Attachment II Performance Work Statement.pdf

PDF 1 MB Posted

Attached to
Traffic Systems Preventative Maintenance
Solicitation number
W51AA126QA058
Issued by

About this file

This is a Performance Work Statement (PWS) for traffic systems maintenance and repairs at Tobyhanna Army Depot (TYAD).

The contractor shall provide semiannual preventative maintenance (twice per year) on all traffic system components, including approximately 11 masts, 38 signals, 6 signs, and 7 lights, ensuring operational status and safety with minimum downtime. Services include diagnostic assessment visits within 48 hours of notification, to be performed at a flat Firm Fixed Price service call rate, with historical data indicating approximately three to four assessment visits annually. Upon completion of each assessment visit, the contractor shall provide a fee proposal to the Government for approval before commencing actual repair work; repair work funding must be added to the contract via bilateral modification under specific line items. The contractor must furnish all labor, tools, materials, equipment, transportation, and supervision necessary to maintain the system in safe and proper working order. The Government facility operates 0700–1530 Monday through Friday, and the contractor must provide support during these hours while maintaining an adequate workforce for uninterrupted performance. The contractor is required to be PennDOT Prequalified and maintain this certification. Key deliverables include a Quality Control Plan (due within 10 days of award), a Contractor Work Plan (due 30 days after award), semiannual preventative maintenance reports (within two weeks of completion), and unscheduled repair reports with proposals (within 7 days of assessment visits). Contract administration involves mandatory compliance with extensive security requirements, safety standards, environmental specifications, and training requirements including Anti-Terrorism Level I training, iWATCH training, OPSEC training, and Operations Security measures for protection of critical information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Traffic Systems Maintenance and Repairs

Part 1 General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a service contract to perform semiannual (twice per year) preventative maintenance on all components of the traffic system for Tobyhanna Army Depot (TYAD). There is also a requirement to perform repairs on an as needed basis. The Government shall not exercise any supervision or control over contract service providers who are subcontractors performing services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the Government. The Contractor shall perform to the standards specified in this PWS. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS.

1.2 Background: Tobyhanna Army Depot (TYAD) has a requirement to maintain an operational traffic system. Safety, compliance and efficiency are cornerstone requirements.

There are approximately 11 masts, 38 signals, 6 signs and 7 lights for this requirement. All of the aforementioned must be operational and safe with minimum downtime

1.3 Scope: The Contractor shall provide non-personal service(s) to perform preventative maintenance and repair to the traffic system and its’ closely associated components at Tobyhanna Army Depot (TYAD). Services shall include semi-annual preventative maintenance and repair in order to maintain the system in a safe and proper working order.

1.4 Objectives: The objective of this service is to maintain the traffic system and its closely associated components. These tasks are in accordance with this PWS.

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award. CDRL A001

The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within ten (10) days. If the Government has provided comments, the Contractor shall then have ten (10) days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than ten (10) days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;

(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);

(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;

(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;

(e) How the Contractor will ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control);

(f) How the Contractor will inventory and track maintenance of all Government Provided Equipment / Materials;

(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and

(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.

1.5.1.1 An Analysis of Quality Control and Timeliness of Submittals (i.e. deliverables) shall be provided to the COR within thirty (30) days upon completion of each option period or Task Order.

1.5.1.2 Reserved

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)

deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.

When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents’ Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th

Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th

1.5.3.2 Reserved

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0700 – 1530, Monday through Friday, except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur twenty-four (24) hours a day / seven (7) days a week. The Government facility is open for operations during the recognized U.S. Holidays identified in paragraph 1.5.3.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the COR. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

The Government facility operating hours occur between the hours of 0700 – 1530, Monday through Friday.

1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0700 – 1530, Monday through Friday. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.

1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.). The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer’s Representative for review within thirty (30) days after date of contract award. The Government will review and either accept or return their comments to the Contractor within ten (10) days. The Contractor shall then have three (3) days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted to the COR for review and acceptance at a minimum thirty (30) days prior to implementation. The timeline noted above shall apply for review and acceptance of proposed changes. CDRL A002

1.5.5 Training Holidays: Reserved

1.5.6 Place of Performance: The work to be performed under this contract will be performed at Tobyhanna Army Depot (TYAD), 11 Hap Arnold Blvd., Coolbaugh Township, PA 18466.

