Attachment E_Pricing Spreadsheet_OPT 2.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Titanium Buffer Federal contract opportunity
- Solicitation number
- SP8000-20-R-0007
- Issued by
- Defense Logistics Agency
About this file
This document contains pricing spreadsheets for a federal contract solicitation seeking a titanium buffer capability. The spreadsheets provide pricing breakdowns for inventory holding, inventory management, and related services under contract line item numbers 2001 through 2004. Labor categories and rates are included along with allocated hours and calculations for other direct costs, profit, overhead and general administrative costs. The total offered prices are stated for each line item.
The related solicitation seeks a contractor to develop, implement and manage strategic titanium alloy buffers to support wartime mobilization, military operations and contingencies. The buffers are intended to provide expedited access to titanium materials for defense contractors and repair parts suppliers. Under the contract the contractor must deliver minimum monthly material quantities from the buffer and offer materials in small minimum purchase quantities through material distribution services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment D - Ti Clauses and Provisions_Rev1.pdf | ||
| Combined SynopsisSolicitation_Ti-Buffer-FY20.pdf | ||
| Attachment C_CLIN Structure_Ti-Buffer FY20.docx | DOCX document | |
| Attachment A_Instructions to Offerors.docx | DOCX document | |
| Attachment D_Ti Clauses and Provisions.docx | DOCX document | |
| Attachment E_Pricing Spreadsheet_Base Yr_Ti-Buffer.xlsx | XLSX spreadsheet | |
| Attachment E_Pricing Spreadsheet_OPT 1.xlsx | XLSX spreadsheet | |
| Attachment B_PWS Titanium Buffer.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ATTACHMENT E
| PRICING BREAKDOWN SPREADSHEET FOR ITEM LINE ITEM 2001 – INVENTORY HOLDING PRICE | ||||
| CLIN 2001 | Labor Category | Rate | Hours | TOTAL |
Price associated with the cost for storing any material needed to support the buffer. It is anticipated that cost will include, facility space, material handling cost, preservation (if required), security provisions etc. Cost should be consistent with those used for commercial/non-Government or in internal cost used to support storage arrangements.
| Labor Category | Rate | Hours | TOTAL | |
| Other Direct Costs |
| Profit |
| Overhead/G&A |
TOTAL OFFERED PRICE $
PRICING BREAKDOWN SPREADSHEET FOR ITEM LINE ITEM 2002 – INVENTORY MANAGEMENT PRICE
CLIN 2002 Labor Category Rate Hours TOTAL
Price associated with establishing and maintaining a system to track material that will be used to meet the requirements of the buffer. Typical systems will as a minimum track location, current state/form, quantity/weight and, sales activity and stock rotation status for material designated to support the buffer. The price also covers cost associated with reporting requirements and providing oversight to insure that prospective customers meet the requirements to use the buffer.
| Labor Category | Rate | Hours | TOTAL | |
| Other Direct Costs |
| Profit |
| Overhead/G&A |
TOTAL OFFERED PRICE $
PRICING BREAKDOWN SPREADSHEET FOR ITEM LINE ITEM 2003 – INVENTORY MANAGEMENT PRICE
CLIN 2003 Labor Category Rate Hours TOTAL
Price associated with the cost for storing any material needed to support the buffer. It is anticipated that cost will include, facility space, material handling cost, preservation (if required), security provisions etc. Cost should be consistent with those used for commercial/non-Government or in internal cost used to support storage arrangements.
| Labor Category | Rate | Hours | TOTAL | |
| Other Direct Costs |
| Profit |
| Overhead/G&A |
| TOTAL OFFERED PRICE | $ | |
| PRICING BREAKDOWN SPREADSHEET FOR ITEM LINE ITEM 2004 – INVENTORY MANAGEMENT PRICE |
CLIN 2004 Labor Category Rate Hours TOTAL
Price associated with establishing and maintaining a system to track material that will be used to meet the requirements of the buffer. Typical systems will as a minimum track location, current state/form, quantity/weight and, sales activity and stock rotation status for material designated to support the buffer. The price also covers cost associated with reporting requirements and providing oversight to insure that prospective customers meet the requirements to use the buffer.
| Labor Category | Rate | Hours | TOTAL | |
| Other Direct Costs |
| Profit |
| Overhead/G&A |
TOTAL OFFERED PRICE $
&"-,Bold"&12&UPRICING BREAKDOWN SHEET
Sheet2
File details come from the government source that posted it. Updated .