ATTACHMENT F - BASE OFFER PRICE BREAKDOWN FORM.pdf

PDF 258 KB Posted

Attached to
Z2FZ--590-24-450 Renovate Transitional Residences
Solicitation number
36C24626R0085
Issued by

About this file

This is a Base Proposal Item Price Breakdown Form for a federal construction contract. The solicitation is RFP Number 36C24626R0085 for Project 590-24-450, titled "Renovate Transitional Residences." The form is a pricing template designed for offerors to submit detailed cost estimates organized by the MasterFormat construction divisions.

The form requires offerors to break down labor and material costs across 28 construction divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, Utilities, Transportation, and Electrical Power Generation. After calculating the Divisions Subtotal, offerors must add line items for Bond, Overhead, and Profit (with percentages to be filled in), resulting in a final Subtotal and Total Base Proposal Item Price. This template is blank and serves as the pricing submission document for qualified contractors responding to this renovation project solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION ATTACHMENT F

BASE PROPOSAL ITEM PRICE BREAKDOWN FORM

RFP NUMBER: 36C24626R0085

PROJECT NO./TITLE: 590-24-450, Renovate Transitional Residences

OFFEROR:

ITEM DESCRIPTION Labor Material Total Cost

Division 1 General Requirements

Division 2 Existing Conditions

Division 3 Concrete

Division 4 Masonry

Division 5 Metals

Division 6 Wood and Plastic

Division 7 Thermal & Moisture Protect

Division 8 Doors and Windows

Division 9 Finishes

Division 10 Specialties

Division 11 Equipment

Division 12 Furnishings

Division 13 Special Construction

Division 14 Conveying Equipment

Division 21 Fire Suppression

Division 22 Plumbing

Division 23 HVAC

Division 25 Integrated Automation

Division 26 Electrical

Division 27 Communications

Division 28 Electronic Safety & Security

Division 31 Earthwork

Division 32 Exterior Improvements

Division 33 Utilities

Division 34 Transportation

Division 48 Electrical Power Generation

Divisions Subtotal:

Overhead/Profit and Insurance

Bond (___%)

Overhead (___%)

Profit (___%)

Subtotal:

TOTAL BASE PROPOSAL ITEM PRICE