The file is a Price Proposal Form for a Naval Facilities Engineering Command contract to replace HVAC systems at Saint Julien's Creek Building 1556. The solicitation (N4008525R0063) requires removing and replacing a 40-ton roof top HVAC unit for the second-floor admin space and replacing roof top air handler and condensing units supporting the server room. The opportunity is exclusively restricted to MACC Holders (N40085-24-D-2508-2512) under a Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Multiple Award Construction Contract for HVAC and mechanical construction projects in the Hampton Roads, Virginia area.

The price proposal form provides a template for contractors to submit a lump sum total price for the entire project, with the pricing expected to comprehensively cover all labor, materials, equipment, tools, management, supervision, disposal, and related items. The form includes a section for entering the total project price, with a single line item for the base price covering the complete HVAC replacement work at Building 1556, and requires contractors to specify the total price, unit price, and completion timeline.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Proposal Form Time for Completion: ______calendar days

Proposal Expiration Date: ________________________

The proposed price shall be the lump sum price for the following items:

Item 0001 (Base Price) – Price includes the following:

Price for the entire work, complete in accordance with the drawings and specifications.

Total Price for Item 0001: $_______________________

Line Item
Description
Quantity
Unit
Unit Price
Subtotal
Total Price
1
BASE PRICE: Total price for the entire work for Building 1556 Replace HVAC project in accordance with the drawings and specifications, complete
1
EA
$
$
$

Contract Line Item Notes

1. The lump sum price above shall be deemed to include all costs required for the specified work, complete in accordance with the drawings and specifications, including all labor, materials, equipment, tools, management, supervision, disposal, and related items.