Attachment_F_P919__Volume_10_of_15.pdf
PDF 30 MB Posted
- Solicitation number
- N6247026R0006
About this file
This document is a detailed structural and mechanical engineering drawing set for the P919 Bulk Tank Farm Improvements, Phase 1 project at Naval Station Rota, Spain. The drawings provide comprehensive technical specifications for pipeline demolition, installation, and structural modifications, focusing on a 450mm JP-5 pipeline installation that involves extensive horizontal directional drilling (HDD) across multiple sections. Key technical elements include pipeline routing through various stations and pits, specifications for pipe supports, loading stations, equipment pads, and demolition of existing infrastructure, with specific attention to utility crossings, pipe expansion loops, and cathodic protection requirements.
The project involves complex pipeline work across multiple sections, with precise engineering details for pipeline segments ranging from 0.73m to 128.71m in length. Critical aspects include provisions for pipeline expansion, high and low point vents, drainage systems, and specific requirements for piggable piping with 3-diameter bend radius elbows. The drawings specify galvanized steel structural components, welding techniques, and coating standards, with explicit instructions for pipe installation, support, and abandonment procedures. The technical documentation is part of a comprehensive engineering effort to modernize fuel infrastructure at the Naval Station, with meticulous attention to structural integrity, utility protection, and installation precision.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPN 200
MATCH EXISTMATCH EXIST
IGUALAR A
EXISTENTE
IGUALAR A
EXISTENTE
S-524P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
NOTES:
A1
1:50
TYPICAL LOADING STATION PLAN
KEYED NOTES:
1. RELOCATE EXISTING LADDER, GUARDRAIL, KICKPLATE AND
SAFETY CAGE TO THE END OF NEW PLATFORM.
2. GALV 80 DIA STD PIPE AT EACH CORNER OF EXTENDED
PLATFORM.
3. GALV UPN 200 AROUND ALL PLATFORM EDGES. ATTACH TO
EXISTING PLATFORM FRAMING W/ 6 mm FILLET WELD ALL
AROUND. CLEAN AND COAT WELDS WITH COLD GALVANIZING
COMPOUND.
4. GALV 38 DIA STD PIPE RAILS AND 6 X 100 KICKPLATE. WELD TO
EXISTING POSTS WITH 6 mm FILLET WELD ALL AROUND. CLEAN
AND COAT WELDS WITH COLD GALVANIZING COMPOUND.
5. SAFETY CHAIN BETWEEN NEW AND EXISTING GUARDRAIL POSTS.
6. GALVANIZED STEEL WELDED GRATING WITH 35X5 BEARING BARS
AT 30 OC AND CROSS BARS AT 100 OC.
7. CUT EXISTING GRATING TO CLEAR NEW PIPE. BAND EDGE OF
OPENING WITH 35X5 BAR WELDED TO GRATING BEARING
BARS.CLEAN AND COAT WELDS WITH COLD GALVANIZING
COMPOUND.
A3
1:20
TYPICAL VALVE ACCESS PLATFORM PLAN
OUTLINE OF EXISTING VALVE
ACCESS PLATFORM ABOVE
MATCH EXIST
T
Y P
T
Y P
1. ALL STEEL INCLUDING BEAMS, CHANNELS, PLATES, ANGLES,
GRATING, BOLTS, ETC SHALL BE HOT DIPPED GALVANIZED.
2. FIELD VERIFY ALL EXISTING DIMENSIONS.
NOTAS DE REFERENCIA:
1. REUBICAR LA ESCALERA, BARANDILLA, PLETINA DE PROTECCIÓN Y
JAULA DE SEGURIDAD EXISTENTES HASTA LA FINALIZACIÓN DE LA
PLATAFORMA NUEVA.
2. TUBO ESTÁNDAR DE DIÁMETRO 80 GALVANIZADO EN CADA ESQUINA
DE LA PLATAFORMA PROLONGADA.
3. UPN 200 GALVANIZADA ALREDEDOR DE LOS BORDES DE LA
PLATAFORMA. UNIR AL MARCO DE LA PLATAFORMA EXISTENTE CON
SOLDADURA EN ÁNGULO DE 6mm ALREDEDOR DE TODO EL PERÍMETRO.
LIMPIAR Y RECUBRIR LAS SOLDADURAS CON UN COMPUESTO
GALVANIZANTE EN FRÍO.
5. CADENA DE SEGURIDAD ENTRE LOS POSTES DE LA
BARANDILLA NUEVOS Y EXISTENTES.
6. REJILLA SOLDADA DE ACERO GALVANIZADO CON BARRAS
PRINCIPALES DE 35X5 CADA 30 ENTRE CENTROS Y BARRAS
TRANSVERSALES CADA 100 ENTRE CENTROS.
4. BARANDILLAS TUBULARES ESTÁNDAR DE DIÁMETRO Y PLETINA DE
PROTECCIÓN DE 6 X 100. SOLDAR A LOS POSTES EXISTENTES CON
SOLDADURA EN ÁNGULO DE 6 mm ALREDEDOR DE TODO EL
PERÍMETRO. LIMPIAR Y RECUBRIR LAS SOLDADURAS CON UN
COMPUESTO GALVANIZANTE EN FRÍO.
NOTAS:
1. TODO EL ACERO INCLUYENDO VIGAS, CANALES, PLACAS, ANGULARES,
REJILLAS, TORNILLOS, ETC, SERÁ GALVANIZADO EN CALIENTE.
2. VERIFICAR EN CAMPO TODAS LAS DIMENSIONES EXISTENTES.
7. CORTAR LA REJILLA EXISTENTE PARA ALIVIAR LA TUBERÍA
NUEVA. ATAR EL BORDE DEL HUECO CON BARRAS DE 35X5
SOLDADAS A LAS BARRAS PRINCIPALES DE LA REJILLA. LIMPIAR
Y RECUBRIR LAS SOLDADURAS CON UN COMPUESTO
GALVANIZANTE EN FRÍO.
CONTORNO DE PLATAFORMA
DE ACCESO A VÁLVULA
EXISTENTE ARRIBA
IGUALAR A
EXISTENTE
T
Í P
I C
O
T
Í P
I C
O
PLANTA TÍPICA DE ESTACIÓN DE CARGA
PLANTA TÍPICA DE PLATAFORMA DE ACCESO A VÁLVULA
A3
S-525P
A3
S-525P
A1
S-525P
0 2 3 4 5
1:50
0 500 1000 2000mm
1:20
M A
T C
H
E
X I S
T I N
G
Ø80 GALVANIZED STEEL PIPE COLUMN WITH
100x250, 14 THICK CAP PLATE AND (2) Ø20 HIGH
STRENGTH BOLTS (TYPICAL)
L75x75x6 DIAGONAL BRACING AT EACH END OF
PLATFORM BOLTED TO GUSSET PLATE WITH (2)
Ø20 HIGH STRENGTH BOLTS (TYPICAL)
250x250x14 GALVANIZED STEEL BASE PLATE
AND (4) Ø20 HIGH STRENGTH BOLTS (TYPICAL)
GALVANIZED STEEL GRATING
LADDER BEYOND NOT SHOWN FOR CLARITY
10 THICK GUSSET PLATE (TYPICAL)
UPN 200
UPN 300
LADDER OPENING
GALVANIZED STEEL GUARD RAILS
GALVANIZED STEEL GRATING
BOLT UPN 200 TO 8 THICK FULL DEPTH
STIFFINER PLATE WITH (2) Ø20 HIGH
STRENGTH BOLTS (TYPICAL)
8 THICK FULL DEPTH STIFFENER PLATE,
CENTER ON EACH PLATFORM POST (TYP)
8 THICK CONTINUOUS
STEEL PLATE
LOCATE BOLTS TO PENETRATE THROUGH
GRATING OPENING AND MATCH HOLES IN
PLATFORM BASE PLATE
6 THICK PLATE WASHER TACK WELD TO
GRATING AND TACK WELD BOLT TO PLATE
WASHER (TYPICAL)
BARANDILLAS DE ACERO GALVANIZADO
ATORNILLAR UPN 200 A PLACA RIGIDIZADORA
EN PROFUNDIDAD COMPLETA DE 8 DE
ESPESOR CON (2) PERNOS DE ALTA
RESISTENCIA DE Ø20 (TÍPICO)
REJILLA DE ACERO GALVANIZADO
HUECO DE LA ESCALERA
PILAR TUBULAR DE ACERO GALVANIZADO DE
Ø80 CON TAPA DE CHAPA SUPERIOR DE
100x250, DE 14 DE ESPESOR Y (2) PERNOS DE
ALTA RESISTENCIA DE Ø20 (TÍPICO)
REJILLA DE ACERO GALVANIZADO
PLACA RIGIDIZADORA EN PROFUNDIDAD
COMPLETA DE 8 DE ESPESOR, CENTRAR CON
CADA POSTE DE PLATAFORMA (TÍPICO)
PLACA DE ACERO CONTINUA DE
8 DE ESPESOR
TÍPICO
TÍPICO
TÍPICO
I G
U A
L A
R
E
X I S
T E
N T
E
UBICAR LOS PERNOS PARA PENETRAR A
TRAVÉS DE LOS HUECOS DE LA REJILLA Y
ALINEARSE CON LOS AGUJEROS DE LA
PLACA BASE DE LA PLATAFORMA
ARANDELA DE 6 DE ESPESOR SOLDADA
POR PUNTOS A LA REJILLA Y PERNO
SOLDADO POR PUNTOS A LA ARANDELA
(TÍPICO)
PLACA BASE DE ACERO GALVANIZADO
DE 250x250x14 Y (4) PERNOS DE ALTA
RESISTENCIA DE Ø20 (TÍPICO)
CARTELA DE ESPESOR 10 (TÍPICO)
ESCALERA AL FONDO NO MOSTRADA
POR CLARIDAD
L 75x75x6 DE ARRIOSTRAMIENTO DIAGONAL EN
CADA EXTREMO DE LA PLATAFORMA
ATORNILLADA A LA CARTELA CON (2) PERNOS
DE ALTA RESISTENCIA DE Ø20 (TÍPICO)
TYP
TYP
S-525P
1:50
SECTION - TYPICAL LOADING STATION
A1
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
SCALE: NTS
SECTION - PLATFORM EXTENSION
A3
KEYED NOTES:
1. RELOCATE EXISTING LADDER, GUARDRAIL, KICKPLATE AND
SAFETY CAGE TO THE END OF NEW PLATFORM.
2. GALV 80 DIA STD PIPE AT EACH CORNER OF EXTENDED
PLATFORM.
3. GALV UPN 200 AROUND ALL PLATFORM EDGES. ATTACH TO
EXISTING PLATFORM FRAMING W/ 6 mm FILLET WELD ALL
AROUND. CLEAN AND COAT WELDS WITH COLD GALVANIZING
COMPOUND.
4. GALV 38 DIA STD PIPE RAILS AND 6 X 100 KICKPLATE. WELD TO
EXISTING POSTS WITH 6 mm FILLET WELD ALL AROUND. CLEAN
AND COAT WELDS WITH COLD GALVANIZING COMPOUND.
5. SAFETY CHAIN BETWEEN NEW AND EXISTING GUARDRAIL POSTS.
6. GALVANIZED STEEL WELDED GRATING WITH 35X5 BEARING BARS
AT 30 OC AND CROSS BARS AT 100 OC.
7. CUT EXISTING GRATING TO CLEAR NEW PIPE. BAND EDGE OF
OPENING WITH 35X5 BAR WELDED TO GRATING BEARING
BARS.CLEAN AND COAT WELDS WITH COLD GALVANIZING
COMPOUND.
EXISTING POST (TYP)
NOTAS DE REFERENCIA:
1. REUBICAR LA ESCALERA, BARANDILLA, PLETINA DE PROTECCIÓN Y
JAULA DE SEGURIDAD EXISTENTES HASTA LA FINALIZACIÓN DE LA
PLATAFORMA NUEVA.
2. TUBO ESTÁNDAR DE DIÁMETRO 80 GALVANIZADO EN CADA ESQUINA
DE LA PLATAFORMA PROLONGADA.
3. UPN 200 GALVANIZADA ALREDEDOR DE LOS BORDES DE LA
PLATAFORMA. UNIR AL MARCO DE LA PLATAFORMA EXISTENTE CON
SOLDADURA EN ÁNGULO DE 6mm ALREDEDOR DE TODO EL
PERÍMETRO. LIMPIAR Y RECUBRIR LAS SOLDADURAS CON UN
COMPUESTO GALVANIZANTE EN FRÍO.
5. CADENA DE SEGURIDAD ENTRE LOS POSTES DE LA
BARANDILLA NUEVOS Y EXISTENTES.
6. REJILLA SOLDADA DE ACERO GALVANIZADO CON BARRAS
PRINCIPALES DE 35X5 CADA 30 ENTRE CENTROS Y BARRAS
TRANSVERSALES CADA 100 ENTRE CENTROS.
4. BARANDILLAS TUBULARES ESTÁNDAR DE DIÁMETRO Y PLETINA DE
PROTECCIÓN DE 6 X 100. SOLDAR A LOS POSTES EXISTENTES CON
SOLDADURA EN ÁNGULO DE 6 mm ALREDEDOR DE TODO EL
PERÍMETRO. LIMPIAR Y RECUBRIR LAS SOLDADURAS CON UN
COMPUESTO GALVANIZANTE EN FRÍO.
7. CORTAR LA REJILLA EXISTENTE PARA ALIVIAR LA TUBERÍA
NUEVA. ATAR EL BORDE DEL HUECO CON BARRAS DE 35X5
SOLDADAS A LAS BARRAS PRINCIPALES DE LA REJILLA. LIMPIAR
Y RECUBRIR LAS SOLDADURAS CON UN COMPUESTO
GALVANIZANTE EN FRÍO.
POSTE EXISTENTE (TÍPICO)
SECCIÓN - PROLONGACIÓN DE PLATAFORMASECCIÓN - ESTACIÓN DE CARGA TÍPICA
A3
S-525P
BALL DRAIN VALVE
CONTRACTION JOINT (TYP)
1. SEE DETAIL D2 THROUGH D4 ON SHEET S-528P FOR BALL DRAIN VALVE DETAILS.
2. SEE MECHANICAL DRAWINGS FOR PIG LAUNCH / RECEIVE DETAILS.
3. LAP SPLICES AND CONCRETE COVER SHALL CONFORM TO REQUIREMENTS OF S-021P
WHERE NOT SPECIFICALLY INDICATED ON THESE DETAILS.
4. SEE DETAIL D1 ON SHEET S-528P FOR CONTRACTION JOINT DETAILS.
5. SEE CIVIL SHEETS FOR LOCATION POINT COORDINATES.
6. MAINTAIN CONSTANT TOC CURB ELEVATION AROUND ENTIRE PERIMETER.
7. SEE CIVIL SHEETS FOR TOP OF PAD ELEVATIONS.
LOCATION
POINT B
LOCATION
POINT A
COLOCAR MATERIAL DE CAPA BASE 150 SUBBASE COMPACTADA.
14600
JUNTA DE CONTRACCIÓN
(TÍPICO)
PUNTO DE
UBICACIÓN A
PUNTO DE
UBICACIÓN B
VÁLVULA DE BOLA
PARA DRENAJE
1. VER DETALLE D2 A D4 EN PLANO S-528P PARA DETALLES DE VÁLVULAS DE BOLA PARA DRENAJE.
2. VER PLANOS DE MECÁNICA PARA DETALLES DE PIG LANZADOR / RECEPTOR.
3. LOS EMPALMES Y EL RECUBRIMIENTO DEL HORMIGÓN SERÁN CONFORME A LOS REQUERIMIENTOS
DEL S-021P DONDE NO ESTÉ ESPECÍFICAMENTE INDICADO EN ESTOS DETALLES.
4. VER DETALLE D1 EN PLANO S-528P PARA DETALLES DE JUNTAS DE CONTRACCIÓN.
5. VER PLANOS DE URBANIZACIÓN PARA COORDENADAS DE LOS PUNTOS DE UBICACIÓN.
150 (MIN) CONTAINMENT
CURB (SEE NOTE 7)
BORDILLO DE CONTENCIÓN
DE 150 (MÍNIMO)(VER NOTA 7)
7. VER PLANOS DE URBANIZACIÓN PARA LAS COTAS DE CARA SUPERIOR DE LOSA.
6. MANTENER CONSTANTE LA COTA DE LA CARA SUPERIOR DEL HORMIGÓN DEL BORDILLO
ALREDEDOR DEL PERÍMETRO COMPLETO DE LA LOSA.
NOTES:
NOTAS:
S
L O
P E
P E
N D
I E
N T
E
S L
O P
E
P E
N D
I E
N T
E
SLOPE
PENDIENTE
S-526P
SCALE: NTS
PIG LAUNCH EQUIPMENT PAD PLAN
A1
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
PLANTA DE LOSA PARA EQUIPO LANZADOR PIG
D2-D4
S-528P
D1
S-528P
D1
S-528P
BALL DRAIN VALVE
15000
CONTRACTION JOINT (TYP)
CONTRACTION JOINT (TYP)
150 (MIN) CONTAINMENT
CURB (SEE NOTE 7)
JUNTA DE CONTRACCIÓN
(TÍPICO)
JUNTA DE CONTRACCIÓN
(TÍPICO)
VÁLVULA DE BOLA
PARA DRENAJE
BORDILLO DE CONTENCIÓN
DE 150 (MÍNIMO) (VER
NOTA 7)
LOCATION
POINT A
PUNTO DE
UBICACIÓN A
LOCATION
POINT B
PUNTO DE
UBICACIÓN B
1. SEE DETAIL D2 THROUGH D4 ON SHEET S-528P FOR BALL DRAIN VALVE DETAILS.
2. SEE MECHANICAL DRAWINGS FOR PIG LAUNCH / RECEIVE DETAILS.
3. LAP SPLICES AND CONCRETE COVER SHALL CONFORM TO REQUIREMENTS OF S-021P
WHERE NOT SPECIFICALLY INDICATED ON THESE DETAILS.
4. SEE DETAIL D1 ON SHEET S-528P FOR CONTRACTION JOINT DETAILS.
5. SEE CIVIL SHEETS FOR LOCATION POINT COORDINATES.
6. MAINTAIN CONSTANT TOC CURB ELEVATION AROUND ENTIRE PERIMETER.
7. SEE CIVIL SHEETS FOR TOP OF PAD ELEVATIONS.
1. VER DETALLE D2 A D4 EN PLANO S-528P PARA DETALLES DE VÁLVULAS DE BOLA PARA DRENAJE.
2. VER PLANOS DE MECÁNICA PARA DETALLES DE PIG LANZADOR / RECEPTOR.
3. LOS EMPALMES Y EL RECUBRIMIENTO DEL HORMIGÓN SERÁN CONFORME A LOS REQUERIMIENTOS
DEL S-021P DONDE NO ESTÉ ESPECÍFICAMENTE INDICADO EN ESTOS DETALLES.
4. VER DETALLE D1 EN PLANO S-528P PARA DETALLES DE JUNTAS DE CONTRACCIÓN.
5. VER PLANOS DE URBANIZACIÓN PARA COORDENADAS DE LOS PUNTOS DE UBICACIÓN.
7. VER PLANOS DE URBANIZACIÓN PARA LAS COTAS DE CARA SUPERIOR DE LOSA.
6. MANTENER CONSTANTE LA COTA DE LA CARA SUPERIOR DEL HORMIGÓN DEL BORDILLO
ALREDEDOR DEL PERÍMETRO COMPLETO DE LA LOSA.
NOTES:
NOTAS:
S L
O P
N
D I E
N T
E
S L
O P
E
P E
N D
I E
N T
E
(MIN) SLOPE
PENDIENTE (MIN)
I N
S
L O
P E
N
D I E
N T
E
M
I N
LOCATION POINT C
PUNTO DE UBICACIÓN C
S-527P
SCALE: NTS
FLOW METER EQUIPMENT PAD PLAN
A1
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
PLANTA DE LOSA PARA EQUIPO DE CONTADOR
D1
S-528P
D1
S-528P
D1
S-528P
D1
S-528P
D2-D4
S-528P
JET FUEL RESISTANT
JOINT SEALANT
225 JET FUEL
RESISTANT BASE
SEAL WATERSTOP
REINFORCEMENT
CARRIED THROUGH JOINT
SELLANTE DE JUNTA
RESISTENTE A COMBUSTIBLE
AERONÁUTICO
ARMADURA LLEVADA A
TRAVÉS DE LA JUNTA
JUNTA ESTANCA DE SELLADO
EN LA BASE DE 225
RESISTENTE A COMBUSTIBLE
AERONÁUTICO
50 LOCKABLE
BALL VALVE
NITRILE WATERSTOP
W/ SS CLAMP
50Ø STEEL PIPE
PRECAST CONCRETE
SPLASH BLOCK
NOTE:
DRAIN PIPE SHALL BE 316 STAINLESS STEEL. LOCKABLE BALL VALVE
SHALL BE FULL-PORT 316 STAINLESS STEEL.
