This is a Base Proposal Item Price Breakdown Form for a federal construction contract. The solicitation is RFP Number 36C24626R0085 for Project 590-24-450, titled "Renovate Transitional Residences." The form is a pricing template designed for offerors to submit detailed cost estimates organized by the MasterFormat construction divisions.
The form requires offerors to break down labor and material costs across 28 construction divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, Utilities, Transportation, and Electrical Power Generation. After calculating the Divisions Subtotal, offerors must add line items for Bond, Overhead, and Profit (with percentages to be filled in), resulting in a final Subtotal and Total Base Proposal Item Price. This template is blank and serves as the pricing submission document for qualified contractors responding to this renovation project solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION ATTACHMENT F
BASE PROPOSAL ITEM PRICE BREAKDOWN FORM
RFP NUMBER: 36C24626R0085
PROJECT NO./TITLE: 590-24-450, Renovate Transitional Residences
OFFEROR:
ITEM DESCRIPTION Labor Material Total Cost
Division 1 General Requirements
Division 2 Existing Conditions
Division 3 Concrete
Division 4 Masonry
Division 5 Metals
Division 6 Wood and Plastic
Division 7 Thermal & Moisture Protect
Division 8 Doors and Windows
Division 9 Finishes
Division 10 Specialties
Division 11 Equipment
Division 12 Furnishings
Division 13 Special Construction
Division 14 Conveying Equipment
Division 21 Fire Suppression
Division 22 Plumbing
Division 23 HVAC
Division 25 Integrated Automation
Division 26 Electrical
Division 27 Communications
Division 28 Electronic Safety & Security
Division 31 Earthwork
Division 32 Exterior Improvements
Division 33 Utilities
Division 34 Transportation
Division 48 Electrical Power Generation
Divisions Subtotal:
Overhead/Profit and Insurance
Bond (___%)
Overhead (___%)
Profit (___%)
Subtotal:
TOTAL BASE PROPOSAL ITEM PRICE
File details come from the government source that posted it. Updated .