Attachment B - Drawings-1862691.pdf
PDF 4 MB Posted
- Attached to
- Saint Julien's Creek Bldg. 1556 Replace HVAC
- Solicitation number
- N4008525R0063
About this file
This document is a comprehensive set of mechanical and electrical engineering drawings for a HVAC replacement project at St. Juliens Creek in Portsmouth, Virginia, prepared for the Naval Facilities Engineering Systems Command Mid-Atlantic. The project involves replacing a 40-ton roof-mounted multizone air handling unit (MAHU-1) for administrative spaces, along with computer room units (CRU-1, CRU-2) and associated condensing units.
Key technical details include installing a new packaged VAV multizone rooftop air conditioning unit with specific requirements such as factory-installed Siemens DDC controls, a 100% modulating outside air economizer, hot water heating coil, and integrated building management system interface. The drawings provide extensive specifications for the new equipment, including electrical connections, control sequences, zone configurations, and system performance parameters. The project is part of a broader Naval Facilities Engineering Command contract focused on HVAC and mechanical construction upgrades in the Hampton Roads, Virginia area, with a targeted completion date of 06/23/2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bldg 1556 PPI 25R0063 GOVRESPONSE_Final.xlsx | XLSX spreadsheet | |
| 25R0063 Site visit Log Signin.pdf | ||
| Amendment 0001.pdf | ||
| Attachment H - Additional Provisions and Clauses.docx | DOCX document | |
| Attachment E - PIEE Vendor Access Instructions.pdf | ||
| Attachment C - General Decision Number VA20250016 062025.pdf | ||
| Attachment D Pre-Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| Attachment F - Price Proposal Form.docx | DOCX document | |
| Attachement A - Specs- 1862691.pdf | ||
| Attachment G - Acknowledgement of Amendment(s).pdf | ||
| 25R0063 General Requirements.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
06/23/2025
�8 ffi ::l t i
I
-�e 0 C u::
I
D
C
::i,;;
N
C � �
0 ,.
.;J
N "' 00 - I "' "' C
0C ch I
C ., :al-r 1l
CJ
.;J
".l 0::
CD
@150 12x10
12"r/J c=
---!><1-
-[::e:J-
-l--
---/::5<:I--
---ch-
9�
-rn--- ,1, ,1, [TI
0 i3 z ----, I c.o.
-<J--
---111-
JL
-:l
---II-
1 2
MECHANICAL LEGEND
THERMOSTAT
HUMIDITY SENSOR
AIR TERMINAL TAG WITH AIR FLOW (CFM)
RECTANGULAR DUCT DIMENSIONS (INCHES)
ROUND DUCT DIMENSION
FLEXIBLE ROUND DUCT
DOWNWARD DIRECTION OF SLOPED PIPING
GATE VALVE
GLOBE VALVE
BUTTERFLY VALVE
MANUAL FLOW CONTROL BALANCING VALVE
CHECK VALVE
AUTOMATIC FLOW BALANCING VALVE
PRESSURE REDUCING VALVE
SQUARE HEAD BALANCING COCK
DRAIN VALVE WITH HOSE CONNECTION
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
RELIEF VALVE
BACKFLOW PREVENTER
MANUAL AIR VENT
AUTOMATIC AIR VENT
VACUUM BREAKER
STEAM TRAP
WYE STRAINER
VALVE IN VERT. PIPING
SPRINKLER HEAD
STRAINER W/ SLOWDOWN VALVE
CLEAN OUT
ECCENTRIC REDUCER
PIPE REDUCER
UNION
THERMOMETER IN PIPE WELL
PRESSURE GAUGE W/ SHUTOFF COCK
PIPE CAP
FLANGE
FLEXIBLE PIPE CONNECTOR
t WxH 1 DUCTWORK (WIDTH x HEIGHT) f IH SUPPLY DUCT TURN UP f 114 RETURN DUCT TURN UP f IIXI SUPPLY OR OUTSIDE AIR DUCT TURN DOWN f 11/1 RETURN OR OUTSIDE AIR DUCT TURN DOWN
90 DEG. ELBOW W/TURNING VANE
1 _l t TYPICAL BRANCH DUCT TAKE-OFF
"'-.-----.7 MVD WITH MANUAL VOLUME DAMPER
tii
I
IMVD
rr_�
ROUND DUCT TAKE-OFF WITH CONICAL
SPIN WITH/MANUAL VOLUME DAMPER
FLEXIBLE DUCTWORK W/:ADJUSTING
ADJUSTING HANDLE FOR DUCT
MOUNTED VOLUME DAMPER
I\J n l/'c'�. c 1F =--, 'J '·. '�·· .. \ ·-·' ·._) - _;
MECHANICAL PIPING LEGEND
---(NAME)-
--A--
-CDR-
-cos-
-CWR-
-cws-
-D--
-DCW-
-DTR-
-DTS-
--G--
-HG-
-HPS-
-HWR-
-HWS-
-LPC-
-LPS-
- RL -
- RS -
-VAC-
PIPING TO BE REMOVED
COMPRESSED AIR PIPING
CONDENSER WATER RETURN PIPING
CONDENSER WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
CHILLED WATER SUPPLY PIPING
CONDENSATE DRAIN PIPING
DOMESTIC COLD WATER PIPING
DUAL TEMPERATUR SUPPLY PIPING
DUAL TEMPERATURE RETURN PIPING
NATURAL GAS PIPING
HOT GAS BYPASS PIPING
HIGH PRESSURE STEAM PIPING
HOT WATER RETURN PIPING
HOT WATER SUPPLY PIPING
LOW PRESSURE CONDENSATE PIPING
LOW PRESSURE STEAM PIPING
REFRIGERANT LIQUID PIPING
REFRIGERANT SUCTION PIPING
VACUUM (AIR)
I l.�·L·--1F--. ·._\ I . .D '_··. '_- -... -- ·' \J ·, --�' ' \ _'--' __ •
M EC HAN ICAL ABBREVIATIONS
AD
AFF
AP
APO
AHU
AQS
8D
BR
BTUH
C Cv cu cw
CFM
CLG
CND
COP
CRAU
DB
DOC
DEG
DX
EAT
EER
EF
EFF
ESP
EWT
F
FCU
FD
FT
FTWG
GPM
HGT
HP
HR
HW
HX
IWG
IAW
kW
LAT
LBS
LV
LWT
MAHU
MAX
MIN
NC
NO
OA
OAU
OU
PH
PRS
PSI
PTAC
PTHP
RA
RH
RL
RS
RTU
SA
SEER
SIM
SP
SQ
TYP
UH
UOI
V
VFD
w
WB
WPD .
r/J
ACCESS DOOR
ABOVE FINISHED FLOOR
ACCESS PANEL
AIR PRESSURE DROP
AIR HANDLING UNIT
AIR QUALITY SENSOR
BALANCING DAMPER
BASEBOARD RADIATOR
BRITISH THERMAL UNIT PER HOUR
COMMON
LOSS COEFFICIENT
CONDENSING UNIT
CHILLED WATER
CUBIC FEET PER MINUTE
CEILING
CONDENSER
COEFFICENT OF PERFORMANCE
COMPUTER ROOM AIR HANDLING UNIT
DRY BULB
DIRECT DIGITAL CONTROL
DEGREE
DIRECT EXPANSION
ENTERING AIR TEMPRATURE
ENERGY EFFICIENCY RATIO
EXHAUST FAN
EFFICIENCY
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
FAHRENHEIT
FAN COIL UNIT
FIRE DAMPER
FEET
FEET OF WATER GAUGE
GALLONS PER MINUTE
HEIGHT
HEAT PUMP, HORSEPOWER
HOUR
HOT WATER
HEAT EXCHANGER
INCHES OF WATER GAUGE
IN ACCORDANCE WITH
KILOWATT
LEAVING AIR TEMPERATURE
POUNDS
LOUVER
LEAVING WATER TEMPERATURE
MAKEUP AIR UNIT
MAXIMUM
MINIMUM
NOISE CRITERIA, NORMALLY CLOSED
NUMBER, NORMALLY OPEN
OUTSIDE AIR
OUTSIDE AIR UNIT
OUTDOOR UNIT
PHASE
PRESSURE REDUCING STATION
POUNDS PER SQUARE INCH
PACKAGED TERMINAL AIR CONDITIONER
PACKAGED TERMINAL HEAT PUMP
RETURN AIR
RELATIVE HUMIDITY
REFRIGERANT LIQUID
REFRIGERANT SUCTION
ROOFTOP UNIT
SUPPLY AIR
SEASONAL ENERGY EFFICIENCY RATIO
SIMILAR
STATIC PRESSURE
SQUARE
TYPICAL
UNIT HEATER
UNLESS OTHERWISE INDICATED
VOLTS
VARIABLE FREQUENCY DRIVE
WIDTH
WET BULB
WATER PRESSURE DROP
DEGREES
DIAMETER
MECHANICAL SYMBOLS
() POINT OF DISCONNECTION
� POINT OF CONNECTION
GENERAL MECHANICAL NOTES
1. THESE GENERAL MECHANICAL NOTES APPLY TO THE ALL
MECHANICAL DRAWINGS IN THIS SET. SHEET SPECIFIC NOTES ARE
INDICATED ON EACH SHEET UNDER GENERAL SHEET NOTES.
2. PATCH ALL HOLES FROM REMOVAL OF PIPING, DUCTWORK, OR
EQUIPMENT TO MATCH ADJACENT CONSTRUCTION.
3. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL
LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
4. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, THIS
CONTRACT'S DOCUMENTS, AND APPLICABLE CODES AND
REGULATIONS.
5. PROVIDE VIBRATION ISOLATORS FOR ALL MECHANICAL EQUIPMENT
TO PREVENT TRANSMISSION OF VIBRATION TO BUILDING
STRUCTURE.
6. PROVIDE ACCESS PANELS IN WALLS AND CEILINGS, WHERE
REQUIRED, TO SERVE FIRE DAMPERS, VALVES, SMOKE DETECTORS,
AND OTHER CONCEALED MECHANICAL EQUIPMENT THAT REQUIRES
ROUTINE MAINTENANCE. ACCESS PANELS BE LARGE ENOUGH TO
ALLOW PROPER CLEARANCE FOR ACCESS DOORS.
7. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING,
CONDUIT, ETC., SHALL BE FIRE STOPPED.
8. EXISTING DUCT AND PIPING SIZES INDICATED ARE APPROXIMATE.
FIELD VERIFY ALL DIMENSIONS.
9. LOCATE ALL NEW HORIZONTAL DUCTWORK ABOVE THE SUSPENDED
CEILINGS UNLESS OTHERWISE INDICATED.
10. ALL 90 DEGREE RECTANGULAR MITERED DUCT ELBOWS IN THE
SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES.
11. PROVIDE PIPE SLEEVES FOR ALL PIPING PENETRATIONS THRU
WALLS AND FLOORS. EACH PIPE SHALL BE SEPARATELY SLEEVED.
PROVIDE CONTINUOUS SEALANT JOINT AROUND PIPE SLEEVE,
BOTH SIDES OF WALL, WATERTIGHT.
12. PROVIDE P-TRAPS IN CONDENSATE DRAIN PIPING AT EACH AHU
UNLESS THE AHU IS EQUIPPED WITH AN INTERNAL TRAP.
I i
!'IAVA(
FOR CCIIWANCIR !Wtfll
ACIMI'(
SATISFICWRY lO 00£
DES KGL jDRW KGL jCHK KGL
PM/DU KEVIN LIS
BRANCH MANAGER R ZACCHIA
ENGR �RECTOR TIM ROUSE
ARE PROlECTION MARK BOWEN C < <O'. z z -< t5 :z::::E o ct:: <.!>::;_ > 01-- - 0::::
u:z � > (1)-c:!' 5 ::; .....l ,.
l'c!!;;: � (J) 0 l;; 0 c...
:::ie I " 0 � l !li w Cl Ii:
l.&J z :c
�a:: en zn::Ow w en z::::;; � uJ ::::;; l!
� LL
<( a..
>en Iw _J W> <i::
o- u f:{lo� i'.= 0 15
::J LL
u en g§ � � z
-' I:!:! :,£ en <( >z en
C,z a:wwz C, zw en s !:!:!
<( 1-
<l'. � �...Ja: :r::a..1-- uW en w a:- � c.o�
LOO
z ....I uJ (.)
:,: <(>- LL
LL ....I
cS en w <>:: u 0 <( .!;
f- > 5 z z,c:c: � w � z
_J lie =>
Q. 0 I- � 1!: Vl
SCALE, AS NOTED
EPROJECT NO., 1862691
CONSTR. CONTR. NO.
NAYrAC DRAWING NO.
12931264
SHEET 02 OF 12
M-001 DRAWfOIW REVl5ION: 12 APfilL 2018
D
C
B
A
I Li Li I_/ C_/
.2 � 0 0
.8 e 6,'
E a.
N .., N
C :, �
I a.
N 0 w I e, [ll N <O
I "' "'
C u::
I
"E ., g / 0 Ci= 0 0
.8
1!., c"l
1S w
D
C
E
I N 0 N .., N
C i g a.
N 0-,.
w <( z
<O N <O 00 - I
·i C
<O"' - I
.fl C ., E:, 0 0
A 0
.a e 1!.,"' =>
CJ
w ,.
<( z w 0::
0-
0-
CD-
� I
I CU-1
I
I
I
:o l@@@l-
I I
I
I
I
I I I
I I - - - - - - -
I
- - - - ____ J
LI
D
I\Jnl/'c'�.c1F =--, 'J '·. '�·· .. \ ·-·' ·
2 3 r[IJ [TI[I]
MAHU-1
10 [SJ I
EF-37 EF-38
MECHANICAL PLAN - ROOF NEW WORK
SCALE: 3/32"=1'-0"
D D D D D D
�001 0 [
I 11 II
r;====�I ·I· I· I· I· I D D
UL
MECHANICAL PLAN - FIRST FLOOR NEW WORK
SCALE: 3/32"= 1'-0"
2 3 11.�·L·--iF--,·
_\ I ' ,D '.··. '_- -... - ·' \J ·, --�' ' \ _'·-' __ •
CD
ED
D D
D
DC-1
PLAN
NORTI, -
PLAN
NORTH
I
DOC' I '
L
0 NEW WORK NOTES
117 REPLACE EXISTING ROOF TOP UNIT WITH NEW PACKAGED ROOFTOP
L!__:_J UNIT AND CURB
[[] PROVIDE A TRANSITION FRAME ON EXISTING ROOF CURB TO
• TRANSITION FROM NEW ROOFTOP UNIT TO EXISTING ROOF CURB.
C[] PROVIDE MANUFACTURER'S STANDARD CONTROLLER WITH DDC CONTROL
INTERFACE.
[1J INSTALL SIEMENS DOC PANEL FROM 1 ST FLOOR TO 2ND FLOOR
CONNECTION.
0 4• 8'
SCALE: 3/32" = 1'
16'
I
!-iAVA(
FOR CCIIWANCIR !Wtfll
ACIMI'(
SATISFICWRY lO 00£
I i
DES KGL
I
DRW KGL
I
CHK KGL
PM/DU KEVIN LIS
BRANCH MANAGER R ZACCHIA
ENGR �RECTOR TIM ROUSE
ARE PROlECTION MARK BOWEN C < <O:;z z -< t5 :z ::::Eoct:: <.!> ,. - > 01-- - 0::::
u:z � > (1)-c:!' 5 ,. .....l ,.
l'c!!;;: �
LL
Ct::
� (J) 0 l;; 0 c...
:::ie I
" 0 � l !li w Cl Ii:
l.&J z :c � en z::::;; �uJ ::::;; l!
i7l a: en er::
ti:::Ow o �LL g
() <( LL
<( a.. f> en (/) f:{lo� i'.= 0 15
::J LL
u en g§ � � z
--' I:!:! :,£ en <( >z en
C,za:
w wz C,z wen
Ct:: Iw
W> LL
o- (/) ::s� � a.. a: 0...
w l-
_J a: en <C
- u
I� Z s !:!:!
<( 1-z ....I uJ u
:,: <( >- LL
LL ....I
c.o � <( LO O :r::
LO <( 8cSin 2 w 0:::
u 0 <( .!;
>- > 5 z z,c:c: � w
� z � _J lie =>
a. 0 I-� 1!: Vl
SCALE, AS NOTED
EPROJECT NO., 1862691
CONSTR. CONTR. NO.
NAYrAC DRAWING NO.
12931266
SHEET 04 OF 12
M-102 DRAWfOIW REVl51DN: 12 APfilL 2018
D
C
B
A
I u_ u_ I_/
0 0
.8 e 6,'
E a.., N
N .., N ., C
I a.
N 0 'i w I e, N "' - I "' "'
-�e0 C u::
I
.fl C ., 0 00
/0 Ci= 0 0
.8
1!., c"l 1S w
D
C
E
N
I
IQ0
N .., N C i g a.
N 0-"' w"' <( z :s
<O N <O ., - I
·i C
<O "'"'- I
.fl C ., E:, 0 00 /
A 0 N
-r .a e 1!.,"' =>
CJ
w <( z w i.:
0-
0-
CD-
� I
I CU-1
I
I
I
:o l@@@l-
I I
I
I
I
I I I
I I - - - - - - -
I
- - - - ____ J
LI
D
I\Jnl/'c'�.c1F =--, 'J '·. '�·· .. \ ·-·' ·
2 3 r[IJ [TI[I]
MAHU-1
10 [SJ I
EF-37 EF-38
MECHANICAL PLAN - ROOF NEW WORK
SCALE: 3/32"=1'-0"
D D D D D D
�001 0 [
I 11 II
r;====�I ·I· I· I· I· I D D
UL
MECHANICAL PLAN - FIRST FLOOR NEW WORK
SCALE: 3/32"= 1'-0"
2 3 11.�·L·--iF--,·
_\ I ' ,D '.··. '_- -... - ·' \J ·, --�' ' \ _'·-' __ •
CD
ED
D D
D
DC-1
PLAN
NORTI, -
PLAN
NORTH
I
DOC' I '
L
0 NEW WORK NOTES
117 REPLACE EXISTING ROOF TOP UNIT WITH NEW PACKAGED ROOFTOP
L!__:_J UNIT AND CURB
[[] PROVIDE A TRANSITION FRAME ON EXISTING ROOF CURB TO
• TRANSITION FROM NEW ROOFTOP UNIT TO EXISTING ROOF CURB.
C[] PROVIDE MANUFACTURER'S STANDARD CONTROLLER WITH DDC CONTROL
INTERFACE.
[1J INSTALL SIEMENS DOC PANEL FROM 1 ST FLOOR TO 2ND FLOOR
CONNECTION.
0 4• 8'
SCALE: 3/32" = 1'
16'
I
!-iAVA(
FOR ""'"""l�JlfllFlC
ACIMI'(
SATISFICWRY lO 00£
I i
DES KGL IDRW KGL ICHK KGL
PM/DU KEVIN LIS
BRANCH MANAGER R ZACCHIA
ENGR IIRECTOR TIM ROUSE
ARE PROlECTION MARK BOWEN C < <O:;z z - < t5 :z ::::Eoct:: <.!> "' - > 01-- - 0::::
u:z � > (1)-c:!' 5 ,. .....l ,.
l'c!!;;: �
LL
Ct::
� (J) 0 l;; 0 c...
:::ie I " 0 � l !li w Cl Ii:
l.&J z :c � en z::::;; �uJ ::::;; l!
i7l a:
en er::
ti:::Ow o �LL g
() <( LL
<( a.. f> en (/) f:{lo� i'.= 0 15
::J LL
u en g§ � � z
--' I:!:! :,£ en <( >z en
C,za:
w wz C,z wen
Ct:: Iw
W> LL
o- (/) ::s� � a..
a: 0...
w l- _Ja: en <C
- u I� Z s !:!:!
<( 1-z ....I uJ u
:,: <(>- LLLL ....I
c.o � <(
LO O :r::
LO <( 8cSin 2 w
0::: u 0 <( .!;
>- > 5 z z,c:c: � w � z � _J lie =>
a. 0 I-� 1!: Vl
SCALE, AS NOTED
EPROJECT NO., 1862691
CONSTR. CONTR. NO.
NAYrAC DRAWING NO.
12931266
SHEET 04 OF 12
M-102 DRAWfOIW REVl51DN: 12 APfilL 2018
D
C
B
A
I u_ u_ I_/
D
C \
CFM
E
I
� IQ
0 0 0 "' 0 .., .8 e
C
6,' � => 0 "----ri
E a. ., .. :,"' >-i g "' a. .., "' "' 0 ., -
C "' � w"'.,, <( z
I :s
a. � "' .,, 0 - 'i <O "' w <O
I 00 -e, I
� ·i
"' 0• 0 C "'
/"' <O "' - "' -I "' � "' -� I e / 0 .fl
C
C u:: E
0 "' 0"' 0 - /
� A I ;;;- 0 .fl
N
C -r ., .a :, e 0 0 / 0 1!
/ 0 ., Ci= "'
0 / 0 CJ
w .8 <( z
1! ., w c"l i.:
1S w
LJC 170 CFI CFM �
CFM
I
I� J 170
CFM I�□ 170
- CFM
�� 180
CFM
A l)
CFM
Ii]
CFM
I I
,� l 1ao
CFM
I � ]180
- CFM
6�� I
� 225
CFM
1.::. 225
I I 250
CFM
r?:1125
CF
- CFM
L • - (j) r
)(J)3 I
CFM [ l
� 175
CFM
I I l\ln l/'c'�. c1F =--,'J '·. '�·· .. \ ·-·' ·
[L]
DJ-
�[TI
I I L_� I I --- ·�� --- ,'Jn / 340 --- --- --- ---
CFM CFM CFM CFM CF CFM
I�� C-□160 [-J 160 160 � �;ci '
CFM CFM CFM �
CFM
ZONE 4 ZONE 5
l;t
� FM
1ZJ 180
CFM
I I
[ l 175 CFM
� CFM
I
C □ 160
CFM-
A
I J175
- CFM
I I
160 - CFM :x-
I\ 180 -
CFM �
I--
LUNt. j L
I 46)CF�
I J
- CFM
I--,, I I I
I , � I I I
ZONES 7900 CFM '\ /
18' x18 ..
I ZONE4 3510 CFM = 18"x18"
I. ZONE3 1850 CFM �
I 12.5"x1 �-
ZONE2 1630 CFM I' I'
12.5 x1 I
ZONE1 1630 CFM
12.5"x1 \
I
I I
:lECTRI� _;LOSET
II
�CFM
X
_LEVA ""
�I� [7 0
[[] - __,--- 80 0
&oc PANEL -v t:::o l, en
I-□ 170
� CFM
I I lgJ170
� CFM
I
I f-13 �FM
PANEL
ZONE 2
TELEPHONE
.l'C"7l .,.....,, A 0 A - -
130 130 CFM CFM
CFM
1-J 170
� CFM
I I
--� CFM
I
11 , I-
I I
_,) 301
CFI
.,.....,,'All-
CFM
nnr o•""'
AUT□L□GIC
130 150
CFM CFM
4 5
0 NEW WORK NOTES
DJ PROVIDE ROOF TOP AIR CONDITIONING UNIT MAHU-1. SEE SHEET M-102
[L]
[TI
[D lliJ
[I]
CFM
I
PROVIDE SUPPLY DUCT CONNECTIONS FROM EXISTING DUCTWORK TO ROOF TOP
UNIT MAHU-1.
PROVIDE RETURN DUCT CONNECTION FROM EXISTING DUCTWORK TO ROOF TOP
UNIT MAHU-1.
PROVIDE SPACE TEMPERATURE WALL MTD (60" AFF.) THERMOSTATS (TYP OF 5) AT
LOCATIONS INDICATED. ROUTE COMMUNICATIONS BACK TO ROOF TOP UNIT. RUN
WIRING IN CONDUIT.
PROVIDE DDC CONTROL PANEL. PROVIDE SEPARATE ZONE SPACE TEMPERATURE
SENSOR FROM EACH ZONE TO THE DDC PANEL. PROVIDE BACNET COMMUNICATIONS
INTERFACE FROM AIR HANDLING UNIT TO DDC PANEL.
PROVIDE CERTIFIED TESTING ADJUSTING AND BALANCING (TABS W/WRITTEN REPORT)
ON THE HVAC SYSTEM. BALANCE AIR FLOWS TO AIR FLOWS AS INDICATED ON THIS
PLAN
360 465
CFM CFM
I '
CFM
�•20 � 120 l-□12c �1 ) l-� 155 ; ]155
� en FM
CF
- M � CFM - CFM
I I I I I lgJ120
CFM I J120
- CFM l��i20
- FM
BOA\__
CFM
l) 80 CFM l)
ZONE 1
r:��M
I
"I
I-;;� 155
- CFM
I �.I
I I
�a155
[- 155
M CFM
I I
; J 155 r-----
I I I lgJ155
CFM [��155
- CFM I ; J 165
- CFM
I ' I J 180 I- CFM
,J
\___ 220
CFM -
155:[-;] CFM ... l"i"J 220
... CFM
I I
(j) 1
I -□160
1�160 155 I"' J - CFM
CFM - CFM
CFM �l CFM
17: �l CF! ,� 175 l�J175 i:::o '7BWOMENS ro � MENS � '- II x I Ix II CFM (j) - 2I � CFM - CFM
465 320
CFM - CFM
i:::o
LJ
NEW WORK PLAN - SECOND FLOOR
SCALE: 1 /8"=1'-0"
1 2
400 C t:O � CFM """"';
I l·-.L·--1F--.·
_\ I ' ,D '.··. ·.--·-. - ·'\J ·, --�' ' \ _'--' __ •
PLAN
NORTH
465 CFM
CFM I I
I
CFM
I
0 4' 8'
L_
SCALE: 0.125 = 1'
16'
!-iAVA(
FOR CCIIWANCIR !Wtfll
ACIMI'(
SATISFICWRY lO 00£
I i
DES KGL IDRW ICHK KGL
PM/DU KEVIN LIS
BRANCH MANAGER R ZACCHIA
ENGR �RECTOR TIM ROUSE
ARE PROlECTION MARK BOWEN C < <O'. z z - < t5 :z ::::Eoct:: <.!> "' - > 01-- - 0::::
u:z � > (1)-c:!' 5,. .....l ,.
I':!!;;:� z
0...
(J) 0 l;; 0 c...
:::ie I" 0 � l !li w Cl Ii:
l.&J z :c i7l a: en _JI- 0 <( 0::: w u
�LL () z en z::::;; � w ::::;; l!
f:{lo� i'.= 0 15 ::, u en g§ � � z
--' I:!:! :,£ en <( >z en
C, z a: w w z C, z w en
<( a.. :r::
>en � Iw ::;;;
w > 0:::
Oi= o
::s <( g a_� LL Wen o a:- z
I Z 0 - uc.o� w s !:!:!
<( 1-z ....I uJ (.)
:,: <( >- LL
.... ....I
LOO (fl cS en w
0::: (.) 0 <( .!; >- > 5 zz,c:c: � w �z�--' lie =>
a. 0 I-� 1!: Vl
SCALE, AS NOTED
EPROJECT NO., 1862691
CONSTR. CONTR. NO.
NAYrAC DRAWING NO.
12931267
SHEET 05 OF 12
M-103 DRAWfOIW REVl5ION: 12 APfilL 2018
D
C
B
A
I u_ u_ I_/
I\ .
I \
:::J 1 \� u
0---
C
E CONDENSING UNIT
I
� IQ
0 ..,"' .8 e
C
6,' � => 0
Ea. ., ., :, "' >-i g"' a.
.., "' 0 ., "' C "' w "'.,, <( z
I :s
a. � 0 .,, "' <O w "' <O
I e, I
� ·i
DAMPERS ----t-----...___
"' 0 C "' /"' <O "' - "' -
I "' � "' -� I (E) SUPPLY DUCTS ---i e / 0 .fl
C
C u:: E
0 "' 0 "' 0 - /
� AI
;;;- 0
.fl N
C -r ., .a
:, e
0 1!
/ 0 ., Ci= "'=>
0 CJ
w .8 <( z 1! ., w c"l
1S i.: MAHU -1 DETAILS
SCALE: 1 /8"=1'-0"
w r7 z -z z w � o_
� I I o_ � o_ :::J o_ o_ :::J
PLAN VIEW
SUPPLY FAN -------. 0�
'----0
-- MAN WAY FLEX CONNECTOR
ELEVATION VIEW
O::'.
O::'.
o_
� w
I\J n l/'c'�. c1F =--, 'J '·. '�·· .. \ ·-·' ·
- OA
z
1 E:
; O::'. RETURN OPENING w
LI..
,----- COIL SECTION
�- FILTER SECTION
i------ (E) RETURN DUCT
I l ·-.L·--1F ___·
_\ I ' ,D '.··. '_- -... - ·'\J ·, --�' ' \ _'--' __ •
(E) ROOF CURB
W/ADAPTER CURB
,..-- MAHU-1
RETURN OPENING
i---- ADAPTER CURB@
(E) ROOF CURB
(E) ROOF DECK
Q NEW WORK NOTES
0 REPLACE EXISTING ROOF TOP UNIT WITH 40 TON ROOF TOP UNIT.
0 PROVIDE A TRANSITION FRAME ON EXISTING ROOF CURB TO
TRANSITION FROM NEW ROOFTOP UNIT TO EXISTING DUCT WORK.
THE TRANSITION CURB MUST BE CONSTRUCTED OF MINIMUM 14
GAGE HOT DIP GALVANIZED STEEL WITH FULLY WELDED WATERTIGHT
JOINTS. TRANSITION CURB MUST BE DESIGNED AND FABRICATED TO
RESIST LOADS AS SPECIFIED IN ASCE 7 LATEST EDITION TAKING
INTO CONSIDERATION, INCLUDING BUT NOT LIMITED TO DEAD LOADS,
LIVE LOADS, IMPACT LOADS, WIND LOADS AND SEISMIC LOADS.
ROOF TOP UNIT MUST BE POSITIONED SUCH THAT IT'S CENTER OF
GRAVITY ALONG THE LENGTH IS CENTERED OVER THE EXISTING
ROOF CURB. EXISTING CURB OUTER TO OUTER DIMENSIONS
MEASURE 22'-5" BY 7'-5".
0 CENTER CENTROID OF NEW EQUIPMENT OVER CENTER OF EXISTING
CURB.
0 INSTALL FLEXIBLE DUCT CONNECTOR BETWEEN NEW ROOF TOP UNIT
TO ROOF DUCTING.
NOTES:
1. VENTURI TYPE MANUAL BALANCING VALVES SHALL BE INSTALLED IN COMPLIANCE WITH THE
DEVICE MANUFACTURER'S INSTALLATION RECOMMENDATIONS AND/OR REQUIREMENTS FOR
STRAIGHT LENGTH OF UNOBSTRUCTED PIPE WITHOUT INLINE APPURTENANCES (CONTROL VALVES, FLANGES, TEMPERATURE WELLS, ETC.) UP AND DOWNSTREAM OF THE VALVE. SINCE OAU AND
AHU HEATING COILS PIPED IN SERIES, ONLY PROVIDE VENTURI BALANCING VALVE WHERE SHOWN
ON PLAN FOR AHU HEATING COIL.
2. PROVIDE UNIONS AND/OR FLANGED PIPE CONNECTIONS TO ALLOW PIPING SECTIONS TO BE
EASILY REMOVED TO PERMIT REMOVAL OF COIL.
3. ARRANGE PIPING TO AVOID BLOCKING ACCESS DOORS FROM BEING FULLY OPEN (MIN. 95") AND
TO ALLOW THE COIL TO BE EASILY REMOVED.
4. THIS DETAIL IS ONLY PROVIDED TO SHOW THE COMPONENTS THAT ARE REQUIRED TO BE
INSTALLED IN THE PIPING SERVING EACH HEATING COIL. IT IS NOT INTENDED TO SHOW THE
EXACT LOCATION WHERE THE CONTROL VALVE, BALANCING VALVE, STRAINER, AND ISOLATION
VALVES ARE TO BE INSTALLED IN THE PIPING SYSTEM.
HOT WATER COIL PLUMBING
SCALE: 1/8"=1'-0"
0 4' 8' 16'
SCALE: 0.125 = 1'
!-IAYA(
FOR CCIIWANCIR !Wtfll
ACTMr(
SATISFICWRY lO 00£
I i
DES KGL IDRW jcHK KGL
PM/DU KEVIN LIS
BRANCH MANAGER R ZACCHIA
ENGR �RECTOR TIM ROUSE
ARE PROlECTION MARK BOWEN C < <O'. z z -< t5 :z ::::Eoct:: <.!> "' - > 01-- - 0::::
u:z � > (1)-c:!' 5 ,. .....l ,.
I':!!;;:�(J) 0 l;; 0 c...
� U) 0 __J
:::ie I
" 0 � a: Cl) �g§0w w a...LL o
� l !li w Cl Ii:
l.&J z :c � en z::::;; � uJ ::::;; l!
f:{lo� i'.= 0 15
::J LL
u en g§ � � z
--' I:!:! :,£ en <( >z en
C,z a:wwz C,z w en s !:!:!
() <( f<( a.. z
>Cl) =:)
Iw u w > ..........._ () i= <(::s <( w a.. a: 6
WI- N
a:� f-l � �
C.O� L
<( 1-z ....I uJ (.)
:,: <(>- LL
LL ....I
�o :,,::: T"" <( t::l en 0:::
(.) 0 <( .!; >- > 5 zz,c:c: � w
� z � _J lie =>
a. 0 I- � 1!: Vl
SCALE, AS NOTED
EPROJECT NO., 1862691
CONSTR. CONTR. NO.
NAYrAC DRAWING NO.
12931268
SHEET 06 OF 12
M-301 DRAWfOIW REVl5ION: 12 APfilL 2018
D
C
B
A
I u_ u_
I_/
C
E
I
� IQ
0 .., .8 e
C
6,'
=> 0
E "'
a. ., i I g "' a.
C "'
� w "' .,, <( z
I :s
a. � 0 .,, -"' <O "'w <O -e, I "'
� ·i
"' 0
C
"' <O
I "' � "' ·� I e /
0 .fl C
C u:: E
0 "' 0
"' 0 - /
� A I
.fl N
C ., .a :, e
1!
Ci=
0 CJ
w .8
<( z ., w c"l i.:
1S w
PACKAGED VAV MULTIZONE ROOFTOP AIR C ONDTIONING UNITS
1.01 SECTION INCLUDES
A. MULTIZONE ROOFTOP UNIT.
B. HOT WATER ELECTRIC HEATER.
C. REFRIGERATION COMPONENTS.
D. UNIT OPERATING CONTROLS.
E. ROOF CURB.
F. ELECTRICAL POWER CONNECTIONS.
G. OPERATION AND MAINTENANCE SERVICE.
H. CONTROLS AND INSTRUMENTATION.
I. EQUIPMENT WIRING SYSTEMS.
1.02 REFERENCES
A. ANSI/NFPA 90A - INSTALLATION OF AIR CONDITIONING AND
VENTILATION SYSTEMS.
B. ARI 360 - UNITARY AIR-CONDITIONING EQUIPMENT.
C. ANSI/ ASH RAE/I ESNA 90.1-1999 - ENERGY STANDARD FOR NEW
BUILDINGS EXCEPT LOW-RISE
RESIDENTIAL BUILDINGS.
D. ANSI/ASHRAE 90A . ENERGY CONSERVATION IN NEW BUILDING
DESIGN
1.03 SUBMITTALS
A. SUBMIT DRAWINGS INDICATING COMPONENTS, DIMENSIONS, WEIGHTS
AND LOADINGS, REQUIRED CLEARANCES, AND LOCATION AND SIZE OF
FIELD CONNECTIONS.
B. SUBMIT PRODUCT DATA INDICATING RATED CAPACITIES, WEIGHTS,
ACCESSORIES, AND ELECTRICAL REQUIREMENTS.
C. SUBMIT MANUFACTURER'S INSTALLATION INSTRUCTIONS.
1.06 OPERATION AND MAINTENANCE DATA
A. SUBMIT OPERATION AND MAINTENANCE DATA.
B. INCLUDE MANUFACTURER'S DESCRIPTIVE LITERATURE, START-UP
AND OPERATING INSTRUCTIONS, INSTALLATION
INSTRUCTIONS, AND MAINTENANCE PROCEDURES.
1.04 HANDLING
A. COMPLY WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR
RIGGING, UNLOADING, AND
TRANSPORTING UNITS.
B. PROTECT UNITS FROM PHYSICAL DAMAGE. LEAVE FACTORY
SHIPPING COVERS IN PLACE UNTIL
INSTALLATION.
1.05 WARRANTY
A. PROVIDE A FULL PARTS WARRANTY FOR ONE YEAR FROM
START-UP OR 18 MONTHS FROM SHIPMENT, WHICHEVER OCCURS
FIRST .
1.06 MAINTENANCE SERVICE
A. FURNISH COMPLETE SERVICE AND MAINTENANCE OF PACKAGED
ROOFTOP UNITS FOR ONE YEAR FROM
DATE OF SUBSTANTIAL COMPLETION BY CONTRACTOR.
B. INCLUDE MAINTENANCE ITEMS AS OUTLINED IN MANUFACTURER'S
OPERATING AND MAINTENANCE DATA.
1.7 EXTRA MATERIALS
A. PROVIDE ONE SET OF FILTERS.
PART 2 PRODUCTS
2.01 SUMMARY
A. THE CONTRACTOR SHALL FURNISH AND INSTALL PACKAGE
MULTIZONE VAV ROOFTOP AIR CONDITIONING UNIT(S) AS SHOWN AND
SCHEDULED ON THE CONTRACT DOCUMENTS. THE UNIT(S) SHALL BE
INSTALLED IN
ACCORDANCE WITH THIS SPECIFICATION AND PERFORM AT THE
SPECIFIED CONDITIONS AS SCHEDULED.
B. PACKAGED ROOFTOP AIR CONDITIONING UNITS SHALL BE
MANUFACTURED BY MANUFACTURER WITH AT LEAST 15 YEARS
EXPERIENCE.
I\Jnl/'c'�.c1F =--, 'J '·. '�·· .. \ ·-·' ·
PACKAGED VAV MULTIZONE ROOFTOP AIR C ONDTIONING UNITS
2.02 GENERAL UNIT DESCRIPTION
A. UNIT(S) FURNISHED AND INSTALLED SHALL BE COOLING ONLY
PACKAGED ROOFTOP AS SCHEDULED ON CONTRACT DOCUMENTS AND
THESE SPECIFICATIONS. COOLING CAPACITY RATINGS SHALL BE BASED
ON ARI STANDARD 360 TESTING REQUIREMENTS. UNIT(S) SHALL
CONSIST OF INSULATED WEATHERTIGHT CASING WITH COMPRESSORS,
AIR COOLED CONDENSER COIL, CONDENSER FANS, EVAPORATOR COIL,
FILTERS,
SUPPLY AND/OR EXHAUST MOTORS AND DRIVES, UNIT CONTROLS.
B. UNIT(S) SHALL BE SINGLE PIECE CONSTRUCTION AS
MANUFACTURED AT THE FACTORY. SITE ASSEMBLED SUBASSEMBLIES
WILL NOT BE ALLOWED.
C. UNIT(S) SHALL BE FACTORY RUN TESTED TO INCLUDE THE
OPERATION OF ALL FANS, COMPRESSORS, HEAT EXCHANGERS,
SAFETIES, LIMITS, AND CONTROL SEQUENCES.
D. UNIT(S) SHALL HAVE LABELS, DECALS, AND/OR TAGS TO AID IN
THE SERVICE OF THE UNIT AND INDICATE
CAUTION AREAS.
E. UNITS SHALL BE DEDICATED DOWN FLOW OR DEDICATED
HORIZONTAL AIRFLOW AS MANUFACTURED.
F. UNIT(S) SHALL BE ASHRAE 90.1 COMPLIANT
2.03 UNIT CASING
A. CABINET: GALVANIZED STEEL, PHOSPHATIZED, AND FINISHED WITH
A PRE-APPLIED BAKED
POLYURETHANE ENAMEL. CABINET SURFACE SHALL BE TESTED 500
HOURS IN SALT SPRAY IN COMPLIANCE
WITH ASTM B117. FULLY GASKETED REMOVABLE ACCESS PANELS.
STRUCTURAL MEMBERS SHALL BE 14
GAUGE WITH ACCESS DOORS AND REMOVABLE PANELS OF MINIMUM 18
GAUGE. PROVIDE 1 /2 INCH
THICK FOIL FACED FIBERGLASS INSULATION ON ALL EXTERIOR PANELS
AND ROOF IN CONTACT WITH THE
RETURN AND CONDITIONED AIR STREAM. CABINET TOP COVER SHALL
BE ONE PIECE CONSTRUCTION OR
WHERE SEAMS EXITS, IT SHALL BE DOUBLE HEMMED AND GASKET
SEALED.
2.04 ELECTRICAL POWER CONNECTIONS
A. SINGLE POINT POWER SUPPLY TO THE UNIT SHALL BE 3 PHASE.
UNIT SHALL BE PROVIDED WITH INTERNAL 3 TRANSFORMER(S) AS
REQUIRED FOR LOW VOLTAGE CONTROL OPERATIONS.
B. PROVIDE A FACTORY-INSTALLED NON-FUSED DISCONNECT SWITCH
WHICH SATISFIES NEC REQUIREMENTS
FOR A SERVICE DISCONNECT SWITCH. DISCONNECT HANDLE SHALL BE
ACCESSIBLE THROUGH THE CONTROL
BOX DOOR SUCH THAT HIGH VOLTAGE POWER MUST BE OFF BEFORE
DOOR CAN BE OPENED.
2.05 AIR FILTERS
A. AIR FILTERS: FILTERS SHALL MOUNT INTEGRALLY WITHIN UNIT AND
BE ACCESSIBLE THROUGH HINGED
ACCESS PANELS. FILTERS SHALL BE TWO INCH THICK STANDARD
EFFICIENCY THROWAWAYS.
2.06 FANS - SUPPLY
A. PROVIDE FORWARD-CURVED FAN MOUNTED WITH FIXED PITCH
SHEAVE DRIVE ASSEMBLY. COMPLETE
FANS ASSEMBLIES SHALL BE STATICALLY AND DYNAMICALLY BALANCED.
B. FAN SHAFT SHALL BE MOUNTED ON GREASE LUBRICATED BALL
BEARINGS.
C. ALL MOTORS SHALL BE CIRCUIT BREAKER PROTECTED.
2.07 HOT WATER HEATER COIL
A. PROVIDE HEAVY DUTY ALUMINUM FINS MECHANICALLY BONDED TO
INTERNALLY ENHANCED, COPPER TUBES.
B. PROVIDE A HOT WATER CONTROL VALVE AND CONTROL CIRCUIT.
FACTORY PRESSURE AND LEAK TEST COILS.
PACKAGED VAV MULTIZONE ROOFTOP AIR CONDTIONING UNITS
2.08 EVAPORATOR COIL
A. PROVIDE HEAVY DUTY ALUMINUM FINS MECHANICALLY BONDED TO
INTERNALLY ENHANCED, COPPER TUBES.
B. PROVIDE A THERMOSTATIC EXPANSION VALVE FOR EACH
REFRIGERATION CIRCUIT. FACTORY PRESSURE AND LEAK TEST COILS AT
300 PSI.
2.09 CONDENSER SECTION
A. PROVIDE ALUMINUM FINS MECHANICALLY BONDED TO COPPER
TUBES. FACTORY PRESSURIZE AND LEAK
TEST TO 450 PSIG.
B. PROVIDE INTEGRAL SUBCOOLING CIRCUIT(S) TO PREVENT
PREMATURE REFRIGERANT FLASHING AND TO INSURE MAXIMUM
OPERATING EFFICIENCY.
C. PROVIDE VERTICAL DISCHARGE, DIRECT DRIVE FANS WITH STEEL
BLADES, AND THREE PHASE MOTORS. FANS 4 SHALL BE STATICALLY
BALANCED. MOTORS SHALL BE PERMANENTLY LUBRICATED, WITH
BUILT-IN CURRENT AND THERMAL OVERLOAD PROTECTION IN A
WEATHER TIGHT CASING.
2.10 REFRIGERATION SYSTEM
A. COMPRESSOR: HERMETIC COMPLIANT SCROLL COMPRESSOR
OPERATING AT 3600 RPM WITH ISOLATED MOUNTING, CENTRIFUGAL OIL
PUMP, OIL SIGHT GLASS, AND DISCHARGE VALVE.
B. PROVIDE WITH THERMOSTATIC TEMPERATURE MOTOR WINDING
CONTROL FOR PROTECTION AGAINST EXCESSIVE TEMPERATURES CAUSED
BY OVER-/UNDER VOLTAGE OPERATION OR LOSS OF CHARGE. ALSO
PROVIDE HIGH AND LOW PRESSURE CUTOUTS.
2.11 VAV ZONE SYSTEM
A. ZONING LAYOUT SHALL USE ZONE CONFIGURATION OF EXISTING
UNIT AND CURB
B. ZONES SHALL BE CONTROLLED BY LOW LEAK CUSTOM RUSKIN
BLADE DAMPERS, WITH ALUMINUM AIRFOIL
CONSTRUCTION, STAINLESS STEEL JAMBS AND RUBBER SEALS .
C. ALL ZONES SHALL INCORPORATE FACTORY MOUNTED BELIMO
ACTUATORS, WIRED TO UNIT CONTROL PANEL
AND TESTED FOR PROPER OPERATION PRIOR TO SHIPMENT.
D. VAV SYSTEM SHALL BE FACTORY PACKAGED AND FULLY
PROGRAMMED AND TESTED FOR OPERATION PRIOR
TO SHIPMENT. PROGRAMMING LOG SHALL BE PROVIDED .
E. ZONED REHEAT SYSTEM SHALL BE INSTALLED WITHIN EACH VAV
ZONE. ALL HEAT MODULES SHALL BE
EASILY REMOVABLE FROM UNIT FOR INSPECTION AND SERVICE. EACH
HEAT MODULE SHALL BE UL
LISTED, AND UNIT POWERED AND CONTROLLED.
2.12 EXHAUST /RETURN SECTION
A. PROVIDE NON-MODULATING EXHAUST FANS CAPABLE OF
EXHAUSTING UP TO 50% OF NOMINAL AIR FLOW.
BAROMETRIC DAMPERS SHALL BE UTILIZED AT FAN OUTLET TO
PREVENT BACKDRAFT CONDITIONS. EXHAUST
FANS SHALL BE FACTORY INSTALLED AND CAPABLE OF 3 SPEEDS:
HIGH, MEDIUM, AND LOW. OPERATION
OF EXHAUST FANS SHALL BE ON OR OFF BASED ON ECONOMIZER
OUTDOOR AIR DAMPER POSITION. ON/OFF
SETPOINT SHALL BE SELECTABLE THROUGH A REMOTE POTENTIOMETER
LOCATED IN THE RETURN AIR SECTION.
11.�·L·--iF--. ·
_\ I ' ,D '.··. '.--·-. - ·' \J ·, --�' ' \ _'--' __ •
PACKAGED VAV MULTIZONE ROOFTOP AIR CONDTIONING UNITS
2.13 OUTDOOR AIR SECTION
A. PROVIDE A FULLY INTEGRATED FACTORY INSTALLED 100%
MODULATING OUTSIDE AIR ECONOMIZER WITH
UNIT RETURN AND BAROMETRIC RELIEF AIR DAMPERS. ECONOMIZER
OPERATION SHALL BE THROUGH
MICROPROCESSOR BASED PRIMARY TEMPERATURE CONTROLS THAT
AUTOMATICALLY MODULATE DAMPERS TO
MAINTAIN SPACE TEMPERATURE CONDITIONS.
1. PROVIDE ECONOMIZER WITH DRY BULB CONTROL.
2. PROVIDE ADJUSTABLE MINIMUM POSITION CONTROL LOCATED
REMOTELY IN THE SPACE.
3. PROVIDE SPRING RETURN MOTOR FOR OUTSIDE AIR DAMPER
CLOSURE DURING UNIT SHUTDOWN OR
POWER INTERRUPTION.
2.14 DAMPERS
A. PROVIDE DAMPERS WITH A LEAKAGE RATE NOT TO EXCEED 2.5%
OF NOMINAL AIRFLOW. LEAKAGE RATES
SHALL BE BASED ON ONE INCH W.C. STATIC PRESSURE.
B. LEAKAGE RATE SHALL BE DETERMINED IN ACCORDANCE WITH AMCA
STANDARD 575.
2.15 UNIT CONTROLS
A. SIEMENS DDC CONTROLS SHALL BE PROVIDED FOR ALL 24 VOLT
CONTROL FUNCTIONS. THE
RESIDENT CONTROL ALGORITHMS SHALL MAKE ALL HEATING, COOLING
AND/OR VENTILATING DECISIONS IN
RESPONSE TO ELECTRONIC SIGNALS FROM SENSORS MEASURING
INDOOR AND OUTDOOR TEMPERATURES.
THE CONTROL ALGORITHM MAINTAINS ACCURATE TEMPERATURE
CONTROL, MINIMIZES DRIFT FROM SET
POINT AND PROVIDES BETTER BUILDING COMFORT. A CENTRALIZED
MICROPROCESSOR SHALL PROVIDE ANTI-
SHORT CYCLE TIMING AND TIME DELAY BETWEEN COMPRESSORS TO
PROVIDE A HIGHER LEVEL OF
MACHINE PROTECTION.
B. VARIABLE AIR VOLUME CONTROLS: PROVIDE ALL NECESSARY
CONTROLS TO OPERATE A VAV-MULTIZONE
ROOFTOP FROM SUPPLY AIR TEMPERATURE AND SPACE TEMPERATURE
INCLUDING SUPPLY AIR
MICROPROCESSOR CONTROLLER, AND SUPPLY AIR SENSOR. THE
MICROPROCESSOR SHALL COORDINATE THE
ECONOMIZER CONTROL AND STAGES OF COOLING WITH SUPPLY AIR
TEMPERATURE RESET CAPABILITY BASED
UPON SPACE TEMPERATURE.
C. THE FOLLOWING SETPOINTS SHALL BE ACCESSIBLE IN THE UNIT
CONTROL PANEL: SUPPLY AIR COOLING
SETPOINT, MORNING WARMUP SETPOINT, STATIC PRESSURE SETPOINT,
AND STATIC PRESSURE DEADBAND.
D. UNIT SHALL HAVE FIVE INDEPENDENT ZONES OF CONTROL. ALL
ZONES SHALL HAVE A WIRELESS (WIRED) SPACE THERMOSTAT.
2.16 BUILDING MANAGEMENT SYSTEM
A. INTERFACE CONTROL MODULE TO INTEGRATE WITH EXIST. SIEMENS
BASEWIDE/BUILDING DDC SYSTEM TO BE FURNISHED [FACTORY
MOUNTING] BY ROOFTOP UNIT MANUFACTURER. THROUGH SIEMENS DDC
CONTROLS, ALL ENERGY
MANAGEMENT FUNCTIONS (SPECIFIED IN ENERGY MANAGEMENT SECTION)
SHALL BE PERFORMED. SEE
BUILDING AUTOMATION AND AUTOMATIC TEMPERATURE CONTROL SYSTEM
SPECIFICATIONS. THE
INTERFACE MODULE WITH NECESSARY CONTROLS AND SENSORS SHALL
ALL BE FACTORY MOUNTED (NOT FIELD
MOUNTED). IF NOT FURNISHED BY ROOFTOP UNIT MANUFACTURER,
THIS SHALL BE FURNISHED BY ENERGY
MANAGEMENT SYSTEM CONTRACTOR FOR FIELD MOUNTING BY SAID
CONTRACTOR AND RATED FOR SERVICE
UP TO 140 F. THE ONLY FIELD CONNECTION TO ENERGY MANAGEMENT
SYSTEM SHALL BE A SINGLE
COMMUNICATION LINK.
!'IAVA(
FOR CCIIWANCIR !Wtfll
ACIMI'(
SATISFICWRY lO 00£
I i
DES KGL IDRW ICHK KGL
PM/DU KEVIN LIS
BRANCH MANAGER R ZACCHIA
ENGR �RECTOR TIM ROUSE
MARK BOWEN ARE PROTECTION
Cl � <( z � :z <( '-' - :::E ,. ' ct: (.!') :E � > 0:::: 01--£ >u:z�
<I'. 0 • (/)....l:::IE :::i:::
i:i I;:;: � � (J) l:n--.o O W >- Cl a.
L_
(I) - I :::;; a: ,--":::ie o �o en 0,; l !li fr'.
W Z �Cl�� LL z z"'
�ii �� � �8g >en :=)
;;lcng§ Iw u (J z .:icr5 W> "- I� �� :
C, ...Ja: 0z a.. 1- f-ffi W en LL w a:- 0z z 0 C, '- 0:'.'. ffi (0 � en
LOO s !:!:! LO
<( I- T""" Z....J
:,.:::,..,...lLI(.)
W LU :,: <( w
>- LL fr'. LL ....I (.)
0 ..,:5 z 1-->o W z c::c:: :::IE -
� z ie 5 lie ii:i -:,
cf. □ 1---w 1!: (/)0
SCALE, AS NOTED
EPROJECT NO., 1862691
CONSTR. CONTR. NO.
NAYrAC DRAWING NO.
12931269
SHEET 07 OF 12
M-501 DRAWfOIW REVl5ION: 12 APfilL 2018
D
C
B
A
I u_ u_
I_/
I C
E
I
C 1:l CE "' 0
C
C e
6,' ;; w C i
0 "' "'� ,.:, w � <( C z 1l
I � -0 "' "'w 00
I - I e, C
0 "' ,C
C "' C
� "'"' "' 00 - I ch "' I
-� e
C ,C ., C
E C
:, u::
0 -.,; C 0 "'
I
N "' -r 'E ., e g
1! � ., "'C =-CE
u C w " ,.! <( z w; ---' "' 0::
u w
[I]
MHAU-1
CONTROLLER
I
CRU-1, [TI
CRU-2,
CU-1
.D.
DJ
SIEMENS
DDC
CONTROLLER
I I [±J
0 0 0
MODEMJ'------
□ TELEPHONE JACK □-------
HOT WATER
SYSTEM
CONTROLLER
n
I\Jnl/'c'�.c1F =--, 'J '·. '�·· .. \ ·-·' ·
DJ
[I]
[TI
[±J ffiJ
4 5
NEW WORK NOTES
PROVIDE BUILDING DOC CONTROLLER. MOUNT IN THE FIRST FLOOR MECHANICAL
ROOM. THE CONTROL MUST MONITOR ALL POINTS ON THE SYSTEMS AND
COMMUNICATE THE DATA REMOTELY VIA TELEPHONE LINE.
PROVIDE INTERFACE FOR COMMUNICATION OF THE MULTIZONE AIR HANDLING UNIT
CONTROLS DATA. COMMUNICATION MUST UTILIZE THE ASHRAE STANDARD BACNET
PROTOCOL. THE MULTIZONE AIR HANDLING UNIT CONTROLS MUST BE PROVIDED BY
THE MANUFACTURER.
PROVIDE AN EQUIPMENT CONTROLLER FOR THE COMPUTER ROOM UNITS 1 SYSTEM
MONITOR. CONNECT TO DOC SERVER AND BUILDING CONTROLLER. THE
CONTROLLER MUST INDEPENDENTLY MONITOR, EXHAUST FAN STATUS, ZONE
TEMPERATURES AND FOR EQUIPMENT ALARMS.
PROVIDE DOC CONTROLS, 3-WAY CONTROL VALVE & PIPING FOR THE HOT WATER
SYSTEM.
SOFTWARE:
PROVIDE DOC SOFTWARE.
TRAINING:
1. PROVIDE (2) 8 HOUR TRAINING DAYS, MATERIALS FOR 5 PEOPLE, HANDS ON, ON SITE WITHIN
30 DAYS OF COMMISSIONING.
DOC CONTROL SYSTEM
[3J [[]
2. PROVIDE (4) 4 HOUR TRAINING SESSIONS, FOR 2 PEOPLE, MANUFACTURER SELECTED SITE
WITHIN 120 MILE OF JOB SITE, EACH SESSION TO BE SCHEDULE BY GOVERNMENT WITH 1
MONTHS NOTICE, AT ANY TIME WITHIN 5 YEARS.
N.T.S.
MULTIZONE HVAC UNIT
SUPPLY FAN O.A. COOLING
ID
TOTAL E.S.P. FAN E.A.T. E.A. T. L.A.T L.A.T TOTAL SEN E.A. T.
CFM in.we. HP CFM D.B. W.B. D.B. W.B. MBH MBH "F
MAHU-1 11520 3 15 2200 80'F 65'F 55F 53'F 383 312 61'F
NOTES:
1. HEATING COIL IN MULTI-ZONE POSITION
2. ESP DOES NOT INCLUDE FILTERS
3. NEMA STARTER SIZE 3
4. PROVIDE 2'' DEEP AUXILIARY S.S DRAIN PAN WITH FLOAT
SWITCH AND CONDENSATE DRAIN PIPED TO NEAREST DRAIN
5. PROVIDE MERV 13 2'' THK. HINGED FILTER ACCESS DOORS.
HEATING
L.A.T. CAP. HW
"F MBH GPM
102'F 206 40
COMPRESSORS
HW H.W. NOM MIN # TYPE
EWT LWT (tons) CMPRS
1 BO'F 160'F 40 2 SCROLL
9. CAPACITY SHALL MATCH INDOOR UNIT
CONDENSER
RE FRIG. MIN # FLA FANS
GFU 1 123
3. PROVIDE MINIMUM OF (1 DO) FREE 10 MINUTE PERSON TO PERSON TELEPHONE TECH
SUPPORT CALLS.
ELECTRICAL
POWER MAX.
REMARKSkW
460V-31!1-60Hz 25 kW 5EE NOTES
10. PROVIDE ELECTRONIC PROGRAMMABLE THERMOSTAT, FOR AUTOMATIC CONTROL OF SYSTEM AND EQUIPPED WITH THE
FOLLOWING FEATURES:
-FOUR TEMPERATURE SETTINGS PER DAILY SCHEDULE
-SELECTABLE DAILY SCHEDULES FOR WEEKDAYS, SATURDAY, & SUNDAY
-SET POINT RANGE: 45'F TO 80'F
6. PROVIDE ADDRESSABLE SMOKE DETECTOR IN SUPPLY DUCT WIRED TO MOTOR STARTER FOR AUTO SHUTDOWN. PROVIDE -DIGITAL LCD CLOCK AND PROGRAM DISPLAY -ELECTRIC RATING: 24VAC/1 .2 AMP MAX WITH BATTERY BACKUPWIRE/CONDUIT TO CONNECT TO BUILDING FIRE ALARM. -CYCLES PER HOUR ADJUSTMENT: COOLING FACTORY SET, MIN. OFF TIME= 5 MINUTES7. PROVIDE 3-WAY HOT WATER VALVE & DDC MOTORIZED ACTUATOR FOR HEATING COIL.. PROVIDE FREEZE
PROTECTION ELECTRIC HEAT TAPE 4W/FT ON HOT WATER PIPING & COIL DOWN TO ZERO DEGREES F. AMBIENT.
8. CONDENSER RATED FOR 95 DEG AMBIENT OUTDOOR AIR (COOLING)
-WALL MOUNTED WITH LOCKING THERMOSTAT GUARD
-SUBBASE: FAN ON-AUTO SWITCH/ HEAT-OFF-COOL SWITCH
11. PROVIDE SINGLE POINT CONNECTION
SPLIT SYSTEM COMPUTER ROOM HVAC UNIT
SUPPLY FAN O.A. COOLING HEATING COMPRESSORS CONDENSER ELECTRICAL
ID
TOTAL E.S. p. FAN E.A. T. E.A.T. L.A.T L.A.T TOTAL SEN E.A.T. L.A. T. CAP. HW HW H.W. NOM MIN # TYPE REFRIG. MIN #
FLA POWER
MAX.
REMARKS CFM in. we. HP CFM D.B. W.B. D.B. W.B. MBH MBH 'F 'F MBH GPM EWT LWT (tons) CMPRS FANS kW
CRU-1 6200 1 .o" 3.75 620 75'F 61 "F 52'F 44'F 127 122 70'F 102'F 206 40 180"F 160'F 40 2 SCROLL GFU 1 37.7 460V-31!1-60Hz 42 kW
CRU-2 6200 1 .o" 3.75 620 75'F 61 'F 52'F 44'F 127 122 70'F 102'F 206 40 180'F 160'F 40 2 SCROLL GFU 1 37.7 460V-3!1l-60Hz 42 kW
CU-1 23650 GFU 4 7.6 460V-3!1l-60Hz XX kW
NOTES:
1 . HEATING COIL IN RE-HEAT POSITION 9. CAPACITY SHALL MATCH INDOOR UNIT
2. ESP DOES NOT INCLUDE FILTERS 10. PROVIDE ELECTRONIC PROGRAMMABLE THERMOSTAT, FOR AUTOMATIC CONTROL OF SYSTEM AND EQUIPPED WITH THE
3. NEMA STARTER SIZE 3 FOLLOWING FEATURES:
-FOUR TEMPERATURE SETTINGS PER DAILY SCHEDULE
-SELECTABLE DAILY SCHEDULES FOR WEEKDAYS, SATURDAY, & SUNDAY
-SET POINT RANGE: 45'F TO 80°F
4. PROVIDE 2" DEEP AUXILIARY S.S DRAIN PAN WITH FLOAT
SWITCH AND CONDENSATE DRAIN PIPED TO NEAREST DRAIN
5. PROVIDE MERV 13 HINGED FILTER ACCESS DOORS. PROVIDE WATER/GLYCOL PUMP AND INSULATED PIPING.
6. PROVIDE ADDRESSABLE SMOKE DETECTOR IN SUPPLY DUCT WIRED TO MOTOR STARTER FOR AUTO SHUTDOWN. PROVIDE -DIGITAL LCD CLOCK AND PROGRAM DISPLAY
WIRE/CONDUIT TO CONNECT TO BUILDING FIRE ALARM.
7. PROVIDE 34.88 KW SUPPLEMENTAL ELECTRIC HEATER IN BOTH CRU
8. COOLER/CONDENSER (CU) RATED FOR 95 DEG AMBIENT OUTDOOR AIR (COOLING) W/ CAPACITY TO MATCH CRU-1 & 2)
9. COMPUTER ROOM UNITS ARE WATER/GLYCOL TYPE AND SHALL CONTROL HUMIDITY FROM 40 TO 60 % ADJUSTABLE.
-ELECTRIC RATING: 24VAC/1.2 AMP MAX WITH BATTERY BACKUP
-CYCLES PER HOUR ADJUSTMENT: COOLING FACTORY SET, MIN. OFF TIME= 5 MINUTES
-WALL MOUNTED WITH LOCKING THERMOSTAT GUARD
-SUBBASE: FAN ON-AUTO SWITCH/ HEAT-OFF-COOL SWITCH
11. PROVIDE SAFETY DISCONNECT SWITCH
I l·-.L·--1F--, ·
_\ I ' ,D '.··. '.--·-. - ·' \J ·, --�' ' \ _'--' __ •
4 5
!-iAVA(
FOR CCIIWANCIR !Wtfll
ACIMI'(
SATISFICWRY lO 00£
DES KGL IDRW ICHK
PM/DU KEVIN LIS
BRANCH MANAGER R ZACCHIA
ENGR �RECTOR TIM ROUSE
I i
ARE PROlECTION MARK BOWEN C < <O'. z z - < t5 :z ::::Eoct:: <.!> ,. - > 01--- 0::::
u:z � >
(1)-c:!' 5 ,. .....l ,.
l'c!!;;: � (J) 0 l;; 0 c...
(f) => _J 0
:::ie I " 0
� l !li w Cl Ii: l.&J z :c
:::. a: <(Vl en fti::: Ow w
�LL
o � en z::::;; � w ::::;; l!
f:{lo� i'.= 0 15 ::J LL u en g§ � � z
---' I:!:!
:,£ en z en
C, z a:w w z C, z w en s !:!:!
<( 1-
(.) <( u <( a.. 0
>en o Iw w�
_J (.) I- <(
::s <( u a.. a: � wl- :r::a:� u
I� � z ....I uJ (.)
:,: <( >- LL LL ....I
(0�
LOO
cS enw 0:::
u 0 <( .!;
>- > 5 z z,c:c: � w � z � _J lie =>
a. 0 I-� 1!:
Vl
SCALE, AS NOTED
EPROJECT NO., 1862691
CONSTR. CONTR. NO.
NAYrAC DRAWING NO.
12931270
SHEET 08 OF 12
M-601 DRAWfOIW REVl5ION: 12 APfilL 2018
D
C
B
A
I u_ u_
I_/
C
E
I
� IQ
0 N 0 .., N
.8 e
C
6,' � => 0
E a. ., a, :, i g N a.
N N
C ,.
� w z
I :s
a. � N -
N w I -e, I
� ·i a, C a, N / "' "'"'- "'- I "' �
I e / 0 .fl
C
C u:: E 0 "' 0 "' 0 - /
� AI
.fl N
C ., .a :, e
0 1!
/ 0 ., Ci= "' => 0 /
0 CJ
w .8 ,.
z
1! ., w c"l 0::
1S w
HOT WATER SYSTEM CONTROL SCHEMATIC
NOT TO SCALE
DD2
AD3 HEDMI
OUTDOOR AIR ) :i:
CSR
EDM I � • • • • • 1 YI I I I I
A02 I I
I ( T)
1)1 '
PACKAGED ROOFTOP A/C UNIT
RETURN
AIR
_o_
)_I;
(FAN
---, � l�l�I IA04
D01 iA6s
� s �s t;w
SUPPLY
AIR
D03
D04
ROOF TOP AIR CONDITIONING UNIT (MAHU-1) CONTROL SCHEMATIC
NOT TO SCALE
1 2
ROOF TOP ACU
LOCAL DDC CONTROLLER
INPUTS
All SUPPLY AIR TEMP 0 Al2 MIXED AIR TEMP g Al3 SUPPLY AIR SP <C
<C Al4 AIR QUALITY SENSOR Al5 FILTER DIRTY
D11 SUPPLY FAN STATUS
D12 EXHAUST FAN STATUS
D13 COMP 1 STATUS
D14 COMP 2 STATUS
0 LOW LIMIT THERMOSTAT 0
@) ACTIVATION
D16 SMOKE DETECTOR ACTIVATION
D17 ACU EMERG. SHUTDOWN 1
D18 ACU EMERG. SHUTDOWN 2
OUTPUTS
� OUTSIDE AIR DAMPER MOTOR
IA021 RETURN AIR DAMPER MOTOR
0 IA03I EXHAUST AIR DAMPER MOTOR g
<C IA041 SUPPLY FAN VFD
<C
I A05 I EXHAUST FAN VFD
I A06 I HOT WATER VALVE
I A071 MULTIZONE DAMPER
@QjJ SUPPLY FAN START/STOP
I\Jnl/'c'�.c1F =--, 'J '·. '�·· .. \ ·-·' ·
3 4 5
MULTIZONE ROOFTOP AIR CONDITIONING UNIT (MAHU-1) SEQUENCE OF OPERATION
THE DDC CONTROLLER MUST OPERATE THE ROOFTOP ACU.
COOLING OPERATION: THE COMPRESSORS MUST BE INTERLOCKED WITH THE SUPPLY AIR FAN MOTOR.
FOR CONDITIONS WHEN THE OA TEMPERATURE IS ABOVE 55"F; WHEN THE SUPPLY AIR
TEMPERATURE RISES ABOVE 55'F, COMPRESSOR #1 CONTRACTOR MUST BE ENERGIZED, STARTING
COMPRESSOR #1 AND CONDENSING FAN MOTORS #1 AND #2. CONDENSER FAN #2 MUST CYCLE
OFF WHEN OA TEMPERATURE IS BELOW 60'F AND CYCLE ON WHEN THE OA TEMPERATURE IS ABOVE 65'F. WHEN SWITCHING FROM ONE FAN TO TWO FAN OPERATION ON A RISE IN OA TEMPERATURE, BOTH COMPRESSORS AND THE OPERATING CONDENSING FAN MUST BE SWITCHED OFF. AFTER THE ANTI-RECYCLING TIMES OUT, BOTH FANS START WITH THE REQUIRED NUMBER OF COMPRESSORS. IF ADDITIONAL COOLING IS REQUIRED, COMPRESSOR #2 CONTACTOR MUST BE ENERGIZED, STARTING
COMPRESSOR #2. COMPRESSOR #2 MAY BE STARTED 15 SECONDS AFTER COMPRESSOR #1.
COMPRESSOR #2 WILL THEN CYCLE ON AND OFF AS REQUIRED TO MAINTAIN THE LEAVING AIR
TEMPERATURE WHILE COMPRESSOR #1 CONTINUES TO RUN. A CALL FOR HEATING FROM THE ZONE
THERMOSTAT WILL MODULATE THE COLD DECK DAMPER OPEN AND MODULATE THE HOT DECK
DAMPER CLOSED.
PROVIDE BOTH COMPRESSORS WITH MINIMUM AND ANTI-RECYCLING TIMERS. WHEN A COMPRESSOR IS STARTED, IT MUST RUN FOR NOT LESS THAN 3 MINUTES. WHEN IT STOPS, IT MUST REMAIN OFF
FOR NOT LESS THAN 3 MINUTES.
COMPRESSORS MUST NOT RUN WHEN THE OA TEMPERATURE IS BELOW 55"F AND WHEN THE
EXISTING LOW SUCTION PRESSURE SWITCH TURNS THEM OFF. WHEN POWER TO THE ACU IS ON, THE CIRCUIT TO THE CRANKCASE HEATER MUST BE ON. OPERATION MUST BE SUCH THAT WHEN
THE UNIT CALLS FOR COOLING, THE HEATER MUST BE OFF. WHEN THE COMPRESSORS ARE OFF, THE HEATERS MUST BE ON.
ECONOMIZER OPERATION: FOR CONDITIONS WHEN THE OA TEMPERATURE IS BELOW 60"F; THE OA AND RETURN AIR DAMPERS MUST BE MODULATED TO MAINTAIN THE SUPPLY AIR TEMPERATURE AT 52'F (SLIGHTLY BELOW THE MECHANICAL COOLING SETPOINT). OA DAMPER MUST BE FULLY OPEN BEFORE MECHANICAL COOLING IS ACTUATED. WHEN THE OA TEMPERATURE IS ABOVE 62°F, THE ECONOMIZER MUST BE DISABLED AND THE DAMPERS OPEN TO THEIR MINIMUM OA POSITION. WHEN
THE ECONOMIZER IS ENABLED, COMPRESSOR #2 MUST BE OFF.
ECONOMIZER SUPPLY AIR MUST BE RESET IN ACCORDANCE WITH THE FOLLOWING SCHEDULE:
OA TEMPERATURE SA TEMPERATURE
30T 52'F 40T 62'F
11.�·L·--iF--,·
_\ I ' ,D '.··. '.--·-. - ·'\J ·, --�' ' \ _'·-' __ •
SUPPLY AIR FAN: THE FAN MUST RUN CONTINUOUSLY IN THE OCCUPIED MODE, CYCLE IN THE
UNOCCUPIED COOLING MODE, AND NOT RUN IN THE UNOCCUPIED HEATING MODE. THE SUPPLY
FAN STATIC PRESSURE SENSOR MUST REGULATE THE DUCT STATIC PRESSURE BY MODULATING
THE VFD TO MAINTAIN THE SETPOINT. SHOULD THE CONTROLS SENSE AN UNUSUALLY HIGH DUCT
PRESSURE, THEY MUST STOP THE SUPPLY FAN AND INPUT AN ALARM TO THE DOC SYSTEM.
SHOULD THE HEATING COIL DISCHARGE AIR TEMPERATURE FALL BELOW THE LOW LIMIT SETPOINT, THE CONTROLS MUST STOP THE SUPPLY FAN AND INPUT AN ALARM TO THE DOC SYSTEM.
MORNING WARM UP/COOL DOWN: ACU CONTROL MUST BE COORDINATED WITH VAV TERMINAL UNIT
SEQUENCE OF OPERATION. SEE VAV TERMINAL UNIT SEQUENCE OF OPERATION.
AIR QUALITY SENSOR: THE AQS MUST MODULATE THE ECONOMIZER DAMPERS (RA AND OA) TO
MAINTAIN THE ROOM AIR QUALITY. THE RANGE OF OPERATION (ADJUSTABLE) MUST BE 5% MINIMUM
AND 25% MAXIMUM.
EXHAUST FAN: WHEN THE BUILDING STATIC PRESSURE AT THE PRESSURE SENSOR INCREASES
ABOVE ITS SETPOINT, (0.10 INCHES WATER, ADJUSTABLE), THE VFD MUST GRADUALLY INCREASE
THE SPEED OF THE EXHAUST FAN. WHEN THE FAN COMES ON, THE EXHAUST DAMPERS MUST
OPEN. AS THE STATIC PRESSURE DECREASES, THE REVERSE MUST OCCUR.
HEATING OPERATION: ACU HOT WATER COIL CONTROL MUST BE COORDINATED WITH VAV TERMINAL UNIT SEQUENCE OF OPERATION. SEE VAV TERMINAL UNIT SEQUENCE OF OPERATION. DURING THE
"OCCUPIED" MODE, CONTROL OF THE HOT WATER COIL MUST BE TRANSFERRED TO THE SUPPLY
AIR TEMPERATURE SENSOR. A CALL FROM THE ZONE THERMOSTAT WILL MODULATE THE COLD
DECK DAMPER CLOSED AND MODULATE THE HOT DECK DAMPER OPEN.
EMERGENCY SHUTDOWN: WHEN AN EMERGENCY SHUTDOWN BUTTON IS MANUALLY DEPRESSED, THE
DOC SYSTEM MUST CLOSE THE ACU OUTSIDE AIR AND EXHAUST AIR DAMPERS AND DISABLE
OPERATION OF THE ACU. A MANUAL RESET OF THE EMERGENCY SHUTDOWN BUTTON MUST OPEN
THE ACU OUTSIDE AND EXHAUST AIR DAMPERS AND ENABLE OPERATION OF THE ACU.
AVA
FOR CCIIWANCIR !Wtfll
ACIMI'(
SATISFICWRY lO 00£
I i
DES KGL joRw jcHK KGL
PM/DU KEVIN LIS
BRANCH MANAGER R ZACCHIA
ENGR �RECTOR TIM ROUSE
ARE PROlECTION MARK BOWEN
D
C z z -C " <C B <( c, :Z z
�Uijl <:> 0 01-- - 0:::: -u:z� > I- "' <I'. 6 . <( ,. _J ,. :::c 0::: l'c! I;:;: � I- w (/J --. 0 => i'i, Cl a. 0 Q_
:::ie I :::;; a: Q" 0 VJ ffi i � t;::: O en
I
LL
w Cl :i: 0 LLW 0 zz.,, a... (.)
<3 <( /5 ::::;; � (.) <( (J) 1/J ::::;; l!i <( a.. w wO>< >
U EU a en --' LL z
��� Iw w _,� W> =:)
:,£rn o- 0 �� ::s� � z a..a:
a: 1-t::l wen _Jz a:- <( C!) ,z uz - -w (0� z sfB LOo � <1- LO<( uz --' T"" w u cS ,,,.. w :i::<( wLJ..I ""'
>- LL LC
LL
0:::
0 �s u
I A 1--> o Z z c::c:: ::E w � z � _J lie =>
a. 0 I-� 1!: VJ
SCALE, AS NOTED
EPROJECT NO., 1862691
CONSTR. CONTR. NO.
NAYrAC DRAWING NO.
12931271
SHEET 09 OF 12
M-602 DRAWfOIW REVl51DN: 12 APfilL 2018
I u_ u_
I_/
DEFENSE LOGISTICS
AGENCY (DLA)
| G-001 |
| M-001 |
| M-101 |
| M-102 |
| M-103 |
| M-301 |
| M-501 |
| M-601 |
| M-602 |
| E-101 |
| E-101 |
| E-102 |
| E-601 |