Attachment I - Submittal Register.xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- Y1DA--652-24-103 Increase Surgical Access Federal contract opportunity
- Solicitation number
- 36C24626R0023
About this file
This is a Submittal Register (Attachment I) for a federal construction contract with the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 6, for project Y1DA--652-24-103 Increase Surgical Access at the Central VA Medical System in Richmond, VA. The register comprehensively catalogs all required submittals organized by construction specification section number (CSI format), detailing what materials, documentation, and approvals must be submitted throughout the project lifecycle, when they must be submitted, and to whom (typically the Contracting Officer's Representative or COR).
The submittal requirements span the full scope of construction work including general requirements (security plans, phasing plans, as-built drawings within 15 days of phase completion), structural elements (shop drawings for reinforcing steel, concrete mix designs, fly ash certifications), mechanical systems (HVAC equipment data, hydronic piping diagrams, testing and balancing reports due 90 days after design review), plumbing (fixture specifications, vacuum and gas system certifications per NFPA 99), electrical systems (panelboard and wiring device certifications due 2 weeks prior to final inspection), fire suppression (wet-pipe sprinkler system as-built drawings in multiple formats per NFPA 13), communications systems (test reports within 90 days of completion, record wiring diagrams as CAD files), specialized work (asbestos abatement and lead-based paint removal plans due minimum 14 days prior to pre-start meetings, laboratory certifications), finishes (paint samples, flooring and tile installation layouts), and site work (pavement markings, concrete exterior improvements). Certifications, manufacturer's literature, qualifications, warranties, operation and maintenance manuals, and various test reports are standard requirements throughout, with most certifications due 2 weeks prior to final inspection.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Photos.zip | ZIP file | |
| 36C24626R0023 0002.docx | DOCX document | |
| Site.Visit.Log.04.09.2026.pdf | ||
| Pre-Bid Site Visit Agenda.pdf | ||
| 36C24626R0023 0001.docx | DOCX document | |
| Attachment A - Drawings.pdf | ||
| Attachment J - 27 52 23 Nurse Call and Code Blue Systems ASI.pdf | ||
| Attachment E - Wage Determination VA20250155.pdf | ||
| Attachment G - Site Visit.docx | DOCX document | |
| Attachment C - Specifications Vol 2.pdf | ||
| 36C24626R0023_2.docx | DOCX document | |
| Attachment K - Brand Name Justification for Hillrom_Redacted.pdf | ||
| Attachment H - Cost Breakdown by Division.xlsx | XLSX spreadsheet | |
| Attachment F - Past Performance Questionnaire.docx | DOCX document | |
| Attachment D - Specifications Vol 3.pdf | ||
| Attachment B - Specifications Vol 1.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| NUMBER | NAME | Name | DESCRIPTION | REFERENCE | Description | WHEN | |
| 01 00 00 | GENERAL REQUIREMENTS- Construction Security Requirements | 1.5 | Security plan, security memorandum | ||||
| 01 00 00 | GENERAL REQUIREMENTS | GENERAL REQUIREMENTS- | |||||
| Document Control | Document Control | 1.5.D | General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information” | ||||
| 01 00 00 | GENERAL REQUIREMENTS | GENERAL REQUIREMENTS- | |||||
| Phasing | Phasing | 1.6 | Phasing plan | ||||
| 01 00 00 | GENERAL REQUIREMENTS | GENERAL REQUIREMENTS- | |||||
| Utilities Services | Utilities Services | 1.6.N.2 | Contractor shall submit a request to interrupt any such services | 7 days in advance of proposed interruption | |||
| 01 00 00 | GENERAL REQUIREMENTS | GENERAL REQUIREMENTS- | |||||
| Survey | Survey | 1.7.A | Contractor shall make a thorough survey with the COR and a representative of VA Supply Service of buildings, areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report | ||||
| 01 00 00 | GENERAL REQUIREMENTS | GENERAL REQUIREMENTS- | |||||
| As-Built Drawings | As-Built Drawings | 1.11.C | Contractor shall deliver two approved completed sets of as-built drawings in the electronic version | 15 days after each completed phase | |||
| 01 32 16.15 | GENERAL REQUIREMENTS | PROJECT SCHEDULES- Contractor's Consultant | Resident Engineer's Field Office | 1.3.A | Contractor shall submit a qualification proposal to the COR, within 10 days of bid acceptance. | 10 days within bid acceptance. | |
| 01 32 16.15 | ERROR:#REF! | PROJECT SCHEDULES- The Complete Project Schedule Submittal | ERROR:#REF! | 1.5 | Project Schedule | Within 5 calendar days after kick-off | |
| 01 32 16.15 | ERROR:#REF! | PROJECT SCHEDULES- The Complete Project Schedule Submittal | ERROR:#REF! | 1.5.D | Contractor shall submit to the COR; the final project schedule. | Within 30 calendar days after receipt of the complete project interim schedule. | |
| 01 33 23 | SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES | SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES- Submittal Register | None | 1.3 | Submit samples required by Section 09 06 00, SCHEDULE FOR FINISHES, in quadruplicate. Submit other samples in single units unless otherwise specified. Submittals will receive consideration only when covered by a transmittal letter signed by Contractor. Submittal drawings (shop, erection or setting drawings) and schedules, required for work of various trades, shall be checked before submission by technically qualified employees of Contractor for accuracy, completeness and compliance with contract requirements. For each drawing required, submit one legible photographic paper or vellum reproducible. Reproducible shall be full size and each drawing shall have marked thereon, proper descriptive title. Reproducible shall be full size. Samples, shop drawings, test reports, certificates and manufacturers' literature and data, shall be submitted. | ||
| 01 45 00 | Quality Control | 1.3 | Submit Interim CQC plan, CQC Plan, and Additional Requirements for Design Quality Control (DQC) Plan, checklists, design quality control, test reports | ||||
| 01 45 35 | Special Inspections | 1.4.M | Submittals required | ||||
| 01 45 35 | Special Inspections | 1.4M | SIOR letter of acceptance, test reports, special inspections, certificates, qualifications | ||||
| 01 57 19 | TEMPORARY ENVIRONMENTAL CONTROLS | TEMPORARY ENVIRONMENTAL CONTROLS- | |||||
