Attachment I - Statement of Work.docx
DOCX document 10 MB Posted
- Solicitation number
- 70Z027Q260000077
About this file
This is a Statement of Work (SOW) for the installation of a complete multi-zoned ductless mini-split heat pump system at United States Coast Guard (USCG) Station Milford Haven, Virginia. The contractor must remove three existing mini-split systems and install nine new units across specified rooms including berthing hallways, offices, communications room, gym, and messdeck. All outdoor condenser and evaporator coils must be factory-treated with epoxy polymer e-coat corrosion control coating formulated for marine environments. The contractor is responsible for site preparation and demolition, proper disposal of removed equipment and refrigerant in accordance with local, state, and federal regulations, condensate line routing, and installation per manufacturer specifications with required clearances maintained.
Electrical work must include a comprehensive demand calculation of all circuits on the main service switchboard and electrical panels per Article 220 of the National Electrical Code to identify available capacity. The contractor must supply and install all branch circuit wiring, conduit/raceways, junction boxes, and protection devices in accordance with NFPA 70/NEC (2023), with minimum No. 12 AWG copper conductors, EMT interior conduit with steel compression fittings, and PVC-coated RMC or IMC for exterior raceways. Submittals due within 30 calendar days of Notice to Proceed must include detailed installation plans with electrical demand calculations and complete product data sheets. Upon completion, the contractor must perform operational testing, provide minimum four hours of training to USCG personnel on operation and maintenance, and submit as-built drawings, two sets of O&M manuals, and product warranties. The contractor must complete all work, including installations, site cleanup, and deliverables, within 60 calendar days from Notice to Proceed, working Monday through Friday from 0800 to 1600 hours unless otherwise approved by the Contracting Officer's Representative. Personnel must be qualified and licensed with appropriate certifications such as EPA Section 608 for HVAC work.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
ENGINEERING SERVICES DIVISION
SCOPE OF WORK
FOR
INSTALL DUCTLESS HVAC SYSTEM
U.S. COAST GUARD STATION
MILFORD HAVEN, VA
COMMANDING OFFICER
UNITED STATES COAST GUARD
CIVIL ENGINEERING UNIT, RM 2179
1240 EAST NINTH STREET
CLEVELAND, OHIO 44199-2060
1.0 GENERAL
1.1 Background
1.1.1 This Scope of Work (SOW) outlines the requirements to provide all necessary labor, materials, equipment, and supervision for the installation of a complete multi-zoned ductless mini-split heat pump system, as well as the replacement of existing deficient units, at United States Coast Guard (USCG) Station Milford Haven. The new installation shall provide comprehensive, independent climate control to the specified zones and ensure fully operational, energy-efficient heating and cooling throughout the Station Building.
1.2 Scope
1.2.1 The contractor is required to provide a reliable and efficient heating and cooling solution for the station. The contractor shall be responsible for a complete and functional installation.
1.3 References
1.3.1 The following references will be provided for the contractor:
1.3.1.1 PSN 05-C04096 Replace Electrical Substation Drawings
1.3.1.2 PSN 05-C04099 Major M&R of Electrical System Drawings
1.3.1.3 PSN 05-C02249 UPH Berthing FCU Replacement Drawings
1.3.1.4 Site Electrical Demand and Consumption Data
1.3.1.5 Existing site photos are included in Appendix (A)
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 SITE PREPARATION AND DEMOLITION
2.1.1 The Contractor shall disconnect, lock-out/tag-out, and remove the three (3) existing mini-split systems located in the Berthing Hallway near Gym, Berthing Area Hallway near Training Room, and Communications Watchstander Room. Demolition shall include head units, refrigerant piping, condensate lines, compressors, and electrical homeruns. The Contractor shall be responsible for the proper disposal of all removed equipment, refrigerant, and debris off-site in accordance with all local, state, and federal laws and regulations.
2.2 NEW MINI-SPLIT INSTALLATION
2.2.1 The Contractor is required to provide and install nine (9) new multi-zoned mini-split heat pump systems in the following rooms: Berthing Hallway near Gym, Berthing Area Hallway near Training Room, Communications Watchstander Room, Reserve Room, OIC’s Office, XPO’s Office, EPO’s Office, Gym, and Messdeck. The final locations and zoning will be confirmed with the Contracting Officer's Representative (COR) prior to installation.
2.2.2 Provide ductless heat pump mini-split that includes compressors, fans, motor(s), drives, coils, air cooled condenser, air filters, controls for fully automatic operation, dehumidification settings, intercomponent piping and wiring, wall-mounted indoor fan coil with factory supplied condensate pump and field terminal connections.
2.2.3 All outdoor heat pump condenser and evaporator coils shall be factory-treated with a flexible, epoxy polymer electro-deposition (e-coat) corrosion control coating formulated for marine environments.
2.2.4 Route condensate lines to the closest available location.
2.2.5 Install units per manufacturer’s recommended instructions and maintain required clearances.
2.2.6 Contractor shall provide a proposed split system schedule for Government review and approval. Schedule shall include the following at minimum; area served, cooling capacity (MBH), heating capacity (MBH), minimum Seasonal Energy Efficiency Ratio (SEER), electrical data, and refrigerant type.
2.3 ELECTRICAL
2.3.1 The Contractor is required to perform a comprehensive demand calculation of all circuits on the main service switchboard and all electrical panels in the Station Building in accordance with Article 220 of the National Electrical Code (NEC). This is to identify the available panel space and capacity to support the additional electrical loads of the new mini-split systems. A formal report of these findings shall be provided to the Government with the installation plan for review and approval before any electrical work commences.
2.3.2 Contractor must supply and install electrical branch circuit wiring, conduit/raceways, fittings, junction box(s), protection devices (i.e., breakers) and all other electrical devices required to perform the scope IAW NFPA 70/NEC (2023).
2.3.2.1 Conductors: Unless specified or indicated otherwise or required by NFPA 70, provide power wires rated for 600-volts, Type THWN/THHN conforming to UL 83, except that grounding wire may be type TW conforming to UL 83. Minimum conductor size for branch circuits: No. 12 AWG (copper).
2.3.2.2 Interior conduit must be EMT with steel compression type fittings. Exposed exterior raceways shall be Polyvinyl Chloride (PVC) coated RMC or IMC. The PVC coating must be factory-applied (NEMA RN 1, Type A40) to prevent salt and moisture intrusion into the galvanized steel.
2.3.2.3 Cabinets, Junction Boxes, and Pull Boxes: UL 50, volume greater than 100 cubic inches, NEMA Type 1 enclosure; sheet steel, hot-dip, zinc=coated. Where exposed to wet, damp, or corrosive environments, NEMA Type 4X.
2.3.3 Contractor must update panel schedules with a permeant marker after installation of any new circuits.
2.4 MECHANICAL
2.4.1 All outdoor compressor units shall be securely mounted on either an exterior wall or on the roof. Locations for the outdoor units will be coordinated with and approved by the COR to minimize aesthetic and operational impacts.
2.4.2 Refrigerant lines shall be neatly run and protected by line-hide or an equivalent protective covering. All penetrations through walls or other surfaces shall be properly sealed and weatherproofed.
2.4.3 All refrigerant line runs, insulation, and connections shall be installed in accordance with manufacturer specifications and industry best practices.
2.5 SUBMITTALS
2.5.1 No later than 30 calendar days after the issuance of the Notice to Proceed, the Contractor shall submit the following for Government review and approval:
| 2.5.1.1 | Installation Plan: Detailed installation plan identifying indoor head unit locations, proposed routing for condensate drain lines and refrigerant lines, and the locations for refrigerant distribution boxes and outdoor compressor units. Please refer to section 2.2.5 for more detail. Installation plan shall be supported by comprehensive demand calculation of the existing electrical sub-panels in accordance with the National Electrical Code (NEC). |
| 2.5.1.2 | Product Submittals: A complete list of product data sheets and specifications for all proposed equipment and accessories. This includes, but is not limited to, the mini-split indoor heads, outdoor compressors, compressor stands/pads, refrigerant piping, pipe insulation, condensate pumps, and control systems. |
2.6 TESTING, TRAINING, AND DELIVERABLES
2.6.1 Upon completion of the installation, the Contractor shall perform a complete operational test of the new systems for the COR. The test must demonstrate the proper function of all heating and cooling modes, control functions, and condensate drainage.
2.6.2 The Contractor shall provide a minimum of four (4) hours of training to USCG personnel on the operation, maintenance, and emergency procedures for the new mini-split systems.
2.6.3 The Contractor must submit As-Built drawings, two (2) complete sets of Operation and Maintenance (O&M) manuals, and all product warranties to the COR upon project completion.
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
3.1.1 The Contractor must provide qualified and licensed personnel to perform all requirements and tasks specified in this task order. Contractor personnel must possess the experience, knowledge, and certifications (e.g., EPA Section 608) necessary for HVAC work.
4.0 OTHER APPLICABLE CONDITIONS
4.1 Period of Performance
4.1.1 The period of performance for this contract, including all installations, site cleanup, punch list items, and required deliverables, must not exceed 60 calendar days from the issuance of the Notice to Proceed (NTP).
4.2 Place of Performance
4.2.1 The primary place of performance will be USCG Station Milford Haven, 63 Mill Point Rd, Hudgins, VA, 23076.
4.3 Hours of Operation
4.3.1 Contractor employees shall perform all work during the normal unit operational hours of 0800 to 1600, Monday through Friday, unless specific permission has been obtained from the COR.
APPENDIX A – Site Photos
Watch Office Mini-split Head
Hallway Mini-split
Gym Mini-split
400 A Main Distribution Panel MDP-MP (Right) Panel MPA (Left)
MDP-MP Breakers
MDP-MP Panel Legend
Panel MPA Legend
Panel HVAC
HVAC Panel Legend image1.png image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg