Attachment G - GFP.pdf

PDF 198 KB Posted

Attached to
Space weather Observations at L1 to Advance Readiness (SOLAR) Series X-ray Irradiance Sensor (XRIS)
Solicitation number
XRIS-DRFP-80GSFC26R7004
Issued by

About this file

This document is a Government Furnished Property (GFP) list for the Space Weather Observations at Lagrange 1 to Advance Readiness (SOLAR) X-Ray Irradiance Sensor (XRIS) project, a joint initiative between the U.S. Department of Commerce (NOAA/NESDIS) and NASA's Goddard Space Flight Center. Document number SOLAR-XRIS-LIST-0008, Revision A became effective August 21, 2025. The document serves as a configuration-controlled specification that requires prior approval from the SOLAR Configuration Control Board for any modifications, with changes submitted via the Technical Data Management System using Signature Control Requests.

The GFP list itself contains minimal substantive content, noting that at the time of this revision, there is no anticipated government-furnished equipment for the SOLAR XRIS project. The document includes a single placeholder entry marked "TBD" (To Be Determined) for quantity, type, equipment control number, acquisition value, and delivery date. The document functions as a template that will be updated as needed when government-furnished property is identified for the project. Supporting materials include a preface explaining the Government's quality assurance surveillance approach under firm fixed-price acquisitions, a configuration management protocol, a change history log documenting the baseline release (July 11, 2024) and Revision A update, and an appendix of acronyms and abbreviations relevant to the SOLAR mission.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective Date: TBD

Expiration Date: TBD

Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.

SOLAR-XRIS-LIST-0008, Revision A

Space Weather Observations at L1 to Advance Readiness (SOLAR)

Series Project, Code 493

Space weather Observations at Lagrange 1 to

Advance Readiness (SOLAR) Project

X-Ray Irradiance Sensor (XRIS)

Government Furnished Property (GFP)

U.S. Department of Commerce (DOC)

National Oceanic and Atmospheric Administration (NOAA)

NOAA Satellite and Information Service (NESDIS)

National Aeronautics and Space Administration (NASA)

GSFC SOLAR CMO

August 21, 2025

Released

SWO Reviewed – Not Subject to Export Control https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm

SOLAR XRIS GFP SOLAR-XRIS-LIST-0008, Revision A

Effective Date: August 21, 2025 ii Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.

Space weather Observations at Lagrange 1 to Advance Readiness (SOLAR) Project

X-Ray Irradiance Sensor (XRIS)

Government Furnished Property (GFP)

Signature/Approval Page

Prepared By:

Edward Glanfield

Reviewed By:

Brian Frey

Charles DeLee

Stephen Husty

Clark (Skip) Owens

Brian Thomas

Cynthia (Cindy) Merrow

Approved By:

James (Jim) Morrissey iii Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.

Preface

Under firm fixed price acquisitions such as this, the Contractor assumes all responsibility and all risk in exchange for greater profits from efficiency and less direct Government involvement in contract activities. However, the Government still has a responsibility to conduct surveillance.

Surveillance spans a spectrum of Government involvement. Surveillance may be as simple as inspecting a delivered support or service at acceptance or as complex as continually monitoring contractor performance. To meet this responsibility, the Government needs to understand the risks involved in the Contractor's activity and how the Contractor is managing those risks.

This Government Quality Assurance Surveillance Plan has been prepared to describe the

Government’s surveillance of this contract. It is a “living” document that will be tailored to the contractor selected. The Government welcomes suggestions for improving this Plan. Of particular interest are ideas on what information the Government should monitor (i.e., metrics) and how the Government can most cost-effectively obtain the relevant performance data it needs.

iv Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.

Configuration Management

This document is a SOLAR signature-controlled document. Changes to this document require prior approval by the SOLAR Configuration Control Board (CCB) Chairperson or designee.

Proposed changes shall be submitted in the SOLAR Technical Data Management System

(TDMS) via a Signature Control Request (SCoRe) along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.

All of the requirements in this document assume the use of the word "shall" unless otherwise stated.

Questions or comments concerning this document should be addressed to:

SOLAR Configuration Management Office

Mail Stop: 493.0

Goddard Space Flight Center

Greenbelt, Maryland 20771 v Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.

Change History Log

Revision Effective Date Description of Changes

(Reference the CCR & CCB/ERB Approval Date)

Revision - 07/11/2024 Baseline Release following the approval of SOLAR-CCR-

Revision A 08/21/2025 Update following the approval of SOLAR-CCR-0144

Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.

The following is a list of Government Furnished Property for the SOLAR XRIS effort.

GFP

Item # Description

Qty Type ECN

Acquisition

Value

Date of Delivery

To Contractor

[TBR] 1 TBD 1 TBD TBD TBD

*Note: At this time there is no anticipated GFE for the SOLAR XRIS Project. This document will be updated accordingly as needed.

Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu_dsp.cfm to verify that this is the correct version prior to use.

Appendix A. Abbreviations and Acronyms

CCB Configuration Control Board

CCR Configuration Change Request

CM Configuration Management

CMO CM Office

DO Delivery Order

ECN Equipment Control Number

GFE Government-Furnished Equipment

GFP Government-Furnished Property

GSFC Goddard Space Flight Center

I&T Integration and Test

L1 Lagrange-1

MAG Magnetometer

NASA National Aeronautics and Space Administration

Rev Revision

S/C or SC Spacecraft

SOLAR Space weather Observations at L1 to Advance Readiness

SOS Spacecraft/Observatory Simulator

XRIS X-Ray Irradiance Sensor