This document is a Government Furnished Property (GFP) list for the Space Weather Observations at Lagrange 1 to Advance Readiness (SOLAR) X-Ray Irradiance Sensor (XRIS) project, a joint initiative between the U.S. Department of Commerce (NOAA/NESDIS) and NASA's Goddard Space Flight Center. Document number SOLAR-XRIS-LIST-0008, Revision A became effective August 21, 2025. The document serves as a configuration-controlled specification that requires prior approval from the SOLAR Configuration Control Board for any modifications, with changes submitted via the Technical Data Management System using Signature Control Requests.
The GFP list itself contains minimal substantive content, noting that at the time of this revision, there is no anticipated government-furnished equipment for the SOLAR XRIS project. The document includes a single placeholder entry marked "TBD" (To Be Determined) for quantity, type, equipment control number, acquisition value, and delivery date. The document functions as a template that will be updated as needed when government-furnished property is identified for the project. Supporting materials include a preface explaining the Government's quality assurance surveillance approach under firm fixed-price acquisitions, a configuration management protocol, a change history log documenting the baseline release (July 11, 2024) and Revision A update, and an appendix of acronyms and abbreviations relevant to the SOLAR mission.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: TBD
Expiration Date: TBD
Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.
SOLAR-XRIS-LIST-0008, Revision A
Space Weather Observations at L1 to Advance Readiness (SOLAR)
Series Project, Code 493
Space weather Observations at Lagrange 1 to
Advance Readiness (SOLAR) Project
X-Ray Irradiance Sensor (XRIS)
Government Furnished Property (GFP)
U.S. Department of Commerce (DOC)
National Oceanic and Atmospheric Administration (NOAA)
NOAA Satellite and Information Service (NESDIS)
National Aeronautics and Space Administration (NASA)
GSFC SOLAR CMO
August 21, 2025
Released
SWO Reviewed – Not Subject to Export Control https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm
SOLAR XRIS GFP SOLAR-XRIS-LIST-0008, Revision A
Effective Date: August 21, 2025 ii Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.
Space weather Observations at Lagrange 1 to Advance Readiness (SOLAR) Project
X-Ray Irradiance Sensor (XRIS)
Government Furnished Property (GFP)
Signature/Approval Page
Prepared By:
Edward Glanfield
Reviewed By:
Brian Frey
Charles DeLee
Stephen Husty
Clark (Skip) Owens
Brian Thomas
Cynthia (Cindy) Merrow
Approved By:
James (Jim) Morrissey iii Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.
Preface
Under firm fixed price acquisitions such as this, the Contractor assumes all responsibility and all risk in exchange for greater profits from efficiency and less direct Government involvement in contract activities. However, the Government still has a responsibility to conduct surveillance.
Surveillance spans a spectrum of Government involvement. Surveillance may be as simple as inspecting a delivered support or service at acceptance or as complex as continually monitoring contractor performance. To meet this responsibility, the Government needs to understand the risks involved in the Contractor's activity and how the Contractor is managing those risks.
This Government Quality Assurance Surveillance Plan has been prepared to describe the
Government’s surveillance of this contract. It is a “living” document that will be tailored to the contractor selected. The Government welcomes suggestions for improving this Plan. Of particular interest are ideas on what information the Government should monitor (i.e., metrics) and how the Government can most cost-effectively obtain the relevant performance data it needs.
iv Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.
Configuration Management
This document is a SOLAR signature-controlled document. Changes to this document require prior approval by the SOLAR Configuration Control Board (CCB) Chairperson or designee.
Proposed changes shall be submitted in the SOLAR Technical Data Management System
(TDMS) via a Signature Control Request (SCoRe) along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.
All of the requirements in this document assume the use of the word "shall" unless otherwise stated.
Questions or comments concerning this document should be addressed to:
SOLAR Configuration Management Office
Mail Stop: 493.0
Goddard Space Flight Center
Greenbelt, Maryland 20771 v Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.
Change History Log
Revision Effective Date Description of Changes
(Reference the CCR & CCB/ERB Approval Date)
Revision - 07/11/2024 Baseline Release following the approval of SOLAR-CCR-
Revision A 08/21/2025 Update following the approval of SOLAR-CCR-0144
Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.
The following is a list of Government Furnished Property for the SOLAR XRIS effort.
GFP
Item # Description
Qty Type ECN
Acquisition
Value
Date of Delivery
To Contractor
[TBR] 1 TBD 1 TBD TBD TBD
*Note: At this time there is no anticipated GFE for the SOLAR XRIS Project. This document will be updated accordingly as needed.
Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.
Appendix A. Abbreviations and Acronyms
CCB Configuration Control Board
CCR Configuration Change Request
CM Configuration Management
CMO CM Office
DO Delivery Order
ECN Equipment Control Number
GFE Government-Furnished Equipment
GFP Government-Furnished Property
GSFC Goddard Space Flight Center
I&T Integration and Test
L1 Lagrange-1
MAG Magnetometer
NASA National Aeronautics and Space Administration
Rev Revision
S/C or SC Spacecraft
SOLAR Space weather Observations at L1 to Advance Readiness
SOS Spacecraft/Observatory Simulator
XRIS X-Ray Irradiance Sensor
File details come from the government source that posted it. Updated .