Attachment E Pricing_updated.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Environmental Health and Safety (EHS) Solution
- Solicitation number
- S-44300-00018021
- Issued by
- Marion County, Oregon
About this file
This is a pricing template (Attachment E) for the Oregon State Hospital's Environmental Health and Safety (EHS) software solution procurement. The document provides a structured format for proposers to submit comprehensive pricing across five primary cost categories: Equipment & Installation, Software & Licensing Costs, Training Costs, and Maintenance & Support Costs, with an additional section for optional Value-Added Services. The template requires detailed breakdowns including quantities, unit costs, extended costs, warranty coverage, and recurring versus one-time expenses. Proposers must itemize equipment needed for solution implementation, specify software licensing terms and duration, detail training services by type and session count, and document maintenance and support services with frequency and associated service level agreements. The contract term is ten years with renewal options extending to a cumulative maximum of fifteen years, with proposals due October 13, 2026, at 5:00 PM Pacific Time and questions due by September 28, 2026.
The pricing proposal evaluation comprises 20 of 100 total points and must include total system cost with identifiable costs and time estimates for each activity, warranty costs, annual preventative maintenance and support costs for up to four years, and percentage discounts on equipment and supplies. Proposers must provide fully loaded personnel costs with detailed salary, wage, and fringe rates by position. Oregon suppliers and services receive a 5% price preference, with reciprocal preferences applying to out-of-state proposers. The hospital serves two campuses (Salem and Junction City) with 742 licensed beds and requires cloud-based, scalable solutions integrating with existing enterprise systems including Oregon Workday. All proposals must comply with OSHA, CMS, Joint Commission, NFPA, and EPA standards and demonstrate SOC 2 or ISO 27001 certification. The anticipated Notice of Intent to Award is November 2, 2026, and proposals remain firm offers valid for 180 days following the closing date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6313_RFP_EHS solution_final draft.pdf | ||
| 6313_questions_responses.pdf | ||
| 18021_Draft Addendum_1.pdf | ||
| 6313_Att B.docx | DOCX document | |
| 6313_RFP_Adden-1_EHS solution.pdf | ||
| 6313_Att E.docx | DOCX document | |
| 6313_Att F.docx | DOCX document | |
| 6313_Att C.docx | DOCX document | |
| 6313_Att D.docx | DOCX document | |
| 6313_Att G.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Part 1 Pricing Summary
| ATTACHMENT E PRICING |
| Part 1 PRICING SCHEDULE SUMMARY |
Instructions: Sheets 2-5 will Auto-calculate totals from other sheets. Do not enter values manually
| Item No | Category | Subtotals |
| 1 | Equipment & Installation | $ - 0 |
| 2 | 5-year Software related costs & Licensing terms | $ - 0 |
| 3 | Training Costs | $ - 0 |
| 4 | Maintenance & Support Costs. | $ - 0 |
| Total Cost | $ - 0 |
2. Equipment & Installation
| ATTACHMENT E PRICING |
| Part 2 Equipment & Installation |
| Instructions for Proposer: |
| List needed equipment separately needed to utilize proposed solution. *Add rows as needed |
| Include quantity, unit cost, and calculate extended cost. |
| Include installation, site assessment, and any setup fees. |
| If pricing varies by location or configuration, note that in a comment’s column |
| Item No. | Description | Quantity | Unit Cost | Extended Cost | Warranty Coverage |
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| Subtotal | $ - 0 |
3. Software & Lic Costs
| ATTACHMENT E PRICING |
| Part 3 SOFTWARE & LICENSING COSTS |
| Software & Licensing. Purpose: Detail software-related costs and licensing terms. |
| Instructions for Proposer: |
| Include costs for software licenses, cloud-based management, and API integrations. |
| Indicate duration (e.g., 5 years) and whether costs are recurring or one-time. |
| Clearly state if licensing is bundled with hardware |
| Reoccuring Cost | ||
| Item No. | Item Description | Cost |
| 1 | ||
| Year 1 | ||
| Year 2 | ||
| Year 3 | ||
| Year 4 | ||
| Year 5 | ||
| Subtotal | $ - 0 |
| One Time Cost | ||
| Item No. | Item Description | Cost |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| Subtotal | $ - 0 |
4. Training Costs
| ATTACHMENT E PRICING |
| Part 4 Training Costs |
| Training. Outline applicable training services for OSH staff and IT personnel. |
Instructions for Proposer:
| Break out training types (e.g., operator, technical, emergency response). |
| Specify number of sessions and cost per session. |
| Include on-demand or refresher training options if available |
| Item No. | Training Type | Sessions | Cost/Session ($) | Total Cost ($) |
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| Subtotal | $ - 0 |
5. Maint & Support Costs
| ATTACHMENT E PRICING |
| Part 5 MAINTENANCE & SUPPORT COSTS |
| Maintenance & Support. Capture ongoing support and maintenance costs. |
| Instructions for Proposer: |
| Include preventive maintenance, remote diagnostics, on-site support, and software updates. |
| Indicate frequency (e.g., annual, as needed). |
| Include any service level agreements (SLAs) or response time guarantees. |
| Indicate if updates are included in the annual subscription service costs |
| Item No. | Service Description | Frequency | Cost |
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| 11 | |||
| Subtotal | $ - 0 |
6. Value Added Svcs
| ATTACHMENT E PRICING |
| Part 6 VALUE ADD SERVICES |
| Value Add Services |
| Instructions: Include optional enhancements not required in the RFP. *Add rows as needed |
Item No. Description of Value-Add Service One Time or Recurring Cost/Unit Notes
Subtotal
File details come from the government source that posted it. Updated .