| Environmental Protection Plan | Environmental Protection Plan | 1.4 | Environmental Protection Plan | After the contract is awarded and prior to the commencement of the work, the Contractor shall meet with the COR to discuss the proposed EPP and to develop mutual understanding relative to details of environmental protection. Not more than 20 days after the meeting, the Contractor shall prepare and submit to the COR for approval, a written and/or graphic Environmental Protection plan. | |||
| 01 57 19 | TEMPORARY ENVIRONMENTAL CONTROLS | TEMPORARY ENVIRONMENTAL CONTROLS- | |||||
| Reduction of Noise | Reduction of Noise | 1.4 | Measure sound level for noise exposure due to the construction at least once every five successive working days while work is being performed above 55 dB(A) noise level | ||||
| 01 74 19 | CONSTRUCTION WASTE MANAGEMENT | CONSTRUCTION WASTE MANAGEMENT- | |||||
| Demolition Debris Management Plan | Demolition Debris Management Plan | 1.5 | Demolition debris management plan, designated manager, monthly summary, target waste diversion rate, final report | ||||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT- Emergency Action Plan and Arrangements | 2.5.1 | Work schedule, staff organization chart, standard operation procedures, specifics of the materials and equipment to be used for this project, approved landfill, required notifications and arrangements, laboratory and personnel, qualificationsm information on personnel, copies of state license, manufacturers technical data for encapsulatns and the MSDS, and application instructions. | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- Asbestos Hazard Abatement Plan | Submittals | 2.3 | Contractor shall establish and submit an Asbestos Hazard Abatement Plan in printed form and loose leaf consisting of simplified text, diagrams, sketches, and pictures that establish and explain clearly the procedures to be followed during all phases of the work by personnel. | Minimum of 14 days prior to the pre-start meeting | |
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT- | ||||||
| Submittals | 2.5.1.A | Submit a detailed work schedule for the ntire project reflecting contract documents and the phasing/schedule requirements from the CPM chart. | Minimum of 14 days prior to the pre-start meeting | ||||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals | Submittals | 2.5.1.B | Submit a staff organization chart showing all personnel who will be working on the project and their capacity/function | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals | Submittals | 2.5.1.D | Submit the specifics of the materials and equipment to be used for this project | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals | Submittals | 2.5.1.E | Submit the name, location, and phone number of the approved landfill | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals | Submittals | 2.5.1.F | Submit required notifications and arrangements made with regulatory agencies | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals | Submittals | 2.5.1.G | Submit the name, location and verification of the laboratory and/or personnel to be used for analysis of air and/or bulk samples | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals | Submittals | 2.5.1.H | Submit qualifications verification | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals | Submittals | 2.5.1.I | Submit information on personnel | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals | Submittals | 2.5.1.J | Submit copies of State license for asbestos abatement | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals During Abatement | Submittals During Abatement | 2.5.2 | Daily log, spection and approval of designated area | ||||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals During Abatement | Submittals During Abatement | 2.5.2.B | The CPIH/CIH shall document and maintain the inspection and approval of the regulated area preparation prior to start of work and daily during work. | ||||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Submittals at the Completion of Abatement | Submittals at the Completion of Abatement | 2.5.3 | Project report, samples | ||||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Certificates of Compliance | Certificates of Compliance | 2.6.3 | The Contractor shall submit to the VA representative certification from the manufacturer indicating compliance with performance requirements for encapsulants | ||||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Design and Layout | Design and Layout | 2.1.3.A | Before start of work submit the design and layout of the regulated area and the negative air machines | ||||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Wet Removal of Amosite | Wet Removal of Amosite | 3.2.4 | Submit full information/documentation on the wetting agent proposed prior to start | ||||
| 02 82 11 | TRADITIONAL ASBESTOS ABATEMENT | TRADITIONAL ASBESTOS ABATEMENT- | |||||
| Laboratory Testing of PCM and TEM Clearance Samples | Laboratory Testing of PCM and TEM Clearance Samples | 3.8.7 | Testing of PCM samples: A complete record, certified by the laboratory, of all air monitoring tests and results. Testing of TEM samples: A complete record, certified by the laboratory, of all TEM results. Testing of Bulk samples: A complete record, certified by the laboratory, of all TEM results shall be furnished | ||||
| 02 82 13.19 | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals | 2.5.1.A | Submit a detailed work schedule for the entire project reflecting contract documents and the phasing/schedule requirements from the CPM chart. | Minimum of 14 days prior to the pre-start meeting | |||
| 02 82 13.19 | TRADITIONAL ASBESTOS ABATEMENT | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals | Laboratory Testing of PCM and TEM Clearance Samples | 2.5.1.B | Submit a staff organization chart showing all personel who will be working on the project and their capacity/function. Provide their qualifications, training, accreditations, and licenses, as appropriate. | Minimum of 14 days prior to the pre-start meeting | |
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals | ERROR:#REF! | 2.5.1.C | Submit AHAP developed specifically for thie projsct, incorporating the requirements of the specifications, prepared, signed, and dated by the CPIH/CIH. | Minimum of 14 days prior to the pre-start meeting | |
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals | ERROR:#REF! | 2.5.1.D | Submit the specifics of the materials and equipment to be used for this project. | Minimum of 14 days prior to the pre-start meeting | |
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals | ERROR:#REF! | 2.5.1.E | Submit the name, location, and phone number of the approved landfill | Minimum of 14 days prior to the pre-start meeting | |
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals | ERROR:#REF! | 2.5.1.F | Submit required notifications and arrangements made with regulatory agencies | Minimum of 14 days prior to the pre-start meeting | |
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals | ERROR:#REF! | 2.5.1.G | Submit the name, location, and verification of the laboratory and/or personnel to be used for analysis of air and/or bulk samples. | Minimum of 14 days prior to the pre-start meeting | |
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals | ERROR:#REF! | 2.5.1.H | Submit qualifications verification | Minimum of 14 days prior to the pre-start meeting | |
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Pre-Start Meeting Submittals | ERROR:#REF! | 2.5.1.J | Submit copies of State license for asbestos abatement | Minimum of 14 days prior to the pre-start meeting | |
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Submittals During Abatement | ERROR:#REF! | 2.5.2.A | The Competent Person shall maintain and submit a daily log at the regulated area documenting the dates and times | ||
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Submittals During Abatement | ERROR:#REF! | 2.5.2.B | The CPIH/CIH shall document and maintain the inspection and approval of the regulated area preparation prior to start of work and daily during work. | ||
| 02 82 13.19 | ERROR:#REF! | ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS- Submittals at Completion of Abatement | ERROR:#REF! | 2.5.3 | The CPIH/CIH shall submit a project report consisting of the daily log book requirements and documentation of events during the abatement project | ||
| 02 83 33.13 | ERROR:#REF! | LEAD-BASED PAINT REMOVAL AND DISPOSAL- Submittals | ERROR:#REF! | 1.6.B | Manufacturer's Literature and Data | ||
| 02 83 33.13 | ERROR:#REF! | LEAD-BASED PAINT REMOVAL AND DISPOSAL- Submittals | ERROR:#REF! | 1.6.C | Test reports | ||
| 02 83 33.13 | ERROR:#REF! | LEAD-BASED PAINT REMOVAL AND DISPOSAL- Submittals | ERROR:#REF! | 1.6.E | Qualifications | ||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Shop Drawings | Shop Drawings | 1.6.B | Reinforcing steel: Complete shop drawings | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Mill Test Reports | Mill Test Reports | 1.6.C.1 | Reinforcing Steel | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Mill Test Reports | Mill Test Reports | 1.6.C.2 | Cement | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.1 | Abrasive aggregate. | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.2 | Lightweight aggregate for structural concrete | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.3 | Air‑entraining admixture | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.4 | Chemical admixtures, including chloride ion content | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.5 | Waterproof paper for curing concrete | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.6 | Liquid membrane‑forming compounds for curing concrete | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.7 | Non‑shrinking grout | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.8 | Liquid hardener | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.9 | Waterstops | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.10 | Expansion joint filler | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.D.11 | Adhesive binder | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.E | Testing Agency for Concrete Mix Design | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.F | Test Report for Concrete Mix Designs | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.G | Shoring and Reshoring Sequence | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Manufacturer's Certificates | Manufacturer's Certificates | 1.6.H | Test reports on splitting tensile strength | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Fly Ash Testing | Fly Ash Testing | 2.3.B | Submit certificate verifying conformance with ASTM 618 initially with mix design and for each truck load of fly ash delivered from source. Submit test results performed within 6 months of submittal date | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Placing Reinforcement: Splicing | Placing Reinforcement: Splicing | 3.2.D.2.a | Submit test reports indicating the chemical analysis to establish weldability of reinforcing steel | ||||
| 03 30 00 | CAST-IN-PLACE CONCRETE | CAST-IN-PLACE CONCRETE- | |||||
| Placing Reinforcement: Splicing | Placing Reinforcement: Splicing | 3.2.D.2.b | Submit a field quality control procedure to insure proper inspection, materials and welding procedure for welded splices | ||||
| 05 12 00 | ERROR:#REF! | STRUCTURAL STEEL FRAMING- Submittals | ERROR:#REF! | 1.4 | Submittal Drawings, test reports, certificates, qualifications, delegated design drawings and calculations, record surveys | ||
| 05 31 00 | STEEL DECKING - Submittals | 1.4 | Submittal drawings, literature and data, certificates, qualifications, insurance certification | ||||
| 05 50 00 | ERROR:#REF! | METAL FABRICATIONS- Submittals | ERROR:#REF! | 1.3 | Manufacturer's Literature and Data, Shop darwings, certificates, design calculations, setting drawings and instructions for installation | ||
| 05 50 00 | ERROR:#REF! | METAL FABRICATIONS- Submittals | ERROR:#REF! | 1.3.C | Shop Drawings of each item showing complete detail | ||
| 06 10 00 | ROUGH CARPENTRY | ROUGH CARPENTRY- | |||||
| Manufacturer’s Literature and Data | Manufacturer’s Literature and Data | 1.3 | Literature and data,certificate for unmarked lumber | ||||
| 06 10 00 | ROUGH CARPENTRY | ROUGH CARPENTRY- | |||||
| Certificates | Certificates | 1.3.E | Manufacturer’s certificate for unmarked lumber | ||||
| 06 16 63 | CEMENTITIOUS SHEATHING | 1.3 | Manufacturer's Literature and Data, samples | ||||
| 06 20 00 | ERROR:#REF! | FINISH CARPENTRY- Submittals | ERROR:#REF! | 1.5.B.1 | Show size, configuration, and fabrication and installation details | ||
| 06 20 00 | ERROR:#REF! | FINISH CARPENTRY- Submittals | ERROR:#REF! | 1.5.C.1 | Manufacturer's Literature and Data | ||
| 07 21 13 | ERROR:#REF! | THERMAL INSULATION- Submittals | ERROR:#REF! | 1.4.B.1 | Show insulation type, thickness, and R-value for each location. | ||
| 07 21 13 | ERROR:#REF! | THERMAL INSULATION- Submittals | ERROR:#REF! | 1.4.C.1 | Manufacturer's Literature and Data | ||
| 07 22 00 | ERROR:#REF! | ROOF AND DECK INSULATION- Submittals | ERROR:#REF! | 1.4 | Submittal drawings, literature and data, samples, qualifications | ||
| 07 22 00 | ERROR:#REF! | ROOF AND DECK INSULATION- Submittals | ERROR:#REF! | 1.4.C.1 | Manufacturer's Literature and Data | ||
| 07 40 00 | ERROR:#REF! | ROOFING AND SIDING PANELS- Submittals | ERROR:#REF! | 1.5 | Samples, shop drawings, literature and data, fire test report, certifications, qualifications, warranty | ||
| 07 40 00 | ERROR:#REF! | ROOFING AND SIDING PANELS- Submittals | ERROR:#REF! | 1.5.D | Manufacturer's Literature and Data | ||
| 07 54 23 | ERROR:#REF! | THERMOPLASTIC POLYOLEFIN (TPO) ROOFING- Submittals | ERROR:#REF! | 1.5 | Submittal Drawings, literature and data, samples, certificates, qualifications, field quality control reports, temporary protection plan, operation and maintenance data | ||
| 07 60 00 | ERROR:#REF! | FLASHING AND SHEET METAL- Submittals | ERROR:#REF! | 1.5 | Shop drawings, literature and data, certificates | ||
| 07 72 00 | Roof Accessories | 1.4 | Shop drawings, product data, and samples, certificates | ||||
| 07 81 00 | ERROR:#REF! | APPLIED FIREPROOFING- Submittals | ERROR:#REF! | 1.3.E | Manufacturer's Literature and Data | ||
| 07 84 00 | FIRESTOPPING | FIRESTOPPING- | |||||
| Qualifications | Qualifications | 1.3 | Installer qualifications, inspector qualifications, literature, data, and installation instructions, list of classification number of systems installed, test reports, certificates | ||||
| 07 84 00 | FIRESTOPPING | FIRESTOPPING- | |||||
| Qualifications | Qualifications | 1.3.D | Inspector qualifications | ||||
| 07 84 00 | FIRESTOPPING | FIRESTOPPING- | |||||
| Certified laboratory test reports | Certified laboratory test reports | 1.3.F, G | ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use, Certifications | ||||
| 07 84 00 | FIRESTOPPING | FIRESTOPPING- | |||||
| Inspections and Acceptance of Work | Inspections and Acceptance of Work | 3.5 | Submit written reports indicating locations of and types of penetrations and type of firestopping used at each location; type is to be recorded by UL listed printed numbers | ||||
| 07 92 00 | JOINT SEALANTS | JOINT SEALANTS- | |||||
| Qualifications | Qualifications | 1.5 | Installer qualifications, certification, installation instructions, cured samples, literature and data, warranty | ||||
| 07 92 00 | JOINT SEALANTS | JOINT SEALANTS- | |||||
| Qualifications | Qualifications | 1.4.D | Contractor certification | ||||
| 07 92 00 | JOINT SEALANTS | JOINT SEALANTS- | |||||
| Product Data | Product Data | 1.5.E | Manufacturer's installation instructions for each product used | ||||
| 07 92 00 | JOINT SEALANTS | JOINT SEALANTS- | |||||
| Samples | Samples | 1.5.F | Cured samples of exposed sealants for each color | ||||
| 07 92 00 | JOINT SEALANTS | JOINT SEALANTS- | |||||
| Warranty | Warranty | 1.5.H | Manufacturer warranty | ||||
| 08 11 13 | HOLLOW METAL DOORS AND FRAMES | HOLLOW METAL DOORS AND FRAMES- | |||||
| Submittal Drawings | Submittal Drawings | 1.4 | Manufacturers literature and data. Test Reports. Qualifications. Blast Design Calculations. | ||||
| 08 11 13 | HOLLOW METAL DOORS AND FRAMES | HOLLOW METAL DOORS AND FRAMES- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.C | Description of each product. Include schedule showing each door and frame requirements, fire label, and smoke control label for openings. Installation instructions. | ||||
| 08 14 00 | ERROR:#REF! | INTERIOR WOOD DOORS- Submittals | ERROR:#REF! | 1.4 | Submittal drawings, literature and data, samples, test reports, operation and maintenance data | ||
| 08 14 00 | ERROR:#REF! | INTERIOR WOOD DOORS- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 08 17 10 | Integrated Door Assemblies | 1.5 | Submittal drawings, Manufacturers literature and data, Certificates, Qualifications, Operation and Maintenance Data. | ||||
| 08 31 13 | ERROR:#REF! | ACCESS DOORS AND FRAMES-Submittals | ERROR:#REF! | 1.4 | Submittal drawings, literature and data | ||
| 08 31 13 | ERROR:#REF! | ACCESS DOORS AND FRAMES- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 08 33 00 | ERROR:#REF! | COILING DOORS AND GRILLES- Submittals | ERROR:#REF! | 1.4.B | Show size, configuration, and fabrication and installation details | ||
| 08 33 00 | ERROR:#REF! | COILING DOORS AND GRILLES- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 08 34 53 | ERROR:#REF! | SECURITY DOORS AND FRAMES- Submittals | ERROR:#REF! | 1.4.A.1 | Product data for each element of work | ||
| 08 34 53 | ERROR:#REF! | SECURITY DOORS AND FRAMES- Submittals | ERROR:#REF! | 1.4.A.2 | Manufacturer's standard color chart | ||
| 08 34 53 | ERROR:#REF! | SECURITY DOORS AND FRAMES- Submittals | ERROR:#REF! | 1.4.A.3 | Certificates | ||
| 08 34 53 | ERROR:#REF! | SECURITY DOORS AND FRAMES- Submittals | ERROR:#REF! | 1.4.A.4 | Shop drawings showing each dimensioned details of each door assembly | ||
| 08 34 59 | ERROR:#REF! | VAULT DOORS AND DAY GATES- Submittals | ERROR:#REF! | 1.4.B | Show size, configuration, configuration, and installation details | ||
| 08 34 59 | ERROR:#REF! | VAULT DOORS AND DAY GATES- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 08 41 13 | ERROR:#REF! | ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS- | ERROR:#REF! | 1.5.B | Shop drawings showing size, configuration, fabrication, and installation details | ||
| 08 41 13 | ERROR:#REF! | ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS- | ERROR:#REF! | 1.5.C | Manufacturer's Literature and Data | ||
| 08 56 53 | ERROR:#REF! | BLAST RESISTANT WINDOWS-Submittals | ERROR:#REF! | 1.5.B | Show dimensioned details of window units, including intended metal and glazing materials | ||
| 08 56 53 | ERROR:#REF! | BLAST RESISTANT WINDOWS-Submittals | ERROR:#REF! | 1.5.C | Manufacturer's Literature and Data | ||
| 08 56 53 | ERROR:#REF! | BLAST RESISTANT WINDOWS-Submittals | ERROR:#REF! | 1.5.E | Certificates | ||
| 08 56 53 | ERROR:#REF! | BLAST RESISTANT WINDOWS-Submittals | ERROR:#REF! | 1.5.F | Calculations | ||
| 08 56 53 | ERROR:#REF! | BLAST RESISTANT WINDOWS-Submittals | ERROR:#REF! | 1.5.G | Qualifications | ||
| 08 56 59 | ERROR:#REF! | SERVICE AND TELLER WINDOW UNITS- Submittals | ERROR:#REF! | 1.4.B | Service windows, showing design, construction, and installation | ||
| 08 56 59 | ERROR:#REF! | SERVICE AND TELLER WINDOW UNITS- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 08 71 00 | DOOR HARDWARE | DOOR HARDWARE- | |||||
| Hardware Schedule | Hardware Schedule | 1.6 | Hardware schedule, Samples and Manufacturers literature, Certificates of compliance and test reports, Record of opening force measurement for all doors equipped with closers. | ||||
