Texas 2021 Attachment IV SPE60420R0409
Fort Hood Invoice Checklist Verification
Items (1-37) needs to appear on all invoices for the verification and processing for payment. All remaining items (38-41) must be provided as backup for Ft Hood’s internal calculations.
GENERAL INFORMATION
1). Provider (logo is optional; but name of contract provider must be reflected)
2). POC name w/ telephone # -
3). Remit payment to information
• includes bank name, address, wire account #
4). Account # --
5).Invoice#
6). Contract # --
7). Invoice date --
8). Payment due date –
9). ESI ID #
• North Fort Hood – 1044320002855787
• Belton Lake Rec – 10443720004006688
10). Tax ID # --
11). Service area --
METERING AND ENERGY COST INFORMATION
12). Service period –
13). Meter #
• North Fort Hood -034217476TD
• Belton Lake Rec -074994936LG
14). Current read
15). Previous read
16). Meter multiplier
17). KW Total
18). Kwh Total
19). Total net quantity
20). Contract price/rate –
21). Unit of issue --
22). Total usage $ charge --
23). Other charges, assessment, adjustments –
TRANSMISSION AND DISTRIBUTION CHARGES 1
24). Metering Charge
25). Distribution System Charge
26). Transmission Charge
27). System Benefit Fund
28). Nuclear Decommissioning Charge
29.) Transition Charge-Off
30). Transmission System Charge
31). Transmission Cost Recovery Factor
32). Rate per each charge
33). Quantity (based on current kw/kwh invoiced data)
34). Total per each charge
35). Total $ of Transmission/Distribution charges
36). KW Peak demand (Actual and Billing)
37). Date and time of Actual Peak demand (KW)
SUPPORTING DATA (Delivered in Excel Format) 38). Interval KW report, 15 minute KW data
39). Interval KVAR report, 15 minute KVAR data
40). T&D Charges Report, (aka: 810 Report)
41). 4CP report, ERCOT’s Coincidental (consisting of date/time information)
NOTES
1 In Accordance with applicable T&D Tariff.
| GENERAL INFORMATION |
| METERING AND ENERGY COST INFORMATION |
| TRANSMISSION AND DISTRIBUTION CHARGES 0F |
| SUPPORTING DATA (Delivered in Excel Format) |
File details come from the government source that posted it. Updated .