Attachment_F_P919__Volume_8_of_15.pdf
PDF 30 MB Posted
- Solicitation number
- N6247026R0006
About this file
This document is a detailed civil site plan and demolition drawing set for the P919 Bulk Tank Farm Improvements, Phase 1 project at Naval Station Rota, Spain. The comprehensive set of drawings includes multiple sheets covering overall site plans, demolition plans, and civil site details across approximately 40 different plan sheets. The project involves extensive infrastructure modifications, including removal and replacement of existing pavements, utility lines, fencing, and site elements across multiple locations.
The drawings specifically outline demolition and site preparation for a complex pipeline and tank farm improvement project, with specific focus on removing and replacing approximately 450mm JP-5 pipelines, various utility lines (including F-76, JP-8, and inactive lines), and associated site infrastructure. The project area encompasses multiple key locations including a booster pump house, Rio Salado Bridge, valve pits, and various horizontal directional drilling (HDD) pit locations. The drawings provide meticulous details on trench limits, utility relocations, pavement removals, and site restoration requirements, with specific instructions for maintaining access to critical buildings and managing traffic during construction.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOIL BORING (* INDICATES NUMBER)
GENERAL PLAN SYMBOLS
OUTLINE OF FUTURE OBJECT
MATERIAL BREAK LINE
SURFACE BREAK LINE
HIDDEN LINE
CENTER LINE
OUTLINE OF NEW OR RELOCATED OBJECT
EL 100.00
ELEVATION DESIGNATION IN FEET
SIGN (ONE OR TWO POST)
TREES (SIZE AND TYPE INDICATED ON PLANS)
GUARD POST (BOLLARD), GUARDRAIL
STORM DRAIN WITH INLET
WATER SUPPLY, WITH VAULT, METER, AND VALVES
SD SD
W W W W
E E E E
UTILITY LINE DESIGNATIONS
ELECTRICAL PRIMARY AERIAL
SANITARY SEWER (GRAVITY MAIN) WITH MANHOLE
SAN SAN
COMM COMM
FO FO
COMMUNICATIONS UNDERGROUND
FIBER OPTIC (BURIED)
WORK IN CONTRACTEXISTING
POINT OF CURVE, POINT OF TANGENT
DIRECTION OF GROUNDWATER FLOW
GRADE CONTROL LINE (GCL)
DEMOLITION - LINEAR
DEMOLITION - SAW CUT
SPOT ELEVATION
TREE LINE
GATES (SINGLE & DOUBLE SWING)
CONSTRUCTION EASEMENT (WITH SURVEY MARKER)
C/E C/E
GRADING AND DRAINAGE SYMBOLS
WORK IN CONTRACTEXISTING
MINOR CONTOUR
MAJOR CONTOUR
FENCE (CHAIN LINK)
X X
ALIGNMENT CENTERLINE, TICK, AND STATIONING
OUTLINE OF EXISTING OBJECT (LINE TYPE VARIES)
SLOPE (3 HORIZ TO 1 VERT) OR
PERCENT (X VERT TO 100 HORIZ)
MATCH LINE
'*' INDICATES TYPE OF SPOT
TP - TOP OF PAVEMENT
FG - FINISHED GRADE
FL - FLOW LINE
TC - TOP OF CURB
P ME - PAVEMENT, MATCH EXISTING
DIRECTION OF PIPE FLOW
AGGREGATE
SECTION LINE
LAND LOT NUMBER
RIGHT-OF-WAY (WITH IRON PIN)
R/W R/W
CIVIL ABBREVIATIONS
DRIP LINE (EXTENTS OF BRANCHES)
WHERE SURVEYED ONLY
SILT FENCE - TYPE NON-SENSITIVE
C I V
I L
L E
G E
N D
S
H E
E T
C-021P
Ø
DIAMETER
CONCRETE PAVEMENT
SIDEWALK PAVEMENT
ASPHALT PAVEMENT
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
& AND
@ AT
ABA ARCHITECTURAL BARRIERS ACT
ADA AMERICANS WITH DISABILITIES ACT
APPROX APPROXIMATELY
CL CENTERLINE
C TO C CENTER TO CENTER
CTRS CENTERS
DIA DIAMETER
E EASTING
EP EDGE OF PAVEMENT
EW EACH WAY
FL FLOWLINE
HMA HOT MIX ASPHALT
L LEFT
MAX MAXIMUM
M, m METER mm MILLIMETER
MIN MINIMUM
N NORTHING
OCEW ON CENTER EACH WAY
PCC PORTLAND CEMENT CONCRETE
R RIGHT, RADIUS
TC TOP OF CURB
THRU THROUGH
TOC TOP OF CONCRETE
TYP TYPICAL
STA STATION
W/ WITH
SÍMBOLOS GENERALES DE PLANTA DESIGNACIONES DE LÍNEAS DE INSTALACIONES
ABREVIATURAS DE URBANIZACIÓN
SÍMBOLOS DE NIVELACIÓN Y DRENAJE
CONTORNO DE OBJETO NUEVO O REUBICADO
CONTORNO DE OBJETO FUTURO
CONTORNO DE OBJETO EXISTENTE (VARIOS TIPOS DE LÍNEAS)
EJE
LÍNEA OCULTA
LÍNEA DE ROTURA DE SUPERFICIE
LÍNEA DE CAMBIO DE MATERIAL
LÍNEA DE SOLAPE
DEMOLICIÓN - LINEAL
DEMOLICIÓN - CORTE DE SIERRA
SONDEO (* INDICA EL NÚMERO)
SEÑAL (UNO O DOS POSTES)
PROTECCIÓN DE POSTE (BOLARDO), BARANDILLA
VALLA (SIMPLE TORSIÓN)
CANCELAS (DE UNA Y DOS HOJAS ABATIBLES)
SERVIDUMBRE DE PASO (CON ESTACAS DE HIERRO)
SERVIDUMBRE DE CONSTRUCCIÓN (CON SEÑAL DE TOPOGRAFÍA)
LÍNEA DE SECCIÓN
VALLA CONTRA EROSIÓN - TIPO NO CONFIDENCIAL
ALINEACIÓN DE ÁRBOLES
PUNTO DE CURVA, PUNTO DE TANGENCIA
EJE DE ALINEACIÓN, MARCA Y DISTANCIA
DIÁMETRO
NÚMERO DE PARCELA
ÁRBOLES (TAMAÑO Y TIPO INDICADOS EN PLANTAS)
LÍNEA DE GOTEROS (EXTENSIÓN DE LA COPA)
SÓLO DONDE SE HAYA TOPOGRAFIADO
EXISTENTE TRABAJO EN CONTRATO
CURVA DE NIVEL SECUNDARIA
CURVA DE NIVEL PRINCIPAL
LÍNEA DE CONTROL DE NIVEL (GCL)
COTA DE PUNTO
'*' INDICA TIPO DE PUNTO
TP - CARA SUPERIOR DE PAVIMENTO
FG - TERRENO ACABADO
FL - LÍNEA DE FLUJO
TC - CARA SUPERIOR DE BORDILLO
P ME - PAVIMENTO, IGUALAR A EXISTENTE
DIRECCIÓN DE FLUJO DE AGUA DE ESCORRENTÍA
PENDIENTE (3 HORIZONTAL A 1 VERTICAL) O
PORCENTAJE (X VERTICAL A 100 HORIZONTAL)
DIRECCIÓN DEL FLUJO EN LA TUBERÍA
/ TRABAJO EN CONTRATO
SANEAMIENTO (PRINCIPAL POR GRAVEDAD) CON POZO
PLUVIALES CON IMBORNALES
SUMINISTRO DE AGUA, CON ARQUETA, CONTADOR, Y VÁLVULAS
LÍNEA ELÉCTRICA PRIMARIA AÉREA
FIBRA ÓPTICA (ENTERRADO)
COMUNICACIONES SUBTERRÁNEAS
ÁRIDOS
PAVIMENTO DE ACERADO
PAVIMENTO DE HORMIGÓN
PAVIMENTO ASFÁLTICO
ARCHITECTURAL BARRIERS ACT
AMERICANS WITH DISABILITIES ACT
APROXIMADAMENTE
CENTROS
ESTE
BORDE DE PAVIMENTO
IZQUIERDA
NORTE
LÍNEA DE FLUJO
DERECHA, RADIO
CARA SUPERIOR DE BORDILLO
A TRAVÉS DE
CARA SUPERIOR DE HORMIGÓN
ESTACIÓN
EN EL CENTRO EN CADA SENTIDO
SEDIMENT FILTER SOCK
CILINDRO FILTRANTE DE SEDIMENTOS
BENCH MARK
BASE DE REPLANTEO
DE CENTRO A CENTRO
METRO
MILÍMETRO
HORMIGÓN DE CEMENTO PORTLAND
TÍPICO
CON
MÍNIMO
MÁXIMO
MEZCLA BITUMINOSA EN CALIENTE
CADA DIRECCIÓN
DIÁMETRO
EJE
CADA
Y
W x
EU
x
EU
x
SD
x
SS
x
CU
x
SANITARY SEWER PIPE
TUBERÍA DE SANEAMIENTO
STORM WATER PIPE
TUBERÍA DE PLUVIALES
WATER LINE
LÍNEA DE AGUA
UNDERGROUND ELECTRICAL LINE
LÍNEA ELÉCTRICA ENTERRADA
ELECTRICAL HIGH VOLTAGE
LÍNEA ELÉCTRICA DE ALTA TENSIÓN
UNDERGROUND COMMUNICATION LINE
LÍNEA DE COMUNICACIONES ENTERRADA
EXISTING
CATCH BASIN
ARQUETA SUMIDERO
FH
HYDRANT
HIDRANTE
CONCRETE HEADWALL
PASACUNETA DE HORMIGÓN
VALVE
VÁLVULA
SANITARY SEWER MANHOLE
POZO DE SANEAMIENTO
TMH
"TYPE D" TELECOMMUNICATION MANHOLE
POZO "TIPO D" DE TELECOMUNICACIONES
TRANSFORMADOR ELÉCTRICO MONTADO EN POSTE
ELECTRICAL TRANSFORMER MOUNTED ON POLE
POSTE ELÉCTRICO DE MADERA
ELECTRICAL WOOD POLE
EMH
ELECTRICAL MANHOLE
POZO ELÉCTRICO
SANITARY SEWER HANDHOLE
ARQUETA DE SANEAMIENTO
FAROLA
LIGHT POLE
SHH
MH
ELECTRICAL DUCTBANK
ELECTRICAL UNDERGROUND DIRECT BURIAL
PRISMA DE CONDUCTOS ELÉCTRICO
LÍNEA ELÉCTRICA DIRECTAMENTE ENTERRADA
/ EXISTENTE
DESIGNACIÓN DE COTA EN PIES
C I V
I L
L E
G E
H E
C-022P
GENERAL LEGEND NOTES:
1. ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS LEGEND MAY NOT APPEAR ON THIS SET OF DRAWINGS.
GENERAL CONSTRUCTION NOTES
1. IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES OR CONFLICTS FOUND IN THE FIELD PRIOR TO OR DURING THE COURSE OF
CONSTRUCTION AND DO NOT PROCEED WITH CONSTRUCTION UNTIL THE CONTRACTING OFFICER RESOLVES THE SAID DISCREPANCY OR CONFLICT.
2. UNLESS OTHERWISE NOTED, REPLACE ,AT CONTRACTOR'S EXPENSE TO MATCH EXISTING CONDITIONS, EXISTING PAVEMENT, UTILITY LINES, AND OTHER
IMPROVEMENTS DAMAGED OR UNDERMINED AS A RESULT OF THE CONTRACTOR'S OPERATIONS. PHOTOGRAPH AND DOCUMENT CONDITION OF ROADS
AND PARKING PRIOR TO BEGINNING CONSTRUCTION AND PROVIDE COPY OF DOCUMENTATION TO CONTRACTING OFFICER.
3. THE EXISTING UNDERGROUND PIPES, CABLES OR DUCT LINES ARE APPROXIMATELY INDICATED ON THE PLANS. VERIFY THE LOCATIONS AND DEPTHS OF
THESE UTILITIES AND EXERCISE PROPER CARE IN EXCAVATING IN THE AREA. WHENEVER CONNECTIONS OF UTILITIES TO EXISTING UTILITIES ARE SHOWN
ON THE PLANS, EXPOSE THE EXISTING UTILITY LINES AT THE CONNECTIONS TO VERIFY UTILITY LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR
LINES. FAILURE TO DO SO MAY RESULT IN CONTRACTOR BEING RESPONSIBLE TO RELOCATE OR ADJUST UTILITIES AT CONTRACTOR'S OWN EXPENSE.
4. PROTECT EXISTING UTILITIES, WHETHER OR NOT SHOWN ON THE DRAWINGS DURING CONSTRUCTION. DAMAGE TO THE EXISTING UTILITIES MUST BE
REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
5. VERIFY AND CHECK DIMENSIONS AND DETAILS SHOWN ON THE DRAWINGS PRIOR TO THE START OF CONSTRUCTION. IMMEDIATELY BRING
DISCREPANCIES TO THE ATTENTION OF THE CONTRACTING OFFICER FOR CLARIFICATION.
6. IN THE EVENT ARTIFACTS OR HUMAN REMAINS ARE UNCOVERED DURING CONSTRUCTION OPERATIONS, IMMEDIATELY SUSPEND WORK AND NOTIFY THE
CONTRACTING OFFICER.
7. TOPOGRAPHICAL SURVEY PREPARED BY PRISM GROUP IN DECEMBER 2020. THIS SURVEY DOES NOT GUARANTEE THE EXISTENCE OR NONEXISTENCE, SIZE, TYPE, OR LOCATION OF UNDERGROUND UTILITIES. THE LOCATION OF UNDERGROUND UTILITIES IS BASED ON SURFACE EVIDENCE AND/OR SURFACE
STRUCTURES IN COMBINATION WITH INFORMATION PROVIDED TO THE SURVEYOR SUCH AS DESIGN AND/OR AS-BUILT DRAWINGS. THE CONTRACTOR
SHALL VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION.
8. FOLLOW THE HORIZONTAL AND VERTICAL ALIGNMENTS. DEVIATIONS FROM THE ALIGNMENTS MUST BE APPROVED BY THE CONTRACTING OFFICER
BEFORE IT IS APPLIED IN THE FIELD.
9. HORIZONTAL COORDINATES AND ELEVATIONS ARE IN UTM METRIC (ZONE 29 NORTH). HORIZONTAL CONTROL IS BASED ON EUROPEAN DATUM 1950
(PORTUGAL/SPAIN). ELEVATIONS ARE IN METERS ABOVE SEA LEVEL (MEAN SEA LEVEL AT ALICANTE).
MH MANHOLE
CB CATCH BASIN
CI CURB INLET
JB JUNCTION BOX
HW HEADWALL
TD TRENCH DRAIN
DRAINAGE STRUCTURE LABELS
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
NOTAS GENERALES DE LEYENDA:
POZO
NOTAS GENERALES DE CONSTRUCCIÓN
ETIQUETAS DE ESTRUCTURAS DE DRENAJE
IMBORNAL
SUMIDERO DE BORDILLO
CAJA DE EMPALMES
PASACUNETA
CANAL DE DRENAJE
1. TODOS LOS SÍMBOLOS Y ABREVIATURAS MOSTRADAS EN ESTA LEYENDA PUEDEN NO APARECER EN ESTE CONJUNTO DE PLANOS.
1. NOTIFICAR INMEDIATAMENTE AL OFICIAL CONTRATANTE DE LAS DISCREPANCIAS O CONFLICTOS ENCONTRADOS EN CAMPO ANTES O DURANTE
EL CURSO DE LA OBRA Y NO PROCEDER CON LA OBRA HASTA QUE EL OFICIAL CONTRATANTE RESUELVA DICHA DISCREPANCIA O CONFLICTO.
2. A MENOS QUE SE INDIQUE OTRA COSA, HACER LAS REPARACIONES BAJO EL COSTE DEL CONTRATISTA PARA IGUALAR LAS CONDICIONES
EXISTENTES, EL PAVIMENTO EXISTENTE, LAS LÍNEAS DE INSTALACIONES, Y OTROS SERVICIOS DAÑADOS O AFECTADOS COMO RESULTADO DE LOS
TRABAJOS DEL CONTRATISTA. FOTOGRAFIAR Y DOCUMENTAR EL ESTADO DE LAS CARRETERAS Y APARCAMIENTOS ANTES DE INICIAR LAS OBRAS
Y PROVEER UNA COPIA DE LA DOCUMENTACIÓN AL OFICIAL CONTRATANTE.
3. LAS TUBERÍAS, CABLES O CONDUCTOS EXISTENTES ENTERRADOS SE INDICAN DE MANERA APROXIMADA EN LAS PLANTAS. VERIFICAR LAS UBICACIONES
Y PROFUNDIDADES DE ESAS INSTALACIONES Y TENER EL CUIDADO ADECUADO EN LA EXCAVACIÓN DE LA ZONA. CUANDO LAS CONEXIONES DE LAS
INSTALACIONES NUEVAS CON LAS EXISTENTES SE MUESTREN EN LAS PLANTAS, EXPONER LAS TUBERÍAS DE INSTALACIONES EXISTENTES EN LAS
CONEXIONES PARA VERIFICAR LAS POSICIONES Y PROFUNDIDADES DE LAS INSTALACIONES ANTES DE LA EXCAVACIÓN PARA LAS NUEVAS. EL NO
HACERLO HARÁ RESPONSABLE AL CONTRATISTA DE LA REUBICACIÓN O AJUSTE DE LA NUEVA INSTALACIÓN BAJO SU PROPIO COSTE.
4. PROTEGER LAS INSTALACIONES EXISTENTES DURANTE LA OBRA, SE MUESTREN O NO EN LOS PLANOS. LOS DAÑOS EN LAS INSTALACIONES EXISTENTES
DEBEN SER REPARADOS POR EL CONTRATISTA SIN COSTE ADICIONAL PARA EL PROPIETARIO.
5. VERIFICAR Y COMPROBAR LAS DIMENSIONES Y DETALLES MOSTRADOS EN LOS PLANOS ANTES DEL COMIENZO DE LA OBRA. TRASLADAR INMEDIATAMENTE
LAS DISCREPANCIAS AL OFICIAL CONTRATANTE PARA SU ACLARACIÓN.
6. EN CASO DE QUE SE DESCUBRA CUALQUIER ARTEFACTO O RESTO HUMANO DURANTE LOS TRABAJOS EN LA OBRA, SUSPENDER INMEDIATAMENTE
LOS TRABAJOS Y NOTIFICAR AL OFICIAL CONTRATANTE.
7. LEVANTAMIENTO TOPOGRÁFICO ELABORADO POR GRUPO PRISMA EN DICIEMRE DE 2020. ESTE LEVANTAMIENTO NO GARANTIZA LA EXISTENCIA O
INEXISTENCIA, TAMAÑO, TIPO O POSICIÓN DE LAS INSTALACIONES ENTERRADAS. LA POSICIÓN DE LAS INSTALACIONES ENTERRADAS SE BASA EN
EVIDENCIAS EN SUPERFICIE Y/O ESTRUCTURAS EN SUPERFICIE EN COMBINACIÓN CON LA INFORMACIÓN PROPORCIONADA AL TOPÓGRAFO, ASÍ
COMO EL DISEÑO Y/O LOS PLANOS AS-BUILT. EL CONTRATISTA VERIFICARÁ LA POSICIÓN DE TODAS LAS INSTALACIONES ANTES DE LA
CONSTRUCCIÓN.
8. SEGUIR LAS ALINEACIONES HORIZONTALES Y VERTICALES. CUALQUIER DESVIACIÓN DE LAS ALINEACIONES DEBE SER APROBADA POR EL OFICIAL
CONTRATANTE ANTES DE QUE SE APLIQUE EN CAMPO.
9. LAS COORDENADAS HORIZONTALES Y LAS COTAS DE ELEVACIÓN ESTÁN EN MÉTRICA UTM (ZONA 29 NORTE). EL CONTROL HORIZONTAL ESTÁ BASADO
EN EL DATUM 1950 (PORTUGAL / ESPAÑA). LAS COTAS DE ELEVACIÓN ESTÁN EN METROS SOBRE EL NIVEL DEL MAR (NIVEL MEDIO DEL MAR EN
ALICANTE)
PIER III
ML-1
ML-4
TE-A
TE-B,C,D
ML-3
V-BRDG-OTLN
A2003
DRYER FOR POOL
FH #14
VALVE PIT #44
(OUTSIDE OF BASE)
TO BULK STORAGE
TO BOOSTER PUMP HOUSE
PIT #1
TANK-2
F-76
TANK-3
F-76
TANK-5
F-76
TANK-4
F-76
TANK-6
F-76
TANK-7
F-76
TANK-8
F-76
TANK-1
F-76
TANK-13
JP-8
TK-17
JP-5
TANK-11
JP-8
TANK-10
JP-8
TK-15
JP-5
TANK-9
JP-8
TK-14
JP-5
TANK-122
JP-8
TANK-120
JP-8
TANK-121
JP-8
TK-16
JP-5
3194B
PIER 3
PIER 3
TANK FARM
PUERTO GATE
RIO SALADO
BRIDGE
A
L
I C
A
N
L
A
N
E
S A
N T
A M
A R
IA
S
T R
E E
T
M
I
O
R
A
L
A
L
I C
A
N
N
E
JP-5 PIPELINE
CD126P
CD128P
CD129P
CD130P
C D
P
C
D
P
C
D
P
CD137P
CD138P
CD139P
CD140P
CD127P
CD141P
CD142P
CD143P
CD131P
CD132P
CD133P
CD144P
0 200
400 500
1:5000
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
CD121P
B1
1:5000
OVERALL DEMOLITION SITE PLAN AND KEY MAP
PLANTA GENERAL EXTERIOR DE DEMOLICIONES Y PLANO DE REFERENCIA
MUELLE 3
PUERTA EL
PUERTO
LÍNEA DE
TUBERÍA JP-5
PUENTE SOBRE
EL RÍO SALADO
PARQUE DE
TANQUES DEL
MUELLE 3
V
Í
I C
A
N
T
E
C A
L L E
S A
N T
A M
A R
ÍA
V
Í
I C
A
N m
F
J
P
R
G
O
B
L
L
A
S
T
C
L
H
B1
MD421P
PIT VP1
B
C4
C-501P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
C1
1:200
DEMOLITION PLAN
CD126P
0 8 12 16 20
1:200
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:
GENERAL NOTES:
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
KEYED NOTES:
1. APPROXIMATE TRENCH LIMITS.
2. REMOVE CHAIN LINK FENCE AND CONCRETE CURB.
3. SILT FENCE.
F O
R
C
O N
T I N
U A
T I O
N
S
H E
P
450mm JP-5
PIPELINE
PLANTA DE DEMOLICIONES
LEYENDA DE DEMOLICIONES:
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
NOTAS DE REFERENCIA:
1. LÍMITES APROXIMADOS DE ZANJA.
2. RETIRAR VALLE METÁLICA Y BORDILLO DE HORMIGÓN.
NOTAS GENERALES:
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
P A
N
T I N
U A
C I Ó
N
V
A
P
3. VALLA CONTRA EROSIÓN.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
EDIFICIOS 134 Y 1741.
LÍNEA DE TUBERÍA
JP-5 DE 450mm
ARQUETA
VP1
4. VER PLANOS "E" Y "EI" PARA LÍNEAS ELÉCTRICAS Y DE FIBRA ÓPTICA.
450 JP-5
PIPELINE
ASPHALT ROAD
4 4
(TYP)
B
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:200
DEMOLITION PLAN
CD127P
0 8 12 16 20
1:200
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:
KEYED NOTES:
1. APPROXIMATE TRENCH LIMITS.
2. FULL DEPTH SAW CUT.
3. REMOVE CHAINLINK FENCE.
4. TEMPORARILY RELOCATE CONCRETE BARRIER.
5. PROTECT UTILITY STRUCTURE. DO NOT UNDERMINE OR DISTURB.
6. REMOVE GUARDRAIL AND POSTS. REINSTALL AFTER COMPLETION OF TRENCH BACKFILLING.
7. REMOVE WHEEL STOPS (TYP).
8. SILT FENCE.
9. SEDIMENT FILTER SOCK.
GENERAL NOTES:
PLANTA DE DEMOLICIONES
LEYENDA DE DEMOLICIONES:
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
NOTAS DE REFERENCIA:
NOTAS GENERALES:
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
CARRETERA DE ASFALTO
LÍNEA DE TUBERÍA
JP-5 DE 450
1. LÍMITES APROXIMADOS DE ZANJA
4. REUBICAR TEMPORALMENTE LAS BARRERAS DE HORMIGÓN.
6. RETIRAR BARANDILLA Y LOS POSTES. REINSTALAR UNA VEZ FINALIZADO EL RELLENO
DE LA ZANJA.
3. RETIRAR VALLA DE SIMPLE TORSIÓN.
2. CORTE DE SIERRA DE PROFUNDIDAD COMPLETA.
5. PROTEGER LA ESTRUCTURA DE SERVICIO. NO SOCAVAR NI MODIFICAR
7. RETIRAR TOPE DE RUEDA (TIP).
8. VALLA CONTRA EROSIÓN
9. CILINDRO FILTRANTE DE SEDIMENTOS
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
A1
C-501P
C4
C-501P
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
EDIFICIOS 134 Y 1741.
CLARIFIER BLDG
L
L
A
S
T
S
U
E3
R
G
O
A
C
T
I
V
E
A1
C-502P
C4
C-501P
A1
C-501P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E 1B1
1:200
DEMOLITION PLAN
CD128P
0 8 12 16 20
1:200
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:KEYED NOTES:
1. APPROXIMATE TRENCH LIMITS.
2. FULL DEPTH SAW CUT.
3. HOLD AND PROTECT LIGHT POLE DURING CONSTRUCTION.
4. SEE SHEET E-428P FOR MANHOLE LOCATION.
5. ABOVE GRADE PIPE STRUCTURE. SHORE TRENCH AND PROTECT IN PLACE.
6. PART OF EXISTING DRIVE REMOVED IN A SEPARATE CONTRACT.
7. PAVING AND PIGGING STATION FROM A SEPARATE CONTRACT.
8. SILT FENCE.
9. SEDIMENT FILTER SOCK.
10. TEMPORARILY RELOCATE CONCRETE BARRIERS.
11. MILL ASPHALT FOR KEY-IN SECTION.
12. PROTECT UTILITY STRUCTURE. DO NOT UNDERMINE OR DISTURB.
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
BOOSTER PUMP
HOUSE
GENERAL NOTES:
PLANTA DE DEMOLICIONES
LEYENDA DE DEMOLICIONES:
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
NOTAS DE REFERENCIA:
NOTAS GENERALES:
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
EDIFICIO CLARIFIER
CUARTO DE
BOMBAS
1. LÍMITES APROXIMADOS DE ZANJA
2. CORTE DE SIERRA DE PROFUNDIDAD COMPLETA.
3. GUARDAR Y PROTEGER FAROLA DURANTE LA OBRA.
5. ESTRUCTURA DE TUBERÍA EXPUESTA. ENTIBAR ZANJA Y PROTEGER IN SITU.
6. PARTE DE CAMINO EXISTENTE A RETIRAR EN UN CONTRACTO DIFERENTE.
7. ESTACIÓN DE PAVIMENTO Y ESTACIÓN PIGGING DESDE UN CONTRATO DIFERENTE.
8. VALLA CONTRA EROSIÓN
9. CILINDRO FILTRANTE DE SEDIMENTOS
10. REUBICAR TEMPORALMENTE LAS BARRERAS DE HORMIGÓN.
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
4. VER PLANO E-428P PARA POSICIÓN DE POZO.
11. FRESAR ASFALTO PARA SECCIÓN EN LLAVE.
12. PROTEGER LA ESTRUCTURA DE SERVICIO. NO SOCAVAR NI MODIFICAR.
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
BOOSTER
PUMP HOUSE
BPH AND CLARIFIER
VALVE PITS
C4
C-501P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E 1B1
1:200
DEMOLITION PLAN
CD129P
0 8 12 16 20
1:200
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:
KEYED NOTES:
1. APPROXIMATE TRENCH LIMITS.
2. SILT FENCE.
3. SEDIMENT FILTER SOCK.
4. ABOVE GRADE PIPE. SHORE TRENCH AND PROTECT IN PLACE.
5. PROTECT UTILITY STRUCTURE. DO NOT UNDERMINE OR DISTURB.
GENERAL NOTES:
NOTAS GENERALES:
LEYENDA DE DEMOLICIONES:
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
PLANTA DE DEMOLICIONES
P
A
N
T
I N
U
A
C
I Ó
V
A
P
P
A
N
T
I N
U
A
C
I
A
P
FOSAS DE VÁLVULAS DE
BPH Y DE CLARIFICACIÓN
NOTAS DE REFERENCIA:
1. LÍMITES APROXIMADOS DE ZANJA
2. VALLA CONTRA EROSIÓN
3. CILINDRO FILTRANTE DE SEDIMENTOS
CUARTO DE
BOMBAS
F
N
T
I N
U
A
T
I
E
P
F
N
T
I N
U
A
T
I
E
P
4. TUBERÍA EXPUESTA. ENTIBAR ZANJA Y PROTEGER IN SITU.
5. PROTEGER LA ESTRUCTURA DE SERVICIO. NO SOCAVAR NI MODIFICAR.
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
H
D
D
B
C4
C-501P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:200
DEMOLITION PLAN
CD130P
0 8 12 16 20
1:200
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:
KEYED NOTES:
1. APPROXIMATE TRENCH LIMITS.
2. SEE SHEET E-130P FOR MANHOLE LOCATION.
3. SILT FENCE.
4. REMOVE CHAIN LINK FENCE.
F
N
T
I N
U
A
T
I
E
P
F
N
T
I N
U
A
T
I
E
P
FOR CONTINUATION SEE SHEET CD141P
350mm JP-5
500mm JP-8
500mm F-76
250mm JP-8
500mm F-76
450mm JP-5
LEYENDA DE DEMOLICIONES:
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
PLANTA DE DEMOLICIONES
P
A
N
T
I N
U
A
C
I
A
P
P
A
N
T
I N
U
A
C
I
A
P
PARA CONTINUACIÓN VER PLANO CD141P
NOTAS DE REFERENCIA:
1. LÍMITES APROXIMADOS DE ZANJA
3. VALLA CONTRA EROSIÓN
4. RETIRAR VALLA METÁLICA DE SIMPLE TORSIÓN
2. VER PLANO E-130P PARA POSICIÓN DE POZO
GENERAL NOTES:
NOTAS GENERALES:
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
HDD-B-2
HDD-B-3
B2
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:200
DEMOLITION PLAN
CD131P
0 8 12 16 20
1:200
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
500mm F-76
250mm JP-8
500mm F-76
500mm JP-8
350mm JP-5
FOR CONTINUATION SEE SHEET CD141P FOR CONTINUATION SEE SHEET CD142P
450mm JP-5
PIPELINE
450mm JP-5
LEYENDA DE DEMOLICIONES:
PLANTA DE DEMOLICIONES
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
PARA CONTINUACIÓN VER PLANO CD142PPARA CONTINUACIÓN VER PLANO CD141P
RETIRAR PAVIMENTO ASFÁLTIC EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
LÍNEA DE
TUBERÍA JP-5
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
GENERAL NOTES:
NOTAS GENERALES:
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
D
B
H
D
D
B
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:200
DEMOLITION PLAN
CD132P
0 8 12 16 20
1:200
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
C4
C-501P
500mm F-76
250mm JP-8
500mm F-76
GENERAL NOTES:
BUS STOP
450mm JP-5
NOTAS GENERALES: LEYENDA DE DEMOLICIONES:
PLANTA DE DEMOLICIONES
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
PARADA DE
AUTOBUS
F
N
T
I
N
U
A
T
I
E
P
P
A
N
T
I
N
U
A
C
I
A
P
KEYED NOTES:
NOTAS DE REFERENCIA:
1. SILT FENCE.
1. VALLA CONTRA EROSIÓN
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
C4
C-501P
A1
C-501P
H
D
D
B
B
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
B1
1:200
DEMOLITION PLAN
CD133P
0 8 12 16 20
1:200
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:KEYED NOTES:
1. APPROXIMATE TRENCH LIMITS.
2. SILT FENCE.
3. SEDIMENT FILTER SOCK.
4. FULL DEPTH SAW CUT.
5. REMOVE PCC SIDEWALK AND CURB.
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
500mm F-76
250mm JP-8
500mm F-76
450mm JP-5
SWIMMING POOL
BUILDING 591
LEYENDA DE DEMOLICIONES:
PLANTA DE DEMOLICIONES
P
A
N
T
I
N
U
A
C
I
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
EDIFICIO 591
PISCINA
NOTAS DE REFERENCIA:
1. LÍMITES APROXIMADOS DE ZANJA.
2. VALLA CONTRA EROSIÓN.
4. CORTE DE SIERRA DE PROFUNDIDAD COMPLETA.
F
N
T
I N
U
A
T
I
E
P
P
A
N
T
I N
U
A
C
I
A
P
F
N
T
I
N
U
A
T
I
E
P
5. RETIRAR HORMIGÓN Y BORDILLO.
3. CILINDRO FILTRANTE DE SEDIMENTO.
GENERAL NOTES:
NOTAS GENERALES:
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
(TYP)
B
L
G
C
A
C4
C-501P
A1
C-501P
B
B
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
DEMOLITION PLAN
CD134P
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:
KEYED NOTES:
1. APPROXIMATE TRENCH LIMITS.
2. REMOVE CURB.
3. FULL DEPTH SAW CUT.
4. RELOCATE EXISTING LIGHT POLE. SEE SHEET E-134P.
5. PROTECT UTILITY STRUCTURE. DO NOT UNDERMINE OR DISTURB.
6. REMOVE 500mm CULVERT AND HEADWALL.
7. REMOVE SIGN AND REINSTALL AFTER COMPLETION OF TRENCH BACKFILLING.
8. REMOVE PCC SIDEWALK AND CURB.
9. REMOVE WHITE VINYL FENCE AND REINSTALL AFTER COMPLETION OF TRENCH BACKFILLING.
10. SHORE TRENCH AND PROTECT BUILDING AND TOWER FOUNDATION.
11. SILT FENCE.
12. SEDIMENT FILTER SOCK.
13. DO NOT DISTURB WATER VALVE.
14. RELOCATE EXISTING MANHOLE. SEE SHEET E-135P.
F
N
T
I
N
U
A
T
I
E
P
F
N
T
I
N
U
A
T
I
E
P
450 mm JP-5
PIPELINE
LEYENDA DE DEMOLICIONES:
PLANTA DE DEMOLICIONES
P
A
N
T
I
N
U
A
C
I
A
P
P
A
N
T
I
N
U
A
C
I
A
P
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
LÍNEA DE TUBERÍA
JP-5 DE 450 mm
NOTAS DE REFERENCIA:
1. LÍMITES APROXIMADOS DE ZANJA.
2. RETIRAR BORDILLO.
3. CORTE DE SIERRA DE PROFUNDIDAD COMPLETA.
5. PROTEGER LA ESTRUCTURA DE SERVICIO. NO SOCAVAR NI MODIFICAR.
6. RETIRAR 500mm DE CUNETA Y PASACUNETA.
7. RETIRAR LA SEÑAL Y VOLVER A INSTALAR UNA VEZ FINALIZADO EL RELLENO DE LA ZANJA.
8. RETIRAR ACERADO DE HORMIGÓN Y BORDILLO.
9. RETIRAR LA VALLA DE VINILO BLANCO Y VOLVER A INSTALARLA UNA VEZ FINALIZADO EL RELLENO DE LA ZANJA.
10. ENTIBAR Y PROTEGER LOS CIMIENTOS DEL EDIFICIO Y DE LA TORRE.
11. VALLA CONTRA EROSIÓN.
12. CILINDRO FILTRANTE DE SEDIMENTOS.
4. REUBICAR FAROLA EXISTENTE. VER PLANO E-134P.
13. NO ALTERAR VÁLVULA DE AGUA.
14. REUBICAR POZO EXISTENTE. VER PLANO E-135P.
GENERAL NOTES:
NOTAS GENERALES:
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
B
B
C4
C-501P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
SITE PLAN
CD135P
REMOVE EXISTING PCC. REMOVE
TO CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:KEYED NOTES:
1. APPROXIMATE TRENCH LIMITS.
2. DO NOT DISTURB LIGHT POLE AND BOLLARDS.
3. DO NOT DISTURB FENCE.
4. PROTECT UTILITY STRUCTURE. DO NOT UNDERMINE OR DISTURB.
5. SILT FENCE.
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
GENERAL NOTES:
450 mm JP-5
PIPELINE
NOTAS GENERALES:
LEYENDA DE DEMOLICIONES:
PLANTA DE DEMOLICIONES
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
LÍNEA DE
TUBERÍA JP-5
NOTAS DE REFERENCIA:
1. LÍMITES APROXIMADOS DE ZANJA
2. NO MODIFICAR POSTES DE LUZ NI BOLARDOS
3. NO MODIFICAR LA VALLA
5. VALLA CONTRA EROSIÓN
4. PROTEGER LA ESTRUCTURA DE SERVICIO. NO SOCAVAR NI MODIFICAR
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
A
C
T
I V
E
A
C
T
I V
E
2 2
BLDG 1741
C4
C-501P
A1
C-501P
B
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
C1
1:500
DEMOLITION PLAN
CD136P
1. APPROXIMATE TRENCH LIMITS.
2. DO NOT DISTURB LIGHT POLE AND BOLLARDS.
3. PROTECT PAD MOUNTED ELECTRICAL EQUIPMENT. DO NOT UNDERMINE
OR DISTURB.
4. FULL DEPTH SAWCUT.
5. DO NOT DISTURB FENCE.
6. REMOVE CULVERT AND HEADWALLS.
7. REMOVE PCC SIDEWALK AND CURB.
8. HOLD AND PROTECT POWER POLE DURING CONSTRUCTION.
9. SILT FENCE.
10. SEDIMENT FILTER SOCK.
DEMOLITION LEGEND:KEYED NOTES:
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
GENERAL NOTES:
450mm JP-5
PIPELINE
NOTAS GENERALES:
LEYENDA DE DEMOLICIONES:
PLANTA DE DEMOLICIONES
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
LÍNEA DE
TUBERÍA JP-5
NOTAS DE REFERENCIA:
1. LÍMITES APROXIMADOS DE ZANJA
2. NO MODIFICAR POSTES DE LUZ NI BOLARDOS
3. PROTEGER EQUIPO ELÉCTRICO MONTADO EN LOSA. NO SOCAVAR NI MODIFICAR
4. CORTE DE SIERRA DE PROFUNDIDAD COMPLETA.
5. NO MODIFICAR VALLA
6. RETIRAR CUNETA Y PASACUNETA
7. RETIRAR ACERADO DE HORMIGÓN
9. VALLA CONTRA EROSIÓN
10. CILINDRO FILTRANTE DE SEDIMENTOS
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
8. GUARDAR Y PROTEGER POSTE DE FUERZA DURANTE LA OBRA.
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
BLDG 1741
(TYP)
HMA PARKING LOT
B9
B10
A1
C-501P
C4
C-501P
BOLSA DE APARCAMIENTO
ASFÁLTICO MEZCLADO EN
CALIENTE
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
DEMOLITION PLAN
CD137P
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:KEYED NOTES:
1. FULL DEPTH SAW CUT.
2. APPROXIMATE TRENCH LIMITS.
3. DO NOT DISTURB FENCE.
4. PROTECT UTILITY STRUCTURE. DO NOT
UNDERMINE OR DISTURB.
5. DO NOT DISTURB GAS POLE OR LIGHT POLE.
6. REMOVE CULVERT AND HEADWALLS.
7. HOLD AND PROTECT POWER POLE DURING
CONSTRUCTION.
8. REMOVE CHAIN LINK FENCE. UNTIE AND PULL
BACK GREEN SCREENING FABRIC.
9. REMOVE TREE.
10. REMOVE CHAIN LINK FENCE.
11. REMOVE PCC SIDEWALK.
12. SALVAGE AND REINSTALL BUS STOP SHELTER.
REMOVE PCC FOR BUS STOP. NOTIFY THE
CONTRACTING OFFICER PRIOR TO DEMOLITION OF
BUS STOP. CONTRACTING OFFICER MUST
COORDINATE DEMOLITION WITH TRANSPORTATION
AND THE RPAO AT THE TIME OF DEMOLITION.
13. SILT FENCE.
14. SEDIMENT FILTER SOCK.
F
N
T
I N
U
A
T
I
E
P
GENERAL NOTES:
KEYED NOTES: (CONTINUED)
NOTAS GENERALES:
LEYENDA DE DEMOLICIONES:
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
PLANTA DE DEMOLICIONES
P
A
N
T
I
N
U
A
C
I
A
P
P
A
N
T
I N
U
A
C
I
A
P
2. LÍMITES APROXIMADOS DE ZANJA.
1. CORTE DE SIERRA DE PROFUNDIDAD
COMPLETA.
3. NO MODIFICAR LA VALLA.
6. RETIRAR CUNETA Y PASACUNETA.
5. NO MODIFICAR EL POSTE DE GAS Y
FAROLA.
12. GUARDAR Y REINSTALAR MARQUESINA DE PARADA
DE AUTOBÚS. RETIRAR HORMIGÓN PARA PARADA DE
AUTOBÚS. NOTIFICAR AL OFICIAL CONTRATANTE
ANTES DE LA DEMOLICIÓN DE LA PARADA DE
AUTOBÚS. EL OFICIAL CONTRATANTE DEBE
COORDINAR LA DEMOLICIÓN CON TRANSPORTES Y
CON EL RPAO EN EL MOMENTO DE LA DEMOLICIÓN.
10. RETIRAR VALLA METÁLICA DE SIMPLE TORSIÓN.
8. RETIRAR VALLA DE SIMPLE TORSIÓN.
DESATAR Y RETIRAR LA MALLA VERDE.
9. RETIRAR ÁRBOL.
13. VALLA CONTRA EROSIÓN.
14. CILINDRO FILTRANTE DE SEDIMENTOS.
11. RETIRAR ACERADO DE HORMIGÓN.
4. PROTEGER LA ESTRUCTURA DE SERVICIO.
NO SOCAVAR NI MODIFICAR.
NOTAS DE REFERENCIA:
NOTAS DE REFERENCIA: (CONTINUACIÓN)
7. GUARDAR Y PROTEGER POSTE DE FUERZA
DURANTE LA OBRA.
F
N
T
I
N
U
A
T
I
E
P
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE COMBUSTIBLE.
2. VER PLANOS "MD" PARA DEMOLICIÓN DE TUBERÍAS DE COMBUSTIBLE.
5. MANTENER LAS MEDIDAS DE CONTROL DE EROSIÓN Y SEDIMENTOS HASTA
QUE FINALICEN TODOS LOS TRABAJOS.
6. ANOTAR LAS ELEVACIONES DE LOS PAVIMENTOS EXISTENTES ANTES
DE SU RETIRADA.
7. COORDINAR LOS CORTES DE CARRETERA PERMITIDOS CON EL OFICIAL
CONTRATANTE. SE DEBE MANTENER UN CARRIL DE CIRCULACIÓN EN
TODO MOMENTO PARA EL TRÁFICO LOCAL Y LOS VEHÍCULOS DE
EMERGENCIA. PRESENTAR LOS PLANES DE CONTROL DE TRÁFICO DE
VEHICULOS Y DE PEATONES PARA SU APROBACIÓN CON UN MÍNIMO
DE 45 DÍAS ANTES DEL INICIO DE LAS OBRAS. SE DEBERÁ MANTENER
EN TODO MOMENTO EL ACCESO DE PEATONES Y VEHÍCULOS A LOS
ML-1
A2003
FH #14
PIT #1
TANK-7
F-76
(TYP)
BLDG 1879
ML-1
C4
C-501P
A1
C-501P
B-11
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
0 20 30 40 50
1:500
B1
1:500
SITE PLAN
CD138P
REMOVE EXISTING PCC. REMOVE TO
CLOSEST JOINT LINE
REMOVE EXISTING ASPHALT PAVING
REMOVE AGGREGATE
REMOVE EXISTING SIDEWALK
REMOVE TREE/SHRUB
DEMOLITION LEGEND:KEYED NOTES:
1. REMOVE CHAIN LINK FENCE.
2. APPROXIMATE TRENCH LIMITS.
3. FULL DEPTH SAW CUT.
4. PROTECT UTILITY STRUCTURE. DO NOT UNDERMINE OR DISTURB.
5. HOLD AND PROTECT POWER POLE DURING CONSTRUCTION.
6. UTILIZE SHORING SYSTEM TO PROTECT EMBANKMENT AROUND TANKS.
7. SILT FENCE.
8. SEDIMENT FILTER SOCK.
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
GENERAL NOTES:
450mm JP-5
PIPELINE
NOTAS GENERALES:
PLANTA DE DEMOLICIONES
P A
N
T I N
U A
C I Ó
N
V
A
P
P
A
N
T
I
N
U
A
C
I
A
P
LEYENDA DE DEMOLICIONES:
RETIRAR PAVIMENTO ASFÁLTICO EXISTENTE
RETIRAR ÁRIDOS
RETIRAR HORMIGÓN EXISTENTE. RETIRAR
HASTA LA JUNTA MÁS CERCANA
RETIRAR ACERADO EXISTENTE
RETIRAR ÁRBOL / ARBUSTO
NOTAS DE REFERENCIA:
2. LÍMITES APROXIMADOS DE ZANJA.
3. CORTE DE SIERRA DE PROFUNDIDAD COMPLETA.
1. RETIRAR VALLA METÁLICA DE SIMPLE TORSIÓN.
5. GUARDAR Y PROTEGER POSTE DE FUERZA DURANTE LA OBRA.
7. VALLA CONTRA EROSIÓN.
8. CILINDRO FILTRANTE DE SEDIMENTOS.
4. PROTEGER LA ESTRUCTURA DE SERVICIO. NO SOCAVAR NI MODIFICAR
6. UTILIZAR UN SISTEMA DE APUNTALAMIENTO PARA PROTEGER EL
TERRAPLÉN ALREDEDOR DE LOS TANQUES.
LÍNEA DE
TUBERÍA JP-5
F
N
T
I
N
U
A
T
I
E
P
1. PAVEMENT REMOVAL AND RESTORATION LIMITS FOR UTILITY
INSTALLATION ARE APPROXIMATE AND SUBJECT TO CONTRACTOR
MEANS AND METHODS.
2. SEE "MD" SHEETS FOR DEMOLITION OF FUEL PIPING.
3. SEE "M" SHEETS FOR FUEL PIPING ALIGNMENT INFORMATION.
4. SEE "E" AND "EI" SHEETS FOR ELECTRICAL AND FIBER OPTIC LINES.
5. MAINTAIN EROSION AND SEDIMENT CONTROL MEASUREMENTS UNTIL
ALL DISTURBANCE ACTIVITIES ARE COMPLETED.
6. RECORD ELEVATIONS OF EXISTING PAVEMENTS PRIOR TO REMOVAL.
7. COORDINATE ALLOWABLE LANE CLOSURES WITH CONTRACTING
OFFICER. ONE LANE OF TRAFFIC MUST BE MAINTAINED AT ALL TIMES
FOR USE OF LOCAL TRAFFIC AND EMERGENCY VEHICLES. SUBMIT
TRAFFIC AND PEDESTRIAN CONTROL PLANS FOR APPROVAL A MINIMUM
OF 45 DAYS PRIOR TO START OF CONSTRUCTION. PEDESTRIAN AND
VEHICLE PARKING ACCESS MUST BE MAINTAINED TO BUILDINGS 134 AND
1741 AT ALL TIMES.
1. LA RETIRADA DEL PAVIMENTO Y LOS LÍMITES DE REPARACIÓN DE
DE LAS INSTALACIONES SON APROXIMADOS Y SUJETOS A LOS
MEDIOS Y MÉTODOS DEL CONTRATISTA.
3. VER PLANOS 'M' PARA INFORMACIÓN DE ALINEACIÓN DE TUBERÍAS
DE…