| 08 71 00 | DOOR HARDWARE | DOOR HARDWARE- | |||||
| Samples and Manufacturers' Literature | Samples and Manufacturers' Literature | 1.6.C | All hardware items (proposed for the project) that have not been previously approved by Builders Hardware Manufacturers Association shall be submitted for approval. Tag and mark all items with manufacturer's name, catalog number and project number | ||||
| 08 71 00 | DOOR HARDWARE | DOOR HARDWARE- | |||||
| Samples and Manufacturers' Literature | Samples and Manufacturers' Literature | 1.6.C | Samples are not required for hardware listed in the specifications by manufacturer's catalog number, if the contractor proposes to use the manufacturer's product specified | ||||
| 08 71 00 | DOOR HARDWARE | DOOR HARDWARE- | |||||
| Hardware Heights | Hardware Heights | 3.1 | Hardware Heights | ||||
| 08 71 00 | DOOR HARDWARE | DOOR HARDWARE- | |||||
| locations | locations | 3.1.A | For existing buildings locate hardware on doors at heights to match existing hardware. The Contractor shall visit the site, verify location of existing hardware and submit locations to VA Resident Engineer for approval | ||||
| 08 71 00 | DOOR HARDWARE | DOOR HARDWARE- | |||||
| Submittals - Final Inspection | Submittals - Final Inspection | 3.3 | Installer to provide letter to COR that upon completion, installer has visited the Project and has accomplished the following. Re-adjust hardware. Evaluate maintenance procedures and recommend changes or additions, and instruct VA personnel. Identify items that have deteriorated or failed. Submit written report identifying problems. | ||||
| 08 71 13 | ERROR:#REF! | AUTOMATIC DOOR OPERATORS- Submittals | ERROR:#REF! | 1.5 | Submittal drawings, Manufacturers literature and data, Test Reports, Qualifications, Operation and Maintenance Data | ||
| 08 71 13 | ERROR:#REF! | AUTOMATIC DOOR OPERATORS- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 08 71 13 | ERROR:#REF! | AUTOMATIC DOOR OPERATORS- Submittals | ERROR:#REF! | 1.4.E | Qualifications | ||
| 08 80 00 | ERROR:#REF! | GLAZING- Submittals | ERROR:#REF! | 1.5 | Manufacturer's Certificates, Warranty, Literature and data, samples | ||
| 08 80 00 | ERROR:#REF! | GLAZING- Submittals | ERROR:#REF! | 1.5.B | Manufacturer's Warranty | ||
| 08 80 00 | ERROR:#REF! | GLAZING- Submittals | ERROR:#REF! | 1.5.C | Manufacturer's Literature and Data | ||
| 08 80 00 | ERROR:#REF! | GLAZING- Submittals | ERROR:#REF! | 1.5.D | Samples | ||
| 08 90 00 | LOUVERS AND VENTS- Submittals | 1.3 | Shop drawings, literature and data, color samples, blast design calcuations | ||||
| 08 90 00 | LOUVERS AND VENTS- Submittals | 1.3.C | Manufacturer's Literature and Data | ||||
| 08 90 00 | LOUVERS AND VENTS- Submittals | 1.3.C | Color samples | ||||
| 09 05 16 | SUBSURFACE PREPARATION FOR FLOOR FINISHES- Submittals | 1.3 | Written approval of compatibility, product data, test data | ||||
| 09 22 16 | NON-STRUCTURAL METAL FRAMING | NON-STRUCTURAL METAL FRAMING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4 | Literature and data, shop drawings, test results | ||||
| 09 22 16 | NON-STRUCTURAL METAL FRAMING | NON-STRUCTURAL METAL FRAMING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.B | Hanger inserts | ||||
| 09 22 16 | NON-STRUCTURAL METAL FRAMING | NON-STRUCTURAL METAL FRAMING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.B | Channels (Rolled steel) | ||||
| 09 22 16 | NON-STRUCTURAL METAL FRAMING | NON-STRUCTURAL METAL FRAMING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.B | Furring channels | ||||
| 09 22 16 | NON-STRUCTURAL METAL FRAMING | NON-STRUCTURAL METAL FRAMING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.B | Screws, clips and other fasteners | ||||
| 09 29 00 | GYPSUM BOARD- Submittals | 1.4 | Manufacturer's Literature and Data, shop dawrings, samples, test results, certificates | ||||
| 09 30 13 | CERAMIC/PORCELAIN TILING- Submittals | 1.3 | Samples, product data, certifications, installer qualifications | ||||
| 09 30 13 | CERAMIC/PORCELAIN TILING- Submittals | 1.3.C | Procduct data | ||||
| 09 51 00 | ACOUSTICAL CEILINGS- Submittals | 1.5 | Submittal drawings, literature and data, samples | ||||
| 09 51 00 | ACOUSTICAL CEILINGS- Submittals | 1.5.C | Manufacturer's Literature and Data | ||||
| 09 65 13 | RESILIENT BASE AND ACCESSORIES- Submittals | 1.4 | Manufacturer's Literature and Data, samples | ||||
| 09 65 13 | RESILIENT BASE AND ACCESSORIES- Submittals | 1.5.C | Samples | ||||
| 09 65 16 | RESILIENT SHEET FLOORING- Submittals | 1.4.B | Manufacturer's Literature and Data | ||||
| 09 65 16 | RESILIENT SHEET FLOORING- Submittals | 1.4.C | Samples | ||||
| 09 65 19 | RESILIENT TILE FLOORING- Submittals | 1.3.B | Manufacturer's Literature and Data | ||||
| 09 65 19 | RESILIENT TILE FLOORING- Submittals | 1.3.C | Samples of each type, color, thickness, and finish. | ||||
| 09 65 19 | RESILIENT TILE FLOORING- Submittals | 1.3.D | Shop drawings indicating layout of patterns as shown on construction documents. | ||||
| 09 67 23.60 | Resinouse Urethane and Epoxy Mortar Flooring | 1.3 | Literature and data, Qualifications, samples, shop drawings, certifications and approvals, warranty | ||||
| 09 68 00 | CARPETING- Submittals | 1.4.B | Product data | ||||
| 09 68 00 | CARPETING- Submittals | 1.4.C | Samples | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Painter qualifications | Painter qualifications | 1.3 | Painter Qualifications, manufcaturers literature and data, sample panels, sample of identity markers if used, manufacturers certificates | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Manufacturer's Literature and Technical Data | Manufacturer's Literature and Technical Data | 1.3.C | Manufacturer's Literature and Data | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Sample Panels | Sample Panels | 1.3.D | After painters' materials have been approved and before work is started submit sample panels showing each type of finish and color specified | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Sample Panels | Sample Panels | 1.3.D | Panels to Show Color: Composition board, 100 x 250 mm (4 x 10 inch) | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Sample Panels | Sample Panels | 1.3.D | Panel to Show Transparent Finishes: Wood of same species and grain pattern as wood approved for use, 100 x 250 mm (4 x 10 inch face) minimum, and where both flat and edge grain will be exposed, 250 mm (10 inches) long by sufficient size, 50 x 50 mm (2 x 2 inch) minimum or actual wood member to show complete finish | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Sample Panels | Sample Panels | 1.3.D | Attach labels to panel stating the following | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Sample Panels | Sample Panels | 1.3.D | Federal Specification Number or manufacturers name and product number of paints used | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Sample Panels | Sample Panels | 1.3.D | Specification code number specified in Section 09 06 00, SCHEDULE FOR FINISHES | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Sample Panels | Sample Panels | 1.3.D | Product type and color | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Sample Panels | Sample Panels | 1.3.D | Name of project | ||||
| 09 91 00 | PAINTING | PAINTING- | |||||
| Samples | Samples | 1.3.D | Sample of identity markers if used | ||||
| 10 11 13 | ERROR:#REF! | CHALKBOARDS AND MARKERBOARDS- Submittals | ERROR:#REF! | 1.3.B | Shop drawings identifying all parts, by name and material and showing design, constrution, installation, and relation to adjacent construction. | ||
| 10 11 13 | ERROR:#REF! | CHALKBOARDS AND MARKERBOARDS- Submittals | ERROR:#REF! | 1.3.C | Manufacturer's Literature and Data | ||
| 10 11 13 | ERROR:#REF! | CHALKBOARDS AND MARKERBOARDS- Submittals | ERROR:#REF! | 1.3.D | Samples | ||
| 10 14 00 | SIGNAGE | SIGNAGE- | |||||
| Interior Sign Samples | Interior Sign Samples | 1.4 | Samples, manufacturers literature and data, sign location plan, shop drawings, layout patterns, qualifications, structural calculations | ||||
| 10 14 00 | SIGNAGE | SIGNAGE- | |||||
| Interior Sign Samples | Interior Sign Samples | 1.4.B | Sign Panel, 203 x 254 mm (8 x 10 inches), with letters | ||||
| 10 14 00 | SIGNAGE | SIGNAGE- | |||||
| Interior Sign Samples | Interior Sign Samples | 1.4.B | Color samples of each color, 152 x 152 mm (6 x 6 inches. Show anticipated range of color and texture | ||||
| 10 14 00 | SIGNAGE | SIGNAGE- | |||||
| Interior Sign Samples | Interior Sign Samples | 1.4.B | Sample of typeface, arrow and symbols in a typical full size layout | ||||
| 10 14 00 | SIGNAGE | SIGNAGE- | |||||
| Manufacturer's Literature | Manufacturer's Literature | 1.4.C | Showing the methods and procedures proposed for the anchorage of the signage system to each surface type | ||||
| 10 14 00 | SIGNAGE | SIGNAGE- | |||||
| Manufacturer's Literature | Manufacturer's Literature | 1.4.C | Manufacturer’s printed specifications and maintenance instructions | ||||
| 10 14 00 | SIGNAGE | SIGNAGE- | |||||
| Sign Location Plan | Sign Location Plan | 1.4.D | showing location, type and total number of signs required | ||||
| 10 14 00 | SIGNAGE | SIGNAGE- | |||||
| Shop Drawings | Shop Drawings | 1.4.E | Scaled for manufacture and fabrication of sign types. Identify materials, show joints, welds, anchorage, accessory items, mounting and finishes | ||||
| 10 14 00 | SIGNAGE | SIGNAGE- | |||||
| Full size layout patterns | Full size layout patterns | 1.4.F | for dimensional letters | ||||
| 10 21 23 | SIGNAGE | CUBICAL CURTAIN TRACKS- Submittals | Qualifications | 1.3 | Samples, shop drawings, literature and data | ||
| 10 21 23 | SIGNAGE | CUBICAL CURTAIN TRACKS- Submittals | Qualifications | 1.3.C | Shop drawings indicating layout of tracks and method of anchorage | ||
| 10 21 23 | SIGNAGE | CUBICAL CURTAIN TRACKS- Submittals | Calculations | 1.3.D | Manufacturer's Literature and Data | ||
| 10 25 13 | Patient Bed Service Walls | 1.3 | Shop drawings, Literature and data, qualifications, operation and maintenance manuals, certifications | ||||
| 10 26 00 | CUBICLE CURTAIN TRACKS | WALL AND DOOR PROTECTION- Submittals | Samples | 1.4 | Shop drawings, literature and data, test reports, qualifications, warranty | ||
| 10 21 23 | CUBICLE CURTAIN TRACKS | WALL AND DOOR PROTECTION- Submittals | Samples | 1.3.D | Manufacturer's Literature and Data | ||
| 10 28 00 | CUBICLE CURTAIN TRACKS | TOILET, BATH, AND LAUNDRY ACCESSORIES- Submittals | Samples | 1.4 | Submittal drawings, literature and data, samples, certificates, qualifications, operation and maintenance data | ||
| 10 28 00 | CUBICLE CURTAIN TRACKS | TOILET, BATH, AND LAUNDRY ACCESSORIES- Submittals | Samples | 1.4.C | Manufacturer's Literature and Data | ||
| 10 28 00 | CUBICLE CURTAIN TRACKS | TOILET, BATH, AND LAUNDRY ACCESSORIES- Submittals | Shop Drawings | 1.4.D | Samples | ||
| 10 44 13 | ERROR:#REF! | FIRE EXTINGUISHER CABIENTS- Submittals | ERROR:#REF! | 1.3 | Manufacturer's Literature and Data | ||
| 11 73 00 | Ceiling Mounted Patient Lift System | 1.4 | Shop drawings, Certificates, literature and data, Individual room layouts, inspection checklist | ||||
| 12 24 00 | ERROR:#REF! | WINDOW SHADES- Submittals | ERROR:#REF! | 1.3.B | Samples | ||
| 12 24 00 | ERROR:#REF! | WINDOW SHADES- Submittals | ERROR:#REF! | 1.3.C | Manufacturer's Literature and Data | ||
| 12 24 00 | ERROR:#REF! | WINDOW SHADES- Submittals | ERROR:#REF! | 1.3.D | Shop drawings indicating fabrication and installation details | ||
| 12 24 00 | ERROR:#REF! | WINDOW SHADES- Submittals | ERROR:#REF! | 1.3.F | Manufacturer's warranty | ||
| 12 32 00 | ERROR:#REF! | MANUFACTURED WOOD CASEWORK-Submittal | ERROR:#REF! | 1.3 | Manufacturer's Literature and Data | ||
| 12 32 00 | ERROR:#REF! | MANUFACTURED WOOD CASEWORK-Submittal | ERROR:#REF! | 1.3.C | Samples | ||
| 12 32 00 | ERROR:#REF! | MANUFACTURED WOOD CASEWORK-Submittal | ERROR:#REF! | 1.3.D | Shop drawings indicating each casework type, showing details of constrution, including materials, hardware and accessories | ||
| 12 32 00 | ERROR:#REF! | MANUFACTURED WOOD CASEWORK-Submittal | ERROR:#REF! | 1.3.E.1 | Manufacturer's qualifications | ||
| 12 32 00 | ERROR:#REF! | MANUFACTURED WOOD CASEWORK-Submittal | ERROR:#REF! | 1.3.E.2 | Installer's qualifications | ||
| 12 36 00 | ERROR:#REF! | COUNTERTOPS- Submittals | ERROR:#REF! | 1.3 | Shop drawings, samples | ||
| 12 36 00 | ERROR:#REF! | COUNTERTOPS- Submittals | ERROR:#REF! | 1.3.C | Samples | ||
| 13 05 41 | ERROR:#REF! | SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS- Submittals | ERROR:#REF! | 1.4.A | Submit a coordinated set of equipment anchorage drawings indicating description, layout, and location of items to be anchored or braced with anchorage or bracing noted and dimensioned | Prior to installation | |
| 13 05 41 | ERROR:#REF! | SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS- Submittals | ERROR:#REF! | 1.4.B | A coordinated set of bracing drawings for seismic protection of piping | Prior to installation | |
| 13 05 41 | ERROR:#REF! | SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS- Submittals | ERROR:#REF! | 1.4.C | A coordinated set of bracing drawings for seismic protection of ductowrk | Prior to installation | |
| 13 05 41 | ERROR:#REF! | SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS- Submittals | ERROR:#REF! | 1.4.D | Submit design calculations prepared and sealed by the registered structural engineer | ||
| 14 24 00 | SIGNAGE | HYDRAULIC ELEVATORS- Shop Drawings | Qualifications | 1.5 | Complete scaled and dimensioned layout in plan and section view showing the arrangement of equipment and all details of eash and every elevator unit specified. | ||
| 14 24 00 | SIGNAGE | HYDRAULIC ELEVATORS- Shop Drawings | Calculations | 1.5.C.1.a | Complete layout showing location of storage tank/pump assembly, controller, piping layout, outside diameter of cylinder/plunger assembly, size of car platform, car frame members, and support assembly. | ||
| 14 24 00 | CUBICLE CURTAIN TRACKS | HYDRAULIC ELEVATORS- Shop Drawings | Samples | 1.5.C.1.b | ` | ||
| 14 24 00 | CUBICLE CURTAIN TRACKS | HYDRAULIC ELEVATORS- Shop Drawings | Samples | 1.5.C.1.c | Rail bracket spacing and maximum vertical forces on guide rails in accordance with H-18-8 for seismic risk zone 2 or greater. | ||
| 14 24 00 | CUBICLE CURTAIN TRACKS | HYDRAULIC ELEVATORS- Shop Drawings | Samples | 1.5.C.2 | Rail bracket spacing and maximum vertical forces on guide rails in accordance with H-18-8 for seismic risk zone 2 or greater. | ||
| 14 24 00 | CUBICLE CURTAIN TRACKS | HYDRAULIC ELEVATORS- Shop Drawings | Samples | 1.5.D | Samples | ||
| 21 05 11 | CUBICLE CURTAIN TRACKS | COMMON WORK RESULTS FOR FIRE SUPPRESSION- Shop Drawings | Shop Drawings | 1.4.B | Manufacturer's Literature and Data | ||
| 21 13 13 | WET-PIPE SPRINKLER SYSTEMS | WET-PIPE SPRINKLER SYSTEMS- | |||||
| Qualifications | Qualifications | 1.4.A.1 | Provide a copy of the installing contractors fire sprinkler and state contractor's license. | ||||
| 21 13 13 | WET-PIPE SPRINKLER SYSTEMS | WET-PIPE SPRINKLER SYSTEMS- | |||||
| Drawings | Drawings | 1.4.A.2 | Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings, include graphical scales that allow the user to determine lengths when the drawings are reduced in size, plan showing the piping to the water supply test location | ||||
| 21 13 13 | WET-PIPE SPRINKLER SYSTEMS | WET-PIPE SPRINKLER SYSTEMS- | |||||
| Manufacturer’s Data Sheets | Manufacturer’s Data Sheets | 1.4.A.3 | data sheets for all materials and equipment proposed for use on the system, include listing information and installation instructions in data sheets | ||||
| 21 13 13 | WET-PIPE SPRINKLER SYSTEMS | WET-PIPE SPRINKLER SYSTEMS- | |||||
| Final Document Submittals | Final Document Submittals | 1.4.A.4 | Provide as-built drawings, testing and maintenance instructions, complete set of as-built drawings showing the installed system with specific interconnections, one full size (or size as directed by the COR) printed copy, one complete set in electronic pdf format, one complete set in AutoCAD format or a format as directed by the COR | ||||
| 21 13 13 | WET-PIPE SPRINKLER SYSTEMS | WET-PIPE SPRINKLER SYSTEMS- | |||||
| Material and Testing Certificate | Material and Testing Certificate | 1.4.A.4.a | Provide a copy of a completed Material and Testing Certificate as indicated in NFPA 13, certificates shall be provided to document all parts of the installation | Upon completion of the sprinkler system installation | |||
| 21 13 13 | WET-PIPE SPRINKLER SYSTEMS | WET-PIPE SPRINKLER SYSTEMS- | |||||
| Material and Testing Certificate | Material and Testing Certificate | 1.4.A.6.a | One paper copy in a binder provided in pdf format on a compact disc or as directed by the COR | ||||
| 21 13 13 | WET-PIPE SPRINKLER SYSTEMS | WET-PIPE SPRINKLER SYSTEMS- | |||||
| Operations and Maintenance Manual | Operations and Maintenance Manual | 1.4.A.6.c | One additional copy of the O&M Manual covering the system in a flexible protective cover | ||||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| Certification | Certification | 1.4.E | contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings and specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation | prior to submitting shop drawings | |||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| List | List | 1.4.F | Lists of previous installations for selected equipment contact persons who will serve as references, with telephone numbers and e-mail addresses | ||||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.G | Electric motor data and variable speed drive data shall be submitted | ||||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.G | Equipment and materials identification | ||||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.G | Firestopping materials | ||||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.G | Hangers, inserts, supports and bracing | ||||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.G | Provide load calculations for variable spring and constant support hangers | ||||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.G | Wall, floor, and ceiling plates | ||||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| Submittals and shop drawings for interdependent items | Submittals and shop drawings for interdependent items | 1.4.H,I | Shop drawings shall be furnished together and complete in a group containing applicable descriptive information. Coordination drawings shall contain: Complete consolidated and coordinated layout drawings for all new systems, and for existing systems that are in the same areas. The drawings shall include plan views, elevations and sections of all systems on a scale of not less than 1:32. Clearly show the proposed location and adequate clearance for all equipment. Details of the following shall be provided: Mechanical equipment rooms, interstitial space hangers, inserts, supports, and bracing, pipe sleeves, equipment penetrations of floors, walls, ceilings, or roofs | ||||
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | COMMON WORK RESULTS FOR PLUMBING- | |||||
| Maintenance Data and Operating Instructions | Maintenance Data and Operating Instructions | 1.4.J | Include complete list indicating all components of the systems with diagrams and listing of recommended replacement parts for keeping in stock supply including sources of supply | ||||
| 22 05 12 | ERROR:#REF! | GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT- Submittals | ERROR:#REF! | 1.4.C | Shop drawings indicating motor nameplate information, electrical ratings, dimensions, mounting details, materials, horsepower, power factor, current as a function of speed, current efficiency, speed as a function of load….. | ||
| 22 05 12 | ERROR:#REF! | GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT- Submittals | ERROR:#REF! | 1.4.D | Operation and Maintenance Manuals | ||
| 22 05 12 | ERROR:#REF! | GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT- Submittals | ERROR:#REF! | 1.4.E | Certifications | 2 weeks prior to final inspection | |
| 22 05 19 | ERROR:#REF! | METERS AND GAGES FOR PLUMBING PIPING- Submittals | ERROR:#REF! | 1.4.A | Manufacturer's Literature and Data | ||
| 22 05 19 | ERROR:#REF! | METERS AND GAGES FOR PLUMBING PIPING- Submittals | ERROR:#REF! | 1.4.B | Operation and Maintenance Manuals | ||
| 22 05 23 | ERROR:#REF! | GENERAL-DUTY VALVES FOR PLUMBING PIPING- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 22 07 11 | ERROR:#REF! | PLUMBING INSULATION- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 22 07 11 | ERROR:#REF! | PLUMBING INSULATION- Submittals | ERROR:#REF! | 1.4.D | Shop drawings specify each type used and state surface burning characteristics | ||
| 22 11 00 | ERROR:#REF! | FACILITY DISTRIBUTION- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 22 11 00 | ERROR:#REF! | FACILITY DISTRIBUTION- Submittals | ERROR:#REF! | 1.4.D | Complete operating and maintenance manuals including wiring diagrams, technical data sheets and information for ordering replacement parts | ||
| 22 13 00 | ERROR:#REF! | FACILITY SANITARY AND VENT PIPING- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 22 13 00 | ERROR:#REF! | FACILITY SANITARY AND VENT PIPING- Submittals | ERROR:#REF! | 1.4.D | Detailed shop drawing of clamping device and extensions when required in connection with the waterproofing membrane or the floor drain | ||
| 22 14 00 | FACILITY STORM DRAINAGE | FACILITY STORM DRAINAGE- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.C | Pipe and Fittings | ||||
| 22 14 00 | FACILITY STORM DRAINAGE | FACILITY STORM DRAINAGE- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.C | Specialty Pipe Fittings | ||||
| 22 14 00 | FACILITY STORM DRAINAGE | FACILITY STORM DRAINAGE- | |||||
| Manufacturer's Literature and Data | Manufacturer's Literature and Data | 1.4.C | Cleanouts | ||||
| 22 14 29 | TOILET, BATH, AND LAUNDRY ACCESSORIES | SUMP PUMPS- Shop Drawings | Certificates | 1.4.C | Manufacturer's Literature and Data | ||
| 22 14 29 | TOILET, BATH, AND LAUNDRY ACCESSORIES | SUMP PUMPS- Shop Drawings | Qualifications | 1.4.C | Pump manufacturer and model. | ||
| 22 14 29 | TOILET, BATH, AND LAUNDRY ACCESSORIES | SUMP PUMPS- Shop Drawings | Operation and Maintenance Data | 1.4.C | Electric motor | ||
| 22 14 29 | FIRE EXTINGUISHER CABINETS | SUMP PUMPS- Shop Drawings | Manufacturer's Literature and Data | 1.4.C | Control panel | ||
| 22 14 29 | MANUFACTURED WOOD CASEWORK | SUMP PUMPS- Shop Drawings | Manufacturer's Literature and Data | 1.4.C | Sensors | ||
| 22 14 29 | MANUFACTURED WOOD CASEWORK | SUMP PUMPS- Shop Drawings | Manufacturer's Literature and Data | 1.4.C | O&M manuals | ||
| 22 40 00 | ERROR:#REF! | PLUMBING FIXTURES- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 22 62 00 | ERROR:#REF! | VACCUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 22 62 00 | ERROR:#REF! | VACCUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES- Submittals | ERROR:#REF! | 1.4.D | Station inlets- a letter from the manufacturer shall be submitted stating that inlets are designed and manufactured to comply with NFPA 99 | ||
| 22 62 00 | ERROR:#REF! | VACCUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES- Submittals | ERROR:#REF! | 1.4.E | Certification - the completed systems have been installed, tested, purged and analyzed in accordance with the requirements | ||
| 22 62 00 | ERROR:#REF! | VACCUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES- Submittals | ERROR:#REF! | 1.4.F | Notorized affidavit from the verifier stating that the verifier undertakes to verify this project and thus agrees to disqualify themselves from supplying any equipment which shall be included in the scope of their verification | ||
| 22 63 00 | ERROR:#REF! | GAS SYSTEMS FOR LABORATORY AND HEALTHARE FACILITIES- Submittals | ERROR:#REF! | 1.4.C | Manufacturer's Literature and Data | ||
| 22 63 00 | ERROR:#REF! | GAS SYSTEMS FOR LABORATORY AND HEALTHARE FACILITIES- Submittals | ERROR:#REF! | 1.4.D | Station outlets - submit letter from manufacturer stating that outlets are designed and manufactured to comply with NFPA 99 | ||
| 22 63 00 | ERROR:#REF! | GAS SYSTEMS FOR LABORATORY AND HEALTHARE FACILITIES- Submittals | ERROR:#REF! | 1.4.E | Certification - the completed systems have been installed, tested, purged and analyzed in accordance with the requirements | ||
| 23 05 11 | GENERAL WORK RESULTS FOR HVAC | GENERAL WORK RESULTS FOR HVAC- | |||||
| Documentation | Documentation | 1.4.E | If equipment is submitted which differs in arrangement from that shown, provide documentation proving equivalent performance, design standards and drawings that show the rearrangement of all associated systems. Additionally, any impacts on ancillary equipment or services such as foundations, piping, and electrical shall be the Contractor’s responsibility to design, supply, and install at no additional cost or time to the Government. | ||||
| 23 05 11 | GENERAL WORK RESULTS FOR HVAC | GENERAL WORK RESULTS FOR HVAC- | |||||
| Certification | Certification | 1.4.F | certify in writing that manufacturers of all major items of equipment have each reviewed contract documents, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation | Prior to submitting shop drawings | |||
| 23 05 11 | GENERAL WORK RESULTS FOR HVAC | GENERAL WORK RESULTS FOR HVAC- | |||||
| Shop Drawings | Shop Drawings | 1.4.G | for interdependent items, containing applicable descriptive information, shall be furnished together. Coordinate and properly integrate materials and equipment to provide a completely compatible and efficient installation | ||||
| 23 05 11 | GENERAL WORK RESULTS FOR HVAC | GENERAL WORK RESULTS FOR HVAC- | |||||
| O&M Manuals | O&M Manuals | 1.4.I | Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replacement parts, and troubleshooting guide. Provide a listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment. Include in the listing belts for equipment: Belt manufacturer, model number, size and style, and distinguished whether of multiple belt sets. | ||||
| 23 05 12 | ERROR:#REF! | GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT- Submittal | ERROR:#REF! | 1.4.E | Manufacturer's Literature and Data |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .