Attachment I - Statement of Work (SOW) Command Door Replacment.pdf

PDF 352 KB Posted

Attached to
USCG Base Portsmouth Command Door Replacement Federal contract opportunity
Solicitation number
70Z02726RFQ000153
Issued by
Department of Homeland Security US Coast Guard

About this file

This is a Statement of Work (SOW) for the replacement of the commanding officer entrance door at USCG Base Portsmouth in Portsmouth, Virginia (4000 Coast Guard Boulevard, Portsmouth, VA 23703).

The contractor must demolish and remove the existing door, frame, and hardware, then furnish and install one pair of 3'0" x 6'8" black storefront doors with frame and two sidelights (total frame opening width approximately 98 inches, each sidelite approximately 13 inches wide). The new doors must feature a medium 10-inch bottom rail, standard push-pull hardware, dead latch, surface closers, and 1/4" clear tempered safety glass on both doors and sidelights. The lock must be small format IC core compatible with the core supplied by the Coast Guard. Installation includes a top flush bolt on the inactive door, no threshold, and proper anchoring, trimming, and caulking per manufacturer specifications. Custom manufacturing occurs at the contractor's facility with installation at USCG Base Portsmouth. The period of performance must not exceed 45 working days after contract award. Work hours are generally 0700-1530 EST Monday through Friday, except federal holidays, though weekend or after-hours work may be approved in writing. Travel costs are included in the overall contract price and are not a separate line item. All contractor employees require base access approval at least five days prior to work commencement and must comply with federal safety (29 CFR 1910 and 1926), environmental (40 CFR), and security regulations. A project manager must be available to the Quality Assurance Evaluator (QAE) during business hours and respond within 24 hours to technical issues.

View the file

Other files for this federal contract opportunity

Other files attached to USCG Base Portsmouth Command Door Replacement, newest first.
File Type Posted
Attachment II - Wage Rates.pdf PDF
SF1442.pdf PDF
70Z02726RFQ000153.pdf PDF
Attachment III - Davis Bacon Act WD Poster.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1/6

STATEMENT OF WORK (SOW)

FOR

USCG Base Portsmouth Command Door Replacement

1.0 GENERAL

1.1 BACKGROUND

The Base command main office entrance door requires replacement due to a failed locking mechanism that renders it incapable of securing the premises effectively. Additionally, the door's age has significantly compromised its functionality, leading to difficulties in opening and closing.

1.2 SCOPE

Contractor will furnish all Labor, equipment and material Demo and dispose of existing doors and frame, Furnish and install one pair of 3'0" x 6'8" black storefront doors with frame and two sidelights, medium 10 in bottom rail Doors to have standard push pull hardware and dead latch, surface closers and 1/4" clear tempered safety glass. Sidelights to have same glass

2.1 TASK ONE. Demolition Existing Door

2.1.1 Demolish and dispose of the Existing doors, frame and all existing hardware

2.1.2 Prepare door frame for installation of the new door according to manufacturer’s instructions. Fill/Level existing opening to ensure a smooth transition from hallway to inside room.

2.1.3 Remove all demolished materials and debris from the site, ensuring proper disposal according to local regulations.

2.2 TASK TWO. Installation of New storefront and Frame

2.2.1 Contractor will furnish and install the following according to manufactures instructions:

Provide and install one pair of 3'0" x 6'8" black storefront doors with frame and two sidelights; total overall frame opening width is approximately 98 inches, with each sidelite measuring approximately 13 inches wide. Medium 10 in bottom rail. Install top flush bolt on inactive door. No threshold for this install. Anchor frame in accordance to manufacture specifications. Trim and caulk all gaps/openings to provide a clean transition from drywall to door frame.

a) Doors to have standard push pull hardware and dead latch.

b) Surface closers and 1/4" clear tempered safety glass. Sidelights to have same glass.

c) Lock on door will need to be small format IC core compatible. Coast Guard to supply the

Core.

2.2.2 Remove all materials and debris from the site, ensuring proper disposal according to local regulations.

3.0 KEY PERSONNEL

PAGE 2/6

Project Manager

3.1 PROJECT MANAGER

3.1.1 The Project Manager must be available to the QAE via telephone between the hours of 0700 and 1530 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 24 hours of notification.

3.2 EMPLOYEE IDENTIFICATION

3.2.1 The QAE will provide a Base Access request form. The Contractor will need to return the Base Access form with list of all employees to the QAE Representative five (5) days prior to commencing work. The USCG Base Portsmouth Security Office will be given a copy of the employee list, and a pass will be issued for entry. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

3.3 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.

Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

3.5 CONDITIONS AFFECTING THE WORK

The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. All contractors that require Base access will have to be pre-vetted for entry prior to commencement of work.

3.6 SECURITY

Each contractor that does not have Real ID on their Driver licenses will need to present one of the following credentials:

. U.S. Department of Defense ID, including IDs issued to Active Duty, Reserve, National Guard, retirees and dependents.

PAGE 3/6

. RAPIDGate Credential

. HSPD-12 PIV card

. State-issued Enhanced Driver's License

. U.S. passport

. U.S. passport card

. DHS trusted traveler cards (Global Entry, NEXUS, SENTRI, FAST) . Permanent resident card . Border crossing card . Federally recognized Tribal Nation/Indian Tribe, including Enhanced Tribal Cards (ETCs) . Foreign government-issued passport . Canadian provincial driver's license or Indian and Northern Affairs Canada card . Transportation worker identification credential . U.S. Citizenship and Immigration Services Employment Authorization Card (I-766) . U.S. Merchant Mariner Credential . Veteran Health Identification Card (VHIC)

3.7 AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

4.0 PERIOD OF PERFORMANCE

The period of performance for this contract must not exceed 45 working days after contract award or as negotiated with Contracting Officer and Facilities Engineering.

4.1 PLACE OF PERFORMANCE

The primary place of performance will be at 4000 Coast Guard Blvd, Portsmouth, VA 23703.

Custom manufacturing will be conducted at Contractor’s facility and installation will be conducted at the USCG Base Portsmouth.

4.2 HOURS OF OPERATION

Contractor employees must generally perform all work between the hours of 0700 and 1530 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government to inspect the work in progress.

4.3 TRAVEL

Travel shall not be included as an additional/separate line item. Travel is required for delivery and installation purposes and shall be included as part of the overall cost.

PAGE 4/6

4.4 GENERAL REPORT REQUIREMENTS

The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).

4.5 CONTRACTOR FURNISHED PROPERTY

The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract.

4.6 GOVERNMENT ACCEPTANCE PERIOD

Upon completion of work, contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.

4.6.1 The QAE will conduct an inspection of the work conducted by the Contractor and will have the right to reject or require correction of any deficiencies found that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the QAE of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

5.0 OTHER APPLICABLE CONDITIONS

5.1 SECURITY/SAFETY

All contractors working on CG Base Portsmouth shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

Written notification must be provided to the Base Safety Officer; in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Base Portsmouth. A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.

Every employee working on Base Portsmouth has the right to a safe and healthy work place.

The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

5.2 ENVIRONMENTAL PROTECTION REQUIREMENTS:

All contractors working on CG Base Portsmouth shall abide by all federal environmental

PAGE 5/6

regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractors written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.

Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Base Portsmouth. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

Hazardous materials used by a contractor are required to be disposed of by that contractor.

Disposal must be in accordance with federal, state, and local guidelines.

5.3 PERMITS: The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

5.4 WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory for the Contracting Officer.

5.5 ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

Existing Door Outside view.

Inside view existing door

PAGE 6/6