1.6 Security Requirements: Contractor personnel performing work under this contract must have a complete background check prior to start of any work to be performed and must maintain the level of security required for the life of the contract.

See the attached document titled “Security Requirements” for the current TYAD Security Requirements. See Part 6, “Applicable Publications”, Section 6.1.13.

1.7 Key Control: Reserved

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.

Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates, or changes in delivery dates.

The COR is not authorized to change any of the terms and conditions of the resulting order.

The COR monitors all technical aspects of the contract and assists in contract administration.

The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: The following are considered key personnel by the Government:

1. David Hudak, Contracting Officer Representative (COR).

2. Jennifer Cannon, Contracting Officer

3. Michele Dooley, Purchasing Agent

Proposals shall include names and qualifications for a primary Program/Contract Manager and an Alternate authorized to act in their absence.

The Contractor who performs this work shall be PennDOT Prequalified, able to show proof and maintain this certification.

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12.1 If applicable, Contractor workspace (staging site, on-site office, desk or work area, etc.)

shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance as requested after contract award. Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles are addressed under Part 4.4.

1.12.2 Contractor Identification Badges: Reserved

1.13 Contractor Travel: Reserved

1.14 Other Direct Costs (ODCs): Reserved

1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be averse to the interests of the Government or others. The Contractor and Contractor personnel shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorize Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.18 Non-Disclosure Statements: Reserved

1.19 Organizational Conflict of Interest (OCI): Reserved

1.20 Phase In /Phase Out Period: Reserved

1.21 Safety: See the attached document titled “SERVICE OR EQUIPMENT INSTALLATION Under $250K CONTRACTOR SAFETY STANDARD JUNE 2024.pdf” for the current TYAD Safety Requirements. See Part 6, “Applicable Publications”, Section 6.1.14.

1.21.1 Host Nation Safety Laws and Regulations: Reserved

1.21.1.1 In addition to other requirements for accident prevention specified in the contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes., the Contractor shall coordinate all work at the site, including development of plans and providing advance notices.

The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of the contract. For compliance with host nation laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:

(a) Conditions of construction and operational activities to be considered include but are not limited to:

(i) For all construction activities meeting the following criteria: the work is scheduled to last longer than 30 working days and more than 20 workers are occupied simultaneously, or the volume of work is scheduled to exceed 500 person days, or the work presents particular tasks, e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater).

(i) Maintenance of tools and equipment.

(ii) Provisions for the storage and disposal of materials and waste, particularly hazardous materials and substances.

(iii) Modifying performance periods for such work, taking into consideration the site conditions.

(iv) Organizing cooperation between different employers and Contractors without employees.

(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans

1.21.1.2 Reserved

1.21.1.3 Reserved

1.22 Environmental Compliance: The following provides information on Environmental Compliance.

See the attached document titled “Standard NEPA Specifications for Projects_9 Jun 25” for the current TYAD Environmental Requirements. See Part 6, “Applicable Publications”, Section 6.1.15.

1.22.1 Environmental Compliance Plan and Program: Reserved

1.23 Required Training: The following provides information on training requirements.

1.23.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within thirty (30) days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or thirty (30) days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within thirty (30) days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve

(12) months except AOR specific AT Level I training which shall be completed as required by local AT policies.

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.

Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within thirty (30) days after completion of the training.

1.23.2 OPSEC Training: See the attached document titled “Security Requirements” for the current TYAD Security Requirements. See Part 6, “Applicable Publications”, Section 6.1.13.

1.23.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) days after the contract is awarded and within thirty (30) days after new employees commence contract performance, with the results reported to the COR within thirty (30) days after the contract is awarded and within thirty (30) days after new employees commence contract performance. Verification of the training shall be provided to the COR within thirty (30) days after completion of the training. Training slides can be found on the Army OneSource website: https://www.militaryonesource.mil/resources/training/

1.23.4 Information Assurance (IA) Training Reserved

https://jkodirect.jten.mil/

1.23.4.2 Reserved

1.23.4.3 Reserved

1.23.5 Personally Identifiable Information (PII): Reserved

1.24 Authorization to Perform Services in Germany Reserved

1.24.1 Reserved

1.24.2 Reserved

1.24.3 Reserved

1.25 Notice to Proceed: the notice to proceed will be provided as indicated below.

☒The effective date of contract will constitute the date of notice to proceed ☐A notice to proceed letter will be issued ☐The date of the letter transmitting the contract will constitute the date of the notice to proceed

1.26 Electromagnetic Compatibility Directive: Reserved

1.27 Government Property and Services: Reserved

1.28 Conventional Forces Europe (CFE) Treaty Verification Inspection: Reserved

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms

2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer – A person with the authority to enter, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note:

The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”

Contractor – A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-Acquired Property - Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

Day – Unless otherwise specified, a calendar day.

Defective Service – A service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property is property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Government Property - All property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Property Administrator - An authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – A key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – Part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) The various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – The key Government-developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – The specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.

Subcontractor – One that enters a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Workday - The number of hours per day the Contractor provides services in accordance with the contract.

Work Week - Monday through Friday, unless otherwise specified.

2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.

ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate

IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3. Government Property and Services

3.1 Services: Reserved

3.2 Facilities: During the service period the contractor shall have limited use of the premises for the performance of their operations, including use of the site. The contractor’s use of the premises is confined to those areas where work is to be performed.

3.3 Utilities: All utilities in the facility will be available for the contractor’s use in performance of tasks outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment: Reserved

3.5 Special Tooling and Test Equipment: Reserved

3.6 Materials: Reserved

3.7 Training: The Government will provide the following training: AT Level 1, iWATCH Army and OPSEC.

3.8 Common Access Cards (CAC): Reserved

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance: Reserved

4.3 Materials: The Contractor shall furnish all materials and supplies necessary to meet the requirements under this PWS.

4.4 Vehicles and Equipment: The Contractor shall furnish all necessary vehicles and equipment to perform the work described in this PWS.

4.5 Background Checks: The Contractor shall provide Background Checks in accordance with this PWS and as determined by the Government.

PART 5

SPECIFIC TASKS

5.1 Basic Services: The Contractor shall provide services to furnish all labor, tools, materials, equipment and transportation necessary to perform semiannual preventative maintenance of the traffic system and its closely associated components at Tobyhanna Army Depot (TYAD) as required by the contract and described herein. The contractor is also responsible for unscheduled repairs on an as needed basis.

5.1.1 Equipment: A separate pdf titled Traffic System Devices will be provided upon contract award. This document identifies functions and other details of the equipment to be maintained and repaired under this service contract. After award, the contractor will be given access to drawings, schedules, pictures and any other necessary information to aid in the ability to meet the requirements of this service.

5.2 Tasks

5.2.1 Preventative Maintenance: The Contractor shall perform scheduled, regular preventative maintenance designed to keep traffic systems and equipment running smoothly and prevent future breakdowns. Preventative maintenance shall be conducted as funded, at a frequency of two (2) lots per year.

5.2.2 Assessment Visits: The Contractor shall respond onsite within 48 hours after being notified by the COR. When an equipment failure occurs, the Contractor shall conduct diagnostic assessment visits. During these visits, the Contractor shall inspect the problem, determine the necessary corrective action, and figure out how to fix it. The Contractor shall perform each assessment visit for a flat fee (Firm Fixed Price service call rate). As part of this visit, the Contractor shall provide a fee proposal to the Government to execute the actual repair work. Historical data records indicate that assessment visits and associated repairs have occurred approximately three to four times per year.

5.2.3 Repair Work: The Contractor shall perform actual repair work identified during the Assessment Visit (Task 5.2.2). The Contractor shall not commence repair work until the fee proposal is determined to be fair and reasonable by Contracting, and the funding is added to the contract as a bilateral modification under specific SLIN(s).

5.2.3.1 Rapid Response Service Calls: For critical, unexpected failures that require attention outside of normal timelines, the Contracting Officer will review the situation for consideration of issuing an immediate Notice to Proceed.

5.2.4 Contract Data Requirements List (CDRLs): The Contractor shall provide all informational data deliverables contractually listed and tracked (A001 and A002). This is a non-priced task; the cost for producing these items shall be included in the priced CLINs. For more information, the Contractor shall refer to Exhibits CDRL A001, CDRL A002.

