLIN 3001Option Year 3FFPTraffic Systems Preventative Maintenance2Lots$0.00Provide a firm-fixed price (FFP) for each semi-annual preventive maintenance visit. All services must be performed in accordance with the Attachment II, Performance Work Statement (PWS) to ensure full system operability
CLIN 3002Option Year 3FFPAssessment Visit1Lots$0.00Provide a firm-fixed price (FFP) for each diagnostic assessment service call visit. Each call requires a 48-hour on-site response to inspect equipment, identify the root cause, and provide a formal repair proposal in accordance with Attachment II, Performance Work Statement (PWS).
Total Evaluated Price for Option Year 3$0.00
CLIN 4001Option Year 4FFPTraffic Systems Preventative Maintenance2Lots$0.00Provide a firm-fixed price (FFP) for each semi-annual preventive maintenance visit. All services must be performed in accordance with the Attachment II, Performance Work Statement (PWS) to ensure full system operability
CLIN 4002Option Year 4FFPAssessment Visit1Lots$0.00Provide a firm-fixed price (FFP) for each diagnostic assessment service call visit. Each call requires a 48-hour on-site response to inspect equipment, identify the root cause, and provide a formal repair proposal in accordance with Attachment II, Performance Work Statement (PWS).
Total Evaluated Price for Option Year 4$0.00
Option to Extend Services (FAR 52.217-8)FFPSix (6) Month Option to Extend Services
1Lot$0.00Pricing for the FAR 52.217-8 six-month extension is not required. For evaluation purposes, the pricing worksheet will automatically calculate this period as one-half (1/2) of the total proposed price for Option Year 4.
TOTAL EVALUATED PRICE >>>>>>>>>>>>>>>>$0.00Price evaluation will be based on this total.

File details come from the government source that posted it. Updated .