Attachment I - Submittal Register.xlsx

XLSX spreadsheet 50 KB Posted

Attached to
Y1DA--652-24-103 Increase Surgical Access Federal contract opportunity
Solicitation number
36C24626R0023
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This is a Submittal Register (Attachment I) for a federal construction contract with the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 6, for project Y1DA--652-24-103 Increase Surgical Access at the Central VA Medical System in Richmond, VA. The register comprehensively catalogs all required submittals organized by construction specification section number (CSI format), detailing what materials, documentation, and approvals must be submitted throughout the project lifecycle, when they must be submitted, and to whom (typically the Contracting Officer's Representative or COR).

The submittal requirements span the full scope of construction work including general requirements (security plans, phasing plans, as-built drawings within 15 days of phase completion), structural elements (shop drawings for reinforcing steel, concrete mix designs, fly ash certifications), mechanical systems (HVAC equipment data, hydronic piping diagrams, testing and balancing reports due 90 days after design review), plumbing (fixture specifications, vacuum and gas system certifications per NFPA 99), electrical systems (panelboard and wiring device certifications due 2 weeks prior to final inspection), fire suppression (wet-pipe sprinkler system as-built drawings in multiple formats per NFPA 13), communications systems (test reports within 90 days of completion, record wiring diagrams as CAD files), specialized work (asbestos abatement and lead-based paint removal plans due minimum 14 days prior to pre-start meetings, laboratory certifications), finishes (paint samples, flooring and tile installation layouts), and site work (pavement markings, concrete exterior improvements). Certifications, manufacturer's literature, qualifications, warranties, operation and maintenance manuals, and various test reports are standard requirements throughout, with most certifications due 2 weeks prior to final inspection.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--652-24-103 Increase Surgical Access, newest first.
File Type Posted
Photos.zip ZIP file
36C24626R0023 0002.docx DOCX document
Site.Visit.Log.04.09.2026.pdf PDF
Pre-Bid Site Visit Agenda.pdf PDF
36C24626R0023 0001.docx DOCX document
Attachment A - Drawings.pdf PDF
Attachment J - 27 52 23 Nurse Call and Code Blue Systems ASI.pdf PDF
Attachment E - Wage Determination VA20250155.pdf PDF
Attachment G - Site Visit.docx DOCX document
Attachment C - Specifications Vol 2.pdf PDF
36C24626R0023_2.docx DOCX document
Attachment K - Brand Name Justification for Hillrom_Redacted.pdf PDF
Attachment H - Cost Breakdown by Division.xlsx XLSX spreadsheet
Attachment F - Past Performance Questionnaire.docx DOCX document
Attachment D - Specifications Vol 3.pdf PDF
Attachment B - Specifications Vol 1.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NUMBERNAMENameDESCRIPTIONREFERENCEDescriptionWHEN
01 00 00GENERAL REQUIREMENTS- Construction Security Requirements1.5Security plan, security memorandum
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
Document ControlDocument Control1.5.DGeneral Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
PhasingPhasing1.6Phasing plan
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
Utilities ServicesUtilities Services1.6.N.2Contractor shall submit a request to interrupt any such services7 days in advance of proposed interruption
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
SurveySurvey1.7.AContractor shall make a thorough survey with the COR and a representative of VA Supply Service of buildings, areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report
01 00 00GENERAL REQUIREMENTSGENERAL REQUIREMENTS-
As-Built DrawingsAs-Built Drawings1.11.CContractor shall deliver two approved completed sets of as-built drawings in the electronic version15 days after each completed phase
01 32 16.15GENERAL REQUIREMENTSPROJECT SCHEDULES- Contractor's ConsultantResident Engineer's Field Office1.3.AContractor shall submit a qualification proposal to the COR, within 10 days of bid acceptance.10 days within bid acceptance.
01 32 16.15ERROR:#REF!PROJECT SCHEDULES- The Complete Project Schedule SubmittalERROR:#REF!1.5Project ScheduleWithin 5 calendar days after kick-off
01 32 16.15ERROR:#REF!PROJECT SCHEDULES- The Complete Project Schedule SubmittalERROR:#REF!1.5.DContractor shall submit to the COR; the final project schedule.Within 30 calendar days after receipt of the complete project interim schedule.
01 33 23SHOP DRAWINGS, PRODUCT DATA, AND SAMPLESSHOP DRAWINGS, PRODUCT DATA, AND SAMPLES- Submittal RegisterNone1.3Submit samples required by Section 09 06 00, SCHEDULE FOR FINISHES, in quadruplicate. Submit other samples in single units unless otherwise specified. Submittals will receive consideration only when covered by a transmittal letter signed by Contractor. Submittal drawings (shop, erection or setting drawings) and schedules, required for work of various trades, shall be checked before submission by technically qualified employees of Contractor for accuracy, completeness and compliance with contract requirements. For each drawing required, submit one legible photographic paper or vellum reproducible. Reproducible shall be full size and each drawing shall have marked thereon, proper descriptive title. Reproducible shall be full size. Samples, shop drawings, test reports, certificates and manufacturers' literature and data, shall be submitted.
01 45 00Quality Control1.3Submit Interim CQC plan, CQC Plan, and Additional Requirements for Design Quality Control (DQC) Plan, checklists, design quality control, test reports
01 45 35Special Inspections1.4.MSubmittals required
01 45 35Special Inspections1.4MSIOR letter of acceptance, test reports, special inspections, certificates, qualifications
01 57 19TEMPORARY ENVIRONMENTAL CONTROLSTEMPORARY ENVIRONMENTAL CONTROLS-
Environmental Protection PlanEnvironmental Protection Plan1.4Environmental Protection PlanAfter the contract is awarded and prior to the commencement of the work, the Contractor shall meet with the COR to discuss the proposed EPP and to develop mutual understanding relative to details of environmental protection. Not more than 20 days after the meeting, the Contractor shall prepare and submit to the COR for approval, a written and/or graphic Environmental Protection plan.
01 57 19TEMPORARY ENVIRONMENTAL CONTROLSTEMPORARY ENVIRONMENTAL CONTROLS-
Reduction of NoiseReduction of Noise1.4Measure sound level for noise exposure due to the construction at least once every five successive working days while work is being performed above 55 dB(A) noise level
01 74 19CONSTRUCTION WASTE MANAGEMENTCONSTRUCTION WASTE MANAGEMENT-
Demolition Debris Management PlanDemolition Debris Management Plan1.5Demolition debris management plan, designated manager, monthly summary, target waste diversion rate, final report
02 82 11TRADITIONAL ASBESTOS ABATEMENT- Emergency Action Plan and Arrangements2.5.1Work schedule, staff organization chart, standard operation procedures, specifics of the materials and equipment to be used for this project, approved landfill, required notifications and arrangements, laboratory and personnel, qualificationsm information on personnel, copies of state license, manufacturers technical data for encapsulatns and the MSDS, and application instructions.Minimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT- Asbestos Hazard Abatement PlanSubmittals2.3Contractor shall establish and submit an Asbestos Hazard Abatement Plan in printed form and loose leaf consisting of simplified text, diagrams, sketches, and pictures that establish and explain clearly the procedures to be followed during all phases of the work by personnel.Minimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENT-
Submittals2.5.1.ASubmit a detailed work schedule for the ntire project reflecting contract documents and the phasing/schedule requirements from the CPM chart.Minimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
SubmittalsSubmittals2.5.1.BSubmit a staff organization chart showing all personnel who will be working on the project and their capacity/functionMinimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
SubmittalsSubmittals2.5.1.DSubmit the specifics of the materials and equipment to be used for this projectMinimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
SubmittalsSubmittals2.5.1.ESubmit the name, location, and phone number of the approved landfillMinimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
SubmittalsSubmittals2.5.1.FSubmit required notifications and arrangements made with regulatory agenciesMinimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
SubmittalsSubmittals2.5.1.GSubmit the name, location and verification of the laboratory and/or personnel to be used for analysis of air and/or bulk samplesMinimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
SubmittalsSubmittals2.5.1.HSubmit qualifications verificationMinimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
SubmittalsSubmittals2.5.1.ISubmit information on personnelMinimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
SubmittalsSubmittals2.5.1.JSubmit copies of State license for asbestos abatementMinimum of 14 days prior to the pre-start meeting
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
Submittals During AbatementSubmittals During Abatement2.5.2Daily log, spection and approval of designated area
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
Submittals During AbatementSubmittals During Abatement2.5.2.BThe CPIH/CIH shall document and maintain the inspection and approval of the regulated area preparation prior to start of work and daily during work.
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
Submittals at the Completion of AbatementSubmittals at the Completion of Abatement2.5.3Project report, samples
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
Certificates of ComplianceCertificates of Compliance2.6.3The Contractor shall submit to the VA representative certification from the manufacturer indicating compliance with performance requirements for encapsulants
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
Design and LayoutDesign and Layout2.1.3.ABefore start of work submit the design and layout of the regulated area and the negative air machines
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
Wet Removal of AmositeWet Removal of Amosite3.2.4Submit full information/documentation on the wetting agent proposed prior to start
02 82 11TRADITIONAL ASBESTOS ABATEMENTTRADITIONAL ASBESTOS ABATEMENT-
Laboratory Testing of PCM and TEM Clearance SamplesLaboratory Testing of PCM and TEM Clearance Samples3.8.7Testing of PCM samples: A complete record, certified by the laboratory, of all air monitoring tests and results. Testing of TEM samples: A complete record, certified by the laboratory, of all TEM results. Testing of Bulk samples: A complete record, certified by the laboratory, of all TEM results shall be furnished
02 82 13.19ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals2.5.1.ASubmit a detailed work schedule for the entire project reflecting contract documents and the phasing/schedule requirements from the CPM chart.Minimum of 14 days prior to the pre-start meeting
02 82 13.19TRADITIONAL ASBESTOS ABATEMENTASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting SubmittalsLaboratory Testing of PCM and TEM Clearance Samples2.5.1.BSubmit a staff organization chart showing all personel who will be working on the project and their capacity/function. Provide their qualifications, training, accreditations, and licenses, as appropriate.Minimum of 14 days prior to the pre-start meeting
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting SubmittalsERROR:#REF!2.5.1.CSubmit AHAP developed specifically for thie projsct, incorporating the requirements of the specifications, prepared, signed, and dated by the CPIH/CIH.Minimum of 14 days prior to the pre-start meeting
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting SubmittalsERROR:#REF!2.5.1.DSubmit the specifics of the materials and equipment to be used for this project.Minimum of 14 days prior to the pre-start meeting
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting SubmittalsERROR:#REF!2.5.1.ESubmit the name, location, and phone number of the approved landfillMinimum of 14 days prior to the pre-start meeting
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting SubmittalsERROR:#REF!2.5.1.FSubmit required notifications and arrangements made with regulatory agenciesMinimum of 14 days prior to the pre-start meeting
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting SubmittalsERROR:#REF!2.5.1.GSubmit the name, location, and verification of the laboratory and/or personnel to be used for analysis of air and/or bulk samples.Minimum of 14 days prior to the pre-start meeting
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting SubmittalsERROR:#REF!2.5.1.HSubmit qualifications verificationMinimum of 14 days prior to the pre-start meeting
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting SubmittalsERROR:#REF!2.5.1.JSubmit copies of State license for asbestos abatementMinimum of 14 days prior to the pre-start meeting
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Submittals During AbatementERROR:#REF!2.5.2.AThe Competent Person shall maintain and submit a daily log at the regulated area documenting the dates and times
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Submittals During AbatementERROR:#REF!2.5.2.BThe CPIH/CIH shall document and maintain the inspection and approval of the regulated area preparation prior to start of work and daily during work.
02 82 13.19ERROR:#REF!ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Submittals at Completion of AbatementERROR:#REF!2.5.3The CPIH/CIH shall submit a project report consisting of the daily log book requirements and documentation of events during the abatement project
02 83 33.13ERROR:#REF!LEAD-BASED PAINT REMOVAL AND DISPOSAL- SubmittalsERROR:#REF!1.6.BManufacturer's Literature and Data
02 83 33.13ERROR:#REF!LEAD-BASED PAINT REMOVAL AND DISPOSAL- SubmittalsERROR:#REF!1.6.CTest reports
02 83 33.13ERROR:#REF!LEAD-BASED PAINT REMOVAL AND DISPOSAL- SubmittalsERROR:#REF!1.6.EQualifications
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Shop DrawingsShop Drawings1.6.BReinforcing steel: Complete shop drawings
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Mill Test ReportsMill Test Reports1.6.C.1Reinforcing Steel
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Mill Test ReportsMill Test Reports1.6.C.2Cement
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.1Abrasive aggregate.
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.2Lightweight aggregate for structural concrete
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.3Air‑entraining admixture
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.4Chemical admixtures, including chloride ion content
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.5Waterproof paper for curing concrete
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.6Liquid membrane‑forming compounds for curing concrete
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.7Non‑shrinking grout
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.8Liquid hardener
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.9Waterstops
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.10Expansion joint filler
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.D.11Adhesive binder
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.ETesting Agency for Concrete Mix Design
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.FTest Report for Concrete Mix Designs
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.GShoring and Reshoring Sequence
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Manufacturer's CertificatesManufacturer's Certificates1.6.HTest reports on splitting tensile strength
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Fly Ash TestingFly Ash Testing2.3.BSubmit certificate verifying conformance with ASTM 618 initially with mix design and for each truck load of fly ash delivered from source. Submit test results performed within 6 months of submittal date
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Placing Reinforcement: SplicingPlacing Reinforcement: Splicing3.2.D.2.aSubmit test reports indicating the chemical analysis to establish weldability of reinforcing steel
03 30 00CAST-IN-PLACE CONCRETECAST-IN-PLACE CONCRETE-
Placing Reinforcement: SplicingPlacing Reinforcement: Splicing3.2.D.2.bSubmit a field quality control procedure to insure proper inspection, materials and welding procedure for welded splices
05 12 00ERROR:#REF!STRUCTURAL STEEL FRAMING- SubmittalsERROR:#REF!1.4Submittal Drawings, test reports, certificates, qualifications, delegated design drawings and calculations, record surveys
05 31 00STEEL DECKING - Submittals1.4Submittal drawings, literature and data, certificates, qualifications, insurance certification
05 50 00ERROR:#REF!METAL FABRICATIONS- SubmittalsERROR:#REF!1.3Manufacturer's Literature and Data, Shop darwings, certificates, design calculations, setting drawings and instructions for installation
05 50 00ERROR:#REF!METAL FABRICATIONS- SubmittalsERROR:#REF!1.3.CShop Drawings of each item showing complete detail
06 10 00ROUGH CARPENTRYROUGH CARPENTRY-
Manufacturer’s Literature and DataManufacturer’s Literature and Data1.3Literature and data,certificate for unmarked lumber
06 10 00ROUGH CARPENTRYROUGH CARPENTRY-
CertificatesCertificates1.3.EManufacturer’s certificate for unmarked lumber
06 16 63CEMENTITIOUS SHEATHING1.3Manufacturer's Literature and Data, samples
06 20 00ERROR:#REF!FINISH CARPENTRY- SubmittalsERROR:#REF!1.5.B.1Show size, configuration, and fabrication and installation details
06 20 00ERROR:#REF!FINISH CARPENTRY- SubmittalsERROR:#REF!1.5.C.1Manufacturer's Literature and Data
07 21 13ERROR:#REF!THERMAL INSULATION- SubmittalsERROR:#REF!1.4.B.1Show insulation type, thickness, and R-value for each location.
07 21 13ERROR:#REF!THERMAL INSULATION- SubmittalsERROR:#REF!1.4.C.1Manufacturer's Literature and Data
07 22 00ERROR:#REF!ROOF AND DECK INSULATION- SubmittalsERROR:#REF!1.4Submittal drawings, literature and data, samples, qualifications
07 22 00ERROR:#REF!ROOF AND DECK INSULATION- SubmittalsERROR:#REF!1.4.C.1Manufacturer's Literature and Data
07 40 00ERROR:#REF!ROOFING AND SIDING PANELS- SubmittalsERROR:#REF!1.5Samples, shop drawings, literature and data, fire test report, certifications, qualifications, warranty
07 40 00ERROR:#REF!ROOFING AND SIDING PANELS- SubmittalsERROR:#REF!1.5.DManufacturer's Literature and Data
07 54 23ERROR:#REF!THERMOPLASTIC POLYOLEFIN (TPO) ROOFING- SubmittalsERROR:#REF!1.5Submittal Drawings, literature and data, samples, certificates, qualifications, field quality control reports, temporary protection plan, operation and maintenance data
07 60 00ERROR:#REF!FLASHING AND SHEET METAL- SubmittalsERROR:#REF!1.5Shop drawings, literature and data, certificates
07 72 00Roof Accessories1.4Shop drawings, product data, and samples, certificates
07 81 00ERROR:#REF!APPLIED FIREPROOFING- SubmittalsERROR:#REF!1.3.EManufacturer's Literature and Data
07 84 00FIRESTOPPINGFIRESTOPPING-
QualificationsQualifications1.3Installer qualifications, inspector qualifications, literature, data, and installation instructions, list of classification number of systems installed, test reports, certificates
07 84 00FIRESTOPPINGFIRESTOPPING-
QualificationsQualifications1.3.DInspector qualifications
07 84 00FIRESTOPPINGFIRESTOPPING-
Certified laboratory test reportsCertified laboratory test reports1.3.F, GASTM E814 tests for systems not listed by FM, UL, or WH proposed for use, Certifications
07 84 00FIRESTOPPINGFIRESTOPPING-
Inspections and Acceptance of WorkInspections and Acceptance of Work3.5Submit written reports indicating locations of and types of penetrations and type of firestopping used at each location; type is to be recorded by UL listed printed numbers
07 92 00JOINT SEALANTSJOINT SEALANTS-
QualificationsQualifications1.5Installer qualifications, certification, installation instructions, cured samples, literature and data, warranty
07 92 00JOINT SEALANTSJOINT SEALANTS-
QualificationsQualifications1.4.DContractor certification
07 92 00JOINT SEALANTSJOINT SEALANTS-
Product DataProduct Data1.5.EManufacturer's installation instructions for each product used
07 92 00JOINT SEALANTSJOINT SEALANTS-
SamplesSamples1.5.FCured samples of exposed sealants for each color
07 92 00JOINT SEALANTSJOINT SEALANTS-
WarrantyWarranty1.5.HManufacturer warranty
08 11 13HOLLOW METAL DOORS AND FRAMESHOLLOW METAL DOORS AND FRAMES-
Submittal DrawingsSubmittal Drawings1.4Manufacturers literature and data. Test Reports. Qualifications. Blast Design Calculations.
08 11 13HOLLOW METAL DOORS AND FRAMESHOLLOW METAL DOORS AND FRAMES-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.CDescription of each product. Include schedule showing each door and frame requirements, fire label, and smoke control label for openings. Installation instructions.
08 14 00ERROR:#REF!INTERIOR WOOD DOORS- SubmittalsERROR:#REF!1.4Submittal drawings, literature and data, samples, test reports, operation and maintenance data
08 14 00ERROR:#REF!INTERIOR WOOD DOORS- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
08 17 10Integrated Door Assemblies1.5Submittal drawings, Manufacturers literature and data, Certificates, Qualifications, Operation and Maintenance Data.
08 31 13ERROR:#REF!ACCESS DOORS AND FRAMES-SubmittalsERROR:#REF!1.4Submittal drawings, literature and data
08 31 13ERROR:#REF!ACCESS DOORS AND FRAMES- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
08 33 00ERROR:#REF!COILING DOORS AND GRILLES- SubmittalsERROR:#REF!1.4.BShow size, configuration, and fabrication and installation details
08 33 00ERROR:#REF!COILING DOORS AND GRILLES- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
08 34 53ERROR:#REF!SECURITY DOORS AND FRAMES- SubmittalsERROR:#REF!1.4.A.1Product data for each element of work
08 34 53ERROR:#REF!SECURITY DOORS AND FRAMES- SubmittalsERROR:#REF!1.4.A.2Manufacturer's standard color chart
08 34 53ERROR:#REF!SECURITY DOORS AND FRAMES- SubmittalsERROR:#REF!1.4.A.3Certificates
08 34 53ERROR:#REF!SECURITY DOORS AND FRAMES- SubmittalsERROR:#REF!1.4.A.4Shop drawings showing each dimensioned details of each door assembly
08 34 59ERROR:#REF!VAULT DOORS AND DAY GATES- SubmittalsERROR:#REF!1.4.BShow size, configuration, configuration, and installation details
08 34 59ERROR:#REF!VAULT DOORS AND DAY GATES- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
08 41 13ERROR:#REF!ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS-ERROR:#REF!1.5.BShop drawings showing size, configuration, fabrication, and installation details
08 41 13ERROR:#REF!ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS-ERROR:#REF!1.5.CManufacturer's Literature and Data
08 56 53ERROR:#REF!BLAST RESISTANT WINDOWS-SubmittalsERROR:#REF!1.5.BShow dimensioned details of window units, including intended metal and glazing materials
08 56 53ERROR:#REF!BLAST RESISTANT WINDOWS-SubmittalsERROR:#REF!1.5.CManufacturer's Literature and Data
08 56 53ERROR:#REF!BLAST RESISTANT WINDOWS-SubmittalsERROR:#REF!1.5.ECertificates
08 56 53ERROR:#REF!BLAST RESISTANT WINDOWS-SubmittalsERROR:#REF!1.5.FCalculations
08 56 53ERROR:#REF!BLAST RESISTANT WINDOWS-SubmittalsERROR:#REF!1.5.GQualifications
08 56 59ERROR:#REF!SERVICE AND TELLER WINDOW UNITS- SubmittalsERROR:#REF!1.4.BService windows, showing design, construction, and installation
08 56 59ERROR:#REF!SERVICE AND TELLER WINDOW UNITS- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
08 71 00DOOR HARDWAREDOOR HARDWARE-
Hardware ScheduleHardware Schedule1.6Hardware schedule, Samples and Manufacturers literature, Certificates of compliance and test reports, Record of opening force measurement for all doors equipped with closers.
08 71 00DOOR HARDWAREDOOR HARDWARE-
Samples and Manufacturers' LiteratureSamples and Manufacturers' Literature1.6.CAll hardware items (proposed for the project) that have not been previously approved by Builders Hardware Manufacturers Association shall be submitted for approval. Tag and mark all items with manufacturer's name, catalog number and project number
08 71 00DOOR HARDWAREDOOR HARDWARE-
Samples and Manufacturers' LiteratureSamples and Manufacturers' Literature1.6.CSamples are not required for hardware listed in the specifications by manufacturer's catalog number, if the contractor proposes to use the manufacturer's product specified
08 71 00DOOR HARDWAREDOOR HARDWARE-
Hardware HeightsHardware Heights3.1Hardware Heights
08 71 00DOOR HARDWAREDOOR HARDWARE-
locationslocations3.1.AFor existing buildings locate hardware on doors at heights to match existing hardware. The Contractor shall visit the site, verify location of existing hardware and submit locations to VA Resident Engineer for approval
08 71 00DOOR HARDWAREDOOR HARDWARE-
Submittals - Final InspectionSubmittals - Final Inspection3.3Installer to provide letter to COR that upon completion, installer has visited the Project and has accomplished the following. Re-adjust hardware. Evaluate maintenance procedures and recommend changes or additions, and instruct VA personnel. Identify items that have deteriorated or failed. Submit written report identifying problems.
08 71 13ERROR:#REF!AUTOMATIC DOOR OPERATORS- SubmittalsERROR:#REF!1.5Submittal drawings, Manufacturers literature and data, Test Reports, Qualifications, Operation and Maintenance Data
08 71 13ERROR:#REF!AUTOMATIC DOOR OPERATORS- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
08 71 13ERROR:#REF!AUTOMATIC DOOR OPERATORS- SubmittalsERROR:#REF!1.4.EQualifications
08 80 00ERROR:#REF!GLAZING- SubmittalsERROR:#REF!1.5Manufacturer's Certificates, Warranty, Literature and data, samples
08 80 00ERROR:#REF!GLAZING- SubmittalsERROR:#REF!1.5.BManufacturer's Warranty
08 80 00ERROR:#REF!GLAZING- SubmittalsERROR:#REF!1.5.CManufacturer's Literature and Data
08 80 00ERROR:#REF!GLAZING- SubmittalsERROR:#REF!1.5.DSamples
08 90 00LOUVERS AND VENTS- Submittals1.3Shop drawings, literature and data, color samples, blast design calcuations
08 90 00LOUVERS AND VENTS- Submittals1.3.CManufacturer's Literature and Data
08 90 00LOUVERS AND VENTS- Submittals1.3.CColor samples
09 05 16SUBSURFACE PREPARATION FOR FLOOR FINISHES- Submittals1.3Written approval of compatibility, product data, test data
09 22 16NON-STRUCTURAL METAL FRAMINGNON-STRUCTURAL METAL FRAMING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4Literature and data, shop drawings, test results
09 22 16NON-STRUCTURAL METAL FRAMINGNON-STRUCTURAL METAL FRAMING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.BHanger inserts
09 22 16NON-STRUCTURAL METAL FRAMINGNON-STRUCTURAL METAL FRAMING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.BChannels (Rolled steel)
09 22 16NON-STRUCTURAL METAL FRAMINGNON-STRUCTURAL METAL FRAMING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.BFurring channels
09 22 16NON-STRUCTURAL METAL FRAMINGNON-STRUCTURAL METAL FRAMING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.BScrews, clips and other fasteners
09 29 00GYPSUM BOARD- Submittals1.4Manufacturer's Literature and Data, shop dawrings, samples, test results, certificates
09 30 13CERAMIC/PORCELAIN TILING- Submittals1.3Samples, product data, certifications, installer qualifications
09 30 13CERAMIC/PORCELAIN TILING- Submittals1.3.CProcduct data
09 51 00ACOUSTICAL CEILINGS- Submittals1.5Submittal drawings, literature and data, samples
09 51 00ACOUSTICAL CEILINGS- Submittals1.5.CManufacturer's Literature and Data
09 65 13RESILIENT BASE AND ACCESSORIES- Submittals1.4Manufacturer's Literature and Data, samples
09 65 13RESILIENT BASE AND ACCESSORIES- Submittals1.5.CSamples
09 65 16RESILIENT SHEET FLOORING- Submittals1.4.BManufacturer's Literature and Data
09 65 16RESILIENT SHEET FLOORING- Submittals1.4.CSamples
09 65 19RESILIENT TILE FLOORING- Submittals1.3.BManufacturer's Literature and Data
09 65 19RESILIENT TILE FLOORING- Submittals1.3.CSamples of each type, color, thickness, and finish.
09 65 19RESILIENT TILE FLOORING- Submittals1.3.DShop drawings indicating layout of patterns as shown on construction documents.
09 67 23.60Resinouse Urethane and Epoxy Mortar Flooring1.3Literature and data, Qualifications, samples, shop drawings, certifications and approvals, warranty
09 68 00CARPETING- Submittals1.4.BProduct data
09 68 00CARPETING- Submittals1.4.CSamples
09 91 00PAINTINGPAINTING-
Painter qualificationsPainter qualifications1.3Painter Qualifications, manufcaturers literature and data, sample panels, sample of identity markers if used, manufacturers certificates
09 91 00PAINTINGPAINTING-
Manufacturer's Literature and Technical DataManufacturer's Literature and Technical Data1.3.CManufacturer's Literature and Data
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DAfter painters' materials have been approved and before work is started submit sample panels showing each type of finish and color specified
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DPanels to Show Color: Composition board, 100 x 250 mm (4 x 10 inch)
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DPanel to Show Transparent Finishes: Wood of same species and grain pattern as wood approved for use, 100 x 250 mm (4 x 10 inch face) minimum, and where both flat and edge grain will be exposed, 250 mm (10 inches) long by sufficient size, 50 x 50 mm (2 x 2 inch) minimum or actual wood member to show complete finish
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DAttach labels to panel stating the following
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DFederal Specification Number or manufacturers name and product number of paints used
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DSpecification code number specified in Section 09 06 00, SCHEDULE FOR FINISHES
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DProduct type and color
09 91 00PAINTINGPAINTING-
Sample PanelsSample Panels1.3.DName of project
09 91 00PAINTINGPAINTING-
SamplesSamples1.3.DSample of identity markers if used
10 11 13ERROR:#REF!CHALKBOARDS AND MARKERBOARDS- SubmittalsERROR:#REF!1.3.BShop drawings identifying all parts, by name and material and showing design, constrution, installation, and relation to adjacent construction.
10 11 13ERROR:#REF!CHALKBOARDS AND MARKERBOARDS- SubmittalsERROR:#REF!1.3.CManufacturer's Literature and Data
10 11 13ERROR:#REF!CHALKBOARDS AND MARKERBOARDS- SubmittalsERROR:#REF!1.3.DSamples
10 14 00SIGNAGESIGNAGE-
Interior Sign SamplesInterior Sign Samples1.4Samples, manufacturers literature and data, sign location plan, shop drawings, layout patterns, qualifications, structural calculations
10 14 00SIGNAGESIGNAGE-
Interior Sign SamplesInterior Sign Samples1.4.BSign Panel, 203 x 254 mm (8 x 10 inches), with letters
10 14 00SIGNAGESIGNAGE-
Interior Sign SamplesInterior Sign Samples1.4.BColor samples of each color, 152 x 152 mm (6 x 6 inches. Show anticipated range of color and texture
10 14 00SIGNAGESIGNAGE-
Interior Sign SamplesInterior Sign Samples1.4.BSample of typeface, arrow and symbols in a typical full size layout
10 14 00SIGNAGESIGNAGE-
Manufacturer's LiteratureManufacturer's Literature1.4.CShowing the methods and procedures proposed for the anchorage of the signage system to each surface type
10 14 00SIGNAGESIGNAGE-
Manufacturer's LiteratureManufacturer's Literature1.4.CManufacturer’s printed specifications and maintenance instructions
10 14 00SIGNAGESIGNAGE-
Sign Location PlanSign Location Plan1.4.Dshowing location, type and total number of signs required
10 14 00SIGNAGESIGNAGE-
Shop DrawingsShop Drawings1.4.EScaled for manufacture and fabrication of sign types. Identify materials, show joints, welds, anchorage, accessory items, mounting and finishes
10 14 00SIGNAGESIGNAGE-
Full size layout patternsFull size layout patterns1.4.Ffor dimensional letters
10 21 23SIGNAGECUBICAL CURTAIN TRACKS- SubmittalsQualifications1.3Samples, shop drawings, literature and data
10 21 23SIGNAGECUBICAL CURTAIN TRACKS- SubmittalsQualifications1.3.CShop drawings indicating layout of tracks and method of anchorage
10 21 23SIGNAGECUBICAL CURTAIN TRACKS- SubmittalsCalculations1.3.DManufacturer's Literature and Data
10 25 13Patient Bed Service Walls1.3Shop drawings, Literature and data, qualifications, operation and maintenance manuals, certifications
10 26 00CUBICLE CURTAIN TRACKSWALL AND DOOR PROTECTION- SubmittalsSamples1.4Shop drawings, literature and data, test reports, qualifications, warranty
10 21 23CUBICLE CURTAIN TRACKSWALL AND DOOR PROTECTION- SubmittalsSamples1.3.DManufacturer's Literature and Data
10 28 00CUBICLE CURTAIN TRACKSTOILET, BATH, AND LAUNDRY ACCESSORIES- SubmittalsSamples1.4Submittal drawings, literature and data, samples, certificates, qualifications, operation and maintenance data
10 28 00CUBICLE CURTAIN TRACKSTOILET, BATH, AND LAUNDRY ACCESSORIES- SubmittalsSamples1.4.CManufacturer's Literature and Data
10 28 00CUBICLE CURTAIN TRACKSTOILET, BATH, AND LAUNDRY ACCESSORIES- SubmittalsShop Drawings1.4.DSamples
10 44 13ERROR:#REF!FIRE EXTINGUISHER CABIENTS- SubmittalsERROR:#REF!1.3Manufacturer's Literature and Data
11 73 00Ceiling Mounted Patient Lift System1.4Shop drawings, Certificates, literature and data, Individual room layouts, inspection checklist
12 24 00ERROR:#REF!WINDOW SHADES- SubmittalsERROR:#REF!1.3.BSamples
12 24 00ERROR:#REF!WINDOW SHADES- SubmittalsERROR:#REF!1.3.CManufacturer's Literature and Data
12 24 00ERROR:#REF!WINDOW SHADES- SubmittalsERROR:#REF!1.3.DShop drawings indicating fabrication and installation details
12 24 00ERROR:#REF!WINDOW SHADES- SubmittalsERROR:#REF!1.3.FManufacturer's warranty
12 32 00ERROR:#REF!MANUFACTURED WOOD CASEWORK-SubmittalERROR:#REF!1.3Manufacturer's Literature and Data
12 32 00ERROR:#REF!MANUFACTURED WOOD CASEWORK-SubmittalERROR:#REF!1.3.CSamples
12 32 00ERROR:#REF!MANUFACTURED WOOD CASEWORK-SubmittalERROR:#REF!1.3.DShop drawings indicating each casework type, showing details of constrution, including materials, hardware and accessories
12 32 00ERROR:#REF!MANUFACTURED WOOD CASEWORK-SubmittalERROR:#REF!1.3.E.1Manufacturer's qualifications
12 32 00ERROR:#REF!MANUFACTURED WOOD CASEWORK-SubmittalERROR:#REF!1.3.E.2Installer's qualifications
12 36 00ERROR:#REF!COUNTERTOPS- SubmittalsERROR:#REF!1.3Shop drawings, samples
12 36 00ERROR:#REF!COUNTERTOPS- SubmittalsERROR:#REF!1.3.CSamples
13 05 41ERROR:#REF!SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS- SubmittalsERROR:#REF!1.4.ASubmit a coordinated set of equipment anchorage drawings indicating description, layout, and location of items to be anchored or braced with anchorage or bracing noted and dimensionedPrior to installation
13 05 41ERROR:#REF!SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS- SubmittalsERROR:#REF!1.4.BA coordinated set of bracing drawings for seismic protection of pipingPrior to installation
13 05 41ERROR:#REF!SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS- SubmittalsERROR:#REF!1.4.CA coordinated set of bracing drawings for seismic protection of ductowrkPrior to installation
13 05 41ERROR:#REF!SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS- SubmittalsERROR:#REF!1.4.DSubmit design calculations prepared and sealed by the registered structural engineer
14 24 00SIGNAGEHYDRAULIC ELEVATORS- Shop DrawingsQualifications1.5Complete scaled and dimensioned layout in plan and section view showing the arrangement of equipment and all details of eash and every elevator unit specified.
14 24 00SIGNAGEHYDRAULIC ELEVATORS- Shop DrawingsCalculations1.5.C.1.aComplete layout showing location of storage tank/pump assembly, controller, piping layout, outside diameter of cylinder/plunger assembly, size of car platform, car frame members, and support assembly.
14 24 00CUBICLE CURTAIN TRACKSHYDRAULIC ELEVATORS- Shop DrawingsSamples1.5.C.1.b`
14 24 00CUBICLE CURTAIN TRACKSHYDRAULIC ELEVATORS- Shop DrawingsSamples1.5.C.1.cRail bracket spacing and maximum vertical forces on guide rails in accordance with H-18-8 for seismic risk zone 2 or greater.
14 24 00CUBICLE CURTAIN TRACKSHYDRAULIC ELEVATORS- Shop DrawingsSamples1.5.C.2Rail bracket spacing and maximum vertical forces on guide rails in accordance with H-18-8 for seismic risk zone 2 or greater.
14 24 00CUBICLE CURTAIN TRACKSHYDRAULIC ELEVATORS- Shop DrawingsSamples1.5.DSamples
21 05 11CUBICLE CURTAIN TRACKSCOMMON WORK RESULTS FOR FIRE SUPPRESSION- Shop DrawingsShop Drawings1.4.BManufacturer's Literature and Data
21 13 13WET-PIPE SPRINKLER SYSTEMSWET-PIPE SPRINKLER SYSTEMS-
QualificationsQualifications1.4.A.1Provide a copy of the installing contractors fire sprinkler and state contractor's license.
21 13 13WET-PIPE SPRINKLER SYSTEMSWET-PIPE SPRINKLER SYSTEMS-
DrawingsDrawings1.4.A.2Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings, include graphical scales that allow the user to determine lengths when the drawings are reduced in size, plan showing the piping to the water supply test location
21 13 13WET-PIPE SPRINKLER SYSTEMSWET-PIPE SPRINKLER SYSTEMS-
Manufacturer’s Data SheetsManufacturer’s Data Sheets1.4.A.3data sheets for all materials and equipment proposed for use on the system, include listing information and installation instructions in data sheets
21 13 13WET-PIPE SPRINKLER SYSTEMSWET-PIPE SPRINKLER SYSTEMS-
Final Document SubmittalsFinal Document Submittals1.4.A.4Provide as-built drawings, testing and maintenance instructions, complete set of as-built drawings showing the installed system with specific interconnections, one full size (or size as directed by the COR) printed copy, one complete set in electronic pdf format, one complete set in AutoCAD format or a format as directed by the COR
21 13 13WET-PIPE SPRINKLER SYSTEMSWET-PIPE SPRINKLER SYSTEMS-
Material and Testing CertificateMaterial and Testing Certificate1.4.A.4.aProvide a copy of a completed Material and Testing Certificate as indicated in NFPA 13, certificates shall be provided to document all parts of the installationUpon completion of the sprinkler system installation
21 13 13WET-PIPE SPRINKLER SYSTEMSWET-PIPE SPRINKLER SYSTEMS-
Material and Testing CertificateMaterial and Testing Certificate1.4.A.6.aOne paper copy in a binder provided in pdf format on a compact disc or as directed by the COR
21 13 13WET-PIPE SPRINKLER SYSTEMSWET-PIPE SPRINKLER SYSTEMS-
Operations and Maintenance ManualOperations and Maintenance Manual1.4.A.6.cOne additional copy of the O&M Manual covering the system in a flexible protective cover
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
CertificationCertification1.4.Econtractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings and specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installationprior to submitting shop drawings
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
ListList1.4.FLists of previous installations for selected equipment contact persons who will serve as references, with telephone numbers and e-mail addresses
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.GElectric motor data and variable speed drive data shall be submitted
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.GEquipment and materials identification
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.GFirestopping materials
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.GHangers, inserts, supports and bracing
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.GProvide load calculations for variable spring and constant support hangers
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.GWall, floor, and ceiling plates
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
Submittals and shop drawings for interdependent itemsSubmittals and shop drawings for interdependent items1.4.H,IShop drawings shall be furnished together and complete in a group containing applicable descriptive information. Coordination drawings shall contain: Complete consolidated and coordinated layout drawings for all new systems, and for existing systems that are in the same areas. The drawings shall include plan views, elevations and sections of all systems on a scale of not less than 1:32. Clearly show the proposed location and adequate clearance for all equipment. Details of the following shall be provided: Mechanical equipment rooms, interstitial space hangers, inserts, supports, and bracing, pipe sleeves, equipment penetrations of floors, walls, ceilings, or roofs
22 05 11COMMON WORK RESULTS FOR PLUMBINGCOMMON WORK RESULTS FOR PLUMBING-
Maintenance Data and Operating InstructionsMaintenance Data and Operating Instructions1.4.JInclude complete list indicating all components of the systems with diagrams and listing of recommended replacement parts for keeping in stock supply including sources of supply
22 05 12ERROR:#REF!GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT- SubmittalsERROR:#REF!1.4.CShop drawings indicating motor nameplate information, electrical ratings, dimensions, mounting details, materials, horsepower, power factor, current as a function of speed, current efficiency, speed as a function of load…..
22 05 12ERROR:#REF!GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT- SubmittalsERROR:#REF!1.4.DOperation and Maintenance Manuals
22 05 12ERROR:#REF!GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT- SubmittalsERROR:#REF!1.4.ECertifications2 weeks prior to final inspection
22 05 19ERROR:#REF!METERS AND GAGES FOR PLUMBING PIPING- SubmittalsERROR:#REF!1.4.AManufacturer's Literature and Data
22 05 19ERROR:#REF!METERS AND GAGES FOR PLUMBING PIPING- SubmittalsERROR:#REF!1.4.BOperation and Maintenance Manuals
22 05 23ERROR:#REF!GENERAL-DUTY VALVES FOR PLUMBING PIPING- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
22 07 11ERROR:#REF!PLUMBING INSULATION- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
22 07 11ERROR:#REF!PLUMBING INSULATION- SubmittalsERROR:#REF!1.4.DShop drawings specify each type used and state surface burning characteristics
22 11 00ERROR:#REF!FACILITY DISTRIBUTION- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
22 11 00ERROR:#REF!FACILITY DISTRIBUTION- SubmittalsERROR:#REF!1.4.DComplete operating and maintenance manuals including wiring diagrams, technical data sheets and information for ordering replacement parts
22 13 00ERROR:#REF!FACILITY SANITARY AND VENT PIPING- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
22 13 00ERROR:#REF!FACILITY SANITARY AND VENT PIPING- SubmittalsERROR:#REF!1.4.DDetailed shop drawing of clamping device and extensions when required in connection with the waterproofing membrane or the floor drain
22 14 00FACILITY STORM DRAINAGEFACILITY STORM DRAINAGE-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.CPipe and Fittings
22 14 00FACILITY STORM DRAINAGEFACILITY STORM DRAINAGE-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.CSpecialty Pipe Fittings
22 14 00FACILITY STORM DRAINAGEFACILITY STORM DRAINAGE-
Manufacturer's Literature and DataManufacturer's Literature and Data1.4.CCleanouts
22 14 29TOILET, BATH, AND LAUNDRY ACCESSORIESSUMP PUMPS- Shop DrawingsCertificates1.4.CManufacturer's Literature and Data
22 14 29TOILET, BATH, AND LAUNDRY ACCESSORIESSUMP PUMPS- Shop DrawingsQualifications1.4.CPump manufacturer and model.
22 14 29TOILET, BATH, AND LAUNDRY ACCESSORIESSUMP PUMPS- Shop DrawingsOperation and Maintenance Data1.4.CElectric motor
22 14 29FIRE EXTINGUISHER CABINETSSUMP PUMPS- Shop DrawingsManufacturer's Literature and Data1.4.CControl panel
22 14 29MANUFACTURED WOOD CASEWORKSUMP PUMPS- Shop DrawingsManufacturer's Literature and Data1.4.CSensors
22 14 29MANUFACTURED WOOD CASEWORKSUMP PUMPS- Shop DrawingsManufacturer's Literature and Data1.4.CO&M manuals
22 40 00ERROR:#REF!PLUMBING FIXTURES- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
22 62 00ERROR:#REF!VACCUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
22 62 00ERROR:#REF!VACCUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES- SubmittalsERROR:#REF!1.4.DStation inlets- a letter from the manufacturer shall be submitted stating that inlets are designed and manufactured to comply with NFPA 99
22 62 00ERROR:#REF!VACCUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES- SubmittalsERROR:#REF!1.4.ECertification - the completed systems have been installed, tested, purged and analyzed in accordance with the requirements
22 62 00ERROR:#REF!VACCUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES- SubmittalsERROR:#REF!1.4.FNotorized affidavit from the verifier stating that the verifier undertakes to verify this project and thus agrees to disqualify themselves from supplying any equipment which shall be included in the scope of their verification
22 63 00ERROR:#REF!GAS SYSTEMS FOR LABORATORY AND HEALTHARE FACILITIES- SubmittalsERROR:#REF!1.4.CManufacturer's Literature and Data
22 63 00ERROR:#REF!GAS SYSTEMS FOR LABORATORY AND HEALTHARE FACILITIES- SubmittalsERROR:#REF!1.4.DStation outlets - submit letter from manufacturer stating that outlets are designed and manufactured to comply with NFPA 99
22 63 00ERROR:#REF!GAS SYSTEMS FOR LABORATORY AND HEALTHARE FACILITIES- SubmittalsERROR:#REF!1.4.ECertification - the completed systems have been installed, tested, purged and analyzed in accordance with the requirements
23 05 11GENERAL WORK RESULTS FOR HVACGENERAL WORK RESULTS FOR HVAC-
DocumentationDocumentation1.4.EIf equipment is submitted which differs in arrangement from that shown, provide documentation proving equivalent performance, design standards and drawings that show the rearrangement of all associated systems. Additionally, any impacts on ancillary equipment or services such as foundations, piping, and electrical shall be the Contractor’s responsibility to design, supply, and install at no additional cost or time to the Government.
23 05 11GENERAL WORK RESULTS FOR HVACGENERAL WORK RESULTS FOR HVAC-
CertificationCertification1.4.Fcertify in writing that manufacturers of all major items of equipment have each reviewed contract documents, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installationPrior to submitting shop drawings
23 05 11GENERAL WORK RESULTS FOR HVACGENERAL WORK RESULTS FOR HVAC-
Shop DrawingsShop Drawings1.4.Gfor interdependent items, containing applicable descriptive information, shall be furnished together. Coordinate and properly integrate materials and equipment to provide a completely compatible and efficient installation
23 05 11GENERAL WORK RESULTS FOR HVACGENERAL WORK RESULTS FOR HVAC-
O&M ManualsO&M Manuals1.4.IComplete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide. Provide a listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment. Include in the listing belts for equipment: Belt manufacturer, model number, size and style, and distinguished whether of multiple belt sets.
23 05 12ERROR:#REF!GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT- SubmittalERROR:#REF!1.4.EManufacturer's Literature and Data