PART 6

APPLICABLE PUBLICATIONS

6. Applicable Publications (Current Editions): If applicable, the following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.

6.1.1 Department of Defense Contract Security Classification Specification (DD Form 254)

6.1.2 Department of Defense Security Agreement (DD Form 441)

6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)

6.1.4 Installation Access Control (AE Reg 190-16)

6.1.5 The Army Physical Security Program (AR 190-13)

6.1.6 Contractor Identification (AE Reg 27-715)

6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)

6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)

6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)

6.1.10 Information Assurance (AR 25-2)

6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)

6.1.12 Policies and Procedures for Property Accountability (AR 735-5)

6.1.13 Security Requirements.

“Security_Requirements_Insert_for_All_SOWs_and_PWSs_Updated_20260401.pdf”

6.1.14 SERVICE OR EQUIPMENT INSTALLATION Under $250K CONTRACTOR SAFETY STANDARD JUNE 2024.pdf

6.1.15 Standard NEPA Specifications for Projects_9 Jun 25.pdf

6.1.16 Commonwealth of Pennsylvania, Department of Transportation Publication 191, Guidelines for the Maintenance of Traffic Systems. This attachment, “pub 191.pdf”

6.1.17 Commonwealth of Pennsylvania, Department of Transportation Publication 212, Official Traffic Control Devices. This attachment, “pub 212.pdf_safe.pdf”

PART 7

ATTACHMENT AND TECHNICAL EXHIBIT LISTING

7. Attachment and Technical Exhibit List

7.1 Technical Exhibit A – Performance Requirements Summary

7.2 Technical Exhibit B – Deliverables Schedule

TECHNICAL EXHIBIT A

Performance Requirements Summary (PRS)

PERFORMANCE

OBJECTIVE

STANDARD PERFORMANCE

THRESHOLD

ACCEPTABLE

QUALITY

LEVELS (AQLs)

METHOD OF

SURVEILLANCE

PRS#1 - PWS para (5.2.1)

Semiannual Preventative Maintenance

The Contractor shall perform a maintenance inspection on all equipment, twice per contract year at a minimum of six-month intervals.

100% Compliance

Zero deviation from the standard

Random Inspection

PRS#2 - PWS para (5.2.2)

Repair Work: The contractor shall repair the necessary equipment to return it to safe and proper operating condition.

Contracting will approve a proposal for repair work prior to the commencement of any repair work.

100% Compliance

Zero deviation from the standard

100% Inspection

TECHNICAL EXHIBIT B

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

CDRL A001

Quality Control Plan

(QCP)

Section 1.5.1

Once within 10 days after contract award and no later than 7 days prior to any anticipated changes.

One copy submitted to COR.

Electronic delivery via email using Microsoft Office Word, Power Point or

PDF

Contracting Officer’s Representative

(COR):

david.t.hudak.civ @army.mil

CDRL A002

Contractor Work Plan Section 1.5.4.3.1

Final written plan 30 days after award and 10 days prior to the implementation of any changes to the work plan (if any).

One copy submitted to COR.

Electronic delivery via email using Microsoft Office Word, Power Point or

PDF

Contracting Officer’s Representative

(COR):

david.t.hudak.civ @army.mil

Semiannual Preventative Maintenance Report Section 5.2.1

Within two weeks after the completion of each semiannual preventative maintenance.

One copy submitted to COR

Electronic delivery via email using Microsoft Office Word, Power Point or

PDF

Contracting Officer’s Representative

(COR):

david.t.hudak.civ @army.mil

Unschedule d Repairs Report and Proposal Section 5.2.2

Within 7 days of the assessment visit.

One copy submitted to COR

Electronic delivery via email using Microsoft Office Word, Power Point or

PDF

Contracting Officer’s Representative

(COR):

david.t.hudak.civ @army.mil

Service or Equipment Installations Under $250K Contractor Safety Standards for TYAD JUNE 2024

SERVICE or EQUIPMENT INSTALLATION CONTRACTOR SAFETY

STANDARDS FOR TYAD

Below are some “installation specific” safety standards which contractors are required to adhere to while performing any work on Tobyhanna Army Depot. It is the contractor’s responsibility to always incorporate these particular requirements into their daily operations while under contract and to institute these specifics into their overall site safety controls. These do not substitute or deflect in any way the requirement to institute and adhere to all OSHA 29 CFR 1910 & 1926 and USACE EM385-1 safety standards, as well as all applicable contractual Federal Acquisition Regulations while performing the work under this contract on Tobyhanna Army Depot.

It is the responsibility of the contractor to enforce the below requirements as well as all current revisions of the above referenced standards. Failure to enforce safety requirements on the depot can result in immediate stop works, safety stand down orders and even complete termination of the contract.

Important Phone Numbers:

Fire or Emergency: 911 Fire Department – (Non-Emergency): This phone number will be provided after award.

Security: This phone number will be provided after award.

Safety Office - This phone number will be provided after award.

S1.0 THE CONTRACTOR IS SOLELY RESPONSIBLE AND LIABLE

FOR JOB- SITE SAFETY

1. Review of the project plans and other documents by any government appointed official does not constitute an acceptance of Federal responsibility or liability for the adequacy of the safety measures identified for the job or for the Contractor's compliance with all applicable safety rules and regulations.

2. The Contractor remains solely responsible and liable for job-site safety at all times during the term of the contract. No outside personnel (other than ET, COR, TYAD Safety, or other government appointed contract personnel) are allowed onto the job site at any time during contract without prior permissions and/or escort by the ET, COR or KO.

3. Tobyhanna Army depot has restrictions on the use of fossil fuels in all buildings.

When it is determined that electric or other alternatively fueled vehicles are insufficient or unavailable for movement of material within the buildings on the installation, fossil-fueled vehicles can be used only when all alternatives of accepted electric material movement equipment have been considered, and the last option is use of a fossil fuel vehicle or project failure. This includes any situations where safety of employees and equipment may be jeopardized. Convenience will never be an acceptable justification to utilize fossil-fueled vehicles. The Government

Contractor Safety Standards for TYAD JUNE 2024

Designated Representative (GDR) will notify the appropriate supervisor(s) or leader(s) in the area where the need to utilize a fossil fuel vehicle is required. The supervisor / leader will take the necessary steps to notify the employees in the work area of the option to leave the area during the material movement process. The GDR and Contractor will also document all actions the Contractor took to utilize electric or other alternatively fueled vehicles. The documentation will specifically state why electric or alternatively fueled vehicles are insufficient and all mitigation efforts used to minimize the effects of fossil-fueled vehicles to include information as to any appropriate scrubbers that can be utilized along with any ventilation or exhaust systems that can be used to externally vented to the outside of the facility.

The documentation must be submitted to the TYAD Safety office for approval prior to any equipment being used. A final copy of the Approved documentation will be provided to the TYAD Safety Division.

4. All direct construction supervision, including subcontractors, must as a minimum, complete an OSHA 30-hour safety course for construction. These certificates must be submitted as part of the site safety plan BEFORE construction activities start.

5. RED CARD PROGRAM - Tobyhanna Army Depot utilizes a program to allow employees to stop an action which is considered unsafe. Employees carry small red cards that can be thrown down when employee sees any action they consider unsafe. Work ceases until TYAD management can decide if it is safe or not.

Contractors are required to comply with this program. If a TYAD employee presents the red card to the contractor, the contractor must stop working until the COR and Safety Office can determine if there is a safety hazard or not.

6. All contractor personnel, to include subcontractors, vendors, suppliers, or visitors, when performing any type of work activity, or gaining access through an occupied area or shop - must have all applicable PPE that is required for the area to include, but not limited to, hardhats, safety glasses, hearing protection, and respirator protection. Notify both COR & Area Supervision, for access approval and prior to any work activities being performed.

S2.0 CODE COMPLIANCE

As noted in Tobyhanna Army Depot Safety Regulation 385-1 - TYAD follows all requirements and is certified as an ISO 45001 facility. Accordingly, the contractor shall comply with and maintain these high safety standards and provide full compliance with all applicable safety regulations and standards. The Contractor shall maintain, monitor, and enforce employee compliance with all applicable rules, regulations, and codes.

Tobyhanna Army Depot requires full contractor compliance with all safety regulations and standards. The Contractor is responsible for maintaining, monitoring, and enforcing all rules, regulations, and codes, by ALL personnel working for the contractor including all subcontractors. These codes include:

Title 29 Code of Federal Regulations-1910 (OSHA General Industry Standards)

Title 29 Code of Federal Regulations-1926 (Construction Industry Standards)

National Fire Protection Association Codes

Uniform Facilities Code

Unified Facilities Guide Specifications (UFGS)

USACE EM385-1-1

All other codes as required to maintain safety standards.

S3.0 JOB HAZARD ANALYSIS (JHA) / ACTIVITY HAZARD ANALYSIS

(AHA)

Prior to the start of work, the contractor shall prepare a JHA / AHA for each phase of work that will be done under the contract. This will be completed in accordance with all applicable OSHA safety requirements. A phase is any operations involving a certain type of work. Examples include demolition, excavation, masonry work, concrete pouring, roofing, and electrical wiring. Work done by each subcontractor is also a phase. The JHA / AHA will:

1. List the activity being performed and identify the sequence of work steps.

2. List the hazards associated with each step, and the procedures and training required to eliminate or reduce the risk to an acceptable level.

S4.0 SITE SPECIFIC SAFETY & ACCIDENT PREVENTION PLANS

Contractors will submit a written Site-Specific Safety / Contractor Accident Prevention Plan prior to beginning activities. The plan must follow the guidelines in OSHA 29 CFR 1926 or 1910 as applicable.

1. Who will implement the plan, including who is responsible for safety and accident prevention?

2. A means for coordinating and controlling subcontractors and suppliers.

3. Safety training.

4. Who will investigate accidents?

5. Emergency response.

6. Job site cleanup and safe access.

7. Public safety requirements such as signs and barricades.

S5.0 FALL PROTECTION

1. Personnel performing works at a height of six feet or more from any lower level shall comply with OSHA 29 CFR 1926.500 through 1926.503 safety standards for any type of new installations. OSHA 29 CFR 1910-28 shall apply to any type of servicing on previously installed equipment.

2. There are currently no certified anchorage points or permanent guardrail systems on any TYAD roof. Most roofs of the depot are more than 20 feet high.

3. Contractors and their employees must be protected from falling off the edge of the roof, regardless of how briefly the employees are at the edge of the roof.

S6.0 ELECTRICAL SAFETY

Follow the current Tobyhanna Army Depot standard. This standard is based on NFPA 70E.

Copies of the TYAD Electrical standard may be obtained by request from the ET, COR or KO on the project or service contract.

S7.0 DEPOT REQUIRED PERMITS / APPROVALS

Permits are required for:

1. Excavation: Contractors must utilize the PA 1 Call system and also coordinate with contracting officer representative (COR) for a TYAD dig permit for any excavations prior to any groundbreaking including digging, drilling and stake driving.

2. Trenching: Contractors will adhere to OSHA requirements and receive approval from TYAD Safety office before any trenching deeper than 5 feet is performed.

Notifications of such activities will be provided to the COR along with required plans, requests and permits prior to any trenching works being performed. Contractor is responsible for field verifying all utilities and underground entities. Excavation or trench greater than 18 inches in depth that remains open greater than (1) day OR left unattended for any period of time shall have a safety orange construction fence installed around the perimeter of the opening. Caution tape or cones for this purpose is unacceptable.

3. Confined Space: All confined space works on TYAD are to be considered as permit required entries, (unless reclassified by the TYAD Safety office,) and Contractor must first request and be provided with an approved "signed" permit from TYAD Safety Office prior to any confined space entry. Contractor will refer to all OSHA requirements and must have a confined space plan and all appropriate safety equipment. Contractor is to request approval from TYAD Safety office through COR prior to entry.

4. Burning / fire: Hot work permits must be obtained daily from the Fire Department.

5. Cranes: For use of cranes and all WHE and LHE at TYAD see S.10.13

6. Army Radiation Permits: Non-Army agencies (including other military Services, vendors, and civilian contractors) require an Army Radiation Permit (ARP) to use, store, or possess ionizing radiation sources on TYAD (see…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .