6313_Att E.docx

DOCX document 37 KB Posted

Attached to
Environmental Health and Safety (EHS) Solution
Solicitation number
S-44300-00018021
Issued by
Marion County, Oregon

About this file

This is an Attachment E document related to the Oregon State Hospital's Environmental Health and Safety (EHS) Solution contract opportunity. The document outlines the functional and technical requirements for a comprehensive EHS software platform designed to streamline and optimize environmental health and safety processes across the organization. The system must integrate multiple core functionalities including incident management, inspections, risk assessments, audits, chemical management, regulatory compliance tracking, employee training management, and advanced reporting capabilities. The solution is intended to provide real-time management and monitoring to ensure a safe, healthy, and compliant work environment across all organizational operations.

The document specifies detailed system requirements encompassing user access controls, data security protocols, system integration capabilities with existing infrastructure, mobile accessibility, customizable dashboards and reporting features, and compliance documentation capabilities. The platform must support various user roles and permission levels, maintain comprehensive audit trails, generate regulatory compliance reports, and facilitate training documentation and tracking. Additional requirements include system reliability standards, data backup and recovery protocols, vendor support and maintenance expectations, and implementation timelines that align with organizational deployment schedules.

View the file

Other files

File Type Posted
6313_Att B.docx DOCX document
6313_Att C.docx DOCX document
6313_Att G.docx DOCX document
6313_Att D.docx DOCX document
6313_RFP_EHS solution_final draft.pdf PDF
6313_Att F.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP S-44300-00018021 EHS Solution Attachment E Part 1 Pricing Schedule Summary Summary Table.

Instructions: Auto-calculate totals from other sheets. Do not enter values manually unless summarizing.

Category
Subtotal ($)
Equipment & Installation
($)
Software & Licensing
($)
Training
($)
Maintenance & Support
($)
Extended Warranty (Optional)
($)
Value-Added Services
($)
Total Proposed Cost
($)

Part 2 Equipment & Installation Instructions for Proposer:

· List each equipment item separately (e.g., single-lane unit, dual-lane unit, tablets, cameras). *Add rows as needed

· Include quantity, unit cost, and calculate extended cost.

· Include installation, site assessment, and any setup fees.

· If pricing varies by location or configuration, note that in a comment’s column.

Item Description
Quantity
Unit Cost
Extended Cost
Warranty Coverage

Part 3 Software & Licensing Costs Software & Licensing. Purpose: Detail software-related costs and licensing terms.

Instructions for Proposer:

· Include costs for software licenses, cloud-based management, and API integrations.

· Indicate duration (e.g., 4 years) and whether costs are recurring or one-time.

· If licensing is bundled with hardware, clearly state that.

Item Description
Duration
Cost
Annual Software Licensing (4 years)
4 years
$
Cloud-based Management Platform
4 years
$
API Integration (Access Control, VMS, etc.)
1-time
$

Part 4 Training Costs Training. Outline training services for OSH staff and IT personnel.

Instructions for Proposer:

· Break out training types (e.g., operator, technical, emergency response).

· Specify number of sessions and cost per session.

· Include on-demand or refresher training options if available.

Training Type
Sessions
Cost/Session
Total Cost ($)

Operator Training

($)
($)

IT/Admin Technical Training

($)
($)

Emergency Protocol Training

($)
($)
On-Demand Training Access
Annual
($)
($)

Part 5 Maintenance & Support Costs Maintenance & Support. Capture ongoing support and maintenance costs.

Instructions for Proposer:

· Include preventive maintenance, remote diagnostics, on-site support, and software updates.

· Indicate frequency (e.g., annual, as needed).

· Include any service level agreements (SLAs) or response time guarantees.

· Indicate if updates are included in the annual subscription service costs

Service Description
Frequency
Cost

Preventive Maintenance

24/7 Remote Diagnostics

On-Site Support (within 24 hrs)
As needed
($)

Software Updates

Downtime Response Plan Implementation
1-time

Part 6 Value Add Services

Value Add Services Instructions: Include optional enhancements not required in the RFP. *Add rows as needed

Description of Value-Add Service
One Time or Recurring
Cost
Notes/Justification

Part 7 Manufacturer Discounts Manufacturer Discounts. Use this table to list any manufacturer-provided discounts that apply to your proposed solution.

Specify:

· The manufacturer name

· The product or component the discount applies to

· The type of discount (e.g., volume-based, bundled with software, promotional)

· The percentage discount

· Any conditions (e.g., minimum quantity, limited time offer)

Manufacturer Name
Product/Component
Discount Type
Discount (%)

File details come from the government source that posted it. Updated .