SALPICADERO DE
HORMIGÓN PREFABRICADO
VÁLVULA DE BOLA
CON BLOQUEO DE
JUNTA ESTANCA DE
NITRILO CON ABRAZADERA
DE ACERO INOXIDABLE
TUBERÍA DE
ACERO DE Ø50
LA TUBERÍA DE DRENAJE SERÁ DE ACERO INOXIDABLE 316. LA
VÁLVULA DE BOLA CON BLOQUE SERÁ DE PUERTO COMPLETO DE
ACERO INOXIDABLE 316
/ NOTA:
M
I N
PRECAST CONCRETE
SPLASH BLOCK
50 LOCKABLE
BALL VALVE
12 DEPRESSION
NITRILE WATERSTOP
W/SS CLAMP
JUNTA ESTANCA DE
NITRILO CON ABRAZADERA
DE ACERO INOXIDABLE
VÁLVULA DE BOLA
CON BLOQUEO DE
SALPICADERO DE
HORMIGÓN PREFABRICADO
REBAJE DE 12
300mm COMPACTED
AGGREGATE BASE
UNDER SLAB
Ø12 BAR - MATCH SLAB
REINFORCEMENT SPACING
STD 90°
HOOK (TYP)
GRADE
PROVIDE 20 CHAMFER
AT CORNERS (TYP)
Ø12 CONTINUOUS
AROUND CORNERS
100 FUEL RESISTANT
WATERSTOP (REQUIRED IF CURB
FORMED SEPARATE FROM SLAB)
NOTES:
1. PLACE BASE COURSE MATERIAL 150 COMPACTED SUBGRADE.
Ø12 @ 300 OCEW
M I N
C
R
PROVEER CHAFLÁN DE 20
EN LAS ESQUINAS (TÍPICO)
Ø12 CONTINUA ALREDEDOR
DE LAS ESQUINAS
TERRENO
PATILLA A 90º
ESTÁNDAR (TÍPICO)
JUNTA ESTANCA RESISTENTE A
COMBUSTIBLE DE 100 (REQUERIDA SI
SE FORMA EL BORDILLO SEPARADO
DE LA LOSA)
Ø12 CADA 300 ENTRE
CENTROS EN CADA CARA
BARRA DE Ø12 - IGUALAR
EL ESPACIAMIENTO DE LA
LOSA EXISTENTE
300mm DE BASE
COMPACTADA DE ÁRIDOS
BAJO LOSA
R E
C U
B R
I M
D
1. COLOCAR EL MATERIAL DE LA CAPA BASE 150 DE SUBBASE
COMPACTADA.
/ NOTAS:
150 CURB
50 STEEL PIPE
TUBERÍA DE ACERO DE 50
BORDILLO
DE 150
S-528P
SCALE: NTS
CONTRACTION JOINT DETAIL
B1
SCALE: NTS
PIG LAUNCH / RECEIVE CONCRETE PAD SECTION
D1
SCALE: NTS
BALL DRAIN VALVE PLAN
D2
SCALE: NTS
BALL DRAIN VALVE SECTION
D3
SCALE: NTS
BALL DRAIN VALVE ELEVATION
D4
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
DETALLE DE JUNTA DE CONTRACCIÓN
ALZADO DE VÁLVULA DE BOLA
PARA DRENAJE
SECCIÓN DE VÁLVULA DE BOLA
PARA DRENAJE
PLANTA DE VÁLVULA DE BOLA
PARA DRENAJE
SECCIÓN DE LOSA DE HORMIGÓN PARA PIG LANZADOR /
RECEPTOR
BOT OF BASE PL EL
IPE240
B
A
B
S H
S
X
PL 12X300X300
(CENTERED ON HSS)
B
NOTE 2
I P
E
NOTE 2
SHS100X10
A
TOS EL
(4) 12Ø HS BOLTS
NOTE 2
IPE160 OR IPE300
BOT OF BASE PL EL BOT OF BASE PL EL
EXST HEB300
NOTA 2
COTA DE LA CARA
INFERIOR DE PLACA BASE
COTA DE LA CARA
INFERIOR DE PLACA BASE
COTA DE LA CARA
INFERIOR DE PLACA BASE
NOTA 2
NOTA 2
HEB300 EXISTENTE
IPE160 O IPE300
(4) PERNOS DE ALTA
RESISTENCIA DE Ø12
PLACA DE 12X300X300
(CENTRADA EN EL HSS)
COTA SUPERIOR
DE ACERO
SHS100 SHOWN
IPE160 @ SIM
CL
COL
CL COL
12 PL
(4) 22Ø HOLES FOR 20Ø
GR55 ADHESIVE ANCHORS
EMBEDMENT = 200
LENGTH = 250
(4) ORIFICIOS DE Ø22 PARA
ANCLAJES ADHESIVOS GR55
DE Ø20
EMPOTRAMIENTO = 200
LONGITUD = 250
EJE DE PILAR
EJE DE
PILAR
PLACA
DE 12
SE MUESTRA SHS100
IPE 160 PARA SIMÉTRICO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
S-530P
NTS
C1
PIPE SUPPORT - TYPE 1
NTS
C2
PIPE SUPPORT - TYPE 2
NTS
C3
PIPE SUPPORT - TYPE 3
NTS
C4
PIPE SUPPORT - TYPE 4
NTS
SECTION
FOR GENERAL NOTES SEE SHEETS S-021P AND S-022P.1.
FIELD LOCATE U-BOLT TO FLANGE.2.
NOTES:
SOPORTE DE TUBERÍA - TIPO 1 SOPORTE DE TUBERÍA - TIPO 2 SOPORTE DE TUBERÍA - TIPO 3 SOPORTE DE TUBERÍA - TIPO 4
SECCIÓN
/ NOTAS:
1. PARA NOTAS GENERALES VER PLANOS S-021P Y S-022P.
2. UBICAR EN CAMPO EL PERNO EN U HASTA LA BRIDA.
B1
S-530P
B1
S-530P
B1
S-530P
B1
S-530P
M-021P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MECHANICAL SYMBOLS / SÍMBOLOS
MECÁNICOS
AIR ELIMINATOR / ELIMINADOR DE AIRE
BALL VALVE / VÁLVULA DE BOLA
BLIND FLANGE / BRIDA CIEGA
CENTRIFUGAL PUMP / BOMBA CENTRÍFUGA
CHECK VALVE / VÁLVULA ANTIRRETORNO
CONTROL VALVE / VÁLVULA DE CONTROL
CUT-AND-COVER UNDERGROUND STORAGE TANK
(UST) / TANQUE DE ALMACENAJE ENTERRADO
CUT-AND-COVER (UST)
D-1 NOZZLE / TOBERA D-1
DB&B PLUG VALVE / VÁLVULA DE DOBLE CIERRE Y
VACIADO
DB&B PLUG VALVE WITH THERMAL RELIEF / VÁLVULA
DE DOBLE CIERRE Y VACIADO CON ALIVIO
TÉRMICO
DETONATOR/ARRESTOR / DETONADOR /
PROTECCIÓN
FILTER / FILTRO
SEPARATOR / SEPARADOR
FLEXIBLE PIPE CONNECTION / CONEXIÓN FLEXIBLE
DE TUBERÍA
FUEL QUALITY METER / MEDIDOR DE CALIDAD DE
COMBUSTIBLE
GATE VALVE / VÁLVULA DE COMPUERTA
HOSE QUICK CONNECTION / CONEXIÓN RÁPIDA
PARA MANGUERA
HOSE / MANGUERA
LINE RELIEVING DIFFERENTIAL THERMAL RELIEF
(LR/DTR) ARROW INDICATES RELIEF DIRECTION /
LÍNEA DE ALIVIO TÉRMICO DIFERENCIAL (LR /
DTR) LA FLECHA INDICA LA DIRECCIÓN DE
DESCARGA
MARINE LOADING ARM / BRAZO DE CARGA MARINO
METER / CONTADOR
MICRONIC FILTER / FILTRO MICRÓNICO
MOTOR OPERATOR / ACCIONADO POR MOTOR
MOTOR OPERATED 4-WAY VALVE / VÁLVULA DE 4
VÍAS ACCIONADA POR MOTOR
PRESSURE SAFETY VALVE / VÁLVULA DE
SEGURIDAD DE PRESIÓN
REDUCER (CONCENTRIC) / REDUCTOR
(CONCÉNTRICO)
STRAIGHTENING VANE / PALA ENDEREZADORA
STRAINER / FILTRO
TURBINE METER / CONTADOR DE TURBINAS
PIG LAUNCHING/RECEIVING EQUIPMENT / EQUIPO
PIG LANZADOR / RECEPTOR
PIPE CAP / TAPA PARA TUBERÍA
SLIP ON FLANGE (SO) / BRIDA DESLIZANTE (SO)
PIPE SECTION / SECCIÓN DE TUBERÍA
CATHODIC CABLE OR CONDUIT / CABLE O
CONDUCTO CATÓDICO
VERTICAL ABOVEGROUND STORAGE TANK / TANQUE
DE ALMACENAMIENTO VERTICAL AÉREO
VERTICAL TURBINE PUMP / BOMBA DE TURBINA
VERTICAL
ABBREVIATIONS /
ABREVIATURAS
A/E AIR ELIMINATOR / ELIMINADOR DE AIRE
AG ABOVE GROUND / SOBRE EL TERRENO
ATF
ABOVEGROUND TANK FARM / ÁREA DE
TANQUES SOBRE EL TERRENO
BP
BALANCED PRESSURE / PRESIÓN EQUILIBRADA
℄ CENTERLINE / EJE
CLH
COMPAŃA LOGISTICA DE HIDROCARBUROS
(COMMERCIAL OIL TRANSPORTATION COMPANY) /
COMPAÑÍA LOGÍSTICA DE HIDROCARBUROS
(EMPRESA COMERCIAL DE TRANSPORTE DE
PETRÓLEO)
CS CARBON STEEL / ACERO AL CARBONO
DBB
DOUBLE BLOCK AND BLEED PLUG VALVE /
VÁLVULA DE DOBLE CIERRE Y VACÍADO
DIA
DIAMETER / DIÁMETRO
DIP
DUCTILE IRON PIPE / TUBERÍA DE FUNDICIÓN
DP
DIFFERENTIAL PRESSURE / PRESIÓN
DIFERENCIAL
HPV HIGH-POINT VENT / VENTEO EN PUNTO ALTO
ID
INNER DIAMETER / DIÁMETRO INTERIOR
LB ELBOW / CODO
LPD LOW-POINT DRAIN / DRENAJE EN PUNTO BAJO
JP
JET PROPULSION / PROPULSIÓN POR CHORRO
MF
MICRONIC FILTER / FILTRO MICRÓNICO
ML
MAIN LATERAL (PIT) / LATERAL PRINCIPAL
(FOSA)
NTS NOT TO SCALE / SIN ESCALA
OD
OUTSIDE DIAMETER / DIÁMETRO EXTERIOR
PRT
PRODUCT RECOVERY TANK / TANQUE DE
RECUPERACIÓN DE PRODUCTO
PSI
POUNDS PER SQUARE INCH / LIBRAS POR
PULGADA CUADRADA
PSI (BP)
POUNDS PER SQUARE INCH BALANCED PRESSURE
/ LIBRAS POR PULGADA CUADRADA DE
PRESIÓN EQUILIBRADA
PSID PSI DIFFERENTIAL / PSI DIFERENCIAL
PSIG
POUNDS PER SQUARE INCH, GAUGE / LIBRAS
POR PULGADA CUADRADA, CALIBRE
SS STAINLESS STEEL / ACERO INOXIDABLE
TYP
TYPICAL / TÍPICO
UG
UNDER GROUND / SUBTERRÁNEO
UNK UNKNOWN / DESCONOCIDO
SWR SEWER / SANEAMIENTO
TRV
THERMAL RELIEF VALVE / VÁLVULA DE ALIVIO
TÉRMICO
WTR WATER / AGUA
BOUNDARY OR LIMITS
PROPOSED MINOR PIPELINE
LINE DESIGNATIONS/LEGEND
EXISTING MINOR PIPELINE
EXISTING MAJOR PIPELINE
A3
REFERENCES
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-460-01, DESIGN: PETROLEUM FUEL FACILITIES
UFC 3-460-03, PETROLEUM FUEL SYSTEMS: MAINTENANCE
UFC 4-150-02, DOCKSIDE UTILITIES FOR SHIP SERVICE
UFC 4-152-01, DESIGN: PIERS AND WHARFS
UFC 4-159-03, MOORINGS
UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)
03 31 30 MARINE CONCRETE
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
33 08 55 FUEL DISTRIBUTION SYSTEM START-UP (NON-HYDRANT)
33 09 52 FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (NON-HYDRANT)
33 52 23.15 POL SERVICE PIPING WELDING
33 52 40 FUEL SYSTEMS PIPING (NON-HYDRANT)
33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT
33 52 43.12 AVIATION FUEL PANTOGRAPHS
33 52 43.13 AVIATION FUEL PIPING
33 52 43.14 AVIATION FUEL CONTROL VALVES
33 52 43.23 AVIATION FUEL FUEL PUMPS
33 52 43.28 FILTER SEPARATOR, AVIATION FUELING SYSTEM
33 52 80 LIQUID FUELS PIPELINE COATING SYSTEMS
33 57 55 FUEL SYSTEMS COMPONENTS (NON-HYDRANT)
ELEVATION
CONCRETE
SAND
GASKET OR NON-SHRINK GROUT
EXISTING GRADE OR COMPACTED EARTH
WIRE MESH
STEEL PLATE
CONNECTION POINT
A
A-
A
A-
SHEET NUMBER OF DWG.
OF ELEVATION ON PLAN
DIRECTION OF SIGHT
WHERE ELEVATION IS SHOWN
STANDARD NORTH ARROWS
SECTION IDENTIFICATION
N
NOTE:
THIS DEFINITIVE DRAWING IS FOR REFERENCE
AND PLANNING PURPOSES ONLY.
A
A-
A
A-
SHEET NUMBER OF DWG.
OF ELEVATION ON PLAN
DIRECTION OF SIGHT
WHERE ELEVATION IS SHOWN
ELEVATION IDENTIFICATION
PIG
DESIGNACIONES / LEYENDA DE LÍNEAS
IDENTIFICACIÓN DE SECCIÓN
IDENTIFICACIÓN DE ALZADO
CONTORNO O LÍMITES
TUBERÍA PRINCIPAL EXISTENTE
TUBERÍA SECUNDARIA EXISTENTE
TUBERÍA SECUNDARIA PROPUESTA
ELEVACIÓN
HORMIGÓN
ARENA
JUNTA O MORTERO SIN RETRACCIÓN
TERRENO EXISTENTE O TIERRA COMPACTADA
MALLA METÁLICA
PLACA METÁLICA
PUNTO DE CONEXIÓN
NOTA:
ESTE PLANO DEFINITIVO ES SÓLO PARA REFERENCIA Y
PLANIFICACIÓN
REFERENCIAS
FLECHA DE NORTE ESTÁNDAR
DIRECCIÓN DE LA VISTA DEL
ALZADO EN PLANTA
NÚMERO DEL PLANO DONDE SE
MUESTRA EL ALZADO
DIRECCIÓN DE LA VISTA DEL
ALZADO EN PLANTA
NÚMERO DEL PLANO DONDE SE
MUESTRA EL ALZADO
GENERAL NOTES:
1. INSTALLATION OF THE FOLLOWING PIPELINES VIA HDD METHOD UNDER THE ARROYO
DEL SALADO RIVER TO TO BE EXECUTED BY THE FOLLOWING SOURCE FUNDING AND
UNDER POTENTIAL SINGLE CONSRUCTION CONTRACT AWARD (SHOULD ALL OPTIONS
BE AWARDED):
NOTAS GENERALES:
1. 18" (450mm) JP5 (P919 MILCON FUNDING)
2. 20" (500mm) F76 (PIER 3 TO ML-2 PROJECT, SRM FUNDING, CONTRACT OPTION)
3. 14" (350mm) JP5 (SRM FUNDING, CONTRACT OPTION)
4. 10" (250mm) JP8 "ENROUTE" (SRM FUNDING, CONTRACT OPTION)
5. 20" (500mm) JP8 (SRM FUNDING, CONTRACT OPTION)
6. 20" (500mm) F76 (SRM FUNDING, CONTRACT OPTION)
2. THE INSTALLATION OF THE NEW 18" JP5 PIPELINE, IN ITS ENTIRETY, FALLS UNDER
INDIVIDUAL MILCON FUNDING. THE INSTALLATION OF THE NEW 20" F76 PIPELINE (DLA
P2024.01016), EXCEPT FOR ITS ASSOCIATED HDD SECTION, FALLS UNDER INDIVIDUAL SRM
FUNDING (SRM-1). ALL OTHER PIPELINES MENTIONED ABOVE (#2 THROUGH #6, HDDS),
SHOULD THE APPLICABLE OPTION BE AWARDED, WILL FALL UNDER A THIRD FUNDING
SOURCE (SEPARATE SRM (SRM-2)).
1. 14" (350mm) JP5
2. 10" (250mm) JP8 "ENROUTE"
3. 20" (500mm) JP8
4. 20" (500mm) F76
3. HDD TIE-IN WORK SCOPE INTO AND ISOLATION OF THE FOLLOWING
EXISTING PIPELINES CURRENTLY LAID ACROSS THE ARROYO DEL SALADO
RIVER UTILITY BRIDGE WILL BE EXECUTED (SHOULD ALL OPTIONS BE
AWARDED) UNDER THE SAME CONSTRUCTION CONTRACT AWARD AS THE
P919 MILCON AND F76 SRM:
4. NOTE THAT THE PHYSICAL REMOVAL OF THE FOUR LINES ON THE UTILITY
BRIDGE REFERENCED IN NOTE 3 (IF REALIZED) WILL OCCUR BY OTHERS AT
A FUTURE DATE UNDER SEPARATE CONSTRUCTION CONTRACT AWARD
(TIMING TBD). THE EXISTING 24" (600mm) F76 (NFSO) PIPELINE
(OUT-OF-SERVICE) IS TO BE ISOLATED AND REMOVED BY OTHERS (NOT
PART OF P919 MILCON SCOPE OF WORK/SOLICITATION).
1. LA INSTALACIÓN DE LAS SIGUIENTES TUBERÍAS EJECUTADAS POR PERFORACIÓN
HORIZONTAL DIRIGIDA BAJO EL ARROYO DEL RÍO SALADO SE REALIZARÁ CON
LAS SIGUIENTES FUENTES DE FINANCIACIÓN Y CON POSIBILIDAD DE SER
ADJUDICADAS CON UN CONTRATO INDEPENDIENTE (TAMBIÉN PODRÍA SER QUE
TODAS LAS OPCIONES SEAN ADJUDICADAS):
1. 18” (450 MM) JP5 (FINANCIACIÓN POR P919 MILCON)
2. 20” (500 MM) F76 (PIER 3 A ML-2 PROJECT, FINANCIACIÓN SRM, OPCIÓN DEL
CONTRATO)
3. 14” (350 MM) JP5 (FINANCIACIÓN SRM, OPCIÓN DEL CONTRATO)
4. 10” (250 MM) JP8 “ENROUTE” (FINANCIACIÓN SRM, OPCIÓN DEL CONTRATO)
5. 20” (500 MM) JP8 (FINANCIACIÓN SRM, OPCIÓN DEL CONTRATO)
6. 20” (500 MM) F76 (FINANCIACIÓN SRM, OPCIÓN DEL CONTRATO)
2. LA INSTALACIÓN DE LA NUEVA TUBERÍA DE 18” JP5, SE FINANCIA EN SU TOTALIDAD
CON FONDOS INDIVIDUALES DE MILCON. LA INSTALACIÓN DE LA NUEVA TUBERÍA
DE 20” F76 (DLA P2024.01016), EXCEPTO EN LA PARTE ASOCIADA A LA PERFORACIÓN
HORIZONTAL DIRIGIDA, SE FINANCIA CON FONDOS DE SRM (SRM-1). TODAS LAS
TUBERÍAS MENCIONADAS ARRIBA (#2 A #6) EN CASO DE QUE ESAS OPCIONES SEAN
ADJUDICADAS, SE FINANCIARÁN CON UNA TERCERA FUENTE (SEPARADA SRM (SRM-2)).
3. LOS TRABAJOS DE CONEXIÓN CON LA TUBERÍA INSTALADA CON
PERFORACIÓN HORIZONTAL DIRIGIDA Y LOS TRABAJOS DE
AISLAMIENTO DE LAS TUBERÍAS EXISTENTES ACTUALMENTE EN EL
PUENTE QUE CRUZA EL ARROYO DEL RÍO SALADO SE EJECUTARÁN
CON EL MISMO CONTRATO QUE EL MILCON P919 Y F76 SRM (EN
CASO DE QUE TODAS LAS OPCIONES SEAN ADJUDICADAS):
1. 14” (350 MM) JP5
2. 10” (250 MM) JP8 “ENROUTE”
3. 20” (500 MM) JP8
4. 20” (500 MM) F76
4. TENER PRESENTE QUE LA RETIRADA DE ESTAS CUATRO LÍNEAS DE
TUBERÍAS EN EL PUENTE (EN CASO DE QUE SE REALICEN) SE
EJECUTARÁN EN FECHA FUTURA CON UN CONTRATO DE
CONSTRUCCIÓN SEPARADO (FECHAS A DETERMINAR): LA TUBERÍA
EXISTENTE DE 24” (600MM) F76 (NFSO) (ACTUALMENTE FUERA DE
SERVICIO) SERÁ AISLADA Y RETIRADA POR OTROS (NO FORMAN PARTE
DEL ALCANCE DE LOS TRABAJOS MILCON P919 / ESTA SOLICITACIÓN).
PIER III
ML-1
ML-4
TE-A
TE-B,C,D
ML-3
V-BRDG-OTLN
A2003
DRYER FOR POOL
FH #14
VALVE PIT #44
(OUTSIDE OF BASE)
TO BULK STORAGE
TO BOOSTER PUMP HOUSE
PIT #1
TANK-2
F-76
TANK-3
F-76
TANK-5
F-76
TANK-4
F-76
TANK-6
F-76
TANK-7
F-76
TANK-8
F-76
TANK-1
F-76
TANK-13
JP-8
TK-17
JP-5
TANK-11
JP-8
TANK-10
JP-8
TK-15
JP-5
TANK-9
JP-8
TK-14
JP-5
TANK-122
JP-8
TANK-120
JP-8
TANK-121
JP-8
TK-16
JP-5
3194B
PIER 3
PIER 3
TANK FARM
PUERTO GATE
RIO SALADO
BRIDGE
ML-4
A
L
I
C
A
N
T
N
E
A
L
I C
A
N
N
E
S
A
N
R
I
R
E
E
T
M
I
O
A
L
A
L
I C
A
N
N
E
JP-5 PIPELINE
MD122P
MD123P
MD124P
MD125P
MD126P
MD127P
MD128P
MD129P
MD141P
MD142P
MD130P
0 200
400 500
1:5000
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD121P
B1
1:5000
OVERALL JP-5 SITE PLAN AND KEY MAP
B1
MD428P
PLANTA EXTERIOR Y DE REFERENCIA GENERAL JP-5
MUELLE 3
PUERTA EL
PUERTO
LÍNEA DE
TUBERÍA JP-5
PUENTE SOBRE
EL RÍO SALADO
PARQUE DE
TANQUES DEL
MUELLE 3
PIER 3
A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
C1
1:200
DEMOLITION PLAN
MD122P
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
H E
P
KEYED NOTES:
1. REMOVE 250mm JP-5 ISSUE PIPELINE, SUPPORTS, FITTINGS
AND VALVES ON PIER 3 FOR 450mm JP-5 PIPELINE.
2. REMOVE 300mm INACTIVE MOGAS PIPELINE, SUPPORTS, FITTINGS AND VALVES ON PIER 3 FOR 450mm JP-5 PIPELINE.
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
PLANTA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
MUELLE 3
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA JP-5 DE 250mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3 PARA
TUBERÍA JP-5 DE 450mm.
2. RETIRAR TUBERÍA INACTIVA DE MOGAS DE 300mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3
PARA TUBERÍA JP-5 DE 450mm.
LEYENDA DE DEMOLICIÓN:
P A
N
T I N
U A
C I Ó
N
V
A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD123P
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
KEYED NOTES:
GENERAL NOTES:
C1
1:200
DEMOLITION PLAN
REMOVE PIPELINE
DEMOLITION LEGEND:
1. REMOVE 250mm JP-5 ISSUE PIPELINE, SUPPORTS, FITTINGS
AND VALVES ON PIER 3 FOR 450mm JP-5 PIPELINE.
2. REMOVE 300mm INACTIVE MOGAS PIPELINE, SUPPORTS, FITTINGS AND VALVES ON PIER 3 FOR 450mm JP-5 PIPELINE.
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
PLANTA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA JP-5 DE 250mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3 PARA
TUBERÍA JP-5 DE 450mm.
2. RETIRAR TUBERÍA INACTIVA DE MOGAS DE 300mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3
PARA TUBERÍA JP-5 DE 450mm.
LEYENDA DE DEMOLICIÓN:
P A
N
T I N
U A
C I Ó
N
V
A
PIER 3
m
J
F
R
G
O
B
L
L
A
S
T
C
L
H
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD124P
0 8 12 16 20
1:200
FOR CONTINUATION SEE SHEET MD122P
FOR CONTINUATION SEE SHEET MD123P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
A1
1:200
DEMOLITION PLAN
KEYED NOTES:
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
1. REMOVE 250mm JP-5 ISSUE PIPELINE, SUPPORTS, FITTINGS
AND VALVES ON PIER 3 FOR 450mm JP-5 PIPELINE.
2. REMOVE 300mm INACTIVE MOGAS PIPELINE, SUPPORTS, FITTINGS AND VALVES ON PIER 3 FOR 450mm JP-5 PIPELINE.
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
PLANTA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA ISSUE JP-5 DE 250mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3 PARA
TUBERÍA JP-5 DE 450mm.
2. RETIRAR TUBERÍA INACTIVA DE MOGAS DE 300mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3
PARA TUBERÍA JP-5 DE 450mm.
LEYENDA DE DEMOLICIÓN:
PARA CONTINUACIÓN VER PLANO MD122P
PARA CONTINUACIÓN VER PLANO MD123P
MUELLE 3
EXISTING BULK
PIPELINES
R
G
O
L
L
A
S
T
C
L
H
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD125P
0 10 15 20 25
1:250
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
C1
1:200
DEMOLITION PLAN
KEYED NOTES:
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
1. REMOVE 250mm JP-5 ISSUE PIPELINE, SUPPORTS, FITTINGS
AND VALVES ON PIER 3 FOR 450mm JP-5 PIPELINE.
2. REMOVE 300mm INACTIVE MOGAS PIPELINE, SUPPORTS, FITTINGS AND VALVES ON PIER 3 FOR 450mm JP-5 PIPELINE.
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
PLANTA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA ISSUE JP-5 DE 250mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3 PARA
TUBERÍA JP-5 DE 450mm.
2. RETIRAR TUBERÍA INACTIVA DE MOGAS DE 300mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3
PARA TUBERÍA JP-5 DE 450mm.
LEYENDA DE DEMOLICIÓN:
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
TUBERÍAS DE TRANSPORTE
A GRANEL EXISTENTES
R
G
O
L
L
A
S
T
C
L
H
VP-1
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD126P
0 8 12 16 20
1:200
KEYED NOTES:
1. REMOVE 250mm JP-5 ISSUE PIPELINE, SUPPORTS, FITTINGS
AND VALVES ON PIER 3, BELOW GRADE AND IN VALVE PIT FOR
450mm JP-5 PIPELINE.
2. REMOVE 300mm INACTIVE MOGAS SUPPORTS, PIPELINE, FITTINGS AND VALVES ON PIER 3, BELOW GRADE AND IN
VALVE PIT FOR 450mm JP-5 PIPELINE.
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
B1
MD421P
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
PLANTA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA ISSUE JP-5 DE 250mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3 PARA
TUBERÍA JP-5 DE 450mm.
2. RETIRAR TUBERÍA INACTIVA DE MOGAS DE 300mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3
PARA TUBERÍA JP-5 DE 450mm.
LEYENDA DE DEMOLICIÓN:
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
C1
1:200
MECHANICAL DEMO PLAN
WATERLINE
A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD127P
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
C1
1:200
DEMOLITION PLAN
KEYED NOTES:
1. REMOVE 250mm JP-5 ISSUE PIPELINE, SUPPORTS, FITTINGS
AND VALVES BELOW GRADE AND IN VALVE PIT FOR 450mm
JP-5 PIPELINE.
2. REMOVE 300mm INACTIVE MOGAS PIPELINE, SUPPORTS, FITTINGS AND VALVES BELOW GRADE AND IN VALVE PIT FOR
450mm JP-5 PIPELINE.
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA ISSUE JP-5 DE 250mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3 PARA
TUBERÍA JP-5 DE 450mm.
2. RETIRAR TUBERÍA INACTIVA DE MOGAS DE 300mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3
PARA TUBERÍA JP-5 DE 450mm.
LEYENDA DE DEMOLICIÓN:
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
LÍNEA DE AGUA
METERING STATIONS
L
L
A
S
T
S
U
E3
R
G
O
A
C
T
I
V
E
BPH-VP-1.5
BPH-VP-2
B1
MD422P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD128P
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
KEYED NOTES:
1. REMOVE 250mm JP-5 ISSUE PIPELINE, SUPPORTS, FITTINGS
AND VALVES BELOW GRADE AND IN VALVE PIT FOR 450mm
JP-5 PIPELINE.
2. REMOVE 300mm INACTIVE MOGAS PIPELINE, SUPPORTS, FITTINGS AND VALVES BELOW GRADE AND IN VALVE PIT FOR
450mm JP-5 PIPELINE.
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
A1
MD423P
B1
1:200
DEMOLITION PLAN
1. SEE SECTION 02 41 00 FOR DEMOLITION REQUIREMENTS.
PLANTA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA ISSUE JP-5 DE 250mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3 PARA
TUBERÍA JP-5 DE 450mm.
2. RETIRAR TUBERÍA INACTIVA DE MOGAS DE 300mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE 3
PARA TUBERÍA JP-5 DE 450mm.
LEYENDA DE DEMOLICIÓN:
P A
N
T I N
U A
C I Ó
N
V
A
P
ESTACIÓN DE MEDIDA
P A
N
T I N
U A
C I Ó
N
V
A
JP8
F76
JP8
BOOSTER
PUMP HOUSE
BPH-VP-2
BPH STRIPPING
PUMP TIE IN
F76
BPH-VP-3
AND 3.5
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD129P
0 8 12 16 20
1:200
F
N
T
I
N
U
A
T
I
E
P
B1
1:200
DEMOLITION PLAN
KEYED NOTES:
GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
A1
MD423P
A1
MD424P
1. REMOVE 300mm INACTIVE MOGAS PIPELINE, SUPPORTS, FITTINGS AND VALVES BELOW GRADE AND IN VALVE PIT FOR
450mm JP-5 PIPELINE.
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
F
N
T
I N
U
A
T
I
E
P
PLANTA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA INACTIVA DE MOGAS DE 300mm, SOPORTES, ACCESORIOS Y VÁLVULAS EN EL MUELLE
3 PARA TUBERÍA JP-5 DE 450mm.
LEYENDA DE DEMOLICIÓN:
P
A
N
T
I N
U
A
C
I Ó
V
A
P
P
A
N
T
I
N
U
A
C
I
A
P
CONECTOR DE
BOMBA AL
SEPARADOR
BPH
CASETA DE
BOMBA DE
IMPULSIÓN
BPH-VP-3
Y 3.5
RIO SALADO VALVE PIT
WEST/SPAGHETTI PIT
100mm JF-STRIPPER
500mm JP-8
500mm F-76
350mm JP-5
250mm JP-5
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD130P
F
N
T
I
N
U
A
T
I
E
P
F
N
T
I N
U
A
T
I
E
P
KEYED NOTES:
1. REMOVE BELOW GRADE 300mm INACTIVE
MOGAS PIPELINE FOR 450mm JP-5 PIPELINE.
GENERAL NOTES:
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
0 8 12 16 20
1:200
C1
1:200
DEMOLITION PLAN
REMOVE PIPELINE
DEMOLITION LEGEND:
B1
MD425P
NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
RETIRAR TUBERÍA
LEYENDA DE DEMOLICIÓN:
PLANTA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
1. RETIRAR TUBERÍA INACTIVA DE MOGAS
DE 300mm ENTERRADA PARA TUBERÍA
JP-5 DE 450mm.
P
A
N
T
I N
U
A
C
I
A
P
P
A
N
T
I
N
U
A
C
I
A
P
ARQUETA OESTE DE
VÁLVULA DE RÍO SALADO
ARQUETA ESPAGUETI
SEPARADOR-JF DE
100mm
RIO SALADO
VALVE PIT
WEST/SPAGHETTI
PIT
ARQUETA
OESTE/ESPAGUETI
ARQUETADE LA
VÁLVULA RÍO SALADO
RIO SALADO BRIDGE
PUENTE RÍO SALADO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD141P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
0 8 12 16 20
1:200
B1
1:200
DEMOLITION PLAN
KEYED NOTES:GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
2. PAINT AREAS OF BRIDGE STEEL BELOW REMOVED
PIPING AND AT LOCATIONS OF REMOVED PIPE
SUPPORTS IN ACCORDANCE WITH SECTION 09 90 00.
3. THE BRIDGE WILL REMAIN AND CONTINUE TO
SUPPORT EXISTING CONDUITS, A 450mm WATER
PIPELINE, 2-200mm SEWER PIPELINES, AND A 150mm
WASTEWATER PIPELINE.
1. 250mm JP-8 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
2. 350mm JP-5 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
3. 500mm F-76 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
4. 500mm JP-8 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
5. 600mm F-76 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
6. REMOVE BELOW GRADE 300mm INACTIVE MOGAS PIPELINE
FOR 450mm JP-5 PIPELINE.
7. BELOW GRADE FUEL PIPING TO BE ABANDONED IN PLACE.
B1
MD425P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
LEYENDA DE DEMOLICIÓN
NOTAS DE REFERENCIA:NOTAS GENERALES:
RETIRAR TUBERÍA
P A
N
T I N
U A
C I Ó
N
V
A
P
PLANTA DE DEMOLICIÓN
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
P A
N
T I N
U A
C I Ó
N
V
A
P
1. TUBERÍA JP-8 DE 250mm, SOPORTES, ACCESORIOS Y
VÁLVULAS. EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
2. TUBERÍA JP-5 DE 350mm, SOPORTES, ACCESORIOS Y
VÁLVULAS. EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
3. TUBERÍA F-76 DE 500mm, SOPORTES, ACCESORIOS Y
VÁLVULAS. EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
4. TUBERÍA JP-8 DE 500mm, SOPORTES, ACCESORIOS Y
VÁLVULAS. EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
5. TUBERÍA F-76 DE 600mm, SOPORTES, ACCESORIOS Y
VÁLVULAS EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
6. RETIRAR TUBERÍA ENTERRADA INACTIVA DE MOGAS
DE 300mm PARA TUBERÍA JP-5 DE 450mm.
7. TUBERÍA DE COMBUSTIBLE ENTERRADA A SER
ABANDONADA EN EL SITIO.
2. PINTAR LAS ZONAS DE ACERO DEL PUENTE SITUADAS
DEBAJO DE LAS TUBERÍAS RETIRADAS Y EN LAS
UBICACIONES DE LOS SOPORTES DE TUBERÍAS
RETIRADOS DE ACUERDO CON LA SECCIÓN 09 90 00.
3. EL PUENTE PERMANECERÁ Y CONTINUARÁ
SOPORTANDO LOS CONDUCTOS EXISTENTES, UNA
TUBERÍA DE AGUA DE 450mm, 2 TUBERÍAS DE
SANEAMIENTO DE 200mm Y UNA TUBERÍA DE AGUAS
RESIDUALES DE 150mm.
RIO SALADO BRIDGE
PUENTE RÍO SALADO
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD142P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
0 8 12 16 20
1:200
B1
1:200
DEMOLITION PLAN
KEYED NOTES:GENERAL NOTES:
REMOVE PIPELINE
DEMOLITION LEGEND:
1. 250mm JP-8 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
2. 350mm JP-5 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
3. 500mm F-76 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
4. 500mm JP-8 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
5. 600mm F-76 PIPELINE, SUPPORTS, FITTINGS, AND VALVES ON
RIO SALADO BRIDGE TO BE REMOVED BY OTHERS.
6. BELOW GRADE FUEL PIPING TO BE ABANDONED IN PLACE.
1. SEE SECTION 01 42 00 FOR DEMOLITION
REQUIREMENTS.
2. PAINT AREAS OF BRIDGE STEEL BELOW REMOVED
PIPING AND AT LOCATIONS OF REMOVED PIPE
SUPPORTS IN ACCORDANCE WITH SECTION 09 90 00.
3. THE BRIDGE WILL REMAIN AND CONTINUE TO
SUPPORT EXISTING CONDUITS, A 450mm WATER
PIPELINE, 2-200mm SEWER PIPELINES, AND A 150mm
WASTEWATER PIPELINE.
LEYENDA DE DEMOLICIÓN
NOTAS DE REFERENCIA:NOTAS GENERALES:
RETIRAR TUBERÍA
P A
N
T I N
U A
C I Ó
N
V
A
P
PLANTA DE DEMOLICIÓN
1. VER SECCIÓN 01 42 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. TUBERÍA JP-8 DE 250mm, SOPORTES, ACCESORIOS Y
VÁLVULAS. EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
2. TUBERÍA JP-5 DE 350mm, SOPORTES, ACCESORIOS Y
VÁLVULAS. EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
3. TUBERÍA F-76 DE 500mm, SOPORTES, ACCESORIOS Y
VÁLVULAS. EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
4. TUBERÍA JP-8 DE 500mm, SOPORTES, ACCESORIOS Y
VÁLVULAS. EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
5. TUBERÍA F-76 DE 600mm, SOPORTES, ACCESORIOS Y
VÁLVULAS EN EL PUENTE RÍO SALADO PARA SER
RETIRADOS POR OTROS.
6. UBERÍA DE COMBUSTIBLE ENTERRADA A SER ABANDONADA
EN EL SITIO.
2. PINTAR LAS ZONAS DE ACERO DEL PUENTE SITUADAS
DEBAJO DE LAS TUBERÍAS RETIRADAS Y EN LAS
UBICACIONES DE LOS SOPORTES DE TUBERÍAS
RETIRADOS DE ACUERDO CON LA SECCIÓN 09 90 00.
3. EL PUENTE PERMANECERÁ Y CONTINUARÁ
SOPORTANDO LOS CONDUCTOS EXISTENTES, UNA
TUBERÍA DE AGUA DE 450mm, 2 TUBERÍAS DE
SANEAMIENTO DE 200mm Y UNA TUBERÍA DE AGUAS
RESIDUALES DE 150mm.
CONTROL ACCESO
AHFE COMM
AHFE POWER
M
M
M
M
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD421P
0 2 3 4 5
1:50
B1
1:50
DEMOLITION PLAN PIT VP-1
S
U
E
KEYED NOTES:
1. REMOVE 250mm JP-5 ISSUE PIPELINE, SUPPORTS, AND VALVE
2. REMOVE 300mm INACTIVE PIPELINE, SUPPORTS, AND VALVE
L
L
A
A
C
T
I
R
G
M
P
REMOVE PIPELINE
DEMOLITION LEGEND:
GENERAL NOTES:
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
LEYENDA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
PLANTA DE DEMOLICIÓN DE POZO VP-1
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA ISSUE JP-5 DE 250mm, SOPORTES Y VÁLVULA.
2. RETIRAR TUBERÍA INACTIVA DE 300mm, SOPORTES Y VÁLVULA.
JP-5
SSUE
TOP.+3.40
TOP.+3.67
TOP.+3.66
TOP.+4.32
INV.+2.68
INV.+2.63
TOP.+3.51
INV.+2.70
TOP.+5.31
TOP.+5.40
TOP.+5.33
TOW+5.82
+5.52
TOW+5.77
+5.44
+5.51
TOW+5.77
TOW+5.79
+5.59
TOW+5.76
+5.47
L
L
A
S
T
F
J
P
I
N
A
C
T
I
V
E
B
A
L
L
A
S
T
J
P
S
U
E
F
MD422P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. REMOVE 250mm JP-5 ISSUE PIPE. PROVIDE BLIND FLANGE.
2. REMOVE INACTIVE MOGAS LINE.
3. PROVIDE SEAL WELDED 6mm END PLATE.
J
P
F
TOP.+3.75
TOP.+3.76
TOP.+3.53
B
A
L
L
A
S
T
I
N
A
C
T
I
V
E
J
P
R
G
O
F
J
P
F
A
C
T
I
V
E
R
G
O m m
B
U
I
L
D
I
N
G
0 2 3 4 5
1:50
B1
1:50
DEMOLITION PLAN - BPH-VP-1.5 MANHOLE
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
GENERAL NOTES:
DEMOLITION LEGEND:
REMOVE PIPELINE
LEYENDA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
PLANTA DE DEMOLICIÓN - POZO BPH-VP-1.5
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR TUBERÍA ISSUE JP-5 DE 250mm. INSTALAR UNA
CONEXIÓN DE BRIDA Y TAPA.
2. RETIRAR TUBERÍA INACTIVA MOGAS.
3. PROVEER SELLADO MEDIANTE PLACA DE 6mm SOLDADA EN EL
EXTREMO.
J
P
F
F
J
P
R
G
O I
N
A
C
T
I
V
E
B
A
L
L
A
S
T
F
F
J
P
J
P
R
G
O
I
N
A
C
T
I
V
E
TOP.+3.75
TOP.+3.76
TOP.+3.67
TOP.+3.66
TOP.+3.66
TOW+5.86
+5.80
TOW+5.86
+5.81
TOW+5.86
+5.56
TOW+5.86
+5.56
TOP.+3.66
TOP.+3.68
TOP.+3.69
TOP.+3.85
TOP.+3.74
TOP.+3.76
TOP.+3.77
MD423P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
L
L
A
S
T
KEYED NOTES:
1. REMOVE INACTIVE MOGAS LINE.
0 2 3 4 5
1:50
A1
1:50
DEMOLITION PLAN - BPH-VP-2 MANHOLE
B
A
L
L
A
S
T
A
C
T
I
R
G
O
DEMOLITION LEGEND:
GENERAL NOTES:
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
REMOVE PIPELINE
LEYENDA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR LÍNEA INACTIVA DE MOGAS.
PLANTA DE DEMOLICIÓN - POZO BPH-VP-2
F
F
INACTIVE
TOW+5.87
+5.63
+5.68
TOW+5.85
TOW+5.88
+5.77
TOW+5.86
+5.59
+5.57
TOW+5.90
+5.74
TOP+3.31
TOP+3.75
TOP+3.85
TOP+3.91
TOP+3.75
TOP+3.76
TOP+3.48
TOP+3.39
TOP+3.84
TOP+3.98
TOP+3.75
MD424P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
KEYED NOTES:
1. REMOVE INACTIVE MOGAS LINE.
2. REMOVE INACTIVE MOGAS LINE UP TO RIO SALADO VALVE
PIT WEST/SPAGHETTI PIT.
0 2 3 4 5
1:50
A1
1:50
DEMOLITION PLAN - BPH-VP-3 & 3.5 MANHOLE
TOW+5.88
L
L
A
A
C
T
I
R
G
O
JP-5 C
AR
G O
F-76
JP-8
F-76
REMOVE PIPELINE
DEMOLITION LEGEND:
GENERAL NOTES:
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
BPH-VP-3
BPH-VP-3.5
LEYENDA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
RETIRAR TUBERÍA
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR LÍNEA INACTIVA DE MOGAS.
2. RETIRAR LA TUBERÍA INACTIVA DE MOGAS QUE SUBE
HASTA LA ARQUETA OESTE/ESPAGUETI ARQUETA DE
VÁLVULA RÍO SALADO.
PLANTA DE DEMOLICIÓN - POZO BPH-VP-3 Y 3.5
TOP.+3.69
TOP.+3.82
TOP.+3.01
INV.+2.24
TOP.+3.54
TOP.+3.50
TOP.+3.48
TOP.+3.91
TOP.+2.97
TOP.+2.89
TOP.+2.71
+2.27
TOP.+3.48
+1.97
+4.04
+4.31
+4.33
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
MD425P
KEYED NOTES:
0 2 3 4 5
1:50
B1
1:50
DEMOLITION PLAN - RIO SALADO VALVE PIT WEST - SPAGHETTI PIT
1. REMOVE BELOW GRADE 300mm INACTIVE MOGAS
PIPELINE FOR 450mm JP-5 PIPELINE.
2. REMOVE 250mm JP-8 PIPELINE, SUPPORTS, FITTINGS, AND VALVES.
3. REMOVE 350mm JP-5 PIPELINE, SUPPORTS, FITTINGS, AND VALVES.
4. REMOVE 500mm F-76 PIPELINE, SUPPORTS, FITTINGS, AND VALVES.
5. REMOVE 500mm JP-8 PIPELINE, SUPPORTS, FITTINGS, AND VALVES.
6. REMOVE 600mm F-76 PIPELINE, SUPPORTS, FITTINGS, AND VALVES.
7. BELOW GRADE FUEL PIPING TO BE ABANDONED IN
PLACE.
TOP.+3.64
TOP.+3.62
TOP.+3.69
1. SEE SECTION 02 41 00 FOR DEMOLITION
REQUIREMENTS.
GENERAL NOTES:
DEMOLITION LEGEND:
LEYENDA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
NOTAS GENERALES:
1. VER SECCIÓN 02 41 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
1. RETIRAR LÍNEA INACTIVA DE MOGAS DE 300mm
BAJO EL TERRENO PARA TUBERÍA JP-5 DE 450mm.
PLANTA DE DEMOLICIÓN - ARQUETA DE VÁLVULA OESTE RÍO SALADO - ARQUETA ESPAGUETI
2. RETIRAR TUBERÍA JP-8 DE 250mm, SOPORTES, ACCESORIOS Y VÁLVULAS.
3. RETIRAR TUBERÍA JP-5 DE 350mm, SOPORTES, ACCESORIOS Y VÁLVULAS.
4. RETIRAR TUBERÍA F-76 DE 500mm, SOPORTES, ACCESORIOS Y VÁLVULAS.
5. RETIRAR TUBERÍA JP-8 DE 500mm, SOPORTES, ACCESORIOS Y VÁLVULAS.
6. RETIRAR TUBERÍA F-76 DE 600mm, SOPORTES, ACCESORIOS Y VÁLVULAS.
7. TUBERÍA DE COMBUSTIBLE ENTERRADA A SER
ABANDONADA EN EL SITIO.
J P
TOP.+18.23
TOP.+18.17
TOP.+17.16
TOP.+17.16
TOP.+17.03
TOP.+17.00
TOP.+18.16
TOP.+18.24
TOP.+17.17
TOP.+17.04
TOP.+16.98
TOP.+17.14
TOW+19.40
+18.96
TOW+19.41
+19.05
+18.26
TOW+19.42
TOW+19.44
+19.08
INV.+16.06
INV.+16.27
L
IM
IT
O
F A
S P
H A
L T
L
IM
IT
E
D E
A S
F A
L T
O
MD428P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
J P
-5
KEYED NOTES:
0 2 3 4 5
1:50
B1
1:50
DEMOLITION PLAN - ML-4 MANHOLE
J P
-8
F -7
J P
-8
J P
-5
J P
-8
F -7
J P
-8 m m J
P -5 m m J
P -8 m m F
-7 m m J
P -8 m m
L
IM
IT
O
F A
S P
H A
L T
L
IM
IT
E
D E
A S
F A
L T
O m m
REMOVE PIPELINE
DEMOLITION LEGEND:
GENERAL NOTES:
1. SEE SECTION 01 42 00 FOR DEMOLITION
REQUIREMENTS.
LEYENDA DE DEMOLICIÓN
NOTAS DE REFERENCIA:
PLANTA DE DEMOLICIÓN - POZO ML-4
RETIRAR TUBERÍA
NOTAS GENERALES:
1. VER SECCIÓN 01 42 00 PARA
REQUERIMIENTOS DE DEMOLICIÓN.
PIER III
ML-1
ML-4
TE-A
TE-B,C,D
ML-3
V-BRDG-OTLN
A2003
DRYER FOR POOL
FH #14
VALVE PIT #44
(OUTSIDE OF BASE)
TO BULK STORAGE
TO BOOSTER PUMP HOUSE
PIT #1
TANK-2
F-76
TANK-3
F-76
TANK-5
F-76
TANK-4
F-76
TANK-6
F-76
TANK-7
F-76
TANK-8
F-76
TANK-1
F-76
TANK-13
JP-8
TK-17
JP-5
TANK-11
JP-8
TANK-10
JP-8
TK-15
JP-5
TANK-9
JP-8
TK-14
JP-5
TANK-122
JP-8
TANK-120
JP-8
TANK-121
JP-8
TK-16
JP-5
3194B
A
L
I C
A
N
N
E
S
A
N
R
R
E
E
T
M
I
A
L
A
L
I C
A
N
N
E
M-122P
M-123P
M-124P
M-125P
M-126P
M-127P
M-128P
M-129P
M-130P
M-131P
M-132P
M-133P
M-134P
M-135P
M-136P
M-137P
M-138P
M-140P
M-139P
M-141P
M-142P
M-143P
0 200
400 500
1:5000
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
M-121P
B1
1:5000
OVERALL MECHANICAL SITE AND KEY PLAN FOR JP-5 PIPELINE
PLANTA EXTERIOR GENERAL DE MECÁNICA Y DE REFERENCIA PARA LA TUBERÍA JP-5
C
P
P
P
D
P
P
D
P
B
A L P
C
P
P
P
P
D
P
D
P
P
P
D
P
D
P
B
A L P
C
P
P
P
D
P
P
D
P
P
BALLAST
F-76
JP-8
F-76
JP-5 CARGO
CLH
WATER
P
F-76
JP-8
F-76
JP-5 CARGO
CLH
WATER
BALLAST
NFSO
JP-8
F-76
JP-5 CARGO
CLH
WATER
P
8"
8-D-P3-5
300mm
12-D-P3-10 12-D-P3-13
300mm
B
A L P
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
C1
1:200
SITE PLAN
M-122P
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
KEYED NOTES:
1. PROVIDE 450mm JP-5 PIPELINE.
2. PROVIDE LOADING ARM CONNECTION.
3. PROVIDE 250mm PIPE WITH ASME CLASS 300 DB&B PLUG
VALVE WITH THERMAL RELIEF AND HOSE CONNECTION AT
END OF EACH LINE.
4. FREE PIPE SUPPORT
5. GUIDED PIPE SUPPORT
GENERAL NOTES:
A1
M-525P
A1
M-526P
B1
M-522P
B3
M-522P
(TYP.)
(TYP.)
PLANTA EXTERIOR
1. PROVEER TUBERÍA JP-5 DE 450mm.
2. PROVEER CONEXIÓN DE BRAZO DE CARGA.
3. PROVEER TUBERÍA DE 250mm CON VÁLVULA DE DOBLE
CIERRE Y VACIADO ASME DE CLASE 300 CON ALIVIO
TÉRMICO Y CONEXIÓN PARA MANGUERA EN EL EXTREMO
DE CADA LÍNEA.
NOTAS DE REFERENCIA:
NOTAS GENERALES:
4. SOPORTE DE TUBERÍA
LIBRE
5. SOPORTE DE TUBERÍA
GUIADA
(TÍPICO)
(TÍPICO)
P A
N
T I N
U A
C I Ó
N
V
A
P
1. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVERGROUND 450mm JP-5 PIPELINE AT 90m
INTERVALS MAXIMUM. EXTEND EACH CABLE TO THE EXISTING
GROUND RING.
1. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG
A LA TUBERÍA JP-5 DE 450mm SOBRE EL TERRENO EN
INTERVALOS DE 90m COMO MÁXIMO. PROLONGAR CADA
CABLE HASTA EL ANILLO DE TIERRA EXISTENTE.
PIER 3
WATER
CLH
JP-5 CARGO
F-76
JP-8
F-76
BALLAST
P
F-76
JP-8
F-76
JP-5 CARGO
CLH
WATER
P
F-76
JP-8
F-76
JP-5 CARGO
CLH
WATER
MUELLE 3
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
C1
1:200
SITE PLAN
M-123P
0 8 12 16 20
1:200
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
GENERAL NOTES:
A1
M-525P
A1
M-526P
KEYED NOTES:
1. PROVIDE 450mm JP-5 PIPELINE.
2. PROVIDE LOADING ARM CONNECTION.
3. PROVIDE 250mm PIPE WITH ASME CLASS 300 DB&B PLUG
VALVE WITH THERMAL RELIEF AND HOSE CONNECTION AT
END OF EACH LINE.
4. FREE PIPE SUPPORT
5. GUIDED PIPE SUPPORT
B1
M-522P
B3
M-522P
4 5
(TYP.) (TYP.)
P A
N
T I N
U A
C I Ó
N
V
A
P
NOTAS GENERALES:
1. PROVEER TUBERÍA JP-5 DE 450mm.
2. PROVEER CONEXIÓN DE BRAZO DE CARGA.
3. PROVEER TUBERÍA DE 250mm CON VÁLVULA DE DOBLE
CIERRE Y VACIADO ASME DE CLASE 300 CON ALIVIO
TÉRMICO Y CONEXIÓN PARA MANGUERA EN EL EXTREMO
DE CADA LÍNEA.
NOTAS DE REFERENCIA:
4. SOPORTE DE TUBERÍA
LIBRE
5. SOPORTE DE TUBERÍA
GUIADA
PLANTA EXTERIOR
(TÍPICO) (TÍPICO)
1. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVERGROUND 450mm JP-5 PIPELINE AT 90m
INTERVALS MAXIMUM. EXTEND EACH CABLE TO THE EXISTING
GROUND RING.
1. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG
A LA TUBERÍA JP-5 DE 450mm SOBRE EL TERRENO EN
C
P
P
P
D
P
P
D
P
C
P
P
P
D
P
P
D
P
P
A
L L A
S T
F
J P
F
J P
C
A R
G O
C L H
W A
T E
R
B
A L P
B
A L P
BFP
R
G
O
L
L
A
S
T
C
L
H
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
B1
M-522P
A1
1:200
SITE PLAN
M-124P
0 8 12 16 20
1:200
FOR CONTINUATION SEE SHEET M-122P
FOR CONTINUATION SEE SHEET M-123P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
KEYED NOTES:
1. PROVIDE 450mm JP-5 PIPELINE.
2. PROVIDE PIPELINE EXPANSION LOOP, HP VENT AND LP
DRAINS.
3. PROVIDE 300mm ASME CLASS 300 DB&B PLUG VALVE WITH
THERMAL RELIEF.
4. FREE PIPE SUPPORT
5. GUIDED PIPE SUPPORT
6. PIPE ANCHOR
GENERAL NOTES:
A4
M-521P
C1
M-521P
C1
M-521P
B3
M-522P
A3
M-522P
4 5
(TYP.)(TYP.)
PLANTA EXTERIOR
NOTAS GENERALES:
P A
N
T I N
U A
C I Ó
N
V
A
P
(TÍPICO) (TÍPICO)
PARA CONTINUACIÓN VER PLANO M-122P
PARA CONTINUACIÓN VER PLANO M-123P
1. PROVEER TUBERÍA JP-5 DE 450mm.
2. PROVEER ANILLO DE EXPANSIÓN DE TUBERÍAS, VENTEO
EN PUNTO ALTO Y DRENAJES EN PUNTOS BAJOS.
3. PROVEER VÁLVULA DE DOBLE CIERRE Y VACIADO DE 300mm
ASME DE CLASE 300 CON ALIVIO TÉRMICO.
NOTAS DE REFERENCIA:
4. SOPORTE DE TUBERÍA
LIBRE
5. SOPORTE DE TUBERÍA
GUIADA
6. ANCLAJE DE
TUBERÍA
1. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVERGROUND 450mm JP-5 PIPELINE AT 90m
INTERVALS MAXIMUM. EXTEND EACH CABLE TO THE EXISTING
GROUND RING.
1. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG
A LA TUBERÍA JP-5 DE 450mm SOBRE EL TERRENO EN
R
G
O
L
L
A
S
T
C
L
H
L116
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
B1
1:200
SITE PLAN
M-125P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
KEYED NOTES:
1. PROVIDE 450mm JP-5 PIPELINE.
2. FREE PIPE SUPPORT
3. GUIDED PIPE SUPPORT
4. PIPE ANCHOR
GENERAL NOTES:
0 8 12 16 20
1:200
B1
M-522P
B3
M-522P
A3
M-522P
4 2 3
(TYP.) (TYP.)
PLANTA EXTERIOR
NOTAS GENERALES:
P A
N
T I N
U A
C I Ó
N
V
A
P
(TÍPICO) (TÍPICO)
P A
N
T I N
U A
C I Ó
N
V
A
P
1. PROVEER TUBERÍA JP-5 DE 450mm.
NOTAS DE REFERENCIA:
2. SOPORTE DE TUBERÍA
LIBRE
3. SOPORTE DE TUBERÍA
GUIADA
4. ANCLAJE DE
TUBERÍA
1. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVERGROUND 450mm JP-5 PIPELINE AT 90m
INTERVALS MAXIMUM. EXTEND EACH CABLE TO THE EXISTING
GROUND RING.
1. UNIR (SOLDADURA EXOTÉRMICA) UN CABLE AISLADO #4 AWG
A LA TUBERÍA JP-5 DE 450mm SOBRE EL TERRENO EN
METER STATION
DRN-100-DI
PUMP HOUSE
PW-80-DI
R
G
O
L
L
A
S
T
C
L
H
VP-1
0+450
0+460
L140
L141
L
E L E
V A
T I O
N
E L E
V A
T I O
N
STATION
STATION
450 JP-5- LINE 3 PROFILE - STA 0+440 TO 0+475
0+440 0+460 0+475
0+440 0+460 0+475
VAULT PIT 1
EXISTING GROUND
PIPE 1-01
45.00m OF 450mm JP-5 m m
F
F
U E
L m m
E
X
F
U E
L
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M C
O M
M A
N D
A
TL
A
N
TI
C
P-
BU
LK
T
AN
K
FA
RM
IM
PR
O
VE
M
EN
TS
, P
H
AS
E
TIMOTHY A.
SCHMITT
17386
B1
M-421P
A4
1:200
PROFILE STA -0+440 TO STA 0+476
M-126P
0 8 12 16 20
1:200
0 8 12 16 20
1:200
KEYED NOTES:
1. PROVIDE 450mm JP-5 PIPELINE.
2. PROVIDE PIPELINE EXPANSION LOOP, HP VENT AND LP
DRAINS.
3. 500mm F-76 PIPELINE BY OTHERS.
4. FREE PIPE SUPPORT
5. GUIDED PIPE SUPPORT
GENERAL NOTES:
1. HORIZONTAL LOCATIONS OF UTILITY CROSSINGS SHOWN
FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR
LOCATING AND PROTECTING EXISTING UTILITIES . DAMAGE
TO EXISTING INFRASTRUCTURE MUST BE REPAIRED AT NO
COST TO GOVERNMENT.
2. FOR PIPE APPURTENANCES, ELEVATION AND ALIGNMENT SEE
TABLES ON SHEET M-620P.
3. BOND (EXOTHERMIC WELD) AN INSULATED #4 AWG CABLE TO
THE ABOVERGROUND 450mm JP-5 PIPELINE AT 90m
INTERVALS MAXIMUM. EXTEND EACH CABLE TO THE EXISTING
GROUND RING.
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
F O
R
C
O N
T I N
U A
T I O
N
S
E
P
0 1 2 3 4
1:40
HORIZONTAL
VERTICAL
C1
1:200
SITE PLAN
A4
M-521P
B1
M-522P
B3
M-522P
SS PIPING
4 5
(TYP.)
(TYP.)
PLANTA EXTERIOR
NOTAS GENERALES:
P A
N
T I N
U A
C I Ó
N
V
A
P
P A
N
T I N
U A
C I Ó
N
V
A
P
(TÍPICO) (TÍPICO)
TUBERÍA DE
ACERO
INOXIDABLE
1. PROVEER TUBERÍA JP-5 DE 450mm.
2. PROVEER ANILLO DE EXPANSIÓN DE TUBERÍAS, VENTEO
EN PUNTO ALTO Y DRENAJES EN PUNTOS BAJOS.
3. TUBERÍA F-76 DE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .