Attachment B Facility Investment.pdf
PDF 296 KB Posted
- Attached to
- Site Safety and Health Officer
- Solicitation number
- B26003481
- Issued by
- Kauai County, Hawaii
About this file
This is a Facility Investment technical specification document for the U.S. Navy at the Pacific Missile Range Facility (PMRF) in Kauai, Hawaii, outlining requirements for sustainment, restoration, and modernization services. The contractor shall provide all labor, management, supervision, tools, materials, and equipment necessary to perform maintenance, repair, alteration, demolition, minor construction, and landscape repair on mechanical equipment structures, building systems, pipelines, pump stations, canals, culverts, flood gates, electrical power transmission lines, and water accumulation areas. Key recurring work includes emergency work orders requiring 24/7 response within one hour, urgent work orders to be completed within five working days, and routine work orders to be completed within 30 calendar days. The contractor must develop and implement a preventive maintenance program addressing pump operation and maintenance at Kawai'ele pump stations with a minimum 95% operational uptime requirement, infrastructure maintenance including sheet pilings and wooden structures, dry ditch and flap gate operations, electrical power line maintenance including tree trimming, and cathodic protection system maintenance per UFC 3-570-06 standards. The contractor must visit pump stations at least five days per week and cycle pumps weekly for 20-minute minimum runs. Non-recurring work may be ordered through task orders with specifications to be determined per individual work orders.
Personnel must be trained and certified by original equipment manufacturers, with electrical and electronic equipment workers requiring certification per NAVFAC MO-200 and cathodic protection personnel trained per UFC 3-570-06. All maintenance and repair work shall comply with approved industry standards, equipment manufacturer specifications, and applicable building and safety codes. The contractor has responsibility for work up to specified limits of liability per work order type: 32 hours of direct labor and $5,000 in direct material for Emergency/Urgent/Routine work, and 32 hours of labor with $2,000 in material for pump repairs. Incidental repairs discovered during preventive maintenance are limited to 32 hours of labor and $2,500 in material per occurrence. Cathodic protection system maintenance is capped at 16 hours of labor and $500 in material annually. All work must be documented in NAVFAC Maximo, and the contractor must submit monthly summaries of completed work orders, preventive maintenance schedules, and proof of all certifications and training requirements. A valid NPDES permit must be obtained and submitted within 30 days of issuance, valid for the contract duration including all option years.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C – 1502000 Facility Investment
14-26-2424 1502000, Page 1 of 14
1502000 – Facility Investment Spec Item Title 1 General Information
1.1 Outline of Services
2 Management and Administration
2.1 Definitions and Acronyms
2.2 Personnel
2.2.1 Certification, Training, and Licensing
2.3 Special Requirements
2.3.1 Work Coordination
2.3.2 Workmanship and Material Standards
2.3.3 Historical Preservation
2.4 References and Technical Documents
3 Recurring Work
3.1 Emergency, Urgent, and Routine (E/U/R) Work
3.1.1 Emergency
3.1.2 Urgent
3.1.3 Routine
3.2 Preventive Maintenance (PM) Program
3.2.1 Pump Operation and Maintenance
3.2.2 Kawai’ele Pump Station Infrastructure
3.2.3 Dry Ditch Flood Gate
3.2.4 Flap Gates
3.2.5 Electric Power Transmission Lines
3.2.6 Cathodic Protection Systems
3.3 National Pollutant Discharge Elimination System Permit (NPDES)
4 Non-Recurring Work
ATTACHMENT B
14-26-2424 1502000, Page 2 of 14
1502000 – Facility Investment Spec Item Title Description 1 General
Information The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for facilities at the PACIFIC MISSILE RANGE FACILITY (PMRF) AT
KAUAI, HAWAII.
1.1 Outline of
Services
The intent of 1502000 Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions only. The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work.
Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consist of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment.
The Contractor shall perform maintenance, repair, alteration, demolition, minor construction, and landscape repair for the following:
Mechanical Equipment Structures -Pump Footing or Foundation -Structural Components -Cathodic Protection Systems -Pipelines
Building Systems -Pump Station -Canals/Culverts and Ravines -Flood Gates, Flap Gates -Electrical Power Transmission Lines and Associated Hardware and Structures -Water Accumulation and Discharge areas (to include Wet Wells)
14-26-2424 1502000, Page 3 of 14
1502000 – Facility Investment Spec Item
Title Description
2 Management and Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 Personnel In additions to the Employee Requirements specified in Annex 02, the Contractor shall provide personnel with the qualifications specified below:
2.2.1 Certification, Training, and Licensing
All maintenance and repair shall be performed by personnel trained and certified by the OEM.
Personnel working with or on electrical or electronic equipment must be trained and certified per NAVFAC MO-200.
Personnel performing work on transformers must be knowledgeable of proper procedures for handling and disposing of insulating fluid containing polychlorinated biphenyls (PCBs)
Personnel performing work in HAZMAT/HAZWASTE must complete the HAZMAT/HAZWASTE handling course or have a minimum of one year of experience working with HAZMAT/HAZWASTE.
Personnel performing work and obtaining test data on the cathodic protection system must be trained per UFC 3-570-06.
All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level or higher.
The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.
2.3 Special
Requirements
2.3.1 Work
Coordination
During exceptional flooding periods, and when necessary, the Contractor shall coordinate all maintenance and repair work with the PMRF Public Works Office in a manner that minimizes the potential flooding at PMRF.
2.3.2 Workmanship
and Material Standards
The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.
Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks.
Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused
14-26-2424 1502000, Page 4 of 14
1502000 – Facility Investment Spec Item
Title Description by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.
The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.
2.3.3 Historical
Preservation
Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state, and local historical policies and regulations.
2.4 References and
Technical Documents
References and Technical Documents are listed in J-0200000-03.
14-26-2424 1502000, Page 5 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard 3 Recurring
Work The Contractor shall maintain, repair, and alter all facilities, installed equipment and systems as necessary to ensure they are fully functional and in normal working condition.
The Contractor shall develop, implement, and execute a Maintenance Program and Other Recurring Service Program to maintain and repair facilities, ground structures, personal property equipment, and installed equipment and systems.
The Contractor shall provide all necessary test instruments, equipment, and tools required to perform maintenance and repair.
The location of Kawai’ele pump stations and other infrastructure is provided in J-1502000-01.
Facilities and Equipment inventory is provided in J- 1502000-02.
The Fifth Amendment of the General Lease No. S-3852 is provided in J-1502000-06.
The Contractor shall efficiently maintain the water level in the wet well of Kawaiele pumping station in accordance with Attachment J-1502000-06 or as may be hereafter amended.
Facilities, ground structures, personal property equipment, and installed equipment and systems are in normal working condition and function properly in accordance with specified standards.
Pump system maintained continuously to prevent flooding during heavy rains.
3.1 Emergency, Urgent, and Routine (E/U/R) Work
The Contractor shall perform E/U/R work in a timely manner to ensure facilities, systems, ground structures and other assets are fully functional, in normal working condition and function properly in accordance with specified standards.
The Contractor shall receive E/U/R work in accordance with the work reception requirements in Annex 2.
The Contractor shall schedule and perform E/U/R work in a way that minimize disruptions to customers and Government operations.
E/U/R work will include a wide variety of work Historical E/U/R work data associated with contracts prior to this solicitation may present data that may not be representative of requirements specified. The Government makes no warranty, express or implied, or assumes any legal liability or responsibility for the
E/U/R work is responded to and completed within the specified time.
Facilities, systems, ground structures and other assets are fully functional, in normal working condition and function properly in accordance with
OEM
specifications, including recertification if applicable.
When a work order is complete the
14-26-2424 1502000, Page 6 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard accuracy, completeness, or usefulness of the historical E/U/R work order data.
The Contractor shall maintain sufficient materials and equipment on hand to support E/U/R work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete E/U/R work within the time limits specified.
The Government may combine multiple requirements received for the same facility, system, ground structure or other asset at the same time into one work order.
Unless otherwise specified, the Contractor has full responsibility for any work up to the work order limit of liability of 32 hours in direct labor and $5,000 in direct material cost per work order. The Government will only pay for the portion of direct labor and/or direct material that exceeds the E/U/R work order limits of liability.
The Contractor shall notify the KO upon identification that the work order will exceed the specified limits of liability in accordance with reporting requirements in Annex 2. If a non-recurring work is issued for the portion exceeding the specified E/U/R work order limits of liability, the Government will issue a task order for the portion of direct labor and/or direct material that exceeds the work order limits.
Examples of work exceeding the E/U/R Work Order limits of liability:
If a work order requires 40 hours in direct labor and facilities, systems, ground structures and other assets do not present danger to personnel or equipment.
Work order properly documented in
NAVFAC
Maximo.
14-26-2424 1502000, Page 7 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard $6,000 in direct material cost, the Government may issue a task order in accordance with the Non-recurring Work portion of the contract for the 8 hours in direct labor and $1,000 in direct material cost that exceeds them work limit of liability.
The Contractor shall submit a monthly summary of completed E/U/R work orders per Section F.
3.1.1 Emergency The Contractor
shall perform emergency work orders in a timely manner to ensure facilities, systems, ground structures and other assets are fully functional, in normal working condition and function properly in accordance with specified standards.
The Contractor shall perform emergency work orders 24 hours a day, seven days a week throughout the contract period.
The Contractor shall respond to emergency work orders with the appropriate service personnel and equipment to commence work immediately.
The Contractor shall remain at the work site until the emergency has been arrested.
If follow-up work is required (after the emergency condition is arrested) to complete the restoration and ensure facilities, systems, ground structures and other assets are fully functional and in normal working condition, the Contractor may request time extension equal to a Routine Work Order. The emergency mitigation and follow-up work shall be considered part of the original work order.
Informational Note:
Historically, approximately 2 emergency work orders originate after normal working hours each month.
Emergency work orders responded to within one hour of receipt of call.
Work continues without interruption until emergent condition is arrested and damage to facilities, systems, ground structures, other assets and personnel is mitigated.
3.1.2 Urgent The Contractor
shall perform urgent work orders
The Contractor shall perform urgent work orders without extended delay.
Urgent work orders are completed
14-26-2424 1502000, Page 8 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard in a timely manner to ensure facilities, systems, ground structures and other assets are fully functional, in normal working condition and function properly in accordance with specified standards.
within five working days.
3.1.3 Routine The Contractor
shall perform routine work orders in a timely manner to ensure facilities, systems, ground structures and other assets are fully functional, in normal working condition and function properly in accordance with specified standards.
Performance of routine work orders is not required outside of Government regular working hours.
Routine work orders are completed within 30 calendar days.
3.2 Preventive
Maintenance (PM) Program
The Contractor shall develop and implement a PM program for facilities, ground structures, personal property equipment, and installed equipment and systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall develop and submit a PM program per Section F. At a minimum, the PM program shall include:
PM management and technical approach
Procedures to evaluate equipment reliability and corrective actions.
Job plans tailored to the OEM technical documentation.
Qualification requirements of the maintenance personnel.
The Contractor is fully responsible for and shall perform any incidental repairs, including replacement, discovered during scheduled maintenance work up to 32 hours of labor and $2,500 per occurrence in direct material cost under the recurring work portion of the contract.
Incidental repairs performed under maintenance are not considered E/U/R work.
Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.
PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.
PM Work properly documented in
NAVFAC
Maximo.
At minimum, the PM program addresses ongoing continuous preventive maintenance for portions of the pump system that
14-26-2424 1502000, Page 9 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard
Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO within two hours of identification. The Government may issue E/U/R work or non-recurring work for the portion of the repairs exceeding the incidental repairs limits of liability. The Government will only pay for the portion of direct labor and/or direct material that exceeds the specified limits of liability.
The Contractor shall not use breakdown maintenance as part of the PM program.
The PM program shall provide an economical approach to accomplish the manufacturers’ recommended maintenance in accordance with OEM standards, and maintenance required to satisfy equipment warranties and keep facilities, ground structures, personal property equipment, and installed equipment and systems in normal working condition.
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program.
These changes will be made at no additional cost to the Government.
The Contractor shall submit a monthly PM work schedule per Section F.
need more frequent maintenance.
All repairs discovered during preventive maintenance work, up to the Recurring limits, are completed. The KO is notified, for repairs exceeding the Recurring limits, within two hours of identification by the Contractor.
3.2.1 Pump
Operation and Maintenance
The Contractor maintenance on pumps to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall operate and maintain the three pumps at Kawaiele pumping station as necessary to lower the level of water at the wet well level in accordance with Attachment J- 1502000-06 or as may be hereafter amended.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
Meters are installed and functioning at
14-26-2424 1502000, Page 10 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard Pumps shall be cycled at least once per week. Each pump shall run for 20 minutes minimum. If cavitation becomes excessive, the pump shall be secured.
Operation consists of weekly, monthly, quarterly, semiannual, and annual maintenance in accordance with the manufacturer’s maintenance manual.
The Contractor shall maintain the pumping station at a minimum 95% operational uptime throughout the period of performance.
Safe operation shall ensure that all pumps requiring operator attendance are staffed by qualified personnel at all times of operation. The KO shall be notified immediately if unsafe conditions are discovered.
The average volume of water pumped is approximately 17 million gallons per day
(MGD).
The Contractor shall visit each pumping station at least 5 days per week (Monday-Friday, unless approved by KO and PMRF PWO). Maintenance tasks and visual observations are noted in the log book located at each pumping station.
The Contractor shall perform repairs to the pumps for up to 32 hours of labor and $2,000 in material, equipment, and parts per repair.
The Contractor shall shutdown, restart, and perform operational checks on all equipment affected by both scheduled and unscheduled utility outages at no all times.
Water level at Kawaiele pumping stations are maintained to a water level in accordance with Attachment J- 1502000-06 or as may be hereafter amended.
14-26-2424 1502000, Page 11 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard additional cost to the Government.
3.2.2 Kawai’ele
Pump Station Infrastructure
The Contractor shall perform maintenance on all infrastructure that supports the pumps at the Kawai’ele pumping station to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The infrastructure includes instrument shed, pipes, railings, cross walk etc. that requires periodic maintenance to deter deterioration. In particular are the sheet pilings. These pilings are crucial to maintain the wet well from collapsing and require constant monitoring and maintenance to deter any major deterioration to the point of potential collapse. (Refer to Attachment J-1502000-01)
Maintenance shall include spot correction efforts to prevent more serious corrosion and deterioration.
Wooden storage shed, wooden barricades, and platforms shall be maintained to prevent further deterioration.
Maintenance shall include painting when required and minor repairs if necessary.
Log all maintenance tasks in the log book at each pumping station.
Maintenance is performed in accordance with Contractor's PM program, work schedule and trade standards.
3.2.3 Dry Ditch
Flood Gate
The Contractor maintenance on the Dry Ditch Flood Gate to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall provide periodic maintenance to assure that the gate is operational at all times. The gate could be crucial during heavy rain.
Maintenance should include other gate infrastructure such as support safety railings and the walkway. Flood gate shall be operated during times of heavy rainstorms to limit flooding to the canals.
No major repair work is required other than periodic preventive maintenance.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
3.2.4 Flap Gates The Contractor
maintenance on the
The Contractor shall provide periodic maintenance to assure that the gates are operational at
Maintenance is accordance with
14-26-2424 1502000, Page 12 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard flap gates to ensure proper operation, to minimize breakdowns, and to maximize useful life.
all times. The gates are crucial during heavy rain.
Flap gates shall be operated during times of heavy rainstorms to limit flooding in the canals.
No major repair work is required other than periodic preventive maintenance.
Contractor's PM program and work schedule.
3.2.5 Electric Power
Transmission Lines
The Contractor shall perform maintenance on the electrical power lines to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall provide maintenance on the electrical power lines to ensure power loss to the pump stations are minimized.
Maintenance of the power lines include pole transformers, guy wires, cross arms and insulators, and any other related items that make power transmission possible.
The Contractor shall be responsible for tree trimming to prevent branches from contacting power lines.
No major repair work is required other than periodic preventive maintenance.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
3.2.6 Cathodic
Protection Systems
The Contractor shall perform maintenance on cathodic protection systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall maintain, inspect, and test cathodic protection systems in accordance with UFC 3-570-06 and instructions provided in Attachment 1502000-05, Cathodic Protection Operation and Maintenance Data.
The cathodic protection system is installed to protect the sheet metal piping at the Kawai’ele Pump station.
The Contractor shall perform maintenance on the cathodic protection system for up to 16 hours of labor and $500 in material, equipment, and parts cost per year.
Maintenance is accordance with Contractor's PM program and work schedule.
The cathodic protection system is operational at all times.
The Contractor is responsible for all repairs discovered during preventive maintenance work, up to the Recurring limits, are completed. The KO
14-26-2424 1502000, Page 13 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard At a minimum, maintenance shall include troubleshooting procedures to correct loss of A.C. input, blown fuses, loose terminals, faulty meters, blown M.O.V. suppressors, open circuits, faulty cathodic load connections, and lightning damage. If the initial inspection should uncover a faulty rectifier, systematic isolation of the various rectifier component should be conducted to determine the cause of nonoperation by following the steps outlined in the manual (Attachment J-1502000-05).
The cathodic protection system must be operational at all times.
The Contractor shall notify the KO for all repairs exceeding the Recurring limits.
is notified, for repairs exceeding the Recurring limits, within two hours of identification by the Contractor.
3.3 National
Pollutant Discharge Elimination System Permit
(NPDES)
The Contractor shall apply for and possess a valid NPDES permit as required under any settlement agreement, court approval or other applicable laws.
The Contractor is required to apply for and obtain a NPDES permit as required under any settlement agreement, court approval or other applicable laws.
Contractor’s NPDES Permit shall be submitted to the KO within 30 Days after permit is obtained per Section F.
Contractor has a valid NPDES permit for the duration of the contract to include all Option Years.
14-26-2424 1502000, Page 14 of 14
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard 4 Non-Recurring
Work Non-recurring work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the
PROCEDURES
FOR ISSUING
ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to non-recurring work ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for Non-recurring work will be the same as those in Spec Item 3 where applicable.