Attachment III- Fire Suppression System Totals.xlsx
XLSX spreadsheet 33 KB Posted
- Solicitation number
- W51AA1-25-R-0009
- Issued by
-
Department of the Army
About this file
The file is an Excel spreadsheet (Attachment III- Fire Suppression System Totals.xlsx) detailing the fire suppression system status for multiple buildings at Tobyhanna Army Depot. The document provides a comprehensive inventory of 262 total sprinkler systems across 121 buildings, with 250 systems currently in service and 12 systems impaired. Impaired systems are located in various buildings including 1D TIERF (3 impaired systems related to Phase 2 renovation), Building 19, Building 54, Building 58, Building 73's Mechanical Room, Building 89, and Building 3005. The impairment reasons range from broken pipes, supply line issues, valve problems, and ongoing renovations, with impairment durations varying from 248 to 2,902 days. The spreadsheet tracks system types including wet, dry, and preaction systems, and notes that several buildings require 5-year inspections in the second year of the contract, with multiple buildings containing fire pumps that must be exercised weekly.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign In Sheet.pdf | ||
| RFIs W51AA1-25-R-0009 Sprinkler System Service.xlsx | XLSX spreadsheet | |
| Attachment II - Pricing Table.xlsx | XLSX spreadsheet | |
| W51AA1-25-R-0009.pdf | ||
| Attachment I - Performance Work Statement .pdf | ||
| Attachment IV- Wage Determinations.pdf | ||
| Attachment V - Quality Assurance Surveillance Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sprinkler System Totals CY24 Sprinkler System Status Tracker
| Total Bldgs with Sprinklers | 121 | Status As Of: |
| Total Sprinkler Systems | 262 | |
| Total Sprinkler In Service | 250 | 3/7/25 |
| Total Sprinkler Impaired | 12 |
| *Any Systems Impaired Enter Forumla =TODAY( In Corresponding "Current Date" Cell then hit enter* | ||||||
| **Any Systems Impaired Enter Forumla =ABS(D(Row #)-E(Row #) In Corresponding "Days IMP" Cell then hit enter** | ||||||
| Sprinkler Systems | Type | Status | Date of IMP | Current Date | Total Days IMP | Comments |
| Bldg. 1A | 25 Systems | |||||
| Café | Wet | In Service | ||||
| 1A South | Dry | In Service | ||||
| Prod. Mgmt. (1) | Wet | In Service | ||||
| I/O cell | Wet | In Service | ||||
| 1A-2-S | Dry | In Service | ||||
| Locker Room | Wet | In Service | ||||
| Prod. Mgmt. (2) | Wet | In Service | ||||
| East Corridor (1) | Wet | In Service | ||||
| 1A-3-S | Dry | In Service | ||||
| Photo Fab | Wet | In Service | ||||
| Enclosed Electronic | Wet | In Service | ||||
| Mech Equipment | Wet | In Service | ||||
| Victaulic PreAct. (1) | Preaction | Impaired | 6/26/24 | 3/7/25 | 254 | (S) System shut down by contractor - Not operating properly. |
| DMOF | Wet | In Service | ||||
| 1A-4-S | Dry | In Service | ||||
| Tool Crib | Wet | In Service | ||||
| TPS Repository | Preaction | In Service | ||||
| Victaulic PreAct. (2) | Preaction | In Service | ||||
| 1A-4-N | Dry | In Service | ||||
| Prod. Mgmt. (3) | Wet | In Service | ||||
| PIID Open Office (1) | Wet | In Service | ||||
| PIID Open Office (2) | Wet | In Service | ||||
| Production Eng. | Wet | In Service | ||||
| East Corridor (2) | Wet | In Service | ||||
| Prod. Mgmt. (4) | Wet | In Service |
| Bldg. 1B Bay 1 | 2 Systems | ||
| 1B-1-1 | Wet | In Service | |
| 1B-1-2 | Wet | In Service |
| Bldg. 1B Bay 2 | 1 System | |||||
| 1B-4-E | Dry | Impaired | 3/27/17 | 3/7/25 | 2902 | Estimated OOS Date - Lateral supply line broke - IJO placed for repairs |
| Bldg. 1B Bay 3 | 5 Systems | ||
| 1B-5-E | Dry | In Service | |
| 1B-6-E | Dry | In Service | |
| 1B-1-W (Wet) | Wet | In Service | |
| 1B-1-W (Dry) | Dry | In Service | |
| 1B-2-W | Wet | In Service |
| Bldg. 1B Bay 4 | 5 Systems | ||
| 1B-3-W | Wet | In Service | |
| 1B-4-W (Wet) | Wet | In Service | |
| 1B-4-W (Dry) | Dry | In Service | |
| 1B-7-E | Wet | In Service | |
| 1B-8-E | Wet | In Service |
| Bldg. 1B Bay 5 | 2 Systems | ||
| 1B-5-W | Wet | In Service | |
| 1B-6-W | Wet | In Service |
| Bldg. 1C Bay 1 | 2 Systems | ||
| NW | Dry | In Service | 5 Year inspection required in OY2 of contract |
| SW | Dry | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 1C Bay 2 | 2 Systems | ||
| NW | Dry | In Service | |
| SW | Dry | In Service |
| Bldg. 1C Bay 3 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 1C Bay 4 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 1C Bay 5 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 1C Bay 6 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 1D TIERF | 4 Systems | |||||
| Bay 1 (1C1) | Wet | Impaired | 6/17/24 | 3/7/25 | 263 | Phase 2 Renovation |
| Bay 2 (4B2) | Wet | Impaired | 4/22/24 | 3/7/25 | 319 | Phase 2 Renovation |
| Bay 3(1C3) | Wet | Impaired | 12/8/23 | 3/7/25 | 455 | Broken pipes - Phase 2 demo/renovation to start in March |
| Bay 4 (4B4) | Wet | In Service |
| Bldg. 1D ASRS | 3 Systems | ||
| Ceiling (4B5) | Wet | In Service | |
| Rack (1C6) | Wet | In Service | |
| Battery Charge (1C5) | Dry | In Service |
| Bldg. 1E | 4 Systems | ||
| Sandblast | Wet | In Service | |
| Paint Shop | Wet | In Service | |
| Plating Shop | Wet | In Service | |
| Boiler Room | Wet | In Service |
| Bldg. 2 Bay 1 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 2 Bay 2 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 2 Bay 3 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 2 Bay 4 | 2 Systems | ||
| Admin Area | Wet | In Service | 5 Year Inspection required in OY2 of contract - Fire Pump (Electric) Qty-1 *Pump must be execised weekly |
| Main Bay | Wet | In Service |
| Bldg. 2 Bay 5 | 3 Systems | ||
| West 6" | Wet | In Service | |
| West 3" | Wet | In Service | |
| East | Wet | In Service |
| Bldg. 2 Bay 6 | 5 Systems | ||
| West 6" | Wet | In Service | |
| West 3" | Wet | In Service | |
| East 6" | Wet | In Service | |
| East 6" Dry | Dry | In Service | |
| East 3" | Wet | In Service |
| Bldg. 3 Bay 1 | 1 Systems | ||
| West | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 3 Bay 2 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 3 Bay 3 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 3 Bay 4 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 3 Bay 5 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 3 Bay 6 | 1 Systems | ||
| East | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 4 Bay 1 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 4 Bay 2 | 2 Systems | |||||
| Riser 1 (Dry) | Dry | In Service | 4/22/24 | 3/7/25 | 319 | Issue with compressor - Work order placed |
| Riser 2 (Wet) | Dry | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 4 Bay 3 | 3 Systems | ||
| East | Dry | In Service | |
| West (Dry) | Dry | In Service | |
| West (Preaction) | Preaction | In Service |
| Bldg. 4 Bay 4 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 4 Bay 5 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 4 Bay 6 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 4A | 1 Systems | ||
| South | Wet | In Service |
| Bldg. 5 Bay 1 | 3 Systems | ||
| East | Dry | In Service | |
| West Riser 1 | Dry | In Service | |
| West Riser 2 | Dry | In Service |
| Bldg. 5 Bay 2 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 5 Bay 3 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 5 Bay 4 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 5 Bay 5 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 5 Bay 6 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 6 Bay 1 | 4 Systems | ||
| North Dry | Dry | In Service | |
| North Main | Wet | In Service | |
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 6 Bay 2 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 6 Bay 3 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 6 Bay 4 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 6 Bay 5 | 2 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service |
| Bldg. 6 Bay 6 | 3 Systems | ||
| East | Wet | In Service | |
| West | Wet | In Service | |
| South Main Riser | Wet | In Service |
| Bldg. 7 Bay 1 | 2 Systems | ||
| West | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Kardex Preaction | Preaction | In Service | |
| Fire Pump (Electric) Qty-1 *Pump must be exercised weekly | |||
| Bldg. 7 Bay 2 | 1 Systems | ||
| West (Bay 1) | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 7 Bay 3 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 7 Bay 4 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 7 Bay 5 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 7 Bay 6 | 2 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service |
| Bldg. 8 Bay 1 | 1 Systems | ||
| West | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 8 Bay 2 | 1 Systems | ||
| West | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Fire Pump (Electric) Qty-1 *Pump must be exercised weekly | |||
| Bldg. 8 Bay 3 | 2 Systems | ||
| West | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Admin | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 8 Bay 4 | 1 Systems | ||
| West | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 8 Bay 5 | 1 Systems | ||
| West | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 8 Bay 6 | 1 Systems | ||
| West | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 9 | 9 Systems | ||
| East | Dry | In Service | |
| West | Dry | In Service | |
| NW Riser 1 | Wet | In Service | |
| NW Riser 2 | Wet | In Service | |
| NW Riser 3 | Wet | In Service | |
| NW Riser 4 | Wet | In Service | |
| SE Riser 1 | Wet | In Service | |
| SE Riser 2 | Wet | In Service | |
| SE Riser 3 | Wet | In Service |
| Bldg. 9A | 1 Systems | ||
| South | Wet | In Service |
| Bldg. 10 | 4 Systems | ||
| 10A Center | Wet | In Service | |
| 10B East | Dry | In Service | |
| 10C East | Dry | In Service | |
| 10C East | Dry | In Service |
| Bldg. 11A | 3 Systems | ||
| 1st Flr Riser 1A | Wet | In Service | |
| 1st Flr Riser 2A | Wet | In Service | |
| 2nd Flr | Wet | In Service |
| Bldg. 11B | 1 Systems | ||
| 2nd Flr Riser | Wet | In Service |
| Bldg. 11C | 2 Systems | ||
| Outside Valve Rm | Wet | In Service | |
| 1st Flr Preaction | Preaction | In Service |
| Bldg. 11D | 1 Systems | |||||
| Phone Room | Preaction | Impaired | 5/24/17 | 3/7/25 | 2844 | Installation of new lateral required (Separate Contract) |
| Bldg. 11E | 4 Systems | ||
| 1st Flr 11C Riser | Wet | In Service | |
| 1st Flr 11D Riser | Wet | In Service | |
| 1st Flr 11E Riser | Wet | In Service | |
| 3rd flr | Wet | In Service |
| Bldg. 12 | 3 Systems | ||
| SE Riser 1 | Wet | In Service | |
| SE Riser 2 | Wet | In Service | |
| SW Riser | Dry | In Service |
| Bldg. 13 | 3 Systems | ||
| Riser 1 | Wet | In Service | 5 Year inspection Required in OY2 of contract |
| Riser 2 | Wet | In Service | 5 Year inspection Required in OY2 of contract |
| Riser 3 | Wet | In Service | 5 Year inspection Required in OY2 of contract |
| Bldg. 13A | 1 Systems | ||
| NE | Wet | In Service | Bldg contains fire pumps (1) electric, (1) diesel (Both 1500 GPM) |
| *Pumps must be exercised weekly | |||
| Bldg. 14 | 1 Systems | ||
| SE | Wet | In Service |
| Bldg. 15 | 1 Systems | ||
| West | Wet | In Service |
| Bldg. 16 | 1 Systems | ||
| SW | Wet | In Service |
| Bldg. 17 | 1 Systems | ||
| West | Wet | In Service |
| Bldg. 18 | 2 Systems | ||
| South | Wet | In Service | |
| North | Wet | In Service |
| Bldg. 19 | 1 Systems | |||||
| South | Wet | Impaired | 1/11/23 | 3/7/25 | 786 | Estimated OOS date - Broken supply lateral underneath Bldg. (Separate Contract) |
| Bldg. 20 | 1 Systems | ||
| Center | Preaction | In Service |
| Bldg. 30 | 4 Systems | ||
| System 1 | Wet | In Service | |
| Hose System | Wet | In Service | |
| System 2 | Wet | In Service | |
| Paint Booth | Wet | In Service | |
| Bldg contains (1) Fire Electric Pump (1500 GPM)*Pumps must be exercised weekly | |||
| Bldg. 34 | 1 Systems | ||
| North | Wet | In Service |
| Bldg. 41 | 2 Systems | ||
| Wet | Wet | In Service | |
| Dry | Dry | In Service |
| Bldg. 42 | 1 Systems | ||
| West | Wet | In Service |
| Bldg. 45 | 1 Systems | ||
| West | Wet | In Service |
| Bldg. 54 | 1 Systems | |||||
| West | Wet | Impaired | 7/18/18 | 3/7/25 | 2424 | Estimated OOS date - Inadequete supply - Level w/ gravity Syst. |
| Bldg. 55 | 5 Systems | ||
| Bay 1 Riser 1 | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bay 1 Riser 2 | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bay 2 Riser 3 | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bay 3 Riser 4 | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bay 5 Riser 5 | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 56 | 1 Systems | ||
| East | Dry | In Service |
| Bldg. 58 | 1 Systems | |||||
| South | Wet | Impaired | 7/2/24 | 3/7/25 | 248 | Pipe leak in bay area |
| Bldg. 66 | 1 Systems | ||
| NE | Wet | In Service |
| Bldg. 69 | 1 Systems | ||
| East | Wet | In Service |
| Bldg. 72 | 6 Systems | ||
| East | Wet | In Service | |
| West Riser 1 | Wet | In Service | |
| West Riser 2 | Wet | In Service | |
| West Riser 3 | Wet | In Service | |
| South 6" | Wet | In Service | |
| South 4" | Wet | In Service |
| Bldg. 72A | 1 Systems | ||
| SE | Wet | In Service |
| Bldg. 73 | 5 Systems | ||
| B Bay NW | Wet | In Service | |
| B Bay SW | Wet | In Service | |
| C Bay | Wet | In Service | |
| Mechnical Rm | Wet | Impaired | Butterfly valve broken unable to open |
| South Boiler | Wet | In Service |
| Bldg. 74 | 3 Systems | ||
| Rack System | Wet | In Service | |
| Ceiling Riser | Wet | In Service | |
| Dry Riser | Dry | In Service | |
| Contains (1) 2000 GPM Electric Fire Pump *Pumps must be exercised weekly | |||
| Bldg. 79 | 1 Systems | ||
| East | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 86 | 1 Systems | ||
| West | Wet | In Service |
| Bldg. 87 | 1 Systems | ||
| West | Wet | In Service |
| Bldg. 88 | 1 Systems | ||
| West | Wet | In Service |
| Bldg. 89 | 1 Systems | |||
| 1st Flr | Dry | Impaired | 3/7/25 | Bldg. currently under renovation |
| Bldg. 90 | 1 Systems | ||
| NW | Wet | In Service |
| Bldg. 91 | 1 Systems | ||
| NW | Wet | In Service |
| Bldg. 92 | 1 Systems | ||
| NW | Wet | In Service |
| Bldg. 95 | 1 Systems | ||
| SW | Wet | In Service | 5 Year inspection required in OY2 of contract |
| Bldg. 96 | 1 Systems | ||
| NW | Wet | In Service |
| Bldg. 97 | 1 Systems | ||
| NW | Wet | In Service |
| Bldg. 98 | 2 Systems | |||||
| Wet | Wet | In Service | ||||
| Dry | Dry | In Service | 1/25/24 | 3/7/25 | 407 | NW corner storge room - Frozen/broken pipe. Area Isolated. |
| Bldg. 220 | 2 Systems | ||
| Wet | Wet | In Service | |
| Dry | Dry | In Service |
| Bldg. 221 | 1 Systems | ||
| Basement | Dry | In Service |
| Bldg. 233 | 1 Systems | ||
| East | Wet | In Service |
| Bldg. 310 | 2 Systems | ||
| Wet | Wet | In Service | |
| Classroom | Wet | In Service |
| Bldg. 334 | 1 Systems | ||
| SW | Wet | In Service |
| Bldg. 335 | 3 Systems | ||
| Riser 1 | Wet | In Service | |
| Riser 2 | Preaction | In Service | |
| Riser 3 | Preaction | In Service |
| Bldg. 337 | 2 Systems | ||
| Wet | Wet | In Service | |
| Dry | Dry | In Service |
| Bldg. 338 | 1 Systems | ||
| South | Dry | In Service |
| Bldg. 606 | 1 Systems | ||
| North | Wet | In Service |
| Bldg. 702 | 1 Systems | ||
| North | Wet | In Service |
| Bldg. 816 | 2 Systems | ||
| South | Wet | In Service | |
| Refrigerator | Wet | In Service |
| Bldg. 1101 | 1 Systems | ||
| Basement | Wet | In Service |
| Bldg. 1102 | 1 Systems | ||
| Basement | Wet | In Service |
| Bldg. 1103 | 1 Systems | ||
| Basement | Wet | In Service |
| Bldg. 1104 | 1 Systems | ||
| Basement | Wet | In Service |
| Bldg. 1105 | 2 Systems | ||
| Wet | Wet | In Service | |
| Dry | Dry | In Service |
| Bldg. 3002 | 2 Systems | ||
| NE | Wet | In Service |
| Bldg. 3005 | 2 Systems | ||
| East | Wet | In Service | |
| South | Dry | Impaired | Fire Pump OOS, Lack of Pressure |
File details come from the government source that posted it. Updated .