ATTACHMENT G - P691 SAT TO Submission - Specs.pdf
PDF 14 MB Posted
- Solicitation number
- 6007134
About this file
This document is ATTACHMENT G - P691 SAT TO Submission - Specs, which contains specifications related to a federal contract opportunity for the Department of the Navy Naval Facilities Engineering Command.
The contract opportunity, Solicitation Number 6007134 for the "P691 Phase I, Aircraft Development and Maintenance Facility", is for site development and construction services of a Sonobuoy Storage Building and an Air Ops Storage Building. The project also includes an option for a Hazmat building and a Furniture, Fixtures, and Equipment (FF&E) Option CLIN. This opportunity is restricted to the ten (10) small businesses participating in the NAVFAC WASHINGTON Gold Small Business Multiple Award Construction Contract (GOLD SB MACC).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER No. 1737036 Contract No. N40080-22D-0001 Installation Project No. P-691
SPECIFICATIONS
Aircraft Development and Maintenance Facility – Ph 1
ADDENDUM 01
Naval Air Station Patuxent River – Maryland
PREPARED BY:
Pond / Michael Baker Joint Venture 3500 Parkway Lane, Suite 500
Peachtree Corners, Georgia 30092
Architectural: Aimee St. Germain, RA Plumbing: David Hurd, PE Interior: Natalie Harmon Electrical: Benjamin Roemer, PE Civil: Kyle Thomas, PE Communications: John Goldcamp, RCDD Structural: Joseph Zgorzynski, PE Fire Protection: Theresa Weyant, FPE Mechanical: David Hurd, PE
Submitted By: Mark Hanselman, PE, SE Date: 19 APRIL 2024 AE Project Manager
Project Manager: Pater Mattes, PE Date:
Government Project Manager
Approved By: Jennifer Blaess, RA Date:
Design Production Manager
P691 Aircraft Development and Maintenance Facility – Ph 1 W.O.N. 1737036 Naval Air Station Patuxent River, MD
P691 Aircraft Development and Maintenance Facility – Ph 1 W.O.N. 1737036
P691 Aircraft Development and Maintenance Facility - Ph 1
W.O.N 1737036
DOCUMENT PROJECT Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/22, CHG 1: 02/23 WORK RESTRICTIONS
01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 08/23 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITYREQUIREMENTS AND
REPORTING
01 35 13 11/20, CHG 1: 02/22 SPECIAL PROJECT PROCEDURES
01 35 26 11/20, CHG 4: 08/23 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)
01 78 30.00 23 10/16 CADD DATA FOR GIS DELIVERABLES
01 91 00.15 05/23, CHG 1: 08/23 BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
DOCUMENT PROJECT Page 2
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM
07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM AIR BARRIERS
07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 61 15.00 20 08/16, CHG 2: 11/18 ALUMINUM STANDING SEAM ROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 08/20 INTERIOR SIGNAGE
10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 26 00 08/20 WALL PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 56 13 04/06 STEEL SHELVING
DIVISION 12 - FURNISHINGS
12 00 01.00
12 35 53
20 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGE
METAL CASEWORK
12 36 16 METAL COUNTERTOPS
12 93 00 08/17 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
13 49 20.00 10 10/07 RFI/EMI SHIELDING Addendum 01
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
DOCUMENT PROJECT Page 3
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 11/17 CYBERSECURITY FOR FACILITY-HVAC
RELATED CONTROL SYSTEMS
25 05 11.02 05/21, CHG 1: 08/23 CYBERSECURITY FOR FIRE ALARM LIFE
SAFETY FACILITY-RELATED CONTROL SYSTEMS
25 05 11.03 05/21, CHG 1: 08/23 CYBERSECURITY FOR ELECTRICAL
FACILITY-RELATED CONTROL SYSTEMS
25 05 11.04 05/21, CHG 1: 08/23 CYBERSECURITY FOR ELECTRONIC SECURITY
SYSTEM (ESS) FACILITY-RELATED CONTROL
SYSTEMS
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 08 11.00 20 11/20 RISK MANAGEMENT FRAMEWORK FOR
FACILITY-RELATED CONTROL SYSTEMS
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 05/17 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 41 00 11/21 AUDIO-VISUAL SYSTEMS
27 51 23 11/21 INTERCOMMUNICATION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 70 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DOCUMENT PROJECT Page 4
DIVISION 31 - EARTHWORK
31 00 00 08/08, CHG 2: 02/21 EARTHWORK
31 36 00 02/21 GABIONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 92 19 10/06 TEMPORARY SEEDING
32 92 23 04/06, CHG 1: 08/21 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING
STATIONS
33 40 00 11/21 STORMWATER UTILITIES
33 46 16 05/18 SUBDRAINAGE PIPING
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
P691 Ai r cr af t Devel opment and Mai nt enance Faci l i t y - Ph 1 W. O. N 1737036 Naval Ai r St at i on Pat uxent Ri ver , MD
DOCUMENT 00 01 15
LI ST OF DRAWI NGS
02/ 11, CHG 1: 08/ 14
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "
1. 2 CONTRACT DRAWI NGS
Cont r act dr awi ngs ar e as f ol l ows:
VOLUME 1 SI TE DRAWI NGS
DRAWI NG NO. NAVFAC DWG NO. TI TLE
G- 000 13150026 PROJECT COVER SHEET
G- 001 13150027 SI TE DRAWI NGS COVER SHEET - VOLUME 1
G- 002 13150028 DRAWI NG I NDEX
GC101 13150029 OVERALL HAUL ROUTE PLAN
GC102 13150030 PHASI NG PLAN - 1
GC103 13150031 PHASI NG PLAN - 2
GC104 13150032 PHASI NG PLAN - 3
GI 001 13150033 CI VI L GENERAL NOTES - 1
GI 002 13150034 CI VI L GENERAL NOTES - 2
GI 003 13150035 ACCESS AND SAFETY NOTES
GI 004 13150036 CI VI L LEGEND AND ABBREVI ATI ONS
GR701 13150037 BORI NG LOGS - 1
GR702 13150038 BORI NG LOGS - 2
GR703 13150039 BORI NG LOGS - 3
GR704 13150040 BORI NG LOGS - 4
GR705 13150041 BORI NG LOGS - 5
GR706 13150042 BORI NG LOGS - 6
DOCUMENT 00 01 15 Page 1
VOLUME 1 SI TE DRAWI NGS
DRAWI NG NO. NAVFAC DWG NO. TI TLE
CD101 13150046 EXI STI NG CONDI TI ON AND DEMOLI TI ON PLAN
CD102 13150047 EXI STI NG CONDI TI ON AND DEMOLI TI ON PLAN
CD103 13150048 EXI STI NG CONDI TI ON AND DEMOLI TI ON PLAN
CS101 13150049 SI TE PLAN
CS102 13150050 SI TE PLAN
CS103 13150051 SI TE PLAN
CS111 13150052 PAVEMENT MARKI NG AND SI GNAGE PLAN
CS121 13150053 JOI NTI NG LAYOUT PLAN
CS131 13150054 SLAB ELEVATI ON PLAN
CS501 13150055 SI TE DETAI LS - 1
CS502 13150056 SI TE DETAI LS - 2
CS503 13150057 SI TE DETAI LS - 3
CS504 13150058 SI TE DETAI LS - 4
CS505 13150059 MARKI NG AND SI GNAGE DETAI LS
CG001 13150060 EROSI ON AND SEDI MENT CONTROL NOTES - 1
CG002 13150061 EROSI ON AND SEDI MENT CONTROL NOTES - 2
CG003 13150062 STORMWATER MANAGEMENT NOTES - 1
CG004 13150063 STORMWATER MANAGEMENT NOTES - 2
CG101 13150064 GRADI NG AND DRAI NAGE PLAN
CG102 13150065 GRADI NG AND DRAI NAGE PLAN
CG103 13150066 GRADI NG AND DRAI NAGE PLAN
CG111 13150067 EROSI ON AND SEDI MENT CONTROL PLAN
CG112 13150068 EROSI ON AND SEDI MENT CONTROL PLAN
CG113 13150069 EROSI ON AND SEDI MENT CONTROL PLAN
CG121 13150070 STORMWATER MANAGEMENT PLAN - 1
CG122 13150071 STORMWATER MANAGEMENT PLAN - 2
DOCUMENT 00 01 15 Page 2
VOLUME 1 SI TE DRAWI NGS
DRAWI NG NO. NAVFAC DWG NO. TI TLE
CG123 13150072 STORMWATER MANAGEMENT PLAN - 1
CG124 13150073 STORMWATER MANAGEMENT PLAN - 2
CG125 13150074 STORMWATER MANAGEMENT PLAN - 1
CG126 13150075 STORMWATER MANAGEMENT PLAN - 2
CG501 13150076 EROSI ON AND SEDI MENT CONTROL DETAI LS - 1
CG502 13150077 EROSI ON AND SEDI MENT CONTROL DETAI LS - 2
CG503 13150078 STORMWATER MANAGEMENT DETAI LS
CU101 13150079 UTI LI TY PLAN
CU102 13150080 UTI LI TY PLAN
CU103 13150081 UTI LI TY PLAN
CU111 13150082 UTI LI TY PROFI LES - WATER LI NE
CU112 13150083 UTI LI TY PROFI LES - FI RE SUPPRESSI ON
CU113 13150084 UTI LI TY PROFI LES - SANI TARY SEWER
CU114 13150085 UTI LI TY PROFI LES - WATER LI NE
CU115 13150086 UTI LI TY PROFI LES - WATER LI NE
CU116 13150087 UTI LI TY PROFI LES - FI RE SUPPRESSI ON
CU117 13150088 UTI LI TY PROFI LES - SANI TARY SEWER
CU501 13150089 UTI LI TY DETAI LS - 1
CU502 13150090 UTI LI TY DETAI LS - 2
CU503 13150091 UTI LI TY DETAI LS - 3
CU504 13150092 UTI LI TY DETAI LS - 4
L- 101 13150093 FACI LI TI ES LOCATI ON PLAN
L- 102 13150094 LANDSCAPE PLAN
L- 103 13150142 LANDSCAPE PLAN
L- 104 13150143 LANDSCAPE PLAN
DOCUMENT 00 01 15 Page 3
VOLUME 1 SI TE DRAWI NGS
DRAWI NG NO. NAVFAC DWG NO. TI TLE
L- 501 13150144 PLANTI NG DETAI LS
VOLUME 2 AI R OPS BUI LDI NGS
DRAWI NG NO. NAVFAC DWG NO. TI TLE
G- 000 13150095 PROJECT COVER SHEET
G- 001 13150096 AI R OPS BUI LDI NG COVER SHEET - VOLUME 2
G- 002 13150097 DRAWI NG I NDEX
GI 001 13150098 BUI LDI NG CODE ANALYSI S
GI 100 13150099 LI FE SAFETY - CODE COMPLI ANCE PLAN
GI 101 13150100 LI FE SAFETY - 1ST FLOOR PLAN
S- 001 13150101 DESI GN CRI TERI A AND GENERAL NOTES
S- 002 13150102 GENERAL NOTES, ABBREVI ATI ONS AND SYMBOLS
S- 101 13150103 FOUNDATI ON PLAN
S- 301 13150104 FOUNDATI ON SECTI ONS
S- 501 13150105 FOUNDATI ON AND SLAB TYPI CAL DETAI LS
S- 502 13150106 FOUNDATI ON AND SLAB TYPI CAL DETAI LS
S- 601 13150107 STRUCTURAL SCHEDULES
S- 602 13150108 PI ER SCHEDULES AND DETAI LS
AE001 13150109 ARCHI TECTURAL NOTES AND SYMBOLS
AE002 13150110 TYPI CAL ABA DETAI LS & MOUNTI NG HEI GHTS
AE101 13150111 FI RST FLOOR PLAN
AE105 13150112 FI RST FLOOR REFLECTED CEI LI NG PLAN
AE109 13150113 ROOF PLAN
AE201 13150114 NORTH AND SOUTH EXTERI OR ELEVATI ONS
AE202 13150115 EAST AND WEST EXTERI OR ELEVATI ONS
DOCUMENT 00 01 15 Page 4
VOLUME 2 AI R OPS BUI LDI NGS
DRAWI NG NO. NAVFAC DWG NO. TI TLE
AE301 13150116 BUI LDI NG SECTI ONS
AE311 13150117 WALL SECTI ONS
AE501 13150118 EXTERI OR DETAI LS
AE601 13150119 DOOR SCHEDULE
AE602 13150120 DOOR DETAI LS
I N001 13150121 I NTERI OR - FI NI SH, FURNI TURE, SI GNAGE SCHEDULES
AND NOTES
I N101 13150122 I NTERI OR - FI NI SH, FURNI TURE AND SI GNAGE PLAN AND
LEGENDS
E- 001 13150123 ELECTRI CAL - NOTES, SYMBOLS, AND ABBREVI ATI ONS
ES101 13150124 ELECTRI CAL - SI TE UTI LI TY PLAN
ES501 13150125 ELECTRI CAL - SI TE DETAI LS
ES502 13150126 ELECTRI CAL - SI TE DETAI LS
ES503 13150127 ELECTRI CAL - SI TE DETAI LS
EG101 13150128 ELECTRI CAL - GROUNDI NG PLAN
EG501 13150129 ELECTRI CAL - GROUNDI NG DETAI LS
EL101 13150130 LI GHTI NG - 1ST FLOOR PLAN
EP101 13150131 POWER - 1ST FLOOR PLAN
E- 501 13150132 ELECTRI CAL - LI GHTI NG CONTROL DETAI LS
E- 502 13150133 ELECTRI CAL - LI GHT FI XTURE DETAI LS
E- 601 13150134 ELECTRI CAL - LI GHTI NG FI XTURE SCHEDULE
E- 602 13150135 ELECTRI CAL - SI NGLE LI NE DI AGRAM AND PANEL
SCHEDULES
T- 001 13150136 TELECOMMUNI CATI ONS SYMBOLS, SCHEDULES, & NOTES
TS101 13150137 TELECOMMUNI CATI ONS - SI TE UTI LI TY PLAN
T- 101 13150138 TELECOMMUNI CATI ONS - 1ST FLOOR PLAN
T- 501 13150139 TELECOMMUNI CATI ONS - DETAI LS
DOCUMENT 00 01 15 Page 5
VOLUME 2 AI R OPS BUI LDI NGS
DRAWI NG NO. NAVFAC DWG NO. TI TLE
T- 601 13150140 TELECOMMUNI CATI ONS - DI AGRAMS
VOLUME 3 HAZMAT BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
G- 000 13150146 PROJECT COVER SHEET
G- 001 13150147 HAZMAT BUI LDI NG COVER SHEET - VOLUME 3
G- 002 13150148 DRAWI NG I NDEX
GI 001 13150149 BUI LDI NG CODE ANALYSI S
GI 100 13150150 LI FE SAFETY - CODE COMPLI ANCE PLAN
GI 101 13150151 LI FE SAFETY - FI RST FLOOR PLAN
H- 111 13150152 HAZARDOUS - PLAN
S- 001 13150153 DESI GN CRI TERI A AND GENERAL NOTES
S- 002 13150154 GENERAL NOTES, ABBREVI ATI ONS AND SYMBOLS
S- 101 13150155 FOUNDATI ON PLAN
S- 301 13150156 FOUNDATI ON SECTI ONS
S- 302 13150157 FOUNDATI ON SECTI ONS
S- 401 13150158 ENLARGED PLANS AT CONTAI NMENT AREAS
S- 501 13150159 FOUNDATI ON AND SLAB TYPI CAL DETAI LS
S- 502 13150160 FOUNDATI ON AND SLAB TYPI CAL DETAI LS
S- 503 13150161 MASONRY TYPI CAL DETAI LS
S- 601 13150162 STRUCTURAL SCHEDULES
S- 602 13150163 PI ER SCHEDULES AND DETAI LS
S- 603 13150164 PI ER DETAI LS
DOCUMENT 00 01 15 Page 6
VOLUME 3 HAZMAT BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
AE001 13150165 ARCHI TECTURAL NOTES AND SYMBOLS
AE002 13150166 TYPI CAL ABA DETAI LS & MOUNTI NG HEI GHTS
AE101 13150167 FI RST FLOOR PLAN
AE105 13150168 FI RST FLOOR REFLECTED CEI LI NG PLAN
AE109 13150169 ROOF PLAN
AE201 13150170 NORTH AND SOUTH EXTERI OR ELEVATI ONS
AE202 13150171 EAST AND WEST EXTERI OR ELEVATI ONS
AE301 13150172 BUI LDI NG SECTI ONS
AE311 13150173 WALL SECTI ONS
AE401 13150174 ENLARGED TOI LET ROOM
AE501 13150175 EXTERI OR DETAI LS
AE510 13150176 I NTERI OR PARTI TI ON TYPE SCHEDULE AND DETAI LS
AE601 13150177 DOOR SCHEDULE
AE602 13150178 DOOR DETAI LS
I N001 13150179 I NTERI ORS - FI NI SH, FURNI TURE AND SI GNAGE
SCHEDULES AND NOTES
I N101 13150180 I NTERI ORS - FI NI SH, FURNI TURE AND SI GNAGE PLAN,
DESK TYPI CAL AND LEGENDS
I N102 13150181 I NTERI ORS - DETAI LS AND SI GNAGE DETAI LS
FA001 13150182 FI RE ALARM - GENERAL NOTES, ABBREVI ATI ONS, &
SYMBOLS
FA002 13150183 FI RE ALARM - SEQUENCE OF OPERATI ONS
FA101 13150184 FI RE ALARM - FI RST FLOOR PLAN
FA501 13150185 FI RE ALARM - DETAI LS
FA701 13150186 FI RE ALARM - RI SER DI AGRAM
FX001 13150187 FI RE PROTECTI ON GENERAL NOTES, ABBREVI ATI ONS, &
SYMBOLS
FX101 13150188 FI RE PROTECTI ON - FI RST FLOOR PLAN
DOCUMENT 00 01 15 Page 7
VOLUME 3 HAZMAT BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
P- 001 13150189 PLUMBI NG GENERAL NOTES, ABBREVI ATI ONS & SYMBOLS
PU111 13150190 PLUMBI NG - UNDERGROUND PLAN
P- 111 13150191 PLUMBI NG - 1ST FLOOR PLAN
P- 151 13150192 PLUMBI NG - ROOF PLAN
P- 401 13150193 PLUMBI NG - ENLARGED PLANS
P- 501 13150194 PLUMBI NG - DETAI LS
P- 601 13150195 PLUMBI NG - SCHEDULES
P- 701 13150196 PLUMBI NG - RI SER DI AGRAMS
P- 702 13150197 PLUMBI NG - RI SER DI AGRAMS
M- 001 13150198 MECHANI CAL - SYMBOLS AND ABBREVI ATI ONS
M- 002 13150199 MECHANI CAL - GENERAL NOTES
MH111 13150200 HVAC - 1ST FLOOR PLAN
MP111 13150201 PI PI NG - 1ST FLOOR PLAN
M- 401 13150202 MECHANI CAL - ENLARGED PLANS
M- 501 13150203 MECHANI CAL - DETAI LS
M- 502 13150204 MECHANI CAL - DETAI LS
M- 503 13150205 MECHANI CAL - DETAI LS
M- 601 13150206 MECHANI CAL - SCHEDULES
M- 602 13150207 MECHANI CAL - SCHEDULES
M- 701 13150208 MECHANI CAL - DI AGRAMS
M- 801 13150209 MECHANI CAL - CONTROLS
M- 802 13150210 MECHANI CAL - CONTROLS
M- 803 13150211 MECHANI CAL - CONTROLS
M- 804 13150212 MECHANI CAL - CONTROLS
M- 805 13150213 MECHANI CAL - CONTROLS
M- 806 13150214 MECHANI CAL - CONTROLS
DOCUMENT 00 01 15 Page 8
VOLUME 3 HAZMAT BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
M- 807 13150215 MECHANI CAL - CONTROLS
E- 001 13150216 ELECTRI CAL - NOTES, SYMBOLS, AND ABBREVI ATI ONS
ES101 13150217 ELECTRI CAL - SI TE UTI LI TY PLAN
ES501 13150218 ELECTRI CAL - SI TE DETAI LS
ES502 13150219 ELECTRI CAL - SI TE DETAI LS
ES503 13150220 ELECTRI CAL - SI TE DETAI LS
EH101 13150221 HAZARDOUS LOCATI ONS PLAN
EG101 13150222 ELECTRI CAL - GROUNDI NG PLAN
EG102 13150223 ELECTRI CAL - LI GHTNI NG PROTECTI ON PLAN
EG501 13150224 ELECTRI CAL - GROUNDI NG DETAI LS
EG502 13150225 ELECTRI CAL - LI GHTNI NG PROTECTI ON DETAI LS
EL101 13150226 LI GHTI NG - 1ST FLOOR PLAN
EP101 13150227 POWER - 1ST FLOOR PLAN
E- 401 13150228 ELECTRI CAL - ENLARGED PLANS
E- 501 13150229 ELECTRI CAL - LI GHTI NG CONTROL DETAI LS
E- 502 13150230 ELECTRI CAL - LI GHT FI XTURE DETAI LS
E- 601 13150231 ELECTRI CAL - LI GHTI NG FI XTURE SCHEDULE
E- 602 13150232 ELECTRI CAL - SI NGLE LI NE DI AGRAM AND PANEL
SCHEDULES
T- 001 13150233 TELECOMMUNI CATI ONS SYMBOLS, SCHEDULES, & NOTES
TS101 13150234 TELECOMMUNI CATI ONS - SI TE UTI LTY PLAN
T- 101 13150235 TELECOMMUNI CATI ONS - 1ST FLOOR PLAN
T- 401 13150236 TELECOMMUNI CATI ONS - ENLARGED PLANS
T- 501 13150237 TELECOMMUNI CATI ONS - DETAI LS
T- 502 13150238 TELECOMMUNI CATI ONS - DETAI LS
DOCUMENT 00 01 15 Page 9
VOLUME 3 HAZMAT BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
T- 601 13150239 TELECOMMUNI CATI ONS - DI AGRAMS
VOLUME 4 SONOBUOY BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
G- 000 13150245 PROJECT COVER SHEET
G- 001 13150246 SONOBUOY BUI LDI NG COVER SHEET - VOLUME 4
G- 002 13150247 DRAWI NG I NDEX
GI 001 13150248 BUI LDI NG CODE ANALYSI S
GI 100 13150249 LI FE SAFETY - CODE COMPLI ANCE PLAN
GI 101 13150250 LI FE SAFETY - FI RST FLOOR PLAN
S- 001 13150251 DESI GN CRI TERI A AND GENERAL NOTES
S- 002 13150252 GENERAL NOTES, ABBREVI ATI ONS AND SYMBOLS
S- 101 13150253 FOUNDATI ON PLAN
S- 301 13150254 FOUNDATI ON SECTI ONS
S- 501 13150255 FOUNDATI ON AND SLAB TYPI CAL DETAI LS
S- 502 13150256 FOUNDATI ON AND SLAB TYPI CAL DETAI LS
S- 503 13150257 MASONRY TYPI CAL DETAI LS
S- 601 13150258 STRUCTURAL SCHEDULES
S- 602 13150259 PI ER SCHEDULES AND DETAI LS
AE001 13150260 ARCHI TECTURAL NOTES AND SYMBOLS
DOCUMENT 00 01 15 Page 10
VOLUME 4 SONOBUOY BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
AE002 13150261 TYPI CAL ABA DETAI LS & MOUNTI NG HEI GHTS
AE101 13150262 FI RST FLOOR PLAN
AE105 13150263 FI RST FLOOR REFLECTED CEI LI NG PLAN
AE109 13150264 ROOF PLAN
AE201 13150265 NORTH AND SOUTH EXTERI OR ELEVATI ONS
AE202 13150266 EAST AND WEST EXTERI OR ELEVATI ONS
AE301 13150267 BUI LDI NG SECTI ONS
AE311 13150268 WALL SECTI ONS
AE501 13150269 EXTERI OR DETAI LS
AE505 13150270 I NTERI OR DETAI LS
AE510 13150271 I NTERI OR PARTI TI ON TYPE SCHEDULE AND DETAI LS
AE601 13150272 DOOR SCHEDULE
AE602 13150273 DOOR DETAI LS
AE701 13150274 RF SHI ELDI NG BOUNDARY
I N001 13150275 I NTERI ORS - FI NI SH, FURNI TURE AND SI GNAGE
SCHEDULES AND NOTES
I N101 13150276 I NTERI ORS - FI NI SH, FURNI TURE AND SI GNAGE PLAN
AND LEGENDS
FA001 13150277 FI RE ALARM - GENERAL NOTES, ABBREVI ATI ONS, &
SYMBOLS
FA002 13150278 FI RE ALARM - SEQUENCE OF OPERATI ONS
FA101 13150279 FI RE ALARM - FI RST FLOOR PLAN
FA501 13150280 FI RE ALARM - DETAI LS
FA701 13150281 FI RE ALARM - RI SER DI AGRAM
FX001 13150282 FI RE PROTECTI ON GENERAL NOTES, ABBREVI ATI ONS, &
SYMBOLS
FX101 13150283 FI RE PROTECTI ON - FI RST FLOOR PLAN
P- 001 13150284 PLUMBI NG GENERAL NOTES, ABBREVI ATI ONS & SYMBOLS
DOCUMENT 00 01 15 Page 11
VOLUME 4 SONOBUOY BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
PU111 13150285 PLUMBI NG - UNDERGROUND PLAN
P- 111 13150286 PLUMBI NG - 1ST FLOOR PLAN
P- 151 13150287 PLUMBI NG - ROOF PLAN
P- 401 13150288 PLUMBI NG - ENLARGED PLANS
P- 501 13150289 PLUMBI NG - DETAI LS
P- 601 13150290 PLUMBI NG - SCHEDULES
P- 701 13150291 PLUMBI NG - RI SER DI AGRAMS
P- 702 13150292 PLUMBI NG - RI SER DI AGRAMS
M- 001 13150293 MECHANI CAL - SYMBOLS AND ABBREVI ATI ONS
M- 002 13150294 MECHANI CAL - GENERAL NOTES
MH111 13150295 HVAC - 1ST FLOOR PLAN
MP111 13150296 PI PI NG - 1ST FLOOR PLAN
M- 301 13150297 MECHANI CAL - SECTI ONS
M- 501 13150298 MECHANI CAL - DETAI LS
M- 502 13150299 MECHANI CAL - DETAI LS
M- 503 13150300 MECHANI CAL - DETAI LS
M- 601 13150301 MECHANI CAL - SCHEDULES
M- 602 13150302 MECHANI CAL - SCHEDULES
M- 701 13150303 MECHANI CAL - DI AGRAMS
M- 801 13150304 MECHANI CAL - CONTROLS
M- 802 13150305 MECHANI CAL - CONTROLS
M- 803 13150306 MECHANI CAL - CONTROLS
M- 804 13150307 MECHANI CAL - CONTROLS
M- 805 13150308 MECHANI CAL - CONTROLS
M- 806 13150309 MECHANI CAL - CONTROLS
M- 807 13150310 MECHANI CAL - CONTROLS
DOCUMENT 00 01 15 Page 12
VOLUME 4 SONOBUOY BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
E- 001 13150311 ELECTRI CAL - NOTES, SYMBOLS, AND ABBREVI ATI ONS
ES101 13150312 ELECTRI CAL - SI TE UTI LI TY PLAN
ES501 13150313 ELECTRI CAL - SI TE DETAI LS
ES502 13150314 ELECTRI CAL - SI TE DETAI LS
ES503 13150315 ELECTRI CAL - SI TE DETAI LS
EG101 13150316 ELECTRI CAL - GROUNDI NG PLAN
EG501 13150317 ELECTRI CAL - GROUNDI NG DETAI LS
EL101 13150318 LI GHTI NG - 1ST FLOOR PLAN
EP101 13150319 POWER - 1ST FLOOR PLAN
E- 401 13150320 ELECTRI CAL - ENLARGED PLANS
E- 501 13150321 ELECTRI CAL - LI GHTI NG CONTROL DETAI LS
E- 502 13150322 ELECTRI CAL - LI GHT FI XTURE DETAI LS
E- 601 13150323 ELECTRI CAL - LI GHTI NG FI XTURE SCHEDULE
E- 602 13150324 ELECTRI CAL - SI NGLE LI NE DI AGRAM AND PANEL
SCHEDULES
T- 001 13150325 TELECOMMUNI CATI ONS SYMBOLS, SCHEDULES, & NOTES
TS501 13150326 TELECOMMUNI CATI ONS - SI TE DETAI LS
T- 101 13150327 TELECOMMUNI CATI ONS - 1ST FLOOR PLAN
T- 401 13150328 TELECOMMUNI CATI ONS - ENLARGED PLANS
T- 501 13150329 TELECOMMUNI CATI ONS - DETAI LS
T- 502 13150330 TELECOMMUNI CATI ONS - DETAI LS
DOCUMENT 00 01 15 Page 13
VOLUME 4 SONOBUOY BUI LDI NG
DRAWI NG NO. NAVFAC DWG NO. TI TLE
T- 601 13150331 TELECOMMUNI CATI ONS - DI AGRAMS
- - End of Document - -
DOCUMENT 00 01 15 Page 14
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s Sal vage Pl an; G
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes t he const r uct i on of new Sonobuoy St or age Faci l i t y , a new Ai r Oper at i ons Bul di ngs, and a new Hazar dous Wast e St or age Faci l i t y . Thi s scope wi l l i ncl ude any i nci dent al r el at ed wor k.
1. 2. 2 Locat i on
The wor k i s l ocat ed at t he Pat uxent Ri ver Naval Ai r St at i on, Mar yl and, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 2. 3 PROJECT ENVI RONMENTAL GOALS
Cont r act or shal l di st r i but e copi es of t he Envi r onment al Goal s t o each subcont r act or and t he Cont r act i ng Of f i cer . The over al l goal f or desi gn, const r uct i on, and oper at i on i s t o pr oduce a bui l di ng t hat meet s t he f unct i onal pr ogr am needs and i ncor por at es t he pr i nci pl es of sust ai nabi l i t y . Speci f i cal l y:
a. Pr eser ve and r est or e t he s i t e ecosyst em and bi odi ver si t y; avoi d s i t e degr adat i on and er osi on. Mi ni mi ze of f s i t e envi r onment al i mpact .
b. Use t he mi ni mum amount of ener gy, wat er , and mat er i al s f easi bl e t o meet t he desi gn i nt ent . Sel ect ener gy and wat er ef f i c i ent equi pment and st r at egi es.
c. Use envi r onment al l y pr ef er abl e pr oduct s and decr ease t oxi c i t y l evel of mat er i al s used.
d. Use r enewabl e ener gy and mat er i al r esour ces.
e. Opt i mi ze oper at i onal per f or mance ( t hr ough commi ssi oni ng ef f or t s) i n or der t o ensur e ener gy ef f i c i ent equi pment oper at es as i nt ended.
Consi der t he dur abi l i t y , mai nt ai nabi l i t y , and f l exi bi l i t y of bui l di ng syst ems.
f . Manage const r uct i on s i t e and st or age of mat er i al s t o ensur e no negat i ve i mpact on t he i ndoor envi r onment al qual i t y of t he bui l di ng.
g. Reduce const r uct i on wast e t hr ough r euse, r ecycl i ng, and suppl i er t ake- back
SECTI ON 01 11 00 Page 1
1. 3 OCCUPANCY OF PREMI SES
Bui l di ng( s) wi l l be occupi ed dur i ng per f or mance of wor k under t hi s Cont r act . Occupancy not i f i cat i ons wi l l be post ed i n a pr omi nent l ocat i on i n t he wor k ar ea.
Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.
1. 4 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.
Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.
I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.
1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.
1. 6 NAVY AND MARI NE CORPS I NTRANET ( NMCI ) COORDI NATI ON REQUI REMENTS
Al l ow t he NMCI Cont r act or access t o t he f aci l i t y t owar ds t he end of const r uct i on ( f i ni shes 90 per cent compl et e, r ough- i n 100 per cent compl et e, I nsi de Pl ant ( I SP) / Out si de Pl ant ( OSP) i nf r ast r uct ur e i n pl ace) t o pr ovi de equi pment i n t he t el ecommuni cat i ons r ooms and make f i nal connect i ons.
Coor di nat e ef f or t s wi t h t he NMCI Cont r act or t o f aci l i t at e j oi nt use of bui l di ng spaces dur i ng t he f i nal phases of const r uct i on. Af t er t he Cont r act i ng Of f i cer has f aci l i t at ed coor di nat i on meet i ngs bet ween t he t wo
SECTI ON 01 11 00 Page 2 cont r act or s, wi t hi n one week, i ncor por at e t he ef f or t of addi t i onal coor di nat i on wi t h t he NMCI Cont r act or i nt o t he const r uct i on schedul e t o demonst r at e a pl an f or mai nt ai ni ng t he cont r act dur at i on.
1. 7 SALVAGE MATERI AL AND EQUI PMENT
I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed st or age ar ea l ocat ed wi t hi n 3 mi l es of t he const r uct i on s i t e.
Pr ovi de a sal vage pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Pr ovi de a syst em f or pr oper t y cont r ol i n t he sal vage pl an. St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 3
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/ 22, CHG 1: 02/ 23
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Li st of Cont act Per sonnel
1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 3. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.
1. 3. 1. 1 Subcont r act or s and Per sonnel Cont act s
Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.
1. 3. 1. 2 Addi t i onal Per sonnel Requi r ement s
1. 3. 1. 3 I nst al l at i on Access
Obt ai n access t o Navy i nst al l at i ons t hr ough par t i c i pat i on i n t he Def ense Bi omet r i cs I dent i f i cat i on Syst em ( DBI DS) . Requi r ement s f or Cont r act or empl oyee r egi st r at i on, and t r ansi t i on f or empl oyees cur r ent l y under Navy
SECTI ON 01 14 00 Page 1
Commer ci al Access Cont r ol Syst em ( NCACS) , ar e avai l abl e at ht t ps: / / www. cni c. navy. mi l / Oper at i ons- and- Management / Base- Suppor t / DBI DS/ .
No f ees ar e associ at ed wi t h obt ai ni ng a DBI DS cr edent i al .
Par t i c i pat i on i n t he DBI DS i s not mandat or y, and Cont r act or per sonnel may appl y f or One- Day Passes at t he Base Vi s i t or Cont r ol Of f i ce t o access an i nst al l at i on.
1. 3. 1. 3. 1 Regi st r at i on f or DBI DS
Regi st r at i on f or DBI DS i s avai l abl e at ht t ps: / / www. cni c. navy. mi l / Oper at i ons- and- Management / Base- Suppor t / DBI DS/ .
Pr ocedur e i ncl udes:
a. Pr esent a l et t er or of f i c i al awar d document ( i . e. DD For m 1155 or SF 1442) f r om t he Cont r act i ng Of f i cer , t hat pr ovi des t he pur pose f or access, t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve.
b. Pr esent val i d i dent i f i cat i on, such as a passpor t or Real I D Act - compl i ant st at e dr i ver ' s l i cense.
c. Pr ovi de compl et ed SECNAV FORM 5512/ 1 t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve t o obt ai n a backgr ound check. Thi s f or m i s avai l abl e f or downl oad at ht t ps: / / www. cni c. navy. mi l / Oper at i ons- and- Management / Base- Suppor t / DBI DS/ .
d. Upon successf ul compl et i on of t he backgr ound check, t he Gover nment wi l l compl et e t he DBI DS enr ol l ment pr ocess, whi ch i ncl udes Cont r act or empl oyee phot o, f i nger pr i nt s, base r est r i ct i on and sever al ot her assessment s.
e. Upon successf ul compl et i on of t he enr ol l ment pr ocess, t he Cont r act or empl oyee wi l l be i ssued a DBI DS cr edent i al , and wi l l be al l owed t o pr oceed t o wor ksi t e.
1. 3. 1. 3. 2 DBI DS El i gi bi l i t y Requi r ement s
Thr oughout t he l engt h of t he cont r act , t he Cont r act or empl oyee must cont i nue t o meet backgr ound scr een st andar ds. Per i odi c backgr ound scr eeni ngs ar e conduct ed t o ver i f y cont i nued DBI DS par t i c i pat i on and i nst al l at i on access pr i v i l eges. DBI DS access pr i v i l eges wi l l be i mmedi at el y suspended or r evoked i f at any t i me a Cont r act or empl oyee becomes i nel i gi bl e.
An adj udi cat i on pr ocess may be i ni t i at ed when a backgr ound scr een f ai l ur e r esul t s i n di squal i f i cat i on f r om par t i c i pat i on i n t he DBI DS, and Cont r act or empl oyee does not agr ee wi t h t he r eason f or di squal i f i cat i on.
The Gover nment i s t he f i nal aut hor i t y.
1. 3. 1. 3. 3 DBI DS Not i f i cat i on Requi r ement s
a. I mmedi at el y r epor t i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer .
b. I mmedi at el y col l ect DBI DS cr edent i al s and not i f y t he Cont r act i ng Of f i cer i n wr i t i ng under t he f ol l owi ng ci r cumst ances:
( 1) An empl oyee has depar t ed t he company wi t hout havi ng pr oper l y r et ur ned or sur r ender ed t hei r DBI DS cr edent i al s.
SECTI ON 01 14 00 Page 2
( 2) Ther e i s a r easonabl e basi s t o concl ude t hat an empl oyee, or f or mer empl oyee, mi ght pose a r i sk, compr omi se, or t hr eat t o t he saf et y or secur i t y of t he I nst al l at i on or anyone t her ei n.
1. 3. 1. 4 Addi t i onal Badge Requi r ement s - NAS Pat uxent Ri ver
I dent i f i cat i on badges wi l l be i ssued t o t he Cont r act or and hi s empl oyees i n accor dance wi t h t he Naval Ai r St at i on Secur i t y Regul at i ons. A copy of t he secur i t y r egul at i ons may be obt ai ned f r om t he secur i t y of f i ce. Al l badges must be r et ur ned or account ed f or t o t he depar t ment of Publ i c Saf et y ' s Pass and I dent i f i cat i on Of f i ce upon expi r at i on of t he badge or cont r act , or t er mi nat i on of t he empl oyee.
1. 3. 1. 5 Empl oyee Li st
The Cont r act or must pr ovi de t o t he Cont r act i ng of f i cer , i n wr i t i ng, t he names of t wo desi gnat ed r epr esent at i ves aut hor i zed t o r equest per sonnel and vehi c l e passes f or empl oyees and subcont r act or ' s empl oyees pr i or t o commencement of wor k under t hi s cont r act . The Cont r act or must adher e t o t he r equi r ement s of " I mpor t ant Cl ar i f i cat i ons - Cont r act or s - How t o Gai n Access, " dat ed 31 Oct ober 1995, i n obt ai ni ng access t o t he Naval Ai r St at i on compl ex f or t he l i f e of t he cont r act . A copy of t hese r equi r ement s wi l l be pr ovi ded at t he pr econst r uct i on meet i ng.
1. 3. 1. 6 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed wi t hi n and out si de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
1. 3. 2 Wor ki ng Hour s
Regul ar wor ki ng hour s wi l l consi st of an 8 1/ 2 hour per i od est abl i shed by t he Cont r act i ng Of f i cer , bet ween 7 a. m. and 3: 30 p. m. , Monday t hr ough Fr i day t hr ough and 7 a. m. t o 3: 30 p. m. on Sat ur day, excl udi ng Gover nment hol i days.
1. 3. 3 Wor k Out si de Regul ar Hour s
Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .
Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y out ages/ cut over s dur i ng nor mal wor ki ng hour s onl y.
1. 3. 4 Occupi ed and Exi st i ng Bui l di ngs
The Cont r act or shal l be wor ki ng i n an exi st i ng bui l di ng whi ch ar e occupi ed.
Do not ent er t he bui l di ngs wi t hout pr i or appr oval of t he Cont r act i ng Of f i cer .
SECTI ON 01 14 00 Page 3
The exi st i ng bui l di ngs and t hei r cont ent s must be kept secur e at al l t i mes. Pr ovi de t empor ar y c l osur es as r equi r ed t o mai nt ai n secur i t y as di r ect ed by t he Cont r act i ng Of f i cer .
Pr ovi de dust cover s or pr ot ect i ve encl osur es t o pr ot ect exi st i ng wor k t hat r emai ns, and Gover nment mat er i al l ocat ed i n t he f aci l i t y dur i ng t he const r uct i on per i od.
Leave at t ached equi pment i n pl ace, and pr ot ect t hem agai nst damage, or t empor ar i l y di sconnect , r el ocat e, pr ot ect , and r ei nst al l t hem at t he compl et i on of t he wor k.
The Gover nment wi l l r emove and r el ocat e ot her Gover nment pr oper t y i n t he ar eas of t he bui l di ngs schedul ed t o r ecei ve wor k.
1. 3. 5 Ut i l i t y Cut over s and I nt er r upt i ons
a. Make ut i l i t y cut over s and i nt er r upt i ons dur i ng nor mal wor ki ng hour s onl y. Conf or m t o pr ocedur es r equi r ed i n par agr aph WORK OUTSI DE
REGULAR HOURS.
b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser vi ce.
c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, compr essed ai r , and ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph
WORK OUTSI DE REGULAR HOURS.
d. Oper at i on of St at i on Ut i l i t i es: The Cont r act or must not oper at e nor di st ur b t he set t i ng of cont r ol devi ces i n t he st at i on ut i l i t i es syst em, i ncl udi ng wat er , sewer , el ect r i cal , and st eam ser vi ces. The Gover nment wi l l oper at e t he cont r ol devi ces as r equi r ed f or nor mal conduct of t he wor k. The Cont r act or must not i f y t he Cont r act i ng Of f i cer gi v i ng r easonabl e advance not i ce when such oper at i on i s r equi r ed.
1. 4 SECURI TY REQUI REMENTS
Cont r act Cl ause FAR 52. 204- 2 Secur i t y Requi r ement s and Al t er nat e I I and t he f ol l owi ng appl y:
1. 4. 1 Naval Ai r St at i on ( NAS) , Pat uxent Ri ver , MD
For ei gn Nat i onal s: Onl y Uni t ed St at es c i t i zens ar e per mi t t ed i n a r est r i ct ed ar eas.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 14 00 Page 4
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 3: 02/ 23
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EP 1110- 1- 8 ( 2021) Engi neer i ng and Desi gn - - Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Ear ned Val ue Repor t ; G
1. 3 EARNED VALUE REPORT
1. 3. 1 Dat a Requi r ed
Thi s Cont r act r equi r es t he use of a cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Schedul e of Pr i ces must not be used wi t h cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Use Ear ned Val ue Repor t der i ved f r om cost - l oaded NAS. Wi t hi n 15 cal endar days of not i ce of awar d, pr epar e and del i ver t o t he Cont r act i ng Of f i cer a Ear ned Val ue Repor t ( const r uct i on Cont r act ) as di r ect ed by t he Cont r act i ng Of f i cer . Pr ovi de a det ai l ed br eakdown of t he Cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces and ext ended pr i ces. Cont r act or over head and pr of i t i ncl udi ng sal ar i es f or f i el d of f i ce per sonnel , i f appl i cabl e, must be pr opor t i onat el y spr ead over al l pay i t ems and not i ncl uded as i ndi v i dual pay i t ems.
1. 3. 2 Payment Schedul e I nst r uct i ons
Payment s wi l l not be made unt i l t he Ear ned Val ue Repor t f r om t he cost - l oaded NAS has been submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer .
Addi t i onal l y, t he Ear ned Val ue Repor t must be separ at ed as f ol l ows:
a. Pr i mar y Faci l i t i es Cost Br eakdown:
SECTI ON 01 20 00 Page 1
Def i ned as wor k on t he pr i mar y f aci l i t i es out t o t he 5 f oot l i ne.
Wor k out t o t he 5 f oot l i ne i ncl udes const r uct i on encompassed wi t hi n a t heor et i cal l i ne 5 f oot f r om t he f ace of ext er i or wal l s and i ncl udes at t endant const r uct i on, such as pad mount ed HVAC cool i ng equi pment , cool i ng t ower s, and t r ansf or mer s pl aced beyond t he 5 f oot l i ne.
b. Suppor t i ng Faci l i t i es Cost Br eakdown:
Def i ned as s i t e wor k, i ncl udi ng i nci dent al wor k, out s i de t he 5 f oot l i ne.
1. 3. 3 Schedul e Requi r ement s f or HVAC TAB
The f i el d wor k r equi r ement s i n Sect i on 23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC must be br oken down i n t he Ear ned Val ue Repor t f r om t he cost - l oaded NAS by separ at e l i ne i t ems whi ch r ef l ect measur abl e del i ver abl es. The val ue f or each pay i t em l i st ed bel ow wi l l be est abl i shed on a case by case basi s f or each Cont r act . The l i ne i t ems ar e as f ol l ows:
a. Appr oval of Desi gn Revi ew Repor t : The TABS Agency i s r equi r ed t o conduct a r evi ew of t he pr oj ect pl ans and speci f i cat i ons t o i dent i f y any f eat ur e, or t he l ack t her eof , t hat woul d pr ecl ude successf ul t est i ng and bal anci ng of t he pr oj ect HVAC syst ems. Submi t t he r esul t i ng f i ndi ngs t o t he Gover nment t o al l ow cor r ect i on of t he desi gn. The pr ogr ess payment wi l l not be i ssued unt i l t he r epor t i s r evi ewed and appr oved.
b. Appr oval of t he pr e- f i el d engi neer i ng r epor t : The TABS Agency submi t s a r epor t whi ch out l i nes t he scope of f i el d wor k. The r epor t must cont ai n det ai l s of what syst ems wi l l be t est ed, pr ocedur es t o be used, sampl e r epor t f or ms f or r epor t i ng t est r esul t s and a qual i t y cont r ol checkl i st of wor k i t ems t hat must be compl et ed bef or e TABS f i el d wor k commences.
c. Season I f i el d wor k: I ncr ement al payment s ar e i ssued as t he TABS f i el d wor k pr ogr esses. The TABS Agency mobi l i zes t o t he pr oj ect s i t e and execut es t he f i el d wor k as out l i ned i n t he pr e- f i el d engi neer i ng r epor t . The HVAC wat er and ai r syst ems ar e bal anced and oper at i onal dat a must be col l ect ed f or one seasonal condi t i on ( ei t her summer or wi nt er dependi ng on pr oj ect t i mi ng) .
d. Appr oval of Season I r epor t : On compl et i on of t he Season I f i el d wor k, t he dat a i s compi l ed i nt o a r epor t and submi t t ed t o t he Gover nment . The r epor t i s r evi ewed, and appr oved, af t er ensur i ng compl i ance wi t h t he pr e- f i el d engi neer i ng r epor t scope of wor k.
e. Compl et i on of Season I f i el d QA check: Cont r act QC and Gover nment r epr esent at i ves meet t he TABS Agency at t he j obsi t e t o r et est por t i ons of t he syst ems r epor t ed i n t he Season I r epor t . The pur pose of t hese t est s ar e t o val i dat e t he accur acy and compl et eness of t he pr evi ousl y submi t t ed Season I r epor t .
f . Appr oval of Season I I r epor t : The TABS Agency compl et es al l Season I I f i el d wor k, whi ch i s nor mal l y compr i sed mai nl y of t aki ng heat t r ansf er t emper at ur e r eadi ngs, i n t he season opposi t e of t hat under whi ch Season I per f or mance dat a was compi l ed. Compi l e t hi s dat a i nt o a r epor t and submi t t o t he Gover nment . On compl et i on of submi t t al r evi ew t o ensur e compl i ance wi t h t he pr e- f i el d engi neer i ng r epor t
SECTI ON 01 20 00 Page 2 scope, pr ogr ess payment i s i ssued. Pr ogr ess payment i s l ess t han t hat i ssued f or t he Season I r epor t s i nce most of t he wat er and ai r bal anci ng wor k ef f or t i s compl et ed under Season I .
1. 4 CONTRACT MODI FI CATI ONS
I n conj unct i on wi t h t he Cont r act Cl ause DFARS 252. 236- 7000 Modi f i cat i on Pr oposal s- Pr i ce Br eakdown, and wher e act ual owner shi p and oper at i ng cost s of const r uct i on equi pment cannot be det er mi ned f r om Cont r act or account i ng r ecor ds, base equi pment use r at es upon t he appl i cabl e pr ovi s i ons of t he
EP 1110- 1- 8.
1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT
1. 5. 1 Cont ent of I nvoi ce
Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR
52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es. The r equest s f or payment shal l i ncl ude t he document s l i s t ed bel ow.
a. The Cont r act or ' s i nvoi ce, on NAVFAC For m 7300/ 30 f ur ni shed by t he Gover nment , showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. For m 7300/ 30 must i ncl ude cer t i f i cat i on by Qual i t y Cont r ol ( QC) Manager as r equi r ed by t he Cont r act .
b. The Ear ned Val ue Repor t f r om t he cost - l oaded NAS.
c. Cont r act or ' s Mont hl y Est i mat e f or Voucher and Cont r act or s Cer t i f i cat i on ( NAVFAC For m 4330) wi t h Subcont r act or and suppl i er payment cer t i f i cat i on. Ot her document s, i ncl udi ng but not l i mi t ed t o, t hat need t o be r ecei ved pr i or t o pr ocessi ng payment i ncl ude t he f ol l owi ng submi t t al s as r equi r ed. These i t ems ar e st i l l r equi r ed mont hl y even when a pay voucher i s not submi t t ed.
d. Mont hl y Wor k- hour r epor t .
e. Updat ed Const r uct i on Pr ogr ess Schedul e and t abul ar r epor t s r equi r ed by t he cont r act .
f . Cont r act or Saf et y Sel f Eval uat i on Checkl i st .
g. Updat ed submi t t al r egi st er .
h. Sol i d Wast e Di sposal Repor t .
i . Cer t i f i ed payr ol l s.
j . Updat ed t est i ng l ogs.
k. Ot her suppor t i ng document s as r equest ed.
1. 5. 2 Submi ssi on of I nvoi ces
I f DFARS Cl ause 252. 232- 7006 Wi de Ar ea Wor kFl ow Payment I nst r uct i ons i s i ncl uded i n t he Cont r act , pr ovi de t he document s l i s t ed i n above par agr aph CONTENT OF I NVOI CE i n t hei r ent i r et y as at t achment s i n Wi de Ar ea Wor k Fl ow
SECTI ON 01 20 00 Page 3
( WAWF) f or each i nvoi ce submi t t ed. The maxi mum si ze of each WAWF at t achment i s t wo megabyt es, but t her e ar e no l i mi t s on t he number of at t achment s. I f a document cannot be at t ached i n WAWF due t o syst em or s i ze r est r i ct i on, pr ovi de i t as i nst r uct ed by t he Cont r act i ng Of f i cer .
Mont hl y i nvoi ces and suppor t i ng f or ms f or wor k per f or med t hr ough t he anni ver sar y…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .