About this file
This file contains facilities and equipment inventory and canal measurement documentation for operation and maintenance work at Pacific Missile Range Facility, Kekaha, Kauai, Hawaii under a Navy contract. The Kawai'ele pump station contains two 200 HP pumps and one 100 HP pump, supported by 142 linear feet of sheet piling, two flap gates, one dry ditch food gate, and associated infrastructure including instrument sheds, debris grills, and steel conduits. The contract encompasses 32,077 linear feet of canals across eight identified sections with varying dimensions and maintenance requirements. Supporting infrastructure includes 5 culverts, 20 power poles, 6 pole transformers, and 26,320 feet of access road. Specific canal maintenance requirements vary by section, with Canal A, C, CC, and D having designated buffer zones where bank clearing is restricted on one side. Canal F has restricted areas near the ocean due to sea turtle protection, and Canal FF requires brush clearing only without dredging operations on a minimum annual basis.
Historical operational data indicates the facility experiences two heavy rainstorms annually exceeding 5 inches of daily rainfall and requires approximately one pump repair per year. Sheet piling maintenance consists of visual observation and condition notation in a logbook with notification to the Contracting Officer when repairs are needed. The contract requires a Site Safety and Health Officer to develop and maintain a comprehensive safety program, conduct monthly inspections and training, and ensure safe execution of all operation and maintenance activities at the facility.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14-26-2424 J-1502000-02, Page 1 of 1
ATTACHMENT J-1502000-02
Facilities and Equipment Inventory
1. Kawai’ele pump station: 2 – 200 HP pumps, 1 – 100 HP pumps, 142 linear ft of sheet piling
2. 32,077 linear ft of canals
3. 5 culverts
4. 20 power poles and 6 pole transformers
5. 26,320 ft of access road
6. One Dry Ditch Food Gate
7. Two Flap Gates
8. Pump Stations infrastructure items: 142 linear ft of sheet piling, one cross walk with railings, two instrument sheds, two debris grill and approximately 20 ft of 3” diameter steel conduits.
Note:
The sheet piling maintenance includes a visual observation and notation of condition in the logbook.
Notify the KO when the sheet piling needs repair.
ATTACHMENT H
Attachment J-1502000-03 Canal Measurements
CANAL LENGTH, WIDTH, AND DEPTH BY SECTION (SEE J-1502000-01 MAPS FOR LOCATION AND LAYOUT)
Canal Identification Length
(FT)
Average Width
(FT)
Approximate Depth
(FT)
1 Canal A 21,750 25 -4 2 Canal B 1,500 20 -4 3 Canal C 2,407 30 -3 4 Canal CC 1,093 30 -3 5 Canal D 2,000 20 -2 6 Canal E - 20 Not on Contract 7 Canal F 1,092 20 -1 8 Canal FF 2,235 60 No dredging – brush rem 1x per year 9 Canal G - 20 Not on Contract 10 Canal H - 20 Not on Contract
Total 32,077
Related Information for Canals Canal A – See maps for portions of Canal A that have no clearing of banks on one side of canal (buffer zone.)
Canal B – Clear banks on both sides of canal Canal C – Clear banks on both sides of canal Canal CC – See maps for portion of Canal CC that have no clearing of banks on one side of canal (buffer zone.)
Canal D – See maps for portions of Canal D that have no clearing of banks on one side of canal (buffer zone) Canal E – Not on contract Canal F – The portion of canal near the ocean is a restricted for sea turtles. DO NOT
CUT brush beyond area shown.
Canal FF – No dredging work; only brush clearing is required (min. 1x per year) Canal G – Not on contract Canal H – Not on contract
J-1502000-03, Page 1 of 1
J-1502000-04, Page 1 of 1
Attachment J-1502000-04 Historical Data
Historically there were two very heavy rainstorms (above 5 inches of rain in any one day) per year.
One pump